N0016721Q0251

This is a combined synopsis/solicitation for commercial items prepared in accordance with Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation that Naval Surface Warfare Center Carderock Division (NSWCCD) intends to issue, and is a Request for Quotes (RFQ) for the following Supplies and/or Services.

This requirement is for the procurement of Preventive Maintenance and Repair services for four (4) Oils Spill recovery (OSR) boats and associated trailers and equipment located in Naval Station Newport, RI, in accordance with the stated Performance Work Statement (PWS) outlined in the solicitation.

The provisions and clauses included and/or incorporated in this solicitation document are those in effect through the Federal Acquisition Circular. This RFQ incorporates all provisions and clauses in effect through Federal Acquisition Circular FAC 2021-06 effective 7/12/2021 located on https://www.acquisition.gov/?q=browsefar and the Defense Federal Acquisition Regulation Supplement (DFARS) DPN 20210709 effective 7/9/2021 located at https://www.acq.osd.mil/dpap/dars/change_notices.html. SEE ATTACHED SOLICITATION FOR CLAUSES AND PROVISIONS. The NAICS code is 336612 and the associated PSC code is J019, and the Small Business Standard is 1,000 for this procurement: NOTE: A Class Waiver is not applicable to a procurement unless the NAICS code, PSC, and NAICS Code Descriptor currently in effect, match the item(s) being procured. This procurement IS being set-aside for small business.

Interested parties may identify their interest to this requirement by submitting a quote and/or capabilities statement no later than 12:00 PM on 26 August 2021. It is anticipated one firm-fixed price purchase order will be issued in response to this RFQ. All responses shall include price(s), FOB point, a point of contact, name and phone number, GSA contract number (if applicable), business size, and payment terms. Each response must clearly indicate the capability of the quoter to meet all specifications and requirements.

Responses to this notice are due on or before 12:00 PM on 26 August 2021, Eastern Daylight Time (EDT) to arnel.ngo@navy.mil.

Point of Contact for this notice is Arnel Ngo, 757-469-6784, arnel.ngo@navy.mil.

Section SF 1449 - CONTINUATION SHEET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

Preventive Maintenance on OSR Boats

FFP

Preventive Maintenance on OSR Boats and associated Trailers in accordance with the Performance Work Statement.

FOB: Destination

PURCHASE REQUEST NUMBER: 1300948789

PSC CD: J019

NET AMT

Exhibit/Attachment Table of Contents

DOCUMENT TYPE
DESCRIPTION
PAGES
DATE
Attachment 1
CDRL A0001
Attachment 2
DID A0001
Attachment 3
CDRL A0002
Attachment 4
DID A0002

PERFORMANCE WORK STATEMENT

Performance Work Statement Oil Spill Response (OSR) Boat Maintenance and Repair Naval Station Newport, RI

1.0 DESCRIPTION OF SUPPLY SPECIFICATION AND INSTALLATION

The Naval Station Newport, RI, has a requirement for four (4) Oil Spill Response (OSR) Boats, associated trailers, and equipment to include Preventive Maintenance (PM) and repair of non-functioning equipment. Preventative maintenance and repairs required under resultant contract shall be performed off-site; unless, repairs are minor and can be performed on-site without interference with base operations.

2.0 BACKGROUND

Naval Station Newport, RI operates a spill response team and routinely conducts simulation exercises of marine diesel spills for effective and efficient action in the event of a real-world incident. The Command requires Preventive Maintenance (PM) and repairs of non-functioning equipment of four (4) Oil Spill Response (OSR) Boats and associated trailers.

3.0OBJECTIVE
3.1After all of the tasks have been completed, the contractor shall provide thoroughlyinspected, fully functional, operational, and well maintained oil spill response boats, associatedtrailers, and equipment for the Commander Navy Region Mid Atlantic (CNRMA) located atNewport, Rhode Island.
3.2GENERAL SPECIFICATIONS FOR OSR BOATS, TRAILERS, AND EQUIPMENT (A002)
3.2.1Hull NumberManufacturerEngine Type
21UB0401Sea Ark150HP Honda (outboard, 4-cylinder; 4-stroke)
30OP1803Kvichak Skimmer Twin 90HP Twin Honda Engines (outboard,4-cylinder; 4-stroke)
30BP0004Sea ArkTwin 150 HP Honda (outboard, 4-cylinder;4-stroke)
25UB1602Metal SharkTwin 115 HP Honda (outboard, 4-cylinder;4-stroke)
Boat NameHull No.Model No.
Metal 0125UB1602Model 25 Feet – Utility Boat
Sea Ark 221UB0401Model 21 Feet - UT Roustabout
Skimmer30OP1803Model 30 Feet – Rapid Response
Platform30BP0004Model 3010-B – Transporter
3.2.2Sea Ark Utility Boat (Quantity: 1 each)
A. Aluminum Hull
B. Major Equipment
1. One EZ Loaders, 2 Axels
2. One 150 Honda Engines with 4 x 14-1/4 x 17 stainless steel Propeller
3.2.3Sea Ark Platform Boat (Quantity: 1 each):
A. Aluminum Hull
B. Major Equipment
1. One EZ loader trailer, 3 Axels
2. Twin 150 Honda Outboard Engines with stainless steel, 3 X 14½ X 15props.
3.2.4Kvichak Skimmer (Quantity: 1 each):
A. Aluminum Hull
B. Major Equipment
1. One EZ loader trailer, 3 Axels
2. 90hp Twin Outboard Honda Engines
3.2.5Metal Shark Utility Boat (Quantity: 1 each):
A. One Boat Master, 2 Axels
B. Twin 115 Honda Outboard Engines with stainless steel, 3 X 141/4X 17 props

