Copy_of_Acrylic_Install_Info_13NOV18.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- N0016719Q0013
About this file
Information on buildings, wall textures, and access
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0016719Q0013_Amendment_to_Solicitation_Acrylics.pdf | ||
| Full_FBO_Post_N0016719Q0013_Acrylic_Frames.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Row Labels | Count of Space |
| 70 | 4 |
| 24x40 | 4 |
| 71 | 1 |
| 32x48 | 1 |
| 73 | 9 |
| 24x48 | 1 |
| 32x48 | 8 |
| 74 | 3 |
| 48x32 | 3 |
| 75 | 2 |
| 32x48 | 2 |
| 80 | 25 |
| 24x30 | 8 |
| 32 x 48 | 5 |
| 32x48 | 10 |
| 32x48 | 1 |
| 60x24 | 1 |
| (blank) | |
| (blank) | |
| Grand Total | 44 |
ordered
| Code | BLDG | Floor | Elevator access? | Classification | Space | Quantity | Size | Panel content | Notes of space | Actions Needed Before Install |
| 73 | 1 | B | Yes | Building 1, Project Room | 1 | 32x48 | Code 731 | drywall | ||
| 80 | 2 | 2 | Yes | Building 2, third floor (between left room 314 door and right room 314 door) 242" | 2 | 24x30 | leadership and division material | drywall; ceiling height 91" | Changed from 5 to 2 | |
| 74 | 3 | 1 | N/A | Building 3, 1st floor (from left room 140 door to right room 140 door) 564" | 10 | 48x32 | Working shots, capabilities, triptypchs | drywall | ||
| 74 | 3 | 1 | N/A | Building 3, 1st floor (from right room 140 door to room 150) 420" | 7 | 48x32 | Working shots, capabilities, triptypchs | drywall | ||
| 74 | 3 | 1 | N/A | Building 3, 1st floor (from right room 150 to room 152) 256" | 3 | 48x32 | Working shots, capabilities, triptypchs | drywall | ||
| 80 | 3 | 1 | Building 3, first floor 75" | 2 | 24x30 | water tunnel history and facts | wood paneling; ceiling height | Good | ||
| 70 | 3 | 2 | Yes | Building 3, 2nd Floor (from corner to room 208) 62" | 1 | 24x30 | 1 Showcase Leadership | drywall; 7' ceilings | ||
| 70 | 3 | 2 | Yes | Building 3, 2nd Floor (from room 208 to corner ) 178" (from corner to room 214) 116" | 5 | 24x40 | 5 Detachments | drywall; 7' ceilings | ||
| 70 | 3 | 2 | Yes | Building 3, 2nd Floor (from room 207 to room 209) | 6 | 24x40 | 6 Division Overview | drywall; 7' ceilings | ||
| 70 | 3 | 2 | Yes | Building 3, 2nd Floor (from room 214 to corner) 85" | 1 | 24x40 | 1 Ship Signatures Overview | drywall; 7' ceilings | ||
| 80 | 4 | 1 | Building 4E Code 85 space 1st floor (from corner to carpet) 138" | 3 | 32x48 | leadership and division material | 2 bulletin boards on wall | |||
| 80 | 4 | 1 | Building 4E SeaPerch space (between 2 columns) 178" | 1 | 60x24 | STEM and SeaPerch material | ceiling height 72" with pipe at 32" and 67" | Don't know location. | ||
| 80 | 4 | 2 | No | Building 4E Code 881 space 2nd floor (between room 220 and 224) 65" | 1 | 24x30 | leadership | paneling; ceiling height 92" | Current patents on wall | |
| 80 | 4 | 2 | No | Building 4E Code 881 space 2nd floor (between room 248 and room 210) 183" | 5 | 24x30 | patents | paneling; ceiling height 92" | Poster on wall | |
| 80 | 4 | 2 | No | Building 4E Code 881 space 2nd floor (between room conference room and trash can) 77" | 1 | 24x30 | division material | paneling; ceiling height 92" | White board and poster on wall | |
| 80 | 7 | 1 | BLDG 7 room 112 | 2 | 32 x 48 | Dry Wall | ||||
| 73 | 7 | 2 | No | Building 7 2nd floor landing 96" | 2 | 32x48 | plaster walls | |||
| 73 | 7 | 2 | No | Building 7 outside conference room (from corner to room 221) 61" | 1 | 32x48 | drywall | |||
| 73 | 7 | Building 7 across from kitchenette 108" | 3 | 24x48 | drywall | |||||
| 73 | 7 | Building 7 waiting room 113.5" | 3 | 32x48 | paneling | |||||
| 73 | 7 | Building 7 (between room 223 and 225) 77.5" | 1 | 32x48 | drywall | |||||
| 73 | 13 | 1 | Buildig 13 trainer (room 103) 48" | 1 | 32x48 | drywall and cinderblock | ||||
