This is a combined synopsis/solicitation for commercial items prepared in accordance with
Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation that Naval Surface
Warfare Center Carderock Division (NSWCCD) intends to issue, and is a Request for Quotes
(RFQ) for the following Supplies and/or Services.
NSWCCD Code 611 has a requirement to procure for Nondestructive Testing Services for the Inspection of Final Machined Forged Aluminum Parts.
The provisions and clauses included and/or incorporated in this solicitation document are those in effect through the Federal Acquisition Circular. This RFQ incorporates all provisions and clauses in effect through Federal Acquisition Circular FAC 2022-04 effective 01/30/2022 located on https://www.acquisition.gov/?q=browsefar and the Defense Federal Acquisition
Regulation Supplement (DFARS) DPN 20220128 effective 01/28/2022 located at https://www.acq.osd.mil/dpap/dars/change_notices.html. SEE ATTACHED SOLICITATION
FOR CLAUSES AND PROVISIONS. The NAICS code is 541380 and the associated PSC code is H320, and the Small Business Standard is $16,500,000 for this procurement: NOTE: A
Class Waiver is not applicable to a procurement unless the NAICS code, PSC, and NAICS
Code Descriptor currently in effect, match the item(s) being procured. This procurement IS being set-aside for small business.
Interested parties may identify their interest to this requirement by submitting a quote and/or capabilities statement no later than 10:00 AM on 06 April, 2022. It is anticipated one firm-fixed price purchase order will be issued in response to this RFQ. All responses shall include price(s), FOB point, a point of contact, name and phone number, GSA contract number (if applicable), business size, and payment terms. Each response must clearly indicate the capability of the quoter to meet all specifications and requirements.
Responses to this notice are due on or before 10:00 AM on 06 April, 2022, Eastern Standard
Time (EST) to christopher.c.rolince.civ@us.navy.mil.
Point of Contact for this notice is Christopher Rolince, 757-513-8285, christopher.c.rolince.civ@us.avy.mil.
https://www.acquisition.gov/?q=browsefar https://www.acq.osd.mil/dpap/dars/change_notices.html mailto:christopher.c.rolince.civ@us.navy.mil mailto:christopher.c.rolince.civ@us.avy.mil
N0016722Q0038
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot Ultrasonic Inspection
FFP
Ultrasonic Inspection of Finish Machined Parts (Post-Hydrostatic Testing) UUV#1.
See Performance Work Statement for detailed description.
FOB: Destination
VENDOR PART NR: 100001680896-0097
PURCHASE REQUEST NUMBER: 1300936923
PSC CD: H320
NET AMT
0002 1 Lot Utrasonic Testing
FFP
Eddy Current and Ultrasonic Inspection of Anodized and Coated Al 7175-T74
Mock-Up. See Performance Work Statement for detailed description.
FOB: Destination
VENDOR PART NR: 100001680896-0097
1001 1 Lot OPTION Ultrasonic Inspection
FFP
Dye Penetrant Inspection of Finish Machined Parts (Post-Hydrostatic Testing)
UUV#1. See Performance Work Statement for detailed description.
FOB: Destination
1002 1 Lot OPTION Ultrasonic Inspection
FFP
Ultrasonic Inspection of Finish Machined Parts UUV#2. See Performance Work
Statement for detailed description. TBD: Delivery will be made at NSWC
Carderock Bethesda MD or Huntington Ingalls Industries, Panama City, FL.
FOB: Destination
PERFORMANCE WORK STATEMENT
Performance Work Statement
Nondestructive Testing Services for the Inspection of Final Machined Forged Aluminum Parts
1.0 Description of Services/Introduction/Background
Naval Surface Warfare Center Carderock Division (NSWCCD) Code 655 requires nondestructive testing and evaluation (NDT&E) services to include ultrasonic testing (UT) and potentially liquid penetrant testing (PT) inspection to support production of a new class of unmanned underwater vehicle (UUV). The UUVs will be fabricated predominantly from thick (<6-inch) aluminum alloy (AA) forgings of AA 7175-T74, though some AA 6061-T6 (forged) and AA 7175 (plate) will also be incorporated into the final structure. Inspection of components in the finish machined and anodized condition is required after hydrostatic testing is complete. In addition, nondestructive testing and evaluation services to inspect anodized and coated component mock-ups, to determine limitations, if any, for support of in-service inspection of components is required. A number of tasks for inspection services are required. The tasks are intended to be individual line items that will be executed and funded with Direct Cite (DC) funding during FY22-23.
