N0016723R0017 solicitation.pdf

PDF 2 MB Posted

Attached to
Specialty Ladder Repair Federal contract opportunity
Solicitation number
N0016723R0017
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Specialty Ladder Repair, newest first.
File Type Posted
N0016723R0017P0001.pdf PDF
8.S.Sole Source Synopsis Solicitation- Sandow Construction Inc.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1301067580

THIS RFP

COMPETITION REQUIREMENTS: TOTAL SMALL BUSINESS SET ASIDE

PROCUREMENT METHOD: CONTRACTING BY NEGOTIATION

SOURCE SELECTION PROCESS: LPTA

TYPE OF CONTRACT: FIRM FIXED PRICE

ESTIMATED COST OF CONSTRUCTION Betw een $100,000 and $250,000

NAICS CODES: 236220 SIZE STANDADRD 45m FEDERAL SUPPLY CODE: Y1HB

ALL PREPOSAL INQUIRIES (PPI'S) MUST BE MADE IN WRITING AND EMAILED TO BROOKS.A.MCLEAN.CIV@US.NAVY.MIL NOT LATER THAN

14 CALENDAR DAYS PRIOR TO THE PROPOSAL DUE DATE

BROOKS MCLEAN

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

18-May-2023

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________90 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________25 May 2023 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NAVAL SURFACE WARFARE CENTER CARDEROCK

BROOKS A. MCLEAN

757-652-4069 BROOKS.A.MCLEAN.CIV@US.NAVY.MIL

904 CORPORATE LANE

CHESAPEAKE VA 23320

N00167

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

12:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: 757-652-4069 TEL: FAX:

N0016723R0017 74

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00 10 00 - Solicitation

STATEMENT OF WORK

Safety Ladder Repair 2023

NAVAL SURFACE WARFARE CENTER

CARDEROCK, MD

1. GENERAL

1.1 SCOPE OF WORK: The Contractor shall supply all material, labor and supervision necessary to modify, replace and install fixed ladders, and add fall arrest systems on select ladders in order to bring them into OSHA compliance per the specifications noted below, complete and ready for use at the Naval Surface Warfare Center, Carderock

Division – West Bethesda, MD.

2. MATERIALS

2.1 Ladders:

a. Ladders at B3, B10 and B14 shall be new, galvanized steel models and meet

OSHA standard 29 CFR 1910.23. The grab bars shall meet 1910.23(d)(7) which requires a 42 inch height from the roof/parapet wall edge or platform.

b. Replacement ladder section at B19 Abay shall be made of same material that is existing.

2.2 Paint for B19 Abay ladder: this paint shall match existing in color and be made for metal applications i.e. Rust oleum. Paint primer shall by the same manufacturer to adhere to the top coat.

2.3 Fall Protection Devices:

a. Fixed Ladder Self-retracting Lifeline SRL Fall Arrest Anchors: shall meet

OSHA 1910.140(c)(5). Models that are used outdoors shall be made for that purpose.

For the purpose of this contract the contractor shall utilize a PE Engineer to design and certify each anchor point used on this project and provide PE stamped drawings and specs.

b. Pull line shall be UV resistant.

c. Telescoping grab bars: Shall be a LadderUp (made by Bilco) or equal. These devices shall have a yellow powder coat finish. This bar must be factory made, capable of raising and lowering with one hand, must lock in place when fully extended.

d. Tie off anchor points: these anchor points shall conform to 29 CFR 1926.502

Subpart M and 29 CFR 1910.140 Subpart I. For the purpose of this contract the contractor shall utilize a PE Engineer to design and certified each anchor point used on this project and provide PE stamped drawings and specs.

3. EXECUTION:

3.1 Make all modifications and repairs to ladders in locations noted below. Also install new ladders where noted.

3.1.1 The following is a list of ladders and abbreviated actions required for each. More detail instructions are further down in this spec.

1. B3; Install new ladder.

2. B10; Replace ladder with new.

3. B14; Replace ladder with new

4. B16; Modify existing ladder to lengthen its grab bars (no lead paint)

5. B19 A Bay; Repair damaged ladder; install lifeline system

6. B19 C Bay; Install lifeline system

7. B19 B Bay; Install lifeline system

3.1.2 Lifeline systems and attachment points shall be designed and certified by an OSHA Fall Protection Qualified Person. This “Qualified” person shall also be a PE engineer. Contactor shall provide a PE stamped scope of work and drawings for these attachment points & systems which meet or exceed OSHA standards noted in section 2.3.

3.1.3 Contractor shall assume all ladders and structures are painted with lead paint in some concentration and shall be handled in an OSHA prescribed manner. Contractor shall take all OSHA required safety measures not to expose workers or occupants to lead dust or fumes.

3.1.3.1 OSHA 29 CFR 1926.62 and OSHA 1910.1025

3.1.3.2 See lead paint results below; just below pictures.

3.2 Bldg. 3 Description: Furnish and install (1) new approx. 80 inch vertical fixed ladder with platform on west exterior wall of elevator penthouse (extending to its roof). See picture below. Note that gutter is on this same wall so ladder brackets must allow for this distance and platform shall be long enough to safety extend on to the roof.