3.3 TRAILERS PREVENTIVE MAINTENANCE ACTIONS

3.3.1Every 6 Months
3.3.1.1Check bearing spindle for warmness after use (slightly warm to touch)
3.3.1.2Trailer - inspect all light operation.
3.3.1.3Break System Actuator - Visually inspect, check for leaks and correct fluid level, greasesurge brake unit.
3.3.1.4Frame Assembly - Visually inspect all welds for cracks, leaf springs condition andcorrosion.
3.3.1.5Check trailer jack stand for proper operation and grease gears.
3.3.1.6Check Caliper & Rotor/Drum assemblies for leaks and malfunction, bolts tightness andcondition.
3.3.1.7Pads - Visually inspect condition and wear.
3.3.1.8Bunk Assembly - Visually inspect fasteners for tightness and carpet condition.
3.3.1.9Winch Cable Assembly - Visually inspect strap/wire/hook for frays and excessivecorrosion and check winch operation and corrosion.
3.3.1.10 Wheels, Hubs & Bearings - Visually inspect lug nuts for tightness, rims for damage, andtire wear (including spare tire).
3.3.1.11 Lights - Check operation and condition of fasteners, inspect electrical connector plug.
3.3.1.12 Make report of all findings. (A001)
3.3.2Every 12 Months
3.3.2.1All items listed above in the "Every 6 Months" categories plus:
3.3.2.2Break System Actuator - Check for brake line corrosion and leaks.
3.3.2.3Frame Assembly - Inspect for deterioration and all fasteners for tightness and corrosion.
3.3.2.4Bunk Assembly - Inspect for deterioration of the wood.
3.3.2.5Hubs & Bearings -Check bearing and hub condition and repack hubs with grease.
3.3.2.6Provide report of all findings (A001)
3.4HULL PRESERVATION - Hull preservation and repairs shall be Performed IAW the following references:
a. Current Fiscal Year NAVSEA Standard Items
b. S9086-VG-STM-010/CH-634, Naval Ship’s Technical Manual, Chapter 634, Deck Covering
c. S9086-VG-STM-020/CH-631, Volume 2, Preservation of Ships in Service
d. SWT 077-01 Hazardous Waste Produced on Naval Vessels Control

Craft availability will be based on operational requirements of craft and Port Operations commitments. Vendor shall paint one (1) craft per year. The vendor shall paint each boat in accordance with industry standards and any applicable environmental regulations including but not limited to OSHA. All painting shall be performed off-site in order to avoid any potential environmental spills. Painting shall include but not be limited to hulls, deck, and wheel house IAW manuals described above.

3.4.1 Dry Dock, Clean, Underwater Hull Painting-Antifouling

3.4.1.1Immediately after dry-docking, pressure wash clean the entire hull (above and belowthe waterline), including sides, bow, stern and marine deck, limit free of all marine growth, usingfresh water.
3.4.1.2Record all markings in exact locations to reinstall all markings after painting of Hull.Cover any items that cannot be removed to prevent getting paint on them.
3.4.1.3Scaffold and shrink-wrap (protect rest of boat from blasting and painting debris) eachcraft as needed to meet environmental requirements.
3.4.1.4Contractor shall ensure each openings to below deck areas (not open for inspection), inand around console control, gages, cabin seat(s) and electrical panels and systems are maskedand properly sealed to protect these areas from intrusion of sand blasting/industrial debrismaterial.
3.4.1.5Contractor shall ensure all through hull openings and depth finder transponders arecovered prior to blasting and painting.
3.4.1.6Contractor shall be responsible for cleaning all industrial debris from craft, to includeremoving access covers for thoroughness.
3.4.1.7Remove and replace with new cathode protection or zinc anodes.
3.4.1.8Accomplish light brush-off blast cleaning sweep (using black walnut shells, to rough upsurface), preserve and apply antifouling to the entire underwater hull surfaces. The final anti-fouling coat shall be Seaguard Antifouling Paint N51B301. Reference A, Item 009-32, includingTable One, Line 9.
3.4.1.9Reposition craft supporting blocks to ensure 100 percent coverage of primer and anti-fouling paint on entire underwater hull.
3.4.1.10 Install markings recorded in 2.1.2
3.4.1.11 Remove protective material used in 2.1.2 - 2.1.5.
3.4.1.12 Install new cathode protection or zinc anodes removed in 2.1.7.
3.4.1.13 Provide report of all findings (A001)
3.4.2Hull Inspection
3.4.2.1Conduct inspection of the craft bilges, exterior and accessible interior hull for damageand deteriorated conditions of each weld and hull plate surface and make report.
3.4.2.2Check for bent fender channeling, cracked welds, transom cracks, corroded fenderchanneling and make report.
3.4.2.3Inspect windows and hardware for damage and make report.
3.4.2.4Provide report of all findings (A001)
3.4.3Non-Skid
3.4.3.1Remove existing and install new non-skid decking material on all waking interior andexterior decking. Ensure non-skid deck covering is a NAVSEA approved proprietary systemconforming to MIL-PRF-24667, Type One, 2 or 3 Comp G. Color shall be FED-STD-595/36118Gray, Flat or Lusterless.
3.4.3.2Install temporary coverings for all doors, hatches, void covers, and various equipmentthat will be affected during the application of non-skid on deck.
3.4.3.3Non-skid scheme shall be applied as identified by designated governmentrepresentative, from side to side and from end to end. NOTE: There shall be a four (4) inch byeight (8) inch border around all cleats and /or tow posts. Cross rolling of welds shall beaccomplished in accordance with Reference B, paragraph NSTM 634-3.29.9 subparagraph 4 of2.2.
3.4.3.4Remove all temporary coverings upon completion of hull preservation.
3.4.3.5Provide report of all findings (A001)