Base Contract Tasking (See Section 4)
TASK NO. DESCRIPTION QUANTITY
4.1 Ultrasonic Inspection of Finish Machined Parts (Post-Hydrostatic Testing)
UUV#1
4.5 Eddy Current and Ultrasonic Inspection of Anodized and Coated Al 7175- T74 Mock-Up
Option Tasking (See Section 4)
TASK NO. DESCRIPTION QUANTITY
4.2 Dye Penetrant Inspection of Finish Machined Parts (Post-Hydrostatic Testing) UUV#1
4.3 Ultrasonic Inspection of Finish Machined Parts UUV#2 11
2.0 Applicable Documents
2.1 ASNT SNT-TC-1A, Recommended Practice for Personnel Qualification and Certification in Nondestructive
Testing
2.2 NAVSEA Technical Publication T9074-AS-GIB-010/271, Requirements for Nondestructive Testing
Methods
2.3 SAE-AMS 2630, Inspection, Ultrasonic Product Over 0.5 Inch (12.7 mm) Thick
2.4 SAE-AMS 2632, Inspection, Ultrasonic of Thin Materials 0.50 Inch (12.7) and Under in Cross-Sectional
Thickness
2.5 ASTM E 2375, Standard Practice for Ultrasonic Testing of Wrought Products
3.0 General Requirements
3.1 The contractor shall ensure that locations of indications reported within inspection records be traceable to physical datum references (locations) on the part. Locations should be referenced for example, by o’clock position or polar coordinates around the circumference, depth from a surface ID/OD, distance from an edge, centerline or other physical location on the part. Once a positional reference system is established by the Contractor, this reference system shall be documented in the inspection report (CDRL A005) and shall be used for all parts subsequently inspected.
3.2 The contractor shall propose and qualify a PT pre-cleaning method for the parts in a manner similar to the procedure of 5.6.2.1 of reference 2.2. Parts will be hydrostatically tested by the government prior to inspection. During testing, the parts will be fully immersed in mineral oil. Prior to providing access to the parts, the government will wipe off surface oil and remove any excess from pockets and recesses. The parts CAN NOT be industrially cleaned (power washing, etc.) due to concerns about potential metal smearing and masking of surface defects post-test. A pre-cleaning process included in the inspection procedures and procedure qualification data (CDRL A003) is required that can be completed in the test facility at NSWCCD to support penetrant testing (PT) inspections described below.
3.2.1. The parts to be inspected will have locations on the internal and external surfaces where surface instrumentation will have been installed and removed. There may be residual adhesive (Micro-measurements MBOND 200 adhesive) that shall be addressed during pre-cleaning method/processes.
3.2.2. The parts to be inspected will be anodized (IAW MIL-A-8625, TYPE III, CLASS 1, AND
DICHROMATE SEAL) at 0.002±20% thick in most areas except for base line surface discontinuities/indications found after final machining which will be masked prior to anodization to prevent the process in the area. There are types of anodized aluminum surfaces that are porous and this can result in background that would reduce contrast or mask any potential discontinuity or indication. In general, surface finish of the parts will be 125 Ra for inner surfaces and 250 to 420 Ra for outer surfaces.
PT procedures (CDRL A003) shall address pre-test cleaning to remove the mineral oil used for hydrostatic testing so that PT inspection is not adversely affected, MBOND 200 adhesive from the part surfaces, and removal of PT materials from the part surfaces post-test.
3.3 The contractor shall ensure that Level I operators are not be permitted to perform inspections unless physically accompanied by, and working in conjunction with, a Level II inspector or Level III examiner.
All inspection results shall be interpreted, evaluated, and dispositioned by a Level II Inspector or Level III Examiner. Personnel shall be certified in accordance with reference 2.2 via by way of reference 2.1, or equivalent per the contractor’s written practice.
4.0 Task Areas
4.1 Ultrasonic Inspection of Finish Machined Parts (Post-Hydrostatic Testing) UUV#1
The contractor shall perform contact ultrasonic shear wave and compression wave testing of components in the final machined and anodized condition post-hydrostatic testing, consisting of the quantity and configurations in Error! Reference source not found.. GFI Drawings are provided for each. I nspection shall be performed in accordance with the requirements of SAE-AMS 2630 (reference 2.3) and SAE-AMS 2632 (reference 2.4), as applicable, to the maximum extent possible and the Class C criteria provided herein. Complex geometry that pose issues with accomplishing 100% UT coverage shall be noted and resolved under a best effort inspection with concurrence of the Government. All indications meeting or exceeding the applicable criteria and areas with limited or no UT coverage shall be reported within the inspection records (CDRL A005). The contractor will be required to provide the appropriate shear wave ultrasonic reference standards to be used for inspection. If shear wave reference standards are not readily available and the government will be required to provide funding for procurement of the standards, the contractor shall ship all procured reference standards back to the Government at the Contractor’s expense within fourteen (14) calendar days of completion of inspection and reporting of inspection results. Ultrasonic compression wave reference standards can be provided as GFP if the contractor does not have any readily available.
Table 1. Hull #1 machined hull components for Post Test UT Inspections.
