Questions _Answers_Ramp_Bunks.docx
DOCX document 16 KB Posted
- Solicitation number
- N00167-16-R-0009
About this file
Questions and Answers received from posting of Solicitation to 2/29/16.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A001_Monthly_Progress_Report.pdf | ||
| A007_Manufacturing_Plan.pdf | ||
| A006_Material_List.pdf | ||
| N00167-16-R-0009.pdf | ||
| A005_Drawings.pdf | ||
| A003_Shipping_Confirmation__Tracking.pdf | ||
| A002_Weekly_Status_Report.pdf | ||
| A004_Engineering_Analysis.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Will/Can AutoCad solid models be provided for all details parts shown as part of NAVSEA Drawing 5110202 Rev D?
a. The two drawings that were provided as part of the solicitation are all that will be provided. No solid models will be provided. A solid model is not necessary for proposal submittal.
2. Will/Can an AutoCad solid model be provided for the Assembly?
a. No, the drawing is all that will be provided. A solid model is not necessary for proposal submittal.
3. The solicitation references providing an “As Built” drawing package as part of the deliverables. Will additional drawings be provided to the Contractor? Is this something that is expected to be generated by the Contractor?
a. Drawings that will be provided are the two (2) drawings listed in the solicitation. If during the production process the contractor encounters something that needs to be changed, the contractor will note the change on the drawing and submit to the Government for approval. Once the change has been approved, the contractor will make the change to the AutoCAD Drawing. This updated AutoCAD drawing is the “as-built” drawing referenced in paragraph 4.4 of Section C. The “as-built” drawing shall be provided with the applicable LCS Bunk as a deliverable. If no changes are needed, the contractor will include the Government (NAVSEA Drawing 5110202 Rev D.) as a deliverable with the completed LCS Bunk.
4. Is it the intention of the NAVY to not apply an aluminum surface treatment to the finished subassemblies and assemblies, ie. Prime and paint?
a. No primer or paint will be applied to the finished assembly
5. Is the contractor required to install Ramp Bunk to LCS ship?
a. No. The contractor will only be required to ship the Ramp Bunk as stated in the requirements.
6. How do I LOG IN to view controlled unclassified drawings?
a. Controlled unclassified drawings/information requires a pin which you obtain from Joint Certification Program (JCP).
b. https://www.dlis.dla.mil/jcp/
c. http://www.wingovernmentcontracts.com/joint-certification-program.htm
7. NAICS code verification? We used 332721; 336611 is the NAICS code being suggested
a. 336611 is ship building and ship repair which this procurement is not considered to be shipbuilding or ship repair. 332721 represents the Precision Machined Products Industry which fits our procurement.