3.4.4 HULL REPAIRS OTHER THAN NORMAL WEAR AND TEAR (OPTIONAL)

3.4.4.1The contractor shall inform the GTPOC of the “as found” condition of the Oil SpillResponse (OSR) Boat if normal wear condition is not met.
3.4.4.2The contractor shall perform an Ultrasonic Testing (UT) scan of the hull.
3.4.4.3The contractor shall repair the hull defect.
3.4.4.4Provide a report of all findings (A001)
3.5NAVIGATION SYSTEM- Perform IAW associated manufacturer’s technical publicationsOwner’s Guide and/or Operator’s Manual for the following:
3.5.1VHF Radio
3.5.1.1VHF Marine Radio. Microphone and Associated Antenna - Check operation, fraying ofwires, loose connections and corrosion.
3.5.1.2Make report of findings.(A001)
3.5.2GPS
3.5.2.1GPS and Associated Antenna - Check operation, fraying of wires, loose connections andcorrosion.
3.5.2.2Make report of findings.(A001)
3.5.3MAGNETIC COMPASS
3.5.3.1Magnetic Compass - Check operation and cleanliness.
3.5.3.2Make report of findings.(A001)
3.6HYDRAULIC STERRING- Perform IAW Teleflex, Sea Star Installation and Owner’s Manual
3.6.1Every 6 Months
3.6.1.1Inspect steering wheel for cracks, looseness, or any other deformities.
3.6.1.2Inspect helm pump assembly for leaks or loose hydraulic lines.
3.6.1.3Inspect steering hoses for kinks, abrasions, cuts, or any other deformities.
3.6.1.4Ensure Helm reservoir fluid level is recommended oil level.
3.6.1.5Inspect the steering cylinders and all other steering components for damage, wear &loose fasteners.
3.6.1.6Turn the wheel in both directions several times to insure smoothed operation.
3.6.1.7Make report of all findings.(A001)
3.7FIRE SUPPRESSION- Perform IAW Inspection, Maintenance and Recharge Service manualand Manufacturer Instructions
3.7.1Fire Extinguishers – Annually
3.7.1.1Verify it is located in designated place with no access or visible obstructions.
3.7.1.2Check to make sure that the instructions and nameplate is securely fastened and legible.
3.7.1.3Check safety seals and tamper indicators are not broken or missing.
3.7.1.4Clean extinguisher to remove dirt, grease or foreign material.
3.7.1.5Check for physical damage, corrosion, abrasions, dents, weld damage, leakage orclogged nozzle.
3.7.1.6Visually inspect pressure gauge reading are in the proper range or position.
3.7.1.7Check fullness by weighing bottle.
3.7.1.8Check date of manufacture (Cylinder must be hydrostatically tested every 5 years).
3.7.1.9Visually inspect the base/foot stand.
3.7.1.10 Check ring pin for freedom of movement.
3.7.1.11 Inspect discharge lever for dirt or corrosion.
3.7.1.12 Inspect and clean hose assembly.
3.7.1.13 Install new tamper seal and record data on the inspection tag.
3.7.1.14 Make report of all findings.(A001)
3.8INTERIOR CABIN INSPECTION - Perform IAW OEM Manual/Instructions
3.8.1Every 6 Months
3.8.1.1Inspect Seat(s) for foundation fasteners are secured and physical condition.
3.8.1.2Aft Door (Canvas) -secured and in good condition.
3.8.1.3Instrument gauges operation and light illumination.
3.8.1.4Inspect wiper blade and motor operation and condition
3.8.1.5Inspect Main Electrical Switch Board for connections, corrosion and conduct operation.
3.8.1.6Horn- check condition and conduct operational test.
3.8.1.7Make report of all findings.(A001)
3.9ELECTRICAL SYSTEMS Perform IAW associated manufacturer’s technical publications andoperator’s manual for the following:
3.9.1Batteries – Every 6 Months
3.9.1.1Battery - Clean battery posts and apply light coat of grease to cable ends.
3.9.1.2Battery Selector Switch - Clean battery posts and apply light coat of grease to cableends.
3.9.1.3Clean battery compartment/box.
3.9.1.4Inspect battery mounting brackets and securing devices for damage & corrosion.
3.9.1.5Test run engines and house electrical/electronic components.
3.9.1.6Provide a report of all findings (A001)
3.9.2Vessel Lighting – Every 6 Months IAW OEM Manual
3.9.2.1Interior Overhead Cabin Lights - Check operation and clean unit.
3.9.2.2Flood Lights - Check operation and clean unit.
3.9.2.3Search Light - Check operation and clean unit.
3.9.2.4Make report of all findings.(A001)
3.9.3Navigation Lights – Every 6 Months
3.9.3.1Remove light cover check bulbs and inspect light contacts for corrosion; clean.
3.9.3.2Apply light coat of electrical silicone grease to bulb contact points.
3.9.3.3Reassemble all lights.
3.9.3.4Conduct operational test.
3.9.3.5Make report of all findings.(A001)
3.10HONDA ENGINE AND PROPULSION MAINTENANCE- Perform IAW Honda ServiceManual/Instructions
3.10.1Every 200 Hours for Honda Single Outboard
3.10.1.1 Fuel Filter (Low Pressure) - Check for water contamination.
3.10.1.2 Lubricate Engine IAW Honda Service Manual
3.10.1.3 Cooling Water Passages - Check / Clean, flush with fresh water
3.10.1.4 Power Trim Tilt - Check for leaks, operation from local and remote stations.
3.10.1.5 Gear Case Oil - Check / Change gear oil and drain seals, Inspect for watercontamination.
3.10.1.6 Engine Oil Filter - Check / Replace
3.10.1.7 Engine Oil - Check / Change
3.10.1.8 Timing Belt - (Check / Adjust)
3.10.1.9 ACG Belt - (Check / Adjust)
3.10.1.10 Thermostat Cover - Check for leaks around housing area.
3.10.1.11 Propeller and fasteners - check condition of cotter pin and propeller blades and propfastener.
3.10.1.12 Engine External Zinc- Check for erosion (Note condition of zinc).
3.10.1.13 Water Pump - Check for water discharge
3.10.1.14 Throttle linkage - Check and adjust.
3.10.1.15 Crankcase Breather Tube - Check
3.10.1.16 Make report of all findings.(A001)
3.10.2Every 200 Hours for Honda Twin Outboards
3.10.2.1 Fuel Filter (Low Pressure) - Check for water contamination.
3.10.2.2 Lubricate Engine IAW Honda Service Manual
3.10.2.3 Cooling Water Passages - Check / Clean, flush with fresh water
3.10.2.4 Power Trim Tilt - Check for leaks, operation from local and remote stations.
3.10.2.5 Gear Case Oil - Check / Change gear oil and drain seals, Inspect for watercontamination.
3.10.2.6 Engine Oil Filter - Check / Replace
3.10.2.7 Engine Oil - Check / Change
3.10.2.8 Timing Belt - (Check / Adjust)
3.10.2.9 ACG Belt - (Check / Adjust)
3.10.2.10 Thermostat Cover - Check for leaks around housing area.
3.10.2.11 Propeller and fasteners - check condition of cotter pin and propeller blades and propfastener.
3.10.2.12 Engine External Zinc- Check for erosion (Report condition of zinc).
3.10.2.13 Water Pump - Check for water discharge
3.10.2.14 Throttle linkage - Check and adjust.
3.10.2.15 Crankcase Breather Tube - Check
3.10.2.16 Make report of all findings.(A001)
3.10.3Every 400 Hours for Honda Single Outboard
3.10.3.1 All items listed above in the “Every 200 Hours for Honda Single Outboard” categoryplus:
3.10.3.2 Spark Plugs - Inspect and report condition.
3.10.3.3 Anode Metal Exhaust Manifold - Check erosion and make report.
3.10.3.4 Anode Metal Stern Bracket - Check erosion and make report.
3.10.3.5 Anode Metal Gear Case - Check erosion and make report.
3.10.3.6 Fuel Filter (Low Pressure Type) - Check / Replace
3.10.3.7 Fuel Filter (High Pressure Type) - Check / Replace
3.10.3.8 Engine Fuel Lines-check for wear/leaks/contamination
3.10.3.9 Boat Fuel Filter / Water Separators Filter - Check / Replace
3.10.3.10 Make report of all findings.(A001)
3.10.4Every 400 Hours for Honda Twin Outboards
3.10.4.1 All items listed above in the "Every 200 Hours for Honda Twin Outboard" category plus:
3.10.4.2 Spark Plugs - Inspect and report condition.
3.10.4.3 Anode Metal Exhaust Manifold - Check erosion and make report.
3.10.4.4 Anode Metal Stern Bracket - Check erosion and make report.
3.10.4.5 Anode Metal Gear Case - Check erosion and make report.
3.10.4.6 Fuel Filter (Low Pressure Type) - Check / Replace
3.10.4.7 Fuel Filter (High Pressure Type) - Check / Replace
3.10.4.8 Engine Fuel Lines-check for wear/leaks/contamination
3.10.4.9 Boat Fuel Filter / Water Separators Filter - Check / Replace
3.10.4.10 Make report of all findings.(A001)
3.11DIESEL ENGINE D1305 MAINTENANCE (Skimmer 30OP1803)
3.11.1Every 50 Hours
3.11.1.1 Check for water and fuel leaks
3.11.1.2 Check fuel pipes and clamp bands
3.11.1.3 Engine Coolant – Check for proper level in heat exchanger and reserve tank
3.11.1.4 Check battery terminals
3.11.1.5 Check for damaged parts and loose hardware
3.11.1.6 Engine oil and filter – Check/Change
3.11.1.7 Provide a report of all findings (A001)
3.11.2Every 100 Hours or 12 Months
3.11.2.1 All items listed above in “Every 50 Hours” category plus:
3.11.2.2 Clear air cleaner element
3.11.2.3 Clean fuel filter
3.11.2.4 Check fan belt tightens
3.11.2.5 Drain fuel water separator
3.11.2.6 Check and replace heat exchanger zincs
3.11.2.7 Provide a report of all findings (A001)
3.11.3Every 200 Hours or 24 Months
3.11.3.1 All items listed above in the “Every 100 Hours” category plus:
3.11.3.2 Check radiator hoses and clamp bands
3.11.3.3 Check intake airline
3.11.3.4 Provide a report of all findings (A001)
3.11.4Every 400 Hours
3.11.4.1 All items listed above in the “Every 200 Hours” category plus:
3.11.4.2 Fuel filter cartridge – Check/Replacement
3.11.4.3 Clean fuel water separator
3.11.4.4 Provide a report of all findings (A001)
3.11.5Every 500 Hours
3.11.5.1 Remove sediment from fuel tank
3.11.5.2 Clean radiator interior
3.11.5.3 Replace fan belt
3.11.5.4 Report findings (A001)
3.11.6Every 12 Months
3.11.6.1 Replace seawater impeller
3.11.6.2 Replace air cleaner element
3.11.6.3 Check electrical wiring for damage and loose connections
3.11.6.4 Provide report of findings (A001)
3.11.7Every 800 Hours
3.11.7.1 Check valve clearance
3.11.7.2 Provide report of findings (A001)
3.11.8Every 1500 Hours
3.11.8.1 Check fuel injection nozzle injection pressure
3.11.8.2 Provide report of findings (A001)
3.11.9Every 3000 Hours
3.11.9.1 Check injection pump
3.11.9.2 Provide report of findings (A001)
3.12.10Every 2 Years
3.12.10.1 Change radiator coolant
3.12.10.2 Replace radiator hoses and clamps
3.12.10.3 Change out engine raw water impeller
3.12.10.4 Provide report of findings (A001)