Unit ID QTY Part DWG#’s Location
2050 1 8756138 Rev. B NSWCCD (West Bethesda, MD)
3050 1 8756296 Rev. E NSWCCD (West Bethesda, MD)
4050 1 8756482 Rev. F NSWCCD (West Bethesda, MD)
5050 1 8756148 Rev C NSWCCD (West Bethesda, MD)
5054 1 8756157 Rev. B NSWCCD (West Bethesda, MD)
6050 1 8756752 Rev. B NSWCCD (West Bethesda, MD)
7054 1 8756733 Rev. B NSWCCD (West Bethesda, MD)
9050 3 8755836 Rev. B NSWCCD (West Bethesda, MD)
9054 1 8755838 Rev B NSWCCD (West Bethesda, MD)
Table 2. Hull #1 Machined Hull Component Longitudinal Wave Ultrasonic Reference Inspection, FBH, AMS-2360
Class C, inch/pound units
Quality Class
Single Discontinuity
FBH Size (1)
Multiple Discontinuities FBH Size (1)
Linear Discontinuity Inch, Max
Loss of Back Reflection %, Max
C 25% of #3 10% of #3 10% of #3 for 0.125 50
(1) FBH numbers indicate diameter in multiples of 1/64 inch of FBH in ultrasonic reference
(2) 11% of a #3 FBH is equivalent to a #1 FBH and may be used in place of the response from the #1 FBH
(3) 44% of a #3 FBH is equivalent to a #2 FBH and may be used in place of the response from the #2 FBH
Table 3. Hull #1 Machined Hull Component Angle Beam Ultrasonic Reference Inspection, FBH, AMS-2630 Class C, inch/pound units
Quality Class
Single Discontinuity
FBH Size (1)
Multiple Discontinuities FBH Size (1)
Linear Discontinuity Inch, Max
C 25% of #3 10% of #3 10% of #3 for 0.125
Table 4. Hull #1 Machined Hull Component Longitudinal Wave Ultrasonic Reference, FBH, AMS-2632 Inspection
Class C, inch/pound units
Quality Class
Single Discontinuity
FBH Size (1)
Multiple Discontinuities FBH Size (1)
Linear Discontinuity Inch, Max
Loss of Back Reflection %, Max
C 25% of #3 10% of #3 10% of #3 for 0.125 50
(2) 11% of a #3 FBH is equivalent to a #1 FBH and may be used in place of the response from the #1 FBH
(3) 44% of a #3 FBH is equivalent to a #2 FBH and may be used in place of the response from the #2 FBH
Table 5. Hull #1 Machined Hull Component Angle Beam Ultrasonic Reference Inspection, FBH, AMS-2632 Class C, Quality Class
Single Discontinuity
FBH Size (1)
Multiple Discontinuities FBH Size (1)
Linear Discontinuity Inch, Max
C 25% of #3 10% of #3 10% of #3 for 0.125
Table 6. Hull #1 Machined Hull Component Angle Beam Ultrasonic Reference Inspection, Notch, AMS-2632 Class C, Quality Class
Single Discontinuity
Notch Size Inch
Multiple Discontinuities
C 25% of E notch 10% of E notch
(1) Notch E = 0.02D x 0.04L
(2) Notch F = 0.03D x 0.05L
4.1.1 The contractor shall retain the following surface resolution requirements:
Table 8. Hull #1 Surface Resolution Requirements
Material Thickness (t)
Resolution Requirements
Up to 1.25 in.
1/8” 1.25 in. and over
2.5 in and over
4.1.2 The contractor shall verify the following: After scanning gain is established and if the examination zone includes the front entry surface, ascertain that the required front surface resolution as listed in table 8 is obtained.
4.1.3 The contractor shall perform additional examination from the opposite side, or, different examination zone depths shall be established, or the examination frequency may be changed as long as all other requirements are met, when entry surface resolution is not sufficient to resolve discontinuities near the part surface, as required by table 8, while achieving at least a 2:1 or greater signal-to-noise ratio. Also, for each examination direction, the contractor shall perform examinations from opposite sides when the maximum metal travel distance is such that the minimum size discontinuity of the applicable class cannot be detected by examination from only one side.
4.1.4 The contractor shall use the transfer technique per ASTM E2375 (reference 2.5) to compensate for differences in sound transmission characteristics that may exist between the reference standards and each part or piece of material to be examined, where possible.
4.1.5 If the noise level on any machined unit is in excess of alarm level settings, the contractor shall document their findings (CDRL A005) and then shall reduce the sensitivity of the inspection (e.g. Quality Class AA) and proceed with inspection to locate and classify indications to the maximum extent possible.
4.1.6 The contractor shall submit ultrasonic (shear and compression wave) inspection procedures and scan plans, proposed calibration standards, along with inspection qualification data to the Government for approval prior to the planned start of inspection (CDRL A003, CDRL A004). The contractor is not permitted to proceed until the Contracting Officer’s Representative (COR) or other authorized Government official has approved the use of the procedure and scan plans. The Government will provide drawings and/or CAD files of the parts for use in developing inspection procedures and scan plans. A mock-up of a forging with various geometric machined features typical of those found within the finish machined parts will be provided once fabricated and available, but may not be provided upon award.
(See Section 4.5).
4.1.7 If discontinuities are detected, the contractor shall redirect the sound beam to maximize the signal amplitude. Discontinuity evaluation (length) shall be assessed in accordance with the requirements contained within NAVSEA Technical Publication T9074-AS-GIB-010/271 (reference 2.2) and reported within the inspection records (CDRL A005).
4.1.8 The contractor shall provide ultrasonic inspection records to the Government following the conduct of inspection (CDRL A005).
4.2 Dye Penetrant Inspection of Finish Machined Parts (Post-Hydrostatic Testing) UUV#1 (Options)
4.2.1 The contractor shall perform dye penetrant inspection of forgings in the final machined condition per the part list in Table 7. Inspection shall be performed in accordance with the requirements of NAVSEA Technical Publication T9074-AS-GIB-010/271 (reference 2.2) except as modified herein. The contractor will be required to travel to the hydrostatic testing site location (NSWC Carderock, West Bethesda, MD) for all of the dye penetrant inspection services support for finished machined parts (post-hydrostatic testing).
Table 7. Hull #1 machined hull components for Post Test PT Inspections.
2050 1 8756138 Rev. B NSWCCD (West Bethesda, MD)
3050 1 8756296 Rev. E NSWCCD (West Bethesda, MD)
4050 1 8756482 Rev. F NSWCCD (West Bethesda, MD)
5050 1 8756148 Rev C NSWCCD (West Bethesda, MD)
5054 1 8756157 Rev. B NSWCCD (West Bethesda, MD)
6050 1 8756752 Rev. B NSWCCD (West Bethesda, MD)
7054 1 8756733 Rev. B NSWCCD (West Bethesda, MD)
9050 3 8755836 Rev. B NSWCCD (West Bethesda, MD)
9054 1 8755838 Rev B NSWCCD (West Bethesda, MD)
4.2.2 The contractor shall perform dye penetrant inspection prior to ultrasonic inspection on the same surfaces to avoid interference between the penetrant dye and any residual couplant.
4.2.3 The contractor shall use fluorescent penetrant of sensitivity level 2 when performing dye penetrant inspection. If excessive background/noise is encountered during the inspection due to surface conditions the contractor shall document their findings (CDRL A005) and proceed with inspection to the maximum extent possible. Inspections must be performed in localized areas with known base line indications which were not anodized in order to check for any potential growth from hydrostatic testing. Bolt holes inner surfaces are excluded from penetrant inspection and shall be plugged or masked if located near the inspection zone(s) where penetrant testing materials could enter. Penetrant materials and inspection equipment required for the inspection shall be provided by the vendor.
4.2.4 The contractor shall submit dye penetrant inspection procedures, along with procedure qualification data, to the Government for approval prior to the planned start of inspection (CDRL A003). The contractor is not permitted to proceed until the Contracting Officer’s Representative (COR) or other authorized Government official has approved the use of the procedure.
4.2.5 The contractor shall evaluate the discontinuity size based on bleed out. All indications greater than 1/16-inch shall be reported within the inspection records (CDRL A005).
4.2.6 The contractor shall not alter the component surfaces for determination of relevancy. The contractor shall contact the Government in the event that indications are found which are thought to be non-relevant.
4.2.7 The contractor shall provide dye penetrant inspection records to the Government following the conduct of inspection (CDRL A005).
4.3 Ultrasonic Inspection of Finish Machined Parts UUV#2 (Options)
4.3.1 The contractor shall perform contact ultrasonic shear wave and compression wave testing of forgings in the final machined and anodized condition for the parts shown in Table 8. GFI Drawings are provided for each. Inspection shall be performed in accordance with the requirements of SAE-AMS 2630 (reference 2.3) and SAE-AMS 2632 (reference 2.4), as applicable, to the maximum extent possible and the Class C criteria provided in section
4.2.1. Complex geometry that pose issues with accomplishing 100% UT coverage shall be noted and resolved under a best effort inspection with concurrence of the Government. All indications meeting or exceeding the applicable criteria and areas with limited or no UT coverage shall be reported within the inspection records (CDRL A005). The contractor will be required to provide the appropriate ultrasonic reference standards to be used for inspection. If shear wave reference standards are not readily available and the government will be required to provide funding for procurement of the standards, the contractor shall ship all procured reference standards back to the Government at the Contractor’s expense within fourteen (14) calendar days of completion of inspection and reporting of inspection results. Ultrasonic compression wave reference standards can be provided as GFP if the contractor does not have any readily available.
Table 8. Hull #2 machined hull components for UT Inspections.
2050 1 8756138 Rev. B See section 5.0 below
3050 1 8756296 Rev. E See section 5.0 below
4050 1 8756482 Rev. F See section 5.0 below
5050 1 8756148 Rev C See section 5.0 below
5054 1 8756157 Rev. B See section 5.0 below
6050 1 8756752 Rev. B See section 5.0 below
7054 1 8756733 Rev. B See section 5.0 below
9050 3 8755836 Rev. B See section 5.0 below
9054 1 8755838 Rev B See section 5.0 below
4.3.2 The contractor shall follow Surface resolution requirements as follows: See sections 4.1.1 –
4.1.4 and table 8.
4.3.3 The contractor shall use transfer technique per ASTM E2375 (reference 2.5) to compensate for differences in sound transmission characteristics that may exist between the reference standards and each part or piece of material to be examined, where possible.
4.3.4 If the noise level on any machined unit is in excess of alarm level settings, the contractor shall document their findings (CDRL A005) and then reduce the sensitivity of the inspection (e.g. Quality Class AA) and proceed with inspection to locate and classify indications to the maximum extent possible.