| 73 | 13 | Building 13 lobby and landing | 2 | 32x48 | Code 734 and Code 72 panels | plaster walls | ||||
| 73 | 13 | Building 13 hallway 99" | 2 | 32x48 | sheet metal paneling | |||||
| 71 | 15 | 1 | Building 15 (from room 108 to room 106) 261.5" | 4 | 32x48 | SEAFAC, STAFAC, STAFAC array and ARD | drywall | |||
| 80 | 16 | 1 | Building 16, first floor (from room 110 to corner) 63" | 1 | 32x48 | division material | drywall | Old acrylic on wall | ||
| 80 | 16 | 1 | Building 16, first floor (from room 112 to 110) 60" | 1 | 32x48 | division material | drywall | Old acrylic on wall | ||
| 80 | 16 | 2 | No | Building 16 second floor (from room 215 to 217) 195" | 3 | 32x48 | leadership and division material | drywall; height restriction at 89" | 2 bulletin boards, 2 pictures on wall | |
| 80 | 16 | 2 | No | Building 16 stairwell | 3 | 32x48 | 36" water tunnel history and facts | concrete; panel on each landing | Paper posters on wall | |
| 80 | 17 | 1 | BLDG 17 Front entrance | 1 | 32 x 48 | Dry Wall | ||||
| 80 | 17 | 2 | Yes | Building 17 second floor (from janitors closet to men's room) 48" | 1 | 24x30 | leadership | cinderblock; ceiling height 88" | Bulletin board on wall | |
| 80 | 17 | 2 | Yes | Building 17 stairwell | 6 | 32x48 | 2 triptychs | cinderblock; will need to figure out mount height | Good | |
| 80 | 18 | 1 | BLDG 18 1Cl4 outside wall facing east | 2 | 32 x 48 | Wood Paneling | ||||
| 80 | 18 | 1 | Building 18 main enterance (between pillars) 216" | 3 | 32x48 | historical material | cinderblock | Good | ||
| 80 | 18 | 1 | Building 18 main enterance (left side from pillar to end) 184" | 3 | 32x48 | historical material | cinderblock | Good | ||
| 80 | 18 | 1 | Building 18 main enterance (right side from pillar to door) 164" | 3 | 32x48 | historical material | ciderblock | T.V., metal sign, directory on wall | ||
| 75 | 80 | 3 | Building 80 (between room 301 and 302) 303" | 4 | 32x48 | Awards | cinderblock | |||
| 75 | 80 | 3 | Building 80 (between room 304 doors) 72" from left door to thermostat and 86" from thermostat and right door | 3 | 32x48 | Code 70 overall, SFOMF Capabilities and Magnetics Lab | cinderblock | |||
| 80 | 192 | 1 | Building 192 (from room 101 to the corner) 206" | 3 | 24x30 | leadership and division material | ceiling height 82" at top of ramp | 7 bulletin boards on wall | ||
| 80 | 192 | 1 | Building 192 (from room 106 to the corner) 260" | 3 | 24x30 | division material | ceiling height 82" at top of ramp | 7 bulletin boards on wall | ||
| 80 | 193 | 1 | Building 193 (from room 107 to corner) 167" | 3 | 32x48 | leadership and division material | drywall | Good | ||
| 80 | 193 | 1 | BLDG 193 107 Foyer | 4 | 24X40 | 82 Division 4 Panel set | drywall | |||
| 80 | L | 2 | Yes | Building L (from corner to conference room) 141" | 3 | 32x48 | leadership and division material | paneling | Don't know location. | |
| 80 | TEMP | 1 | Temp BLDG C01 | 3 | 32 x 48 | Dry Wall | ||||
| 80 | TEMP | 1 | Temp BLDG C80 | 3 | 32 x 48 | Dry Wall |
Removed
| 80 | Building 16, first floor (between room 115 and 117) 187" | 3 | 32x48 | leadership and patents | drywall; ceiling height 87" | Patents on wall | REMOVE |
| 80 | Building 16 second floor (from room 216 to 214) 150" | 2 | 32x48 | division material | drywall | 4 pictures on wall | REMOVE |
| 80 | Building 18 MASK (from room 106C to room 106B) 296" | 4 | 24x40 | MASK material | wood paneling; ceiling height is 92"; mount in middle 4 panels | Snap frames here. | REMOVE |
| 80 | Building 18 Rotating Arm (10' wall) 279" | 3 | 32x48 | Rotating ARM material | cinderblock | Good | REMOVE |
| 72 | Building 125 | still need to meet with |
File details come from the government source that posted it.