4.0 QUALIFICATIONS

4.1The Contractor shall provide trained/certified technicians to perform repairs andpreventative maintenance on the Engines, Outdrives, Electrical Equipment, Navigation Systemsand Westerbeke Generators. If the Contractor has a new hire during the term of this contractafter the awarded date, Contractor shall provide new hire training certificates forreview/approval prior to new hire commencement of work on this contract.
4.2Certification is required to work on Honda outboard engines

5.0 GOVERNMNET FURNISHED EQUIPMENT AND PROPERTY

5.1All property to be furnished to the contractor is listed in CDRL A002 and its attachedspreadsheet.
5.2For the maintenance/repairs of a boat off-site, it shall be the contractor’s responsibilityto load the boat on a trailer, provide over the road transportation to their facility and provideonsite secure storage for the boat while it is the contractor's possession. Port Operations mayopt to have the boat on a trailer at Port Operations facility in which the contractor will pick upfrom the facility and transport it to the contractor’s facility. Once the repair is complete, theboat shall be returned to its original location, which shall include re-launching the boat. Thecontractor is solely responsible for obtaining all necessary vehicle passes, stickers and proper IDcards for all contractor employees requiring access to the Base. The contractor shall comply withall Federal, State, Local laws and Federal Regulations asapplicable to tasks included in this PWS
5.3All property will be delivered to the following address:
ATTENTION:Clifford Unruh
Naval Station Newport
Newport, RI 02421
Phone: 860-694-3756

6.0 DELIVERABLES

6.1All work will be complete and delivered to government by end of the Period ofPerformance of the contract.
6.2The contractor shall provide deliverables as described in the PWS and as listed below:
NUMBER
NAME
A001
Test/Inspection Report
A002
GFP Government Furnished Equipment/Property

7.0 SECURITY REQUIREMENTS

7.1All items generated will be UNCLASSIFIED, Distribution Statement D.
7.2Contractor personnel shall comply with all local base/installation security proceduresrequired to gain access to US Government facilities. All contractor equipment, personnel andvehicles are subject to inspection and search by US government security officials (or designatedrepresentatives) upon entry to any government owned and/or operated installations andfacilities. The Government reserves the right to visit and inspect, the Contractor’sassets/facilities used in support of this requirement.
7.3Base vehicle passes are required for all contractor employees privately owned vehiclesrequiring access to Government facilities for the performance of this contract. Themethodology for obtaining varies from one installation to another, therefore; the Contractor willcoordinate with the Government Technical Point of Contact (GTPOC) to gain access to the basefacilities to complete the work assigned under this contract.

8.0 PERIOD OF PERFORMANCE

8.1 Period of performance is one (1) year from date of contract award

9.0 APPLICABLE DOCUMENTS/REFERENCES

Document Type
No/Version
Title
Date
NAVSEA Report
N/A
Current FY NAVSEA Standard Items
N/A
US Navy Tech Manual
S9086-VG-STM-010/CH-634
Naval Ship’s Technical Manual, Chapter 634, Deck Covering
N/A
US Navy Tech Manual
S9086-VG-STM-020/CH-631
Preservation of Ships in Service, Volume II
N/A
N/A
SWT 077-01
Hazardous Waste Produced on Naval Vessels; Control
N/A

10.0 ADDITIONAL INFORMATION

10.1Hours of operations are Monday – Friday, 0730 – 1600 at Naval Station Newport,Newport, RI 02421.
10.2The contractor is responsible for providing all the necessary personnel, equipment,labor, parts, fuel, and supplies to complete this task. The contractor shall provide all personalprotective equipment and preventative maintenance materials required to perform the specifictasks as defined in this section.
10.3The contractor will notify the GTPOC in writing in advance of any delays.
10.4The cost of transporting boats for preventative maintenance work is included in the costof respective preventative maintenance work. The cost of transporting boats for repair will beitemized on the invoice - not to exceed 3 hours (1 hour for loading/unloading and 2 hours fortransporting) round trip. If picked up from the Port Operations facility the cost for transportingboats for repair will be itemized on the invoice - not to exceed 2 hours for transporting, roundtrip.
10.5Due to security measures, delays may occur during vehicle inspection to obtain Baseentry. Additionally, pier access for repairs may require additional inspections and passes. Hoursmay not be charged for delays due to vehicle breakdown or failure to obtain proper Base ID inadvance.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
0001
POP 15-SEP-2021 TO

14-SEP-2022

N/A
N/A

FOB: Destination

CLAUSES INCORPORATED BY REFERENCE

52.204-7
System for Award Management
OCT 2018
52.204-13
System for Award Management Maintenance
OCT 2018
52.204-16
Commercial and Government Entity Code Reporting
AUG 2020
52.204-18
Commercial and Government Entity Code Maintenance
AUG 2020
52.204-19
Incorporation by Reference of Representations and Certifications.
DEC 2014
52.204-21
Basic Safeguarding of Covered Contractor Information Systems
JUN 2016
52.212-1
Instructions to Offerors--Commercial Items
JUL 2021
52.212-4
Contract Terms and Conditions--Commercial Items
OCT 2018
52.219-6 (Dev)
Notice of Total Small Business Set-Aside (DEVIATION 2020-O0008).
OCT 2020
52.232-39
Unenforceability of Unauthorized Obligations
JUN 2013
52.232-40
Providing Accelerated Payments to Small Business Subcontractors
DEC 2013
52.245-1
Government Property
JAN 2017
52.245-9
Use And Charges
APR 2012
52.247-23
Contractor Liability for Loss of and/or Damage to Household Goods
JAN 1991
252.203-7000
Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7002
Requirement to Inform Employees of Whistleblower Rights
SEP 2013
252.203-7005
Representation Relating to Compensation of Former DoD Officials
NOV 2011
252.204-7003
Control Of Government Personnel Work Product
APR 1992
252.204-7012
Safeguarding Covered Defense Information and Cyber Incident Reporting
DEC 2019
252.204-7015
Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.204-7016
Covered Defense Telecommunications Equipment or Services -- Representation
DEC 2019
252.204-7017
Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation
MAY 2021
252.204-7018
Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2021
252.204-7019
Notice of NIST SP 800-171 DoD Assessment Requirements
NOV 2020
252.204-7020
NIST SP 800-171 DoD Assessment Requirements
NOV 2020
252.211-7007
Reporting of Government-Furnished Property
AUG 2012
252.213-7000
Notice to Prospective Suppliers on Use of Supplier Performance Risk System in Past Performance Evaluations
SEP 2019
252.223-7008
Prohibition of Hexavalent Chromium
JUN 2013
252.225-7048
Export-Controlled Items
JUN 2013
252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
DEC 2018
252.232-7010
Levies on Contract Payments
DEC 2006
252.237-7010
Prohibition on Interrogation of Detainees by Contractor Personnel
JUN 2013
252.243-7001
Pricing Of Contract Modifications
DEC 1991
252.245-7001
Tagging, Labeling, and Marking of Government-Furnished Property
APR 2012
252.245-7002
Reporting Loss of Government Property
JAN 2021
252.245-7003
Contractor Property Management System Administration
APR 2012
252.245-7004
Reporting, Reutilization, and Disposal
DEC 2017
252.247-7023
Transportation of Supplies by Sea
FEB 2019

CLAUSES INCORPORATED BY FULL TEXT

C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)

The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s)A0001 and A0002, attached hereto.

(End of Text)

E-246-H013 INSPECTION AND ACCEPTANCE OF DATA (NAVSEA) (OCT 2018)

Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form 1423.

(End of text)

F-247-W001 NSWCCD DELIVERY AND OVERWEIGHT VEHICLE GUIDELINES (NAVSEA) (OCT 2018)

The following is provided for informational purposes only:

US NAVY GBLOC BBNV

Unit ID Code/DoDAAC: N00167 Naval Surface Warfare Center 9500 MacArthur Blvd, Bldg. 143 W. Bethesda, MD 20817

Receiving Hours:

0600-1400 MON thru THURS

0600-1330 FRI

Directions:

River Rd Exit off the I-495 Capital beltway. (Rte. 190W, exit 39W).

Turn Left only Bradley Blvd. (Rte. 191) (Traffic signal controlled intersection). Proceed 0.5 miles.

Turn Left onto Persimmon Tree Road (4 way stop). Proceed 1.4 miles.

Turn Right onto Eggert Road. Proceed 0.7 miles and cross over MacArthur Blvd to the CD NSWC Gate 3 entrance (Truck Gate).

Note: Once on Eggert Road, head straight into the back gate. You will cross over MacArthur Blvd.

Once in gate, turn right, and drive straight until you see bldg. 143 on left. Look for blue sign on your left for bldg. 143 or the loading dock.

“All drivers must either have a NCAC or Defense Biometric Identification System (DBIDS) card in addition they must have proof of US citizenship with them (birth certificate or US passport or state enhanced driver’s license [only issued by WA, NY, VT, & MI]).” OVERSIZED CALL 24 HRS IN ADVANCE, (301) 227-4060/4062/4330 OR DSN 287-4060/4062/4330. NO ANIMALS ALLOWED ON BASE.

MUST BE CLEARED BY SECURITY PERSONNEL AT COMMERCIAL GATE. 301-227-1551 PRESENT BILL OF LADING TO SECURITY OFFICERS AND CREDENTIALS.

Call 1-877-679-2231 for Base status if needed to check for inclement weather or other unannounced or unscheduled closings.

MACARTHUR BOULEVARD – OVERWEIGHT VEHICLE GUIDELINES

1. Roadway has a posted load (weight) restriction of 6 tons GVW.

2. Washington Aqueduct (WA) makes exceptions up to approximately 15 tons GVW for special conditions. (School buses, garbage trucks, fire trucks, construction work and special deliveries).

3. Two methods of approval:

a. Verbal (short duration access)

b. Permit (daily/weekly/monthly business)

4. Verbal Method:

a. Applicants calls WA

b. WA requests location of delivery, day of delivery, and GVW of vehicle.

c. WA makes approval or disapproval decisions based on weight of vehicle, location of delivery and conduit condition in that area.

d. If approved by WA, the Montgomery County Police are called and given notice of approval (301-652-9200).

The following information is given to the Police:

a. Name of delivery company

b. Address of delivery

c. Date of delivery

The police record the information in a log book at the Bethesda Police Station. If the applicant is stopped by the police on MacArthur Boulevard, he should tell the police officer that he has been approved and the police officer should call the police station to verify the approval. If there is no record at the police station the truck driver will get a ticket and be fined.

5. Permit Method:

a. Applicant calls Montgomery County Department of Public Works and Transportation, Division of Traffic and Parking Services at 301-217-2190 for permit application.

b. Applicant completes permit application and sends it back to Montgomery County.

c. Montgomery County sends application to WA for approval or rejection.

d. WA reviews application and approved or rejects it based on GVW criteria and purpose of request.

e. WA sends application back to County. If approved Montgomery County will issue a bumper sticker permit and if disapproved County sends letter of rejection.

6. No concrete trucks are allowed on MacArthur Boulevard due to excessive weight. Trucks normally weigh 30 to 40 tons loaded. Concrete trucks can be driven to a street intersection at MacArthur Boulevard and concrete can be pumped or transported by a front end loader to the specified building site.

7. No ten wheel trucks are allowed on MacArthur Boulevard due to excessive weight. Single axle trucks are permitted if GVW is less than 15 tons.

8. Overweight trucks can cross MacArthur at locations of heavy duty crossings.

HEAVY DUTY (AND MEDIUM DUTY) CROSSINGS ON MACARTHUR BOULEVARD

1. Anglers Inn 12” reinforced concrete slab supported by W 12x79 beams, 4’ c.c. and bridging “New Conduit” only. Three-foot-thick concrete wall extending down to floor slab of conduit supports W 12x79. Old conduit has 12” concrete slab on grade over it.

2. Brickyard Road 12” reinforced concrete slab supported by W 12X79 beams, 4’ c.c., supported by 3’ thick concrete walls outside and 4’ thick intermediate wall.

3. Palisades (Medium Duty) 10” concrete slab (no supports) with #4 @ 12” both ways. Drive in and out on North side of MacArthur Blvd. from Eggert Drive.

4. Eggert Drive (Navy Haul Road) Consist of 2’-8” and 2’-1” thick concrete slabs over new and old conduits. Slab reinforced with 1” square bars at 4” and 41/2” respectively.

5. PersimmonTree Road Same as Brickyard Road.

6. 77th Street Same as Brickyard Road (supported on deep caissons instead of walls)

7. Oxford Road Same as Brickyard Road

8. Goldsboro Road (Medium Duty) 10” concrete slab (no supports) over conduits around x-conn #3 and South East to Glen Echo parking lot with #4 @ 12” both ways (one layer)

9. Brookmont Vehicles must use special heavy duty ramp from Boulevard to Brookmont.

F-247-W001 ADDENDUM

F-247-W001 MACARTHUR DELIVERY ADDENDUM:

In the event the MacArthur Boulevard gate is closed, the contractor shall use the main gate on Clara Barton Parkway. For more information please call (301)227-4060/4062/4330 or 1-877-679-2231.

CLAUSES INCORPORATED BY FULL TEXT

G-232-H002 PAYMENT INSTRUCTIONS AND CONTRACT TYPE SUMMARY FOR PAYMENT OFFICE (NAVSEA) (JUN 2018)

(a) The following table of payment office allocation methods applies to the extent indicated.

For Government Use Only

Contract/Order Payment Clause
Type of Payment Request
Supply
Service
Construction
Payment Office

Allocation Method

52.212-4 (Alt I), Contract Terms and Conditions—Commercial Items 52.216-7, Allowable Cost and Payment 52.232-7, Payments under Time-and-Materials and Labor-Hour Contracts

Cost Voucher
X
X
N/A
Line item specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested.
52.232-1, Payments
Navy Shipbuilding Invoice (Fixed Price)
X
N/A
N/A
Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.

52.232-1, Payments;

52.232-2, Payments under Fixed-Price Research and Development Contracts;

52.232-3, Payments under Personal Services Contracts;

52.232-4, Payments under Transportation Contracts and Transportation-Related Services Contracts; and 52.232-6, Payments under Communication Service Contracts with Common Carriers

Invoice
X
X
N/A
Line Item Specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested.
52.232-5, Payments Under Fixed-Price Construction Contracts
Construction Payment Invoice
N/A
N/A
X
Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.
52.232-16, Progress Payments
Progress Payment*
X
X
N/A
Contract-wide proration. Funds shall be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN. Progress Payments are considered contract level financing, and the “contract price” shall reflect the fixed price portion of the contract per FAR 32.501-3.

52.232-29, Terms for Financing of Purchases of Commercial Items;

52.232-30, Installment Payments for Commercial Items

Commercial Item Financing*
X
X
N/A
Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and 32.1007(b)(2).
52.232-32, Performance-Based Payments
Performance-Based Payments*
X
X
N/A
Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and 32.1007(b)(2).
252.232-7002, Progress Payments for Foreign Military Sales Acquisitions
Progress Payment*
X
X
N/A
Allocate costs among line items and countries in a manner acceptable to the Administrative Contracting Officer.

*Liquidation of Financing Payments. Liquidation will be applied by the payment office against those ACRNs which are identified by the payment instructions for the delivery payment and in keeping with the liquidation provision of the applicable contract financing clause (i.e., progress payment, performance-based payment, or commercial item financing).

(b) This procurement contains the following contract type(s):

Item
Type
CLIN 0001
FP – Fixed Price

G-242-H001 GOVERNMENT CONTRACT ADMINISTRATION POINTS-OF-CONTACT AND RESPONSIBILITIES (NAVSEA) (OCT 2018)

(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.

(b) The contracting officer is the only person authorized to change this contract or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel - that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this contract.

(c) The points of contact are as follows:

(i) The Procuring Contracting Officer (PCO) is:

Name: Michelle Knox Address: 904 Corporate Lane Chesapeake, VA 23320 Phone: (757) 282-1357 E-mail: michelle.r.knox@navy.mil

(ii) The Contract Specialist is:

Name: Arnel Ngo Address: 904 Corporate Lane Chesapeake, VA 23320 Phone: (757) 469-6784 E-mail: arnel.ngo@navy.mil

(d) The Technical Point of Contact (TPOC) is the contracting officer’s representative for technical matters when a COR is not appointed. The TPOC is responsible for technical issues of contract administration, such as providing all items of Government Furnished Information (GFI), Government Furnished Material (GFM) and Government Furnished Equipment (GFE) if specified in the contract as well as the inspection and acceptance of all contract deliverables.

The Technical Point of Contact (TPOC) is:

Name: [ * ] Address: [ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx]; FAX: (Area Code) xxx- [xxxx] E-mail: [ * ]

[ * ] To be completed at contract award

G-242-H002 HOURS OF OPERATION AND HOLIDAY SCHEDULE (NAVSEA) (OCT 2018)

(a) The policy of this activity is to schedule periods of reduced operations or shutdown during holiday periods. Deliveries will not be accepted on Saturdays, Sundays or Holidays except as specifically requested by the [insert activity name]. All goods or services attempted to be delivered on a Saturday, Sunday or Holiday without specific instructions from the Contracting Officer or his duly appointed representative will be returned to the contractor at the contractor’s expense with no cost or liability to the U.S. Government.

(b) The federal Government observes the following holidays:

HOLIDAYS*

New Year's Day Martin Luther King's Birthday Presidential Inauguration Day (Washington DC metro area only) President's Day Memorial Day Independence Day Labor Day Columbus Day Veteran's Day Thanksgiving Day Christmas Day

* Except for the Presidential Inauguration Day, if the actual date falls on a Saturday, the holiday will be observed the preceding Friday. If the holiday falls on a Sunday, the observance shall be on the following Monday.

The actual date of observance for each of the above holidays, for a specific calendar year, may be obtained from the OPM website at OPM.GOV or by using the following direct link: https://www.opm.gov/policy-data-oversight/snow-dismissal-procedures/federal-holidays/#url.

(c) Delayed Opening, Early Dismissal and Closure of Government Facilities. When a Government facility has a delayed opening, is closed or Federal employees are dismissed early (due to severe weather, security threat, security exercise, or a facility related problem) that prevents personnel from working, onsite contractor personnel regularly assigned to work at that facility shall follow the same reporting and/or departure directions given to Government personnel. The contractor shall not direct charge to the contract for such time off, but shall follow parent company policies regarding taking leave (administrative or other). Non-essential contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal, delayed opening, or during periods of inclement weather, onsite contractors should monitor the OPM website as well as radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.

(d) When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site contractors shall continue working established work hours or take leave in accordance with parent company policy. Those contractor employees who take leave shall not direct charge the non-working hours to the contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, or closings in accordance with the FAR, applicable cost accounting standards, and the company’s established policy and procedures. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary. The Contracting Officer will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy and procedures.

(e) If you intend to visit the Contracts Office, it is advised that you call for an appointment at least 24 hours in advance.

(f) The hours of operation are as follows:

AREAFROM TO
West Bethesda, MD08001400
Norfolk, VA08001400
Virginia Beach, VA08001400

(g) All deliveries to the Receiving Officer or Technical Point of Contact and address identified in Box 15, shall be made Monday through Friday from 0800 to 1400, local time. Deliveries will not be accepted after 1400 . No deliveries will be accepted on federal government holidays.

G-242-W001 CONTRACT ADMINISTRATION FUNCTIONS (NAVSEA) (OCT 2018)

(a) In accordance with FAR 42.302(a) all functions listed are delegated to the ACO except the following items to be retained by the PCO:

N/A

(b) In accordance with FAR 42.302(b), the following additional functions are delegated to the ACO:

N/A

L-204-H003 NOTIFICATION OF USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA) (APR 2019)

(a) NAVSEA may use a contractor to manage official contract files hereinafter referred to as "the support contractor", including the official file supporting this procurement. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file management services are acquired will contain a requirement that

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the offeror may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed Protected Information, for the unauthorized duplication, release, or disclosure of such Protected Information.

(c) Submission of a proposal will be considered as consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file management support contractor for the limited purpose of executing its file support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Offerors are free to enter into separate non-disclosure agreements with the file support contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the files or otherwise encumber the government.

(End of provision)

52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)

The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at 52.204-26, Covered Telecommunications Equipment or Services--Representation, or in paragraph (v)(2)(i) of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items. The Offeror shall not complete the representation in paragraph (d)(2) of this provision if the Offeror has represented that it "does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services" in paragraph (c)(2) of the provision at 52.204-26, or in paragraph (v)(2)(ii) of the provision at 52.212-3.

(a) Definitions. As used in this provision-

Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

(b) Prohibition.

(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to--

(i) Prohibit the head of an executive agency from procuring with an entity to provide a…