4.3.5 The contractor shall submit ultrasonic (shear and compression wave) inspection procedures and scan plans, along with inspection qualification data, to the Government for approval prior to the planned start of inspection (CDRL A003, CDRL A004). Ultrasonic (shear and compression wave) inspection procedures and scan plans previously approved under Task
4.1 are permitted for use as long as the procedures and scan plans have not been altered.
Any alteration to the procedure and/or scan plans technical in nature shall require resubmittal to the Government along with the accompanying qualification data as applicable (CDRL A003, CDRL A004). The contractor is not permitted to proceed until the Contracting Officer’s Representative (COR) or other authorized Government official has approved the use of the procedure and scan plans. The Government will provide drawings of the parts for use in developing inspection procedures and scan plans. A mock-up of a forging with various geometric machined features typical of those found within the finish machined parts will be provided once fabricated and available, but may not be provided upon award. (See Section 4.5).
4.3.6 The contractor shall evaluate discontinuities in accordance with the process outlined in section 4.1.8.
4.3.7 The contractor shall provide ultrasonic inspection records to the Government following the conduct of inspection (CDRL A005).
4.4 Eddy Current and Ultrasonic Inspection of Anodized and Coated Al 7175-T74 Mock-Up
4.4.1 The Contractor shall provide a copy of an eddy current crack detection procedure to the
Government for review. The procedure shall have been developed for aluminum alloy (7xxx preferable) crack detection inspection within plate, and have been validated to show that crack-like indications 1/8- inch long by 0.010-inch wide by 0.015-inch deep (maximum dimensions) can be reliably detected. The eddy current crack detection procedure, along with inspection qualification data, shall be submitted to the Government no later than fourteen (14) calendar days following the issuance of this contract (CDRL A003).
4.4.2 The Contractor shall utilize their eddy current crack detection procedure (see 4.5.1), to determine the applicability and limitations for use of the procedure to inspect forged aluminum components that have been anodized and coated. A mock-up of a forging with various geometric machined features typical of those found within the finish machined parts will be anodized and coated and will be made available to the contractor for use in evaluating the applicability and limitations of existing Contractor ultrasonic and eddy current inspection procedures for the inspection of anodized and coated aluminum components. The Contractor shall document all technical changes to the eddy current procedure needed, if any, to bring the procedure into compliance for use in the inspection of anodized and coated aluminum components. A list of these changes and supporting technical rationale shall be provided to the Government for information (CDRL A002).
4.4.3 The contractor shall utilize the ultrasonic inspection procedures and scan plans previously approved by the Government under Task 4.2, to determine the applicability and limitations for use of the procedure and scan plans to inspect forged aluminum components that have been anodized and coated. A mock-up of a forging with various geometric machined features typical of those found within the finish machined parts will be anodized and coated and will be made available to the contractor for use in evaluating the applicability and limitations of existing Contractor ultrasonic and eddy current inspection procedures for the inspection of anodized and coated aluminum components. The Contractor shall document all technical changes needed, if any, to bring the procedure into compliance for use in the inspection of anodized and coated aluminum components. A list of these changes and supporting technical rationale shall be provided to the Government for information (CDRL A002).
5.0 Travel
The contractor will be required to travel to NSWC-Carderock for most, if not all, of the post-hydrostatic test nondestructive testing services support. Personnel shall be available to travel within fourteen (14) calendar days of notification from the government that finished machined parts are available for inspection at locations listed below. It is anticipated that a maximum of 4 trips will be required to complete all inspections. .
Travel Destination SOW Task(s) Unit ID’s to inspect (number of parts PER
TRIP)
Number of Trips
NSWC
Carderock
(NSWCCD)
Macarthur Blvd, West Bethesda, MD, 20817
4.1; 4.2 2050 (1), 3050 (1), 4050 (1), 5050 (1), 5054 (1), 6050 (1), 7054 (1) 9050 (3), 9054 (1)
(Task Area 4.1.
Travel consists of one trip to NSWCCD for eight days)
(Task Area 4.2.
Travel consists of one trip to NSWCCD for twelve days)
NSWC
Carderock
(NSWCCD)
Macarthur Blvd, West Bethesda, MD, 20817
OR
Huntington Ingalls Industries 209 Ellen Ln Panama City, FL 32408
4.3; 2050 (1), 3050 (1), 4050 (1), 5050 (1), 5054 (1), 6050 (1), 7054 (1) 9050 (3), 9054 (1)
(Task Area 4.3.
Travel consists of one trip for twelve days)
6.0 Deliverables
The contractor shall deliver all Contract Data Requirements Lists (CDRLs) in accordance with this section.
6.1 Contracting Officer’s Management Report (CDRL Item A001)
The contractor shall provide monthly status updates during the performance of all Task Orders. The report shall include a summary of work completed, work schedule status, planned work for the next month, problem areas with proposed solutions, funding expended (current period and cumulative), and remaining balance. Monthly status reports may be combined to cover multiple or parallel tasks so long as each specific is addressed therein. Work performed under each Task shall be reported in a manner as to clearly delineate progress associated with each task.