3.3 Bldg. 10 Description: Remove and dispose of existing ladder. Furnish and install

(1) new approx. 208 inch vertical fixed ladder with platform to building exterior.

Ladder is located on the east side of 2 story section of this building.

3.4 Bldg. 14 Replace existing ladder with (1) new approx. 144 inch vertical fixed ladder with platform to building exterior. Ladder is located on the north side if this building.

3.5 Bldg. 16 Repair existing approx. 4 ft vertical fixed ladder. Add additional pipe on grab bars to extending them to 42 inches. Ladder is located in the B16 high bay area; far south; motor access ladder. See picture below.

3.6 Bldg. 19 A Bay Ladder: Remove and dispose of lower approx. 12 ft section of ladder (this ladder section is damaged) (see picture below). Pipe which is bolted to this ladder section shall be disposed of. Furnish and install new approx. 12 ft steel ladder section and weld to remaining ladder section maintaining original strength or more. Rung extension from floor shall come up 1ft from the bottom, due interference with pipe at floor level.

Existing cage shall remain intact. Contractor shall make whatever cuts & welds necessary to replace ladder and reattach cage to match existing.

Ladder is located inside Abay adjacent to north entry door.

Prime and paint ladder section. 1 coat primer & 2 coats topcoat per section 2.2.

3.7 Bldg 19 A Bay Ladder: Furnish and install Fixed Ladder SRL Fall Arrest Anchor

(Self-retracting Lifeline) on both (2) sections of this ladder path to the roof.

1. First section is approx. 42 ft. to platform.

2. Second section is approx. 13 ft. to roof hatch.

3. See pictures and drawing below.

3.8 B19 A Bay Ladder: Install a telescoping grab bar for roof access.

3.9 B19 A Bay Ladder: Install tie off anchor point to roof approx. 8 ft from roof hatch depending on the Qualified Person’s design criteria and required placement to achieve a safe anchor point.

1. Provide and install weatherproof SRL Fall Arrest Anchor (Self-retracting Lifeline) allowing workers to attach and detach from ladder self-retracting lifeline while always being tied off.

2. Provide and install a pull line so retractable cable can be pulled to the worker from the ladder/roof hatch area. See section 2.3b.

3.10 B19 C Bay Ladder: Furnish and install Fixed Ladder SRL Fall Arrest Anchor

(Self-retracting Lifeline) on all three (3) sections of this ladder path to the roof.

1. First section is approx. 22 ft. to platform.

2. Second section is approx. 31 ft to 3rd section.

3. Third Section is approx. 17 ft. to roof hatch.

4. See pictures and drawing below.

3.11 B19 C Bay Ladder: Install a telescoping grab bar for roof access.

3.12 B19 C Bay Ladder: Install tie off anchor point to roof approx. 8 ft from roof hatch depending on the Qualified Person’s design criteria and required placement to achieve a safe anchor point.

1. Provide and install weatherproof SRL Fall Arrest Anchor (Self-retracting Lifeline) allowing workers to attach and detach from ladder self-retracting lifeline while always being tied off.

3.13 Bldg. 19 B Bay Ladder: Furnish and install Fixed Ladder SRL Fall Arrest Anchor

(Self-retracting Lifeline) on all both (2) sections of this ladder path to the roof.

1. First section is approx. 30 ft. to platform.

2. Second section is approx. 12 ft. to roof hatch

3. See pictures and drawing below.

3.14 B19 B Bay Ladder: Install a telescoping grab bar for roof access.

3.15 B19 B Bay Ladder: Install tie off anchor point to roof approx. 8 ft from roof hatch depending on the Qualified Person’s design criteria and required placement to achieve a safe anchor point.

1. Provide and install weatherproof SRL Fall Arrest Anchor (Self-retracting Lifeline) allowing workers to attach and detach from ladder self-retracting lifeline while always being tied off.

3.16 Prior to the commencement of work the Contractor shall:

a. Schedule all work with the Designated Gov. POC.

b. Provide a list of worker(s) with their worker qualifications prior to the commencement of worker (noted in submittals).

c. Insure all workers have been trained in OSHA Fall Protection requirements. (included in submittals).

d. All employees shall wear required PPE for this work.

e. Contractor is responsible to field verify all measurements and site conditions before ordering any material or starting work.

f. The Contractor must notify the Designated Gov. POC of any conditions that differ from that indicated on these documents.

g. All work shall comply with the NEC (National Electrical Code, NFPA (National Fire Protection Association), Army Corps of

Engineers [EM 385-1 (Engineering Manual)] and OSHA regulations.

h. Some work sites are in an occupied buildings. Subsequently, certain precautions must be maintained to insure a safe environment for our tenants. The contractor is expected to place safety signs, cones or caution tape to close off an area anytime the tenants may be in proximity to a hazardous area.

All applicable OSHA codes shall be followed.

i. All trash and debris associated with this project shall be removed daily and disposed of offsite.

j. Note truck route to base below. MacARTHUR

BOULEVARD FROM SANGAMORE ROAD TO GREAT

FALLS IS A RESTRICTED ROADWAY. “Commercial vehicles with more than four wheels are not permitted. This includes all buses. Private vehicles of more than one ton capacity are also prohibited. This law is strictly enforced.”

Bldg 3 Ladder Location Pic:

Bldg 10 Ladder Locaton Pic:

Bldg. 14 Ladder Location Pic:

Bldg. 16 Ladder Location Pic

Bldg. 19 Abay Ladder Location Pic:

Bldg. 19 Cbay Location Pic:

Bldg. 19 Bbay Locaton Pic:

Site Address: Work shall be performed at the following location:

Naval Surface Warfare Center

9500 MacArthur Blvd

West Bethesda, MD 20817

Bldg locations for this ladder work:

Paint Sample Results

4. SUBMITTALS: Proposed material submittals required of the Contractor shall be made allowing sufficient time for processing, review, approval, and procurement before the

Contractor is ready to use the material. Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements. The contractor shall clearly and specifically identify in the submittal documentation any proposed deviations from the contract requirements, and request approval of a substitute.

With the exception of clearly identified proposed deviations, the Contractor shall certify on all submittals that the proposed material conforms to contract requirements.

Incomplete submittals and submittals with inadequate data will be rejected. When required, catalog data shall be printed pages on permanent copies of manufacturer's catalogs. Three (3) copies of the following submittal(s) are required:

1. Safety Plan with:

Fall Protection Plan; fall protection training certs

Worker Qualifications: Lead paint worker certs

Lift Plan (if used)

Plan to address disturbing lead paint safely; for workers and occupants.

2. Project Schedule/Work Plan

3. Environmental Plan

5. SECURITY REQUIREMENTS: The site access is controlled by the Naval District

5.1 Washington (NDW) police force. Security badges and after hours entry requests are processed through the Government contract representative to the Naval Surface

Warfare Center (NSWC) Security Office. NSWC is the major tenant at the Carderock site. Contractor personnel working at NSWC must be fully identified. Contractors will provide the following information at the Visitor’s Center (not electronically) on all employees, staff, subcontractors personnel, etc., who will require access:

. full name

. date and place of birth

. nationality (if non-U.S. Citizen, alien registration number)

If Contractor vehicles are required for use on Center, the following ID is required:

. make

. model

. license

. insurance information

5.2 To maintain safety, security and efficiency, contractors are encouraged to enroll in the

DBIDS Program to validate their business relationship with NSWC Carderock.

Enrollment can be made by submitting a DBIDS enrollment forms to the security office (301-227-1500/1501. Once the company is enrolled, their employees can register at NSWC Carderock Registration Station located in building 20, the NSA

Washington Visitor Center (Located at the Front-Gate). The Visitor Center hours of operation are Monday through Friday 06:00 to 16:00. Upon successful completion of identity authentication and background screening, a personalized DBIDS credential for each approved employee is manufactured and shipped to the Visitor Center.

Qualified employees typically receive their DBIDS credentials in less than two (2) weeks. Annual enrollment and registration fees apply. Credentials are scanned at the various entry control points, streamlining access and ensuring an individual driving in company vehicles are who those persons claims to be. Participating contractors can receive long-term access (90 days to 1 year), access through all gates that size allows, vehicle pass valid for 30 days (1 year with vetting and sponsorship), and access times based on company requirements. Non-participating contractors are restricted to one

(1) day access passes, limited gate access, one (1) day vehicle passes (no exceptions) and limited access times between the hours of 05:30 to 16:30 Monday to Friday.

5.3 Contract personnel are expected to perform most work during normal NSWC duty hours with some work being performed outside normal working hours of Monday through Friday, 8:00 AM to 4:30 PM, holidays excluded.

5.4 When work must be performed outside normal working hours, permission must be obtained from the Security Office through the Project Manager or Government

Designated Rep.

5.5 Contractor personnel must confine themselves to the work sites specified in their contract. Visiting other areas is prohibited.

5.6 Alcoholic beverages, weapons, cameras, sound recorders, illicit drugs and explosives are prohibited on NSWC property.

5.7 Use of Government property without prior written approval of the Contracting

Officer is prohibited.

5.8 The NDW Police arrange for special contractor parking if required. Contractor personnel must not park in numbered spaces, areas reserved for car pools, or other prohibited areas. Posted speed limits and traffic restrictions must be observed at all times.

5.9 Accidents or problems of a security/safety nature must be reported to the NDW

Police and Safety Office immediately.

5.10 Contractor personnel working on station for less than five days may be required to log in and out at the Visitor's Center each day and will not be issued an Extended

Entry Contractor’s Badge.

5.11 Pursuant to federal regulations, all personnel and vehicles on NDW property are subject to search by authorized personnel at any time.

5.12 All contractors’ personnel are required to display the NSWC issued identification badge on their person at all times while present at the laboratory. Access to NDW or

NSWC property will not be allowed without this identification badge. The badge is to be displayed on the person outer clothing, above the waist and in full view.

Identification badges and vehicle passes issued to contractor personnel remain the property of the U.S. Government and must be surrendered upon completion of the contractor at the termination of individual employment, and when requested by the

Government.

5.13 A list of all personnel working under this contract should be turned in immediately after award in order to allow sufficient time to process security information.

6. SMOKING RESTRICTIONS: The bearing and use of lighted cigarettes, cigars, pipes, or any tobacco product is prohibited in the following areas:

a. All buildings including private offices, lobbies, and restrooms

b. Alleys and passages between buildings

c. Stairways and ramps leading to building entries and exits

d. Within 20 feet of building entries and exits

e. Within 20 feet of heating, ventilation, and air conditioning intake ducts.

f. Hazardous areas containing flammable liquids, gases, vapors, and all other locations where there is a collection of readily ignitable combustible material

7. STATION PERMITS: Permits are required for, but not necessarily limited to, welding and burning. Permits must be requested by the Contractor and approved by the Government

Designated Representative and the Fire Department, on a daily basis.

8. STORM PROTECTION: If a warning of gale force winds is issued, take precautions to minimize any danger to persons, and protect the work and any nearby Government property.

Precautions shall include, but not be limited to, closing openings, removing loose materials, tools, and equipment from exposed locations, and removing or securing scaffolding and other temporary work. Close openings in the work if storms of lesser intensity pose a threat to the work or any nearby Government property.

9. ASBESTOS AND LEAD MATERIAL: If material is encountered which may contain asbestos and or lead and must be disturbed, do not touch the material. Should the discovery of such suspected material affect the contractor's planned work schedule, the contractor shall redirect the work crew to other portions of the unaffected work and modify the schedule at no additional cost to the Government. The Contracting Officer shall be notified immediately, in writing, regarding the discovery of the suspected material and of any adverse impact the

Contractor may expect to incur due to this situation. Within 14 calendar days, the Contracting

Officer will perform laboratory tests to determine if there is asbestos or lead. If asbestos or lead is not a danger, the Contracting Officer will direct the Contractor to proceed in the identified area without change.

10. SAFETY REQUIREMENTS: In order to provide control for protection of the life and health of employees, pedestrians and avoid work interruptions in the performance of this contract, the Contractor shall comply with all pertinent provisions of the 29 CFR 1910 General, and with any additional measures the Contracting Officer may determine to be reasonably necessary. Copies of this manual may be obtained from the Superintendent of Documents, U.S.

Government Printing Office, Washington, D.C., 20402. Additionally, it is the Contractor's responsibility to familiarize himself with the Corps of Engineers Manual, EM 385-1-1, dated

November 30, 2014, and incorporate those general and additional safety requirements into daily working procedures that will provide safe working conditions during performance of this

Contract. Copies of this manual may also be found online.

10.1 Safety Plan: Submit in writing a safety plan for preventing accidents. The Plan shall be in accordance with the Army Corps of Engineers EM-385 1-1 dated November

30th 2014 and OSHA Construction Regs. Contractor shall meet with the

Government Designated Representative to discuss the safety plan and develop mutual understandings relative to the overall safety program related to this project.

The safety plan shall include:

a. General Construction Safety: Part 1910, sections 1910.1 through 1910.1450

b. 12.3 Hazard Communication: 29 CFR 1910.1200

c. 12.4 Lockout Or Tagout Procedure: 29 CFR 1910.147

d. Fall Protection: 29 CFR 1926

e. Working on Aerial Lifts: 29 CFR 1926.453 (if applicable)

f. Activity Hazard Analysis: Create an AHA for every hazard (with the exception of general construction safety i.e. hard hats, eye protection, foot protection etc) that may cause a threat to worker safety and Carderock personnel safety during this project.

11. ENVIRONMENTAL PROTECTION REQUIREMENTS: Provide and maintain, during the life of the contract, environmental protection. Plan for and provide environmental protective measures to control pollution that develops during normal construction practice. Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project.

Comply with Federal, state, and local regulations pertaining to the environment, including but not limited to, water, air, soil, and noise pollution.

a. Preserve the natural resources within the project boundaries and outside the limits of permanent work. Restore to an equivalent or an improved condition upon completion of work. Confine construction activities to within the limits of the work indicated or specified.

b. Protect existing trees which are to remain and which may be injured, bruised, defaced, or otherwise damaged by construction operations. Remove displaced rocks from uncleared areas. Remove trees and other landscaped features scarred or damaged by equipment operations. Replace them with equivalent undamaged trees and landscape features at no additional cost to the Government. Obtain Contracting Officer approval of replacement items and methods.

c. Prevent oily or other hazardous substances from entering the ground, drainage areas, storm drainage system, or local bodies of water.

N0016723R0017

d. Provide for temporary protection of erodible soils by using silt fences, berms and other suitable methods to control runoff from the construction operations. Provide permanent protection at the end of the project by establishing vegetation and mulch.

Provide new seeding and mulch to stabilize area where ground is disturbed. Include topsoil or nutriment during the seeding operation and water in place as necessary to establish a suitable stand of grass.

e. Pickup solid wastes daily and place in covered containers which are regularly removed by the Contractor from Government property. Do not prepare or cook food on the project site. Prevent contamination of the site or other areas when handling and disposing of wastes. At project completion, leave the areas clean.

f. Handle generated hazardous waste in accordance with 40 CFR 262. Dispose of hazardous waste in accordance with Federal, State, and local regulations including 40

CFR 263 and 40 CFR 264. Take precautions to prevent spills of oils and hazardous material. In the event of a spill, immediately notify the Contracting Officer and initiate containment operations utilizing personnel properly trained and protected for such situations.

g. Keep dust down at all times, including during nonworking periods. Sprinkle or treat, with dust suppressants, the soil at the site, and other areas disturbed by operations. Dry power brooming will not be permitted. Instead use vacuuming, wet mopping, wet sweeping, or wet power brooming. Only wet cutting will be permitted for cutting concrete, and bituminous concrete.

h. Make the maximum use of low-noise emission products, as certified by the EPA.

Blasting or the use of explosives is prohibited.

12. TRANSPORTATION ON STATION: No employee of the Contractor shall be allowed to operate a privately owned vehicle on Station other than for ingress and egress. All private vehicles shall be parked in a designated area and remain until the end of the work shift at which time they shall be driven directly to the gate for exit from the station. Any desired transportation of personnel, supplies or equipment on station by the Contractor shall be accomplished by the use of one (1) registered vehicle furnished by the Contractor and operated by an assigned driver appointed by and responsible to his "Supervisor".

13. STORAGE OF MATERIALS AND EQUIPMENT: Government furnished storage facilities are not available to the Contractor in the vicinity of the work site. The Contractor shall provide suitable storage facilities as approved by the Contracting Officer if he intends to leave materials and equipment in the work area overnight or on weekends. The security of the

Contractor's property or his personnel's property shall be the full responsibility of the Contractor.

The Government will accept no liability in case of loss due to fire or theft.

14. AVAILABILITY OF UTILITY SERVICES: The Government will furnish water, electric lights, and power in the quantity not to exceed the amount necessary for the normal prosecution of the work, at the nearest available outlet. The Contractor shall make all piping and wiring connections thereto and shall extend the services to the site of the work. On completion of the work, all such temporary connections shall be removed by the Contractor and any removed or damaged portions of the Government services at the points of connection shall be repaired or replaced.

(a) Other Utilities: The Contractor shall make arrangements to obtain all utilities not furnished by the Government, at his/her own expense.

(b) The Government will not provide refuse facilities. The contractor will be required to dispose of all garbage and other waste materials generated by his work at a licensed off-site landfill.

15. INSPECTION: All work is subject to inspection by a designated Government

Representative during performance of specified work, and upon completion of the job.

16. GOVERNMENT REPRESENTATIVE: The work will be under the general direction of a designated Government representative. This designated person has complete charge of, and exercises full supervision over the work in so far as it affects the interests of the Government.

Any claim for time extension, cost modification, or other formal contracting action shall be submitted to the Contracting Officer. The provisions of this paragraph or provisions elsewhere in this Contract regarding supervision, approval, or direction by the Contracting Officer or the designated person shall not relieve the Contractor of responsibility for accomplishing the work, with regard to sufficiency or time of performance, except as otherwise provided.

17. ORAL MODIFICATION: No oral statement of any person other than the Contracting

Officer, or his representative, as provided in the clause in the Contract entitled "Changes", shall in any manner of degree modify or otherwise affect the terms of this Contract.

18. TIME FOR COMPLETION: All work shall be completed by the Contractor within 136 days from the date of award due to expiring funds.

19. WORK SCHEDULE: All work shall be performed during normal working hours, between

7:30 AM and 4:00 PM, Monday through Friday, except (a) federal holidays, or (b) other days so designated by the Commanding Officer. Any work other than these hours or weekend work will be permitted only when advance written approval has been issued by the Government. The main rear commercial entrance located off McArthur Blvd. will be closed at 2:00 PM each day.

Contractor personnel need to contact the NDW Police at (301)227-1502 to leave by this gate after 2:00 PM. Contractor personnel are cautioned that driving commercial vehicles on the Clara

Barton Parkway is prohibited.

TRUCK ROUTE TO NAVAL SURFACE WARFARE CENTER

CARDEROCK DIVISION

DAVID TAYLOR MODEL BASIN

Take Exit # 39 off Beltway --- (River Road Route 190 to Potomac)

At Exit Ramp Light, turn west towards Potomac

Travel on River Road approximately 1 ½ miles to the three traffic light (River Road &

Bradley Blvd Route 191)

Turn LEFT onto Bradley Blvd and proceed ½ mile to Persimmon Tree Road

Turn LEFT onto Persimmon Tree Road and travel 1 ½ miles to Eggert Drive (on the right)

Turn RIGHT onto Eggert Drive and go ½ mile to MacArthur Blvd

Proceed ACROSS MacArthur Blvd, dropping down the hill to the back gate (gate 3) of

NSWC/CD

Stop for the guard to sign you aboard

Tell the guard you are here to see Norman Leizear @ BLDG.42 Office# 301-227-2970

***END OF SPECIFICATION***

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lite Modify, replace and install fixed ladder

FFP

Modify, replace and install fixed ladder

FOB: Destination

VENDOR PART NR: 300000101304-0132

PURCHASE REQUEST NUMBER: 1301067580

PSC CD: Z2HB

NET AMT

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 01-JUN-2023 TO

30-SEP-2023

N/A NAVAL SURFACE WARFARE CENTER

CARDEROCK

MARY K. GARREN

9500 MACARTHUR BLVD

WEST BETHESDA MD 20817

301-227-2865

FOB: Destination

N00167

Section 00 21 16 - Instructions to Proposers

INSTRUCTIONS TO PROPOSER

Section 00 21 16 – INSTRUCTIONS TO PROPOSERS

PROPOSAL SUBMISSION REQUIREMENT – INSTRUCTION TO PROPOSERS

1.0 INTRODUCTION

1.1 ELIGIBILITY

1.2 QUESTIONS

1.3 START DATE FOR USE IN COST/PRICE PROPOSAL

2.0 INSTRUCTIONS FOR SUBMISSIONS OF OFFERS

2.1 GENERAL

2.2 ELECTRONIC SUBMISSION

2.3 PROPOSAL FORMAT

2.3.1 COVER PAGE AND TABLE OF CONTENTS

2.3.2 PAGE NUMBERING SYSTEM

2.3.3 GLOSSARY OF ABBREVIATION AND ACRONYMS

2.3.4 FILE NAMING CONVENTION

2.3.5 PAGE LIMITATION

2.3.6 GENERAL CONTENT INSTRUCTIONS

3.0 PROPOSAL ORGANIZATION AND CONTENT

3.1 COVER LETTER

3.2 SPECIAL NOTICE

3.3 EVALUATION FACTORS

4.0 EVALUATION FACTORS

4.1 FACTOR 1 – CORPORATE EXPERIENCE (VOLUME I)

4.1.1 SUBFACTOR A: CONSTRUCTION EXPERIENCE

4.1.2 SUBFACTOR B: DESIGN EXPERIENCE

4.2 FACTOR 2 – TECHNICAL CAPABILITIES AND APPROACH (VOLUME II)

4.3 FACTOR 3 - PAST PERFORMANCE (VOLUME III)

4.4 FACTOR 4 – SAFETY (VOLUME V)

4.5 FACTOR 5 - TOTAL EVALUATED PRICE (VOLUME VI)

5.0 ADDITIONAL REQUIRED INFORMATION

1.0 INTRODUCTION

1.2 It is the intention of this solicitation to result in the award of a Firm-Fixed Price (FFP) contract/task order. This procurement is solicited as a Total Set Aside for Small Business under

NAICS 236220 – Commercial and Institutional Building Construction. The Contractor shall supply all material, labor and supervision necessary to modify, replace and install fixed ladders, and add fall arrest systems on select ladders in order to bring them into OSHA compliance per the specifications noted below, complete and ready for use at the Naval Surface

Warfare Center, Carderock Division – West Bethesda, MD.

The predominant Product Service Code (PSC) for this requirement will be Y1HB – Construction of Government-owned Government-operated (gogo)R&d Facilities. This PSC aligns with the

DoD taxonomy associated with the acquisition of services and falls under the Knowledge Based

Services taxonomy. Based on the effort to be procured, to provide engineering and technical services.

In this solicitation, the Government will evaluate both technical capability and price.

1.1 ELIGIBILITY

This solicitation is a Total Small Business Set-Aside. Offers from other than Small Business concerns are ineligible for award and will not be evaluated. The Small Business Offeror shall ensure its proposal complies with FAR 52.219-14 entitled “Limitations on Subcontracting” to be eligible for award.

1.2 QUESTIONS

It is the Offeror's responsibility to bring to the attention of the Procuring Contracting Officer

(PCO) at the earliest possible time, but prior to the solicitation closing date, any ambiguities, discrepancies, inconsistencies, or conflicts between the Statement of Work (SOW) and other solicitation documents attached hereto or incorporated by reference. All questions shall be submitted within 5 calendar days after issuance of the solicitation. Questions received after this date may be answered at the discretion of the Government.

1.3 START DATE FOR USE IN COST/PRICE PROPOSAL

In order to allow for procurement lead-time and a fair and equal evaluation of all proposals submitted under this competitive procurement, all proposals shall be based on an estimated start date of June 17, 2023. This date is only an estimate of the anticipated start date and will be used for the purpose of proposal evaluation only. The definitive start date will be stated in the contract award document.

2.0 INSTRUCTIONS FOR SUBMISSION OF OFFERS

The government reserves the right to reject any proposal that does not comply with these proposal preparation/submission instructions. Note: Information requested and submitted in one volume will not be considered for purposes of evaluation of information contained in another volume. Cost/price proposal submissions must reflect what is submitted in the technical volume.

2.1 GENERAL

Offerors shall comply with the instructions for the format and content of the proposal; proposals that fail to comply may be ineligible for award.

(a) Definitions. As used in this solicitation –

“In writing” or “written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

Proposal modification is a change made to a proposal before the solicitation’s closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

Proposal revision is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer.

Day is defined as a calendar day unless otherwise specified. If the last day of a specified period falls on a Saturday, Sunday, or Federal Holiday, the period shall be deemed to end on the next Federal work day.

Major Subcontractor is defined as a subcontractor performing 49% or more of total proposed burdened labor costs.

(b) Amendments to the solicitation. If this solicitation is amended, terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s). The

Offeror shall demonstrate that the proposal is in response to the latest amendment.

(c) Proposal submissions, modifications, revisions, and withdrawals shall be uploaded electronically.

Offerors may submit modifications to their proposals at any time before the solicitation closing date and time. In the event of an amendment to the solicitation that requires Offerors to submit proposal modifications, the Offerors will be notified in the same manner as the RFP was provided.

After the solicitation closing date and time, Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.

Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.

2.2 ELECTRONIC SUBMISSION

Offerors shall submit proposals via email to Brooks A. McLean atBrooks.a.McLean.civ@us.navy.mil via DOD Safe at https://safe.apps.mil/ and contain “N00167-

23-R-0017” in the subject line to ensure that the proposal submission is received by the Contracting mailto:Brooks.a.McLean.civ@us.navy.mil https://safe.apps.mil/

Officer no later than the solicitation’s closing date/time in order to be considered eligible for award.

Failure to submit a complete proposal prior to the solicitation closing date and time will in almost all circumstances render the proposal late and unacceptable.

Offerors are responsible for submitting proposals and any revisions by the time specified in the solicitation. Any proposal (including proposal modifications or revisions) the Government does not receive by the exact time specified for receipt of offers is “late” and will not be considered. The solicitation will close at the exact date and time specified in the solicitation and Offerors will be unable to submit/upload proposals after that time. Proposals may be withdrawn by written notice to the Contracting Officer provided such notice is received prior to contract award.

2.3 PROPOSAL FORMAT

All Offerors are required to submit proposals in accordance with the format and content specified herein. The requirements below apply equally to subcontractors. Proposals that do not meet the below requirements may be deemed unacceptable and may not be eligible for award. The electronic proposal shall be prepared with:

Microsoft Word, Excel, or (searchable) Adobe Acrobat software (note: instructions regarding use of certain electronic products (e.g., Microsoft Office, Excel, Adobe) listed herein shall not be construed as Government endorsement of specified products);

No hyperlinks to locations outside a document (certain hyperlinks to places within a document, such as table of contents numbers, section headings, and table or figure cross references are acceptable);

All files named with the Offeror’s company name and title/subject of file content;

All files named with the file extension .doc, .docx, .xls, .xlsx, or .pdf;

Spreadsheet files (workbooks) provided for all prime AND subcontractors shall include all formulas, functions, macros, computations, and equations used to compute the proposed amounts. There shall be no cell references to data or links to files not included in the Technical and Management volume and the Cost/Price volume, submissions, as appropriate. For each workbook, all rows, columns, cells, and worksheets shall be visible

(object. Visible=true). Zero height/zero width rows/columns in worksheets are not acceptable. Worksheet cells formatted with the font color equal to the fill color are not acceptable. Print image files or pictures (for example, a picture of an Excel spreadsheet embedded in a Word document) shall not be used;

Spreadsheets shall include all calculations in the cells (e.g., show all formulas). The

Government MUST be able to determine how all direct and indirect rates are calculated.

DO NOT hard enter data where formulas were used to calculate the entered value;

All files named with the file extension .doc or .docx shall be Microsoft Word 2010 compatible;

Prime /Subcontractor Cost Summaries shall be submitted using Microsoft Excel (2010 or compatible) in the Cost Summary Format provided as an attachment in Section B or

Section 00 15 01;

Narratives related to the cost/price summary data may be provided in Microsoft Word;

Any other attached documents requested herein shall be compatible with Microsoft

Office. Compression tools are limited to PKZip or WinZip;

Offerors shall propose to provide all items in order to be deemed eligible for this award;

and

Offerors shall submit proposals in response to this solicitation in English and in U.S.

dollars.

Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the

Government except for evaluation purposes, shall mark the title page with the following legend:

"This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed in whole or in part for any purpose other than to evaluate this proposal. If; however, a contract is awarded to this Offeror as a result of, or in connection with, the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government’s right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction is contained in sheets

[insert numbers or other identification of sheets]"; and

Mark each sheet of data it wishes to restrict with the following legend:

"Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal."

Additionally, the electronic proposal shall be prepared so that, if printed, the proposal meets the following requirements:

8.5 x 11-inch paper;

Single-spaced typed lines;

1-inch margins;

12-point Times New Roman Font text;

Only graphs/tables/charts as may be necessary to convey a response to the items/information requested in this solicitation. The font size for text contained in embedded graphics

(tables and illustrations) shall be no smaller than 9-point Times New Roman font; and

The spreadsheets (landscape orientation) shall be formatted for printing such that all data is in a font no smaller than 9-point Times New Roman and row and column headings appear on each printed page.

2.3.1 COVER PAGE AND TABLE OF CONTENTS

Each proposal volume shall include a Cover Page and a Table of Contents. The Cover Page shall identify the solicitation number, amendment number (if any), proposal volume and title, and the

Offeror’s name. Volume I shall include a Master Table of Contents and Proposal Cross-

Reference Table. The Proposal Cross-Reference Table shall indicate the required proposal content and the section/page number where this content appears in the proposal. Cover Pages, Tables of Contents, and the Proposal Cross-Reference Table will not count against page limitations.

2.3.2 PAGE NUMBERING SYSTEM

The Offeror shall use a standard page numbering system to facilitate proposal references. All pages shall be numbered. Consecutive pages will be numbered within sections. Charts, graphs, and other insert materials shall be page-numbered as part of the page numbering system.

2.3.3 GLOSSARY OF ABBREVIATION AND ACRONYMS

The Offeror may submit a glossary which includes abbreviations, acronyms, and their corresponding definitions. Glossaries will not count against page limitations.

2.3.4 FILE NAMING CONVENTION

All files must be submitted in the following formats:

Corporate Experience Company Name Document Name Volume #

Example: Corporate Experience Company X_ Corporate Experience _Volume I

Technical Company Name Document Name Volume #

Example: Technical Company X_Technical_Volume II

Past Performance Company Name Document Name/Attachment #_Volume #

Example: Past Performance Company X_Previous Contracting Efforts Volume III

Management Approach Company Name Document Name Volume #

Example: Technical Company X_ Management Approach _Volume IV

Safety Company Name Document Name Volume #

Example: Technical Company X_ Safety _Volume V

Cost/Price _Company Name_Document Name_Vol #(or Attachment Number)

Example: Cost_Company X_Cost Narrative_Volume VI

Example: Cost_Company X_Cost Summary_Attachment 1

2.3.5 PAGE LIMITATION

Page limitations are identified for each volume of the proposal as shown below and will be treated as maximums. If exceeded, excess pages will not be read or considered in proposal evaluation. When both sides of a sheet display printed material, it shall be counted as two pages.

Section 00 21 16

Instruction to

Proposers

Paragraph

Required Documentation Volume

Included in

Volume Page

Limitation

Page

Limitation

3.0 Proposal Organization and Content No 3

3.1 Cover Letter No 1

3.2 Special Notices No 1

4.1 Factor 1 Corporate Experience (VOLUME I) I No

4.1.1 Subfactor A Construction Experience I Yes 6-10

4.1.2 Subfactor B Design Experience I Yes 6-10

4.2 Factor 2 – Technical Capabilities and

Approach(VOLUME II) II Yes

4.3 Factor 3 Past Performance (VOLUME III) III No

4.4 Factor 4 Safety (VOLUME V) V Yes 3

4.5 Factor 5 Price (VOLUME VI) VI Yes 2

5.0 Additional Required Information No 3

2.3.6 GENERAL CONTENT INSTRUCTIONS

(a) The Offeror shall not simply rephrase or restate the Government’s requirements in its proposal. The Offeror shall provide sufficient details and convincing rationale to address how the Offeror intends to meet the requirements. Offerors shall assume that the Government has no prior knowledge of its facilities, capabilities, or approach.

(b) The Offeror shall include sufficient details to permit a complete and accurate evaluation of the proposal. The proposal shall clearly demonstrate the Offeror’s understanding of the requirements and the feasibility of its approaches to meet those requirements. This is solely the Offeror’s responsibility. Proposals that merely offer to perform work in accordance with this solicitation, or which fail to present more than an indication of capability of compliance with the technical requirements without elaboration shall be deemed unacceptable and not considered further. Offerors shall identify technical uncertainties and assumptions within the requirements set forth in the solicitation and provide specific courses of action for their resolution. Offerors are cautioned that failure to provide the necessary information may result in their ratings being downgraded accordingly. Note that the information required by FAR 52.215-

22, if applicable to the proposal, is a material requirement; therefore, failure to include the required information in the technical and cost volumes, as appropriate, will render the Offeror ineligible for award.

(c) Offerors are to ensure that all information supporting each factor is contained wholly within the appropriate volume as specified in the Cross-Reference Table, above. In particular, Offerors are cautioned not to include any cost/price information in any non-cost/price volume.

3.0 PROPOSAL ORGANIZATION AND CONTENT

3.1 COVER LETTER

Offerors shall provide a cover letter which constitutes the legal offer and contains the following information:

a. The solicitation number,

b. Name, address, email address, and telephone numbers of the Offeror,

c. Offeror’s CAGE code and/or DUNS number,

d. List of all enclosures being transmitted as part of the proposal,

e. ,

f. A statement that the offer is in response to the solicitation and is valid through 180 days after the proposal due date.

g. A statement specifying the extent of the agreement all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

h. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the Offeror’s behalf in connection with the Government in connection with this solicitation.

i. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .