02. PWS_LCC Acrylics revised 33022.pdf
PDF 467 KB Posted
- Attached to
- Acrylic poster frames, graphics and vinyl wall wrap Federal contract opportunity
- Solicitation number
- N0016722Q0061
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N0016722Q0061 combined synopsis-solicitation amended.pdf | ||
| 02 Minimum Specification revised 33022.docx | DOCX document | |
| N0016722Q0061 Combined Synopsis-Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
LCC Acrylic Wall Hanger and Graphics Installation Project
1.0 DESCRIPTION OF SERVICES/INTRODUCTION: The Naval Architecture and Engineering
Department of the Naval Surface Warfare Center, Carderock Division (NSWCCD) is contracting a company to provide updated wall hangings and graphics throughout various portions of the facility.
2.0 BACKGROUND: There are several construction and historical digital images that can be used in the creation of the contracted imagery. Testing conducted at this facility has aided in the development of several ship and submarine propulsion system designs. Images from these tests can also be used as needed.
3.0 OBJECTIVE:
3.1 The contractor shall design, build and furnish the material listed below:
3.1.1 19 medium size acrylic poster frames approximately 24”’x36” with 1/4" thickness with wall stand-off ; Glossy Finish
3.1.2 6 small size acrylic poster frames approximately 20”x20” with 1/4” thickness with wall stand-off; Glossy Finish
3.1.3 2 Vinyl wraps, sized 17'x8', with imagery to be placed on each side of LCC
Engineering Wing hallway
3.1.4 1 Vinyl wrap, sized 14.5'x9', with imagery to be placed on the LCC entryway wall
3.1.5 4 Graphics for a 20’x8’ wall with stand-off from wall to be made of 3MM white polymetal material and each sized at 4.5'x7.5' 1/4" THICK
3.2 The contractor shall provide design services to support the creation of materials in section
3.1
3.3 The contractor shall install all material listed in section 3.1
4.0 SPECIAL QUALIFICATIONS:
4.1 N/A
5.0 APPLICABLE DOCUMENTS
5.1
Document
Type
No./Version Title Date
DoD
Instruction
5000.64 Accountability and Management of DoD-OWNED
Equipment and Other Accountable Property.
Attachment (1)
2 Nov
SECNAV
Form
SECNAV
5512/1
Department of the Navy Local Population ID
Card/Base Access Pass Registration Attachment (2)
May
6.0 GOVERNMENT FURNISHED EQUIPMENT/PROPERTY/INFORMATION
6.1
Document
Type
No./Version Title Date
LCC Digital N/A Digital images of LCC testing and construction, Various
Images Distro A, Approved for Public Release
7.0 DELIVERABLES: N/A
8.0 PERIOD OF PERFORMANCE: To be completed within 3 months following date of contract award.
9.0 SECURITY REQUIREMENTS: All contractors needing access to the facility will require a
DD5512 form to be filled out and submitted to the LCC Site Director no less than two weeks prior to arrival.
File details come from the government source that posted it. Updated .