6.2 Report -- Modifications to Existing Inspection Procedures Required to Perform Inspection
Through Anodization and Coatings (CDRL Item A002)
The contractor shall provide a report that summarizes all work performed under Section 4.5 Tasking. The report shall include lessons learned (applicability and limitations) for use of inspection method(s), results of nondestructive testing procedure qualification, modifications needed to the inspection procedures, and supporting technical rationale for the modifications, as applicable.
6.3 Nondestructive Inspection Procedures and Procedure Qualification Data (CDRL Item A003) The contractor shall provide the inspection procedure for each method in accordance with the requirements of NAVSEA Technical Publication T9074-AS-GIB-010/271 (reference 2.2) unless otherwise indicated within the SOW. Written procedures shall be signed by the cognizant Examiner of the Contractor’s Activity, certifying that the procedures meet the requirements of NAVSEA Technical Publication T9074-AS-GIB-010/271 (reference 2.2) or applicable inspection requirements document referenced herein, and have been qualified by proving that known discontinuities, either natural or artificial, can be reliably detected and evaluated. Inspection procedures and data documenting procedure qualification shall be provided to the Government at the time the procedure is submitted to the Government for approval of use.
6.4 Ultrasonic Inspection Scan Plans (CDRL A004)
The contractor shall provide scan plans proposed for use during the ultrasonic inspection of components.
Scan plans shall be submitted in coincidence with the related Ultrasonic Inspection procedure(s).
6.5 Nondestructive Inspection Records/Reports (CDRL Item A005) An inspection record shall be completed for each component inspected and for each inspection method required by the SOW. Inspection records shall be written in accordance with the requirements contained within NAVSEA Technical Publication T9074-AS-GIB-010/271 (reference 2.2), and shall include as a minimum, the record requirements listed in the applicable inspection method section therein. In addition, to the records requirements contained within NAVSEA Technical Publication T9074-AS- GIB- 010/271 (reference 2.2) the following additional information shall be included within the records for each inspection method:
For ultrasonics:
a) Approved scan plan identification.
b) Location of indications (as referenced to the part, for example o’clock position, ID, OD, distance from centerline…).
c) Discontinuity length, depth, and amplitude.
For dye penetrant (Options):
a) Location of indications (as referenced to the part, for example o’clock position, ID, OD, distance from centerline…).
b) Size of indications (based on bleed-out) and physical appearance (rounded, aligned rounded, linear…)
The contractor shall provide the inspection records to the Government no later than fourteen (14) calendar days following the completion of each inspection method.
7.0 Government Furnished Information/Property (GFI/GFP)
7.1 GFI
Machined Part drawing PDFs (Distro D)
Mock up drawings/CAD files for machined conditions
Title Document ID
Machined Drawing - 2050 8756138 Rev. B
Machined Drawing – 3050 8756296 Rev. E
Machined Drawing - 4050 8756482 Rev. F
Machined Drawing - 5050 8756148 Rev C
Machined Drawing - 5054 8756157 Rev. B
Machined Drawing – 6050 8756752 Rev. B
Machined Drawing - 7054 8756733 Rev. B
Machined Drawing – 9050 8755836 Rev. B
Machined Drawing - 9054 8755838 Rev B
NDT Mockup A 8772991
NDT Mockup B 8772992
NDT Mockup C 8772993
NDT Mockup D 8772994
7.2 GFP
7.2.1 Mock-ups of machined parts will be provided to the contractor to support development of ultrasonic inspection procedures and scan plans for the inspection of final machined components.
The same or similar mock-up will later be anodized and coated and then provided to the contractor to support development of ultrasonic and eddy current inspection procedures. Mock-ups will be provided 2 weeks after receipt by the government.
7.2.2 Ultrasonic testing compressional wave reference standards, if required.
8.0 Return of GFI/GFP
The contractor shall ship all GFP back to the Government at the Contractor’s expense within fourteen
(14) calendar days of completion of inspection and reporting of inspection results.
9.0 Security
All work under this contract is Unclassified.
10.0 Enterprise-Wide Contractor Manpower Reporting Application (ECMRA)
The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for NSWCCD via a secure data collection site.
Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:
(1) W, Lease/Rental of Equipment;
(2) X, Lease/Rental of Facilities;
(3) Y, Construction of Structures and Facilities;
(4) D, Automatic Data Processing and Telecommunications, IT and Telecom-Telecommunications Transmission (D304) and Internet (D322) ONLY;
(5) S, Utilities ONLY;
(6) V, Freight and Shipping ONLY.
The contractor is required to completely fill in all required data fields using the following web address https://www.ecmra.mil.
http://www.ecmra.mil/
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year.
Contractors may direct questions to the help desk, linked at https://www.ecmra.mil.
11.0 Place of Performance
The place of performance for inspection tasking will be at NSWCCD (West Bethesda, Maryland) unless otherwise indicated (see section 5.0 above). Some performance, such as procedure development and qualification can be performed at the contractor’s facility. All required travel will be within the Continental United States (CONUS). The contractor is expected to arrange travel and transportation for personnel and equipment required to complete all tasks.
12.0 Period of Performance
The period of performance is FY22-FY23
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
1001 Destination Government Destination Government
1002 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 15-APR-2022 TO
30-SEP-2023
N/A N/A
FOB: Destination
0002 POP 15-APR-2022 TO
1001 POP 15-APR-2022 TO
1002 POP 15-APR-2022 TO
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018
52.204-13 System for Award Management Maintenance OCT 2018
52.204-16 Commercial and Government Entity Code Reporting AUG 2020
52.204-17 Ownership or Control of Offeror AUG 2020
52.204-18 Commercial and Government Entity Code Maintenance AUG 2020
52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-20 Predecessor of Offeror AUG 2020
52.204-21 Basic Safeguarding of Covered Contractor Information
Systems
DEC 2021
52.204-22 Alternative Line Item Proposal JAN 2017
52.212-1 Instructions to Offerors--Commercial Items JUN 2020
52.212-3 Alt I Offeror Representations and Certifications--Commercial
Products and Commercial Services (NOV 2021) Alternate I
OCT 2014
52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018
52.219-6 Alt I Notice of Total Small Business Set-Aside (NOV 2020)
Alternate I
MAR 2020
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.245-1 Government Property SEP 2021
52.245-9 Use And Charges APR 2012
52.247-34 F.O.B. Destination NOV 1991
252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013
252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
DEC 2019
252.204-7015 Notice of Authorized Disclosure of Information for Litigation
Support
MAY 2016
252.204-7016 Covered Defense Telecommunications Equipment or Services
-- Representation
DEC 2019
252.204-7017 Prohibition on the Acquisition of Covered Defense
Telecommunications Equipment or Services -- Representation
MAY 2021
252.204-7018 Prohibition on the Acquisition of Covered Defense
Telecommunications Equipment or Services
JAN 2021
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2020
252.204-7020 NIST SP 800-171 DoD Assessment Requirements NOV 2020
252.211-7007 Reporting of Government-Furnished Property AUG 2012
252.215-7013 Supplies and Services Provided by Nontraditional Defense
Contractors.
JAN 2018
252.223-7008 Prohibition of Hexavalent Chromium JUN 2013
252.225-7048 Export-Controlled Items JUN 2013
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006
252.232-7017 Accelerating Payments to Small Business Subcontractors--
Prohibition on Fees and Consideration
APR 2020
252.243-7001 Pricing Of Contract Modifications DEC 1991
252.244-7000 Subcontracts for Commercial Items JAN 2021
252.245-7001 Tagging, Labeling, and Marking of Government-Furnished
Property
APR 2012
252.245-7002 Reporting Loss of Government Property JAN 2021
252.245-7003 Contractor Property Management System Administration APR 2012
252.245-7004 Reporting, Reutilization, and Disposal DEC 2017
252.247-7023 Transportation of Supplies by Sea FEB 2019
CLAUSES INCORPORATED BY FULL TEXT
52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)
(a) Basis for Award
The Government has determined that an award to the responsible Quoter that submits the Lowest-Priced, Technically Acceptable (LPTA) quote in response to this solicitation will represent the best value to the
Government. Quotes will be evaluated to determine the LPTA quote based on the following factors:
Factor 1 Price
Factor 2 Technical Capability
A quote must be rated "ACCEPTABLE" for each non-price factor to be eligible for award. An "UNACCEPTABLE" rating for any non-price factor will result in the entire quote being rated "UNACCEPTABLE" overall; an overall rating of "UNACCEPTABLE" makes a quote ineligible for award. A quote must contain sufficient information to enable evaluators to determine acceptability; if there is insufficient information to determine acceptability of the quote, the quote will be rated “UNACCEPTABLE” overall. Each of the evaluation factors will be rated as set forth below. Technical tradeoffs will not be made and no additional credit will be given for exceeding acceptability.
The Government will evaluate the lowest priced quote for technical acceptability. If it is not acceptable, the
Government will evaluate the next lowest quote for technical acceptability, and so forth, to determine the lowest-priced, technically acceptable quote, at which point all evaluations will stop.
The Government reserves the right to request that the awardee reduce its total price, or adjust CLIN prices with no change to total price, in order to reduce administrative costs and avoid unnecessary burdens for the agency pursuant to FAR 13.002.
(b) Evaluation Factors
Factor 1: Price
Quotes must include a proposed price for each Contract Line Item Number (CLIN) (see SF 1449 Continuation Sheet provided in this RFQ, pages 3 through 4). The Government will determine prices by adding the total proposed price for all CLINS. Quotes will be ranked from lowest- to highest-priced.
Factor 2: Technical Capability
The Government will evaluate the lowest priced Quoter for acceptability of Technical Capability. If the quote is not found to be acceptable, the Government will evaluate the next lowest quote for acceptability of technical capability, and so forth, to determine the lowest-priced quote that is acceptable for Technical Capability, at which point evaluators will evaluate of the acceptability of that quoter’s Past Performance.
Technical Capability evaluations will result in one of the following ratings:
TABLE 1 - TECHNICAL RATINGS
Rating Description
Acceptable Quote meets the minimum requirements of the solicitation.
Unacceptable Quote does not meet the minimum requirements of the solicitation.
Minimum Requirements:
The following are the minimum requirements a quote must meet to be deemed acceptable for the Technical
Capability factor:
1) The quote must meet the requirements set forth in the Performance Work Statement (PWS) (provided) and the terms and conditions found in the solicitation.
PRICE
Quoters responding to this solicitation are advised that, prior to award, the government may request quoters to submit information/data to support price reasonableness such as copies of paid invoices for the same or similar items, sales history for the same or similar items, price list with effective date and/or copies of catalog pages along with any applicable discounts.
QUESTIONS: Any questions in relation to this solicitation shall be submitted to Chris Rolince by email at
Christopher.c.rolince.civ@us.navy.mil. The cut-off date for questions is 1:00 pm on 04 April 2022.
(c) Contract Award
The Government shall mail or email a written notice of award to the successful quoter. Upon receipt, the quoter shall either commence performance, or have an authorized representative sign the award and return it to the
Contracting Officer; a binding contract is formed upon the earlier of either of those actions.
(End of provision)
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2022)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)
(section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by
Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or
Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19
U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services: [Contracting Officer check as appropriate.]
___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV
2021) (41 U.S.C. 4704 and 10 U.S.C. 2402).
___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509).
___ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN
2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment
Act of 2009.)
___ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L.
109-282) (31 U.S.C. 6101 note).
___ (5) [Reserved]
___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.
L. 111-117, section 743 of Div. C).
___ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) (31 U.S.C. 6101 note).
___ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41
U.S.C. 2313).
____ (10) [Reserved]
____ (11) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (SEP 2021) (15 U.S.C. 657a).
____ (12) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (SEP 2021) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
____ (13) [Reserved]
____ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
____ (ii) Alternate I (MAR 2020) of 52.219-6.
____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
____ (ii) Alternate I (MAR 2020) of 52.219-7.
____ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C. 637(d)(2) and (3)).
____ (17)(i) 52.219-9, Small Business Subcontracting Plan (NOV 2021) (15 U.S.C. 637(d)(4)).
____ (ii) Alternate I (NOV 2016) of 52.219-9.
____ (iii) Alternate II (NOV 2016) of 52.219-9.
____ (iv) Alternate III (JUN 2020) of 52.219-9.
____ (v) Alternate IV (SEP 2021) of 52.219-9.
____ (18) (i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).
____ (ii) Alternate I (MAR 2020) of 52.219-13.
____ (19) 52.219-14, Limitations on Subcontracting (SEP 2021) (15 U.S.C. 657s).
____ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C. 637(d)(4)(F)(i)).
____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (SEP 2021) (15 U.S.C.
657f).
__X__ (22) (i) 52.219-28, Post-Award Small Business Program Rerepresentation (SEP 2021) (15 U.S.C.
632(a)(2)).
____ (ii) Alternate I (MAR 2020) of 52.219-28.
____ (23) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-
Owned Small Business Concerns (SEP 2021) (15 U.S.C. 637(m)).
____ (24) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns
Eligible Under the Women-Owned Small Business Program (SEP 2021) (15 U.S.C. 637(m)).
____ (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).
____ (26) 52.219-33, Nonmanufacturer Rule (SEP 2021) (15 U.S.C. 657s).
__X__ (27) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
__X__(28) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (JAN 2022) (E.O. 13126).
__X__ (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
__X__ (30)(i) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).
____ (ii) Alternate I (FEB 1999) of 52.222-26.
____ (31)(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
____ (ii) Alternate I (JUL 2014) of 52.222-35.
__X__ (32)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).
____ (ii) Alternate I (JUL 2014) of 52.222-36.
____ (33) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
____ (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O.
13496).
__X__ (35)(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O.
13627).
____ (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
____ (36) 52.222-54, Employment Eligibility Verification (NOV 2021). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)
____ (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (MAY
2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN
2016) (E.O. 13693).
____ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners
(JUN 2016) (E.O. 13693).
____ (40) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and
13514).
____ (ii) Alternate I (OCT 2015) of 52.223-13.
____ (41)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (JUN 2014) of 52.223-14.
____ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b).
____ (43)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s
13423 and 13514).
____ (ii) Alternate I (JUN 2014) of 52.223-16.
__X__ (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020)
(E.O. 13513).
____ (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).
____ (46) 52.223-21, Foams (JUN 2016) (E.O. 13693).
____ (47)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
____ (ii) Alternate I (JAN 2017) of 52.224-3.
____ (48) 52.225-1, Buy American--Supplies (NOV 2021) (41 U.S.C. chapter 83).
____ (49) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (NOV 2021) (41 U.S.C. chapter
83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
____ (ii) Alternate I (JAN 2021) of 52.225-3.
____ (iii) Alternate II (JAN 2021) of 52.225-3.
____ (iv) Alternate III (JAN 2021) of 52.225-3.
____ (50) 52.225-5, Trade Agreements (OCT 2019) 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
__X__ (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
____ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016)
(Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
____ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150
____ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C.
5150).
____ (55) 52.229-12, Tax on Certain Foreign Procurements (FEB 2021).
____ (56) 52.232-29, Terms for Financing of Purchases of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .