This is a Statement of Work (SOW) for the procurement and installation of new automatic door operators and controls on 4 doors in Building 2036 at Naval Support Activity (NSA) Crane in Indiana. The scope includes installing automatic door operators with two push button operators each at Vestibule 105 (building main access doors), Room 106 (Men's restroom) and Room 100, along with repairing existing concrete sidewalk sections to allow access to existing concrete ramp, repairing concrete floor sections, and installing metal transition strips to comply with ADA and EEO regulations.

The contractor must provide all management, labor, materials, equipment, transportation, supervision, and environmental/quality controls. Key requirements include installing electrical components from Room 111's panel, coordinating with NSWC Physical Security for integration with the building's AMAG electronic locking system, providing as-built drawings, and maintaining daily reports and weekly status meetings. The contract has a completion date of March 31, 2025. The contractor must have 10 years of experience in construction work with government property and submit proof of two similar self-performed projects completed within the last 3 years. Technical capability, past performance and schedule are rated as significantly more important than cost in the evaluation criteria.

View the file

Other files

File Type Posted
Layout- Revised.pdf PDF
N0016424Q05320001.pdf PDF
RFI 1.pdf PDF
SF 1449 - N0016425Q0532.pdf PDF
wage determination.pdf PDF
SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Acquisition & Construction Management Branch Code 1022

Statement of Work (SOW) Building 2036 Automatic Door Operators Operators

1.0 SCOPE

The scope of this effort is to provide all management, labor, material, equipment, transportation, supervision, and environmental and quality controls, to accomplish the procurement and installation of new automatic door operators and controls on 4 doors in B-2036 at Naval Support Activity (NSA) Crane, located in Crane, Indiana. The scope of work also includes the repair of existing concrete sidewalk section to allow access to existing concrete ramp, repair of existing concrete floor section on the building main access door and installation of metal transition strips. These renovations are required to improve the building conditions to comply with ADA and EEO regulations.

2.0 ACRONYM TABLE

Acronym Table

SOW

Statement of Work

HVAC&R Heating, Ventilation, Air- Conditioning, & Refrigeration

CFR Code of Federal Regulations ODS Ozone Depleting Substance

ASHRAE

American Society of Heating, Refrigerating and Air-Conditioning Engineers

RTA

Requiring Technical Activity

ASNRDA Assistant Secretary of the Navy for Research and Development Acquisition

HPSB High Performance and Sustainable Building

DoD Department of Defense SOP Standard Operating Procedure DoDD Department of Defense Directive PPE Personal Protective Equipment

DoDI Department of Defense Instruction

OSHA Occupational Safety and Health Administration

HDBK Handbook NSWC Naval Surface Warfare Center

NSA Naval Surface Activity QASP Quality Assurance Surveillance Plan

POV Privately Owned Vehicle Vols. Volumes

SOH Safety and Occupational Health UFGS Unified Facilities Guide Specification

UFC Unified Facilities Criteria USC United States Code

Code 1022 SOW (Building 2036)

DON

Department of the Navy

DBIDS Defense Biometric Identification System

SECNAV Secretary of the Navy DFOW Definable Feature of Work AHA Activity Hazard Analysis PAK Post Award Kickoff SLP Standard Lift Plan COR Contracting Officer Representative APP Accident Prevention Plan SDS Safety Data Sheet

ACM

Asbestos Containing Material

ACBM Asbestos Containing Building Material

NLT

No Later Than

CRCD Contract Required Completion Date

VOC Volatile Organic Compound NTP Notice to Proceed

FF&E Furniture, Fixtures & Equipment DOR Designer of Record ADA The American with Disabilities Act STC Sound Transmission Class NEC National Electrical Code EEO Equal Employment Opportunities PAK Post Award Kick-off Meeting

3.0 APPLICABLE DOCUMENTS

Unless otherwise specified, the revision level and date for each specification or standard cited within the solicitation/contract (including any specifications or standards cited in any drawing, handbook, or referenced specification or standard contained within this solicitation), shall be that listed in the Department of Defense Index of Specifications and Standards (DODISS) and supplement thereto. The following documents of the revision or issue in effect at the date of award form a part of this SOW for reference. In the event of a conflict between the documents referenced herein and the contents of this SOW, the contents of this SOW shall prevail.

3.1 Specifications and Applicable Documents:

ER 415-1-10 Submittal Register UFGS 01 33 00 Submittal Procedures UFGS Division 26 Electrical UFGS 03 01 00 Rehabilitation of Concrete UFGS 08 71 00 Door Hardware

3.2 Standards:

MIL-STD-461F DoD Interface Standard- Requirements for the Control of Electromagnetic Interference Characteristics of Subsystems and Equipment

EM385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements Manual

10 CFR 435 Energy Conservation Voluntary Performance Standards for Commercial and Multi-Family High Rise Residential Buildings

29 CFR 1910 Occupational Safety and Health Standards 29 CFR 1926 Safety and Health Regulations for Construction 40 CFR 300 National Oil and Hazardous Substances Pollution

Contingency Plan 40 CFR 355 Emergency Planning and Notification 40 CFR 763.99 Asbestos-Containing Materials Exclusions

3.3 Other Publications and Regulations:

TITLE 40 Code of Federal Regulations UFGS 01 74 19 Construction and Demolition Waste Management UFGS 01 33 29 Sustainability Reporting USC42, Chapter 55 National Environmental Policy; Section 4321-

4370d ASN (RDA) MEMO DoN Policy on Digital Product/Technical Data w/Attachment "Guidance on Acquisition and Conversion of Product / Technical Data to Digital Form"

DoD 5000.04-M-1 Cost and Software Data Reporting Manual, Cost Analysis Improvement Group (CAIG)

USC42, Chapter 55 National Environmental Policy; Section 4321- 4370d

UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings

UFC 1-300-08 Transfer and Acceptance of DOD Real Property NFPA 70E Electrical Safety in the Workplace UFGS 01 45 00.10 10 Quality Control CR-1022-ACQ-FM-11000-000002 CDRL Submittal Form

3.4 Instructions and Directives:

NSACRANEINST 08020.1E Explosive Safety Program At NSA Crane NSACRANEINST 08020.1E CH-11 Explosive Safety Program Chapter 11 HERO

Program NSACRANEINST 08020.1E CH-2 Explosive Safety Program Chapter 2 Safety

Requirement in Explosive Areas NSACRANEINST 08020.1E CH-4 Explosive Safety Program Chapter 4 Parking of

POV in Explosive Magazine Areas NSACRANEINST 08020.1E CH-5 Explosive Safety Program Chapter 5 Wildfire

Prevention & Control NSACRANEINST 08020.4B Hazards of Electromagnetic Radiation to

Ordnance Emission Control Bill

NSACRANEINST 11200.7C Motor Vehicle and Pedestrian Traffic Control and Enforcement

NSACRANEINST 11262.1A Management of Weight Handling Equipment NSACRANEINST 5530.4A CH-1 Installation Access Control NSACRANEINST 5100.13A NSA Crane Smoking and Tobacco Use NSWCCRANEINST 05090.2D Hazardous Waste Management Plan NSWCCRANEINST 05100.7 Hazardous Material Control and Management

Program

NSWCCRANEINST 12000.3 COVID-19 Face Covering Policy NSWCCRANEINST 12735.1A Workplace Violence Prevention NSWCCRANEINST 12792.2 Drug-Free Workplace Program NSWCCRANEINST 5100.1B Occupational Health and Safety Program NSWCCRANEINST 5100.2A Contractor Health and Safety Program NSWCCRANEINST 5500.1A Portable Electronic Devices, Photography, and

Audio Visual Recording

NSWCCRANEINST 5104.1 Radiological Affairs Support Program OPNAVINST 1500.76B Naval Training System Requirements, Acquisition, and Management OPNAVINST 5100.19E Vols. I, II, and III: Navy Safety and Occupational

Health (SOH) Program Manuel for Forces Afloat OPNAVINST M-5102.1 Navy Safety and Occupational Health (SOH)

Program Manual OPNAVINST 5102.1 Navy and Marine Corps Mishap and Safety

Investigation, Reporting, and Record Keeping SECNAVINST 5370.2J Standards of Conduct and Government Ethics DoDI 5000.02 Operation of the Defense Acquisition System DoDD 4140.1 Supply Chain Materiel Management Policy DoDD 5000.01 The Defense Acquisition System

4.0 PERFORMANCE REQUIREMENTS

The Contractor shall furnish the required material, equipment and labor to accomplish the procurement and installation of new automatic door operators and controls on 4 doors in B-2036. Door locations include Vestibule 105 (building main access doors), Room 106 (Men’s restroom) and Room 100. The Contractor shall repair an existing concrete sidewalk section to allow access to the existing concrete ramp, repair of existing concrete floor section on the building main access door and install metal transition strips.

Contractor shall utilize new material; no postconsumer or recovered material will be authorized for use. The Contractor shall adhere to all State and Federal building codes. The Contractor must provide As-Built Drawings for approval. (CDRL A014)

4.1 REQUIREMENTS

The scope of this project will be performed in B-2036.

4.1.2 Automatic Doors and Operators

4.1.2.1 Door Operators

A. Contractor shall purchase and install automatic door operators with two push button operators each.

B. Door Locations: Vestibule 105 (building main access doors), Room 106 (Men’s restroom) and

Room 100.

4.1.2.2 Electrical

A. Contractor shall install all electrical components to provide power for the new automatic door operators and controls from the closest panel located in Room 111.

B. Contractor shall install appropriate size breaker, conduit, and wire. All penetrations shall be fire caulked. Existing ceiling in Room 111 is drywall ceiling. Contractor shall be responsible for field verification of actual conditions.

C. Contractor shall notify the NSWC RTA and COR at least 14 working days prior to install the new automatic door operator and controls in Room 100 and Vestibule 105. NSWC Physical Security coordination is required prior to install the new automatic door operator and controls to be tie in to the building AMAG electronic locking system in Room 100 and Vestibule 105.

B. Contractor shall contact the Building POC for entry to Room 111.

4.1.2.3 System Performance

A. Comply with the requirements of ANSI/BHMA A156.10. Provide operators that move doors from fully closed to fully opened position in five seconds maximum time interval, when speed adjustment is at maximum setting.

B. Equipment: Conforming to UL 325. Provide key operated power disconnect wall switch for each door installation.

C. Electrical Wiring, Connections and Equipment: Motors, starters, controls, associated devices, and interconnecting wiring required for installation shall be installed according to the NEC.

4.1.2.4 Products

A. Provide door operators from one manufacturer.

B. Provide one type of operator throughout project.

4.1.2.5 Swing Door Operators:

A. Type: Institutional type.

B. Size: As recommended by manufacturer for door weight and sizes.

C. Function:

1. Provide operators, enclosed in housing, permitting opening of door by energizing motor and stopped by electrically reducing Voltage and stalling motor against mechanical stop.

2. Door to close by means of spring energy, and closing force controlled by gear system and motor being used as dynamic brake without power, or controlled by hydraulic closer in electro-hydraulic operators.

3. Opening and Closing Speeds: Field adjustable.

4. Operators with checking mechanism providing cushioning action at last part of door travel, in both opening and closing cycle.

5. Operators capable of recycling doors instantaneously to full open position from any point in closing cycle when control switch is activated.

6. When automatic power is interrupted or shut-off, permit doors to easily open manually without damage to automatic operator system and meet NFPA 101 requirements for forces required to open doors.

D. Connect hardware with drive arm attached to door with pin linkage rotating in a self-lubricating bearing. Prevent doors from pivoting on shaft of operator.

E. Operator Housing:

1. ASTM B209, Type 6063-T5 aluminum alloy, 112 mm (4-1/2 inches) wide by 140 mm

(5.5 inches) high by 3.2 mm (0.125 inch) thick, aluminum extrusions with enclosed end caps for application to 100 mm (4 inches) and larger frame systems.

F. Power Operator:

1. Completely assembled and sealed unit including gear drive transmission, mechanical spring and bearings, located in aluminum case and filled with special lubricant for extreme temperature conditions. Rubber mounted units with provisions for easy maintenance and replacement, without removing door from pivots or frame.

G. Motors:

1. Provide with interlock to prevent operation when doors are electrically locked from opening.

H. Electrical Control:

1. Self-contained electrical control unit, including necessary transformers, relays, rectifiers, and other electronic components for proper operation and switching of power operator.

2. Connecting Harnesses: Interlocking plugs.

I. Accessories:

1. Metal mounting supports, brackets and other accessories necessary for installation of operators at head of door frames.

J. Microprocessor Controls:

1. Multi-function microprocessor control providing adjustable hold open time (1-30 seconds) with fully adjustable opening speed, LED indications for sensor input signals and operator status and power assist close options. Control capable of receiving activation signals from any device with normally open dry contact output.

2. Hold doors held open by low Voltage applied to the continuous duty motor.

3. Controls:

a. Adjustable safety circuit that monitors door operation and stops opening direction of door if obstruction is sensed.

b. Recycle feature that reopens door if obstruction is sensed at any point during closing cycle.

c. Standard three position key switch with functions for ON, OFF, and HOLD OPEN, mounted on operator enclosure, door frame, or wall.

4.1.2.6 Power Units

A. Self-contained, electric operated and independent of door operator.

1. Capacity and size of power circuits according to automatic door operator manufacturer's specifications.

4.1.2.7 Door Controls

A. Control Devices: ANSI/BHMA A156.10; control opening and closing functions.

B. Open doors when control device is actuated; hold doors in open positions; then, close doors after an adjustable time period, unless safety device or reactivated control interrupts operation.

C. Manual Controls:

1. Push Plate Wall Switch: Recessed type, stainless steel push plate minimum 100 mm by

100 mm (4 inch by 4 inch), with 13 mm (l/2 inch) high letters "To Operate Door-Push" engraved on face of plate.

D. Motion Detector:

1. Mounting: Surface or concealed.

2. Detection Area: 1500 mm (60 inches) deep and 1500 mm (60 inches) across, plus or minus

150 mm (6 inches).

3. Response Time: 25 milliseconds, maximum.

4. Control Power: 24 Volt DC.

5. Design units to be unaffected by cleaning material, solvents, dust, dirt and outdoor weather conditions.

4.1.2.8 Safety Devices

A. Swing Doors: Install presence sensor on pull side of door to detect any person standing in door swing path and prevent door from opening.

B. Time delay Switches: Adjustable between 3 to 60 seconds and control closing cycle of doors.

C. Install decal signs with "Caution Automatic Door" on both faces of each automatic door.

D. Install decal signs with “Automatic Door Active Switch to Operate” on walls of each push button operators.

4.1.3 Flooring

A. Contractor shall repair existing concrete sidewalk section to allow access to existing concrete ramp.

B. Contractor shall repair existing concrete floor section and install new wheelchair ADA aluminum transition strip ( ≥8”) on Vestibule 105 (building main access door).

D. Contractor to provide samples for the new wheelchair ADA aluminum transition strips. (CDRL

A015)

Additional Notes:

A) Contractor shall provide a daily report (CDRL A008).

B) Contractor shall provide a schedule at PAK meeting and provide updated schedule if any deviation over five (5) days of the approved schedule (CDRL A016).

C) Contractor shall clean the worksite at the end of each workday. Contractor shall dispose of any scrap material and clean any spills that may occur.

D) The Contractor shall hold weekly status meeting and provide meeting minutes two days after weekly meeting is held. (CDRL A021) E) Contractor shall coordinate and schedule underground utility marking prior to digging. Proof of utility marking shall be submitted to the COR within two (2) business days of receipt. Proof may be an email with a date and time stamp of schedule marking and/or a receipt after completion.

F) The Contractor shall comply with manufacturer’s recommendations in demolition and installation of all materials and equipment.

G) The Contractor shall be responsible for field verification of actual conditions prior to commencement of work.

H) Contractor is responsible for all applicable permits related to the prosecution of the work required (CDRL

A017).

I) All utility outages required for the completion of the proposed scope shall be coordinated with the COR/RTA with applicable advanced notice, as to not disrupt other activities.

J) The Contractor is responsible for securing their worksite, staged materials and safeguarding all communications.

K) Contractor shall provide as-built drawings. (CDRL A014) L) Contractor shall provide for arc flash labels on all new disconnects or electrical panels. (CDRL A015) M) Circuit Directory shall need updated for all necessary panels. (CDRL A015) N) Contractor shall provide weekly Certified Payrolls for all employees working on the project on the Monday following the prior week. (CDRL A020) O) No cell phone, smart watches, tablets, or electronics of any kind will be authorized inside the building.

P) The Contractor shall coordinate with the Building 2036 POC to get access to the building.

Q) See Figure #1- B-2036 Layout.

Submittal Requirements A. Contractor is responsible for providing a Submittal Register utilizing form ER 415-1-10 (CDRL A015) for all anticipated submittal items.

B. Submittals are to be provided to the Government for review and acceptance by the COR prior to procurement of material.

C. The QCM shall follow processes set forth in the Quality Control plan and UFGS Spec 01 45 00.10 20 to ensure the products being submitted are contract compliant.

D. Submittals shall include the following where applicable:

a. Shop Drawings

b. Product Data

c. Samples

d. Design Data

e. Test Reports

f. Manufacturer’s Instructions

g. Manufacturer’s Field Reports

h. Operation and Maintenance Data

4.2 Installation Access

Physical access to the Government’s facility at Naval Support Activity (NSA), Crane shall be through the use of the Defense Biometric Identification System (DBIDS) and associated data processing/information services for purposes of protecting U.S./Coalition/allied government/national security areas of responsibility and information. The contractor shall obtain employee personal identity verification credentialing (badge) by submitting to the NSA Crane Visitor Center, form SECNAV 5512/1 (APR 2014), for each contractor employee. Upon Base Registrar authorization of form 5512/1 the contractor shall submit form NSA Crane 5512/47 DBIDS Badge Application Record to the NSWC Crane Security Division. The Contractor shall retrieve badges of employed personnel upon separation.

Each employee shall affix their badge on their person above the waist at all times while on the Activity. Badges may only be removed for safety reasons and must be reaffixed when work is completed.

DBIDS information can be found at the following website: http://dbids.dmdc.mil/

For Contract employees or subcontractors requiring infrequent access to the Activity, one day temporary passes MAY be authorized. Requests for temporary passes shall be submitted, including the completed SECNAV 5512/1 form, to the COR at least 5 working days prior to the requested base access day. Employees shall also be prepared to provide a completed SECNAV 5512/1 form to the authorizing individual the day of their visit. Temporary passes MAY be authorized up to and including a 28 day duration. A base pass request DOES NOT guarantee base access. Approved base access will be communicated to the Contractor by the NSWC Construction Manager, or their designee.

Be advised that the DBIDS process and temporary pass process both involve a background check. Persons with a Felony conviction in the last 10 years will not be issued badges or passes.

Individuals supporting these efforts shall comply with the latest security regulations applicable to the government facility/installation.

a. Depending on the facility/installation regulations, contractor personnel shall present a proper form of identification(s) and vehicle proof of insurance or vehicle rental agreement.

b. All contractor persons engaged in work while on government property shall be subject to inspection of their vehicles at any time by the government, and shall report any known or suspected security violations to the local host Security Department.

Failure to obtain entry approval will not affect the contract price or the time of completion.

4.3 Program Management

The Contractor shall comply with the manufacturer’s recommendations in installation of all materials and equipment.

The Contractor shall provide a copy of installation instructions and maintenance manuals 5 days prior to BOD (CDRL A019). The Contractor shall be responsible for field verification of actual conditions prior to commencement of work.

The Contractor shall be responsible for quality control of all work that is performed via this task order. The Contractor is responsible for compliance with the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385- 1-1, and shall maintain a safe working environment at all times during the performance of this task order. Although this document is intended to identify all significant features of work to be accomplished in the performance of this task order, it should not be considered absolutely inclusive of all minor tasks required for completion of the major work described herein.

4.3.1 Design and Construction Quality Control Plan

The Contractor shall establish and maintain a Quality Control program that is administered by a Design and Construction Quality Control organization, using Quality Control (Design and Construction) Plans, (CDRL A007) Commissioning Plans and Reports, meetings, a Coordination and Mutual Understanding Meeting, three phases of control, submittal review and approval, testing, completion inspections, and QC certifications, Inspections in accordance with Section 01 45 00.00 10 QUALITY CONTROL and documentation necessary to provide design, materials, equipment, workmanship, fabrication, construction and operations which comply with the requirements of this Contract. The QC program must cover on-site and off-site work. (CDRL A008) No construction work or testing may be performed unless the Contractor’s QC Manager is on the work site. QC Manager must be an individual with a minimum of 10 years combined experience as a superintendent, inspector, QC Manager, project manager, or construction manager on similar size and type construction contracts which included the major trades that are part of this contract.

4.3.2 Inspection Benchmarks

A) Periodic quality / safety checks at Government determined frequency. The Government may or may not provide notification to the Contractor prior to quality and safety checks.

B) Pre-Final

The Contractor shall notify the COR when pre-final inspection is ready. The COR will schedule the Pre-Final with the construction manager, Contracts Department and Building POC.

The Government and QC Manager will perform this inspection collectively to verify that the facility is complete and ready to be occupied. A Government "Pre-Final Punch List" will be documented by the QC Manager as a result of this inspection. The QC Manager will ensure that all items on this list are corrected prior to notifying the Government that a "Final" inspection with the Building POC can be scheduled. Any items noted on the "Pre-Final" inspection must be corrected in a timely manner and be accomplished before the contract completion date for the work or any particular increment thereof, if the project is divided into increments by separate completion dates.

G) Final (At completion) Inspection

The Contractor shall notify the COR at least 5 working days prior to the requested date for the final acceptance inspection. The Contractor shall state within the notice that all items previously identified on the pre-final punch list will be corrected and acceptable, along with any other unfinished contract work, by the requested date of the Final Acceptance Inspection. The Contractor must be represented by the QC Manager, the Project Superintendent, and others deemed necessary. Attendees for the Government may include the COR, Construction Management personnel, and personnel representing the building POC.

4.4 Safety and Health

The requirements of this order may require Contractor personnel to come in contact or be exposed to hazardous conditions. The Contractor shall abide by all applicable federal, local, and state occupational safety and health requirements. The Government will provide Standard Operating Procedures (SOP) when applicable. The Contractor must have on record a corporate safety plan and shall provide a copy to the COR when instructed. The Contractor shall ensure all employees have appropriate Personal Protection Equipment (PPE). The Contractor shall ensure employees have all required training and certifications related to Occupational Safety and Health Administration (OSHA) requirements.

Any Contractor employee exhibiting unsafe behavior may be removed from the NSWC Crane site. Such removal shall not relieve the Contractor from meeting its contractual obligations and shall not be considered an excusable delay as defined in FAR 52.249-14.

4.4.1 Activity Hazard Analysis (AHA)

Before beginning each activity, task, or Definable Feature of Work (DFOW) involving a type of work presenting hazards not experienced in previous project operations, or where a new work crew or subcontractor is to perform the work, the Contractor(s) performing that work activity must prepare an AHA. Format the AHA in accordance with EM 385-1- 1, Section 1 or as directed by the COR. Submit the AHA for review, at maximum, ten (10) working days after the PAK meeting. (CDRL A002) The Government reserves the right to require the Contractor to revise and resubmit the AHA if it fails to effectively identify the work sequences, specific anticipated hazards, site conditions, equipment, materials, personnel and the control measures to be implemented.

4.4.2 Accident Prevention Plan

Contractor shall provide a site-specific Accident Prevention Plan (APP), including Activity Hazard Analyses (AHA), in accordance with EM 385-1-1 Appendix A, paragraph 3.k for the construction team to follow during design, each DFOW, site visits, testing, and investigations. Update the APP if there are changes in the personnel, or the tasks to be performed. Submit the APP for review and acceptance by the Government at maximum, ten (10) days after the PAK meeting. (CDRL A003) Plan must be accepted by the COR before work can begin. SSHO may also be designated the role of the QCM and Superintendent if deemed acceptable by Government personnel.

4.5 Waste Management Plan

The Contractor shall submit a waste management plan within 10 days after the PAK meeting. In accordance with UFGS 01 74 19 Construction and Demolition Waste Management. The plan must demonstrate how the project waste diversion goal is met and plan must include the following: (CDRL A009)

The Contractor shall maintain records to document the quantity of waste generated. The contractor shall make the records available to the COR during construction, and a copy of the records must be delivered to the COR upon completion of the construction. (CDRL A011)

Ensure Hazardous Waste is labeled, handled and stored in accordance with the Safety Data Sheets (SDS) and regulations.

The Contractor shall contact the COR to set up a temporary hazardous waste storage area. This storage area shall not exceed 60 days.

The Contractor shall immediately (within 10 minutes) call Emergency Dispatch at 911, and COR for any hazardous material spillage.

The Contractor shall be responsible for clean-up efforts in accordance with 40 CFR 300 and shall provide verbal and written notifications to the COR (CDRL A010) as required by 40 CFR 355.

Any unforeseen hazardous material is found or suspected to be hazardous material, the contractor shall notify the COR. (CDRL A004) Stop work and wait for the government for instructions.

4.6 Environmental

4.6.1 The Contractor shall demonstrate a current and compliant Environmental, Safety, and Occupational Health Program in accordance with DoDD 4715.1E. (CDRL A002).The Contractor shall not use any Asbestos Containing Material (ACM) at any time during the construction. The Contractor shall verify that all materials, including those supplied by third parties, are asbestos free.

A written certification letter shall be provided by the Contractor to the Contract Officer certifying that the finished work is asbestos free. A signed letter-head stating, “to the best of my knowledge, no Asbestos Containing Building Material (ACBM) was used as a building material in the building” may suffice, per 40 CFR part 763.99 (a)(7). (CDRL A013)

The Contractor shall submit SDS for any suspect materials to the COR.(CDRL A018)

4.6.2 Provide protection of areas and spaces not to be painted. Prior to surface preparation and coating applications, remove, mask, or otherwise protect such items not to be coated that are in contact with surfaces to be coated. Following completion of painting, reinstall removed items by workmen skilled in the trades. Restore surfaces contaminated by coating materials, to original condition and repair damaged items.

4.6.3 Comply, at minimum, with manufacturer recommendations for space ventilation during and after paint application. Isolate area of application from rest of building when applying high-emission paints or coatings.

4.6.4 Do not apply coating when air or substrate conditions are:

Less than 3 degrees C 5 degrees F above dew point;

Below 10 degrees C 50 degrees F or over 35 degrees C 95 degrees F, unless specifically pre-approved by the

COR and the product manufacturer.

4.6.5 Do not use materials having a lead content over 0.6 percent by weight of nonvolatile content.

4.6.6 All coatings containers used to apply the contents therein to a surface directly from the container by pouring, siphoning, brushing, rolling, padding, ragging, or other means shall be closed when not in use.

4.6.7 Containers of any Volatile Organic Compound (VOC) containing materials used for thinning and cleanup shall be closed when not in use.

4.6.8 Compliance with the VOC content limits shall not exceed the following limits: flat coatings (0.835 lb VOC/gal), non-flat coatings (1.25 lb VOC/gal), non-flat-high-gloss coatings (2.09 lb VOC /gal) and floor coatings (2.09 lb VOC/gal), as per coating category identified in 326 IAC 8-14-3. The Contractor shall provide chemical products Safety Data Sheets (SDS) to show compliance with VOC content limit (CDRL A018).

4.6.9 Do not, under any circumstances, violate the manufacturer’s application recommendations.

4.6.10 All technicians conducting work on Heating, Ventilation, Air-Conditioning, & Refrigeration (HVAC&R) systems that could result in a release of refrigerant must be certified as a Section 608 Technician. Copies of technician certifications must be provided to the COR at least 14 days prior to working on equipment containing refrigerant.

(CDRL A015) Products containing Ozone Depleting Substance (ODS) and non-exempt substitute refrigerants in a sealed, self-contained system shall be disposed of in accordance with 40 CFR 82. The full refrigerant charge, in pounds, of the installed HVAC&R systems must be provided to the RTA. This full charge value must also be permanently marked at the system.

4.6.11 For HVAC equipment being demolished, submit to the COR a record of the technician name, date of refrigerant recovery, the full refrigerant charge, the system location, make, model, and serial number, type and amount of refrigerant recovered, to where and whom the material was transferred, date of transfer, and if refrigerant will be reclaimed or destroyed. (CDRL A015) Recovered Class I ODS and Hydrochlorofluorocaron (HCFC-22) is property of the government and must be returned to the Navy’s ODS reserve. The Contractor must notify the RTA to arrange for delivery of the refrigerant to Crane’s repository at B2748.

4.7 Closeout Submittals

As-built drawings are developed and maintained by the Contractor and depict actual conditions, including deviations from the Contract Documents. These deviations and additions may result from coordination required by, but not limited to: contract modifications; official responses to Contractor submitted Requests for Information; direction from the Contracting Officer; designs, which are the responsibility of the Contractor, and differing site conditions. Maintain the as built throughout construction as redlined hard copies on site. These files serve as the basis for the creation of the record drawings. Other closeout submittals may include, but not limited to, warranty documentation, operation and maintenance manuals, manifests, testing results, equipment training report, as applicable. The as-built drawings shall be submitted for COR approval, at a minimum, five (5) working days following the Final Inspection. (CDRL A014)

4.8 Warranty Management Plan

Develop a warranty management plan, which contains information relevant to FAR 52.246-21. At least 10 working days before the planned pre-warranty meeting, submit one set of the warranty management plan. (CDRL A012) Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesmen, or of engineering background, not necessarily familiar with this contract. The construction warranty period will begin on the date of project acceptance and continue for the full product warranty period. A joint 6 month and 11 month warranty inspection will be conducted, measured from time of acceptance, by the Contractor, COR, and the Customer Representative.

5.0 TECHNICAL DATA DELIVERABLES

All CDRL’s that are sent to the COR for approval shall use CR-1022-ACQ-FM-11000-000002, CDRL transmittal form as a cover page.

CDRL DID Number DID Title Applicable

SOW

Paragraph

Deliverable Schedule

A001 DI-MGMT-81834 Contractor’s Personnel Roster 6.14 NLT 10 days after

PAK

A002 DI-SAFT-81841 Activity Hazard Analysis Report 4.4.1, 4.6.1 NLT 10 working days after the PAK

A003 DI-MISC-80508B Accident Prevention Plan 4.4.2 NLT 10 working days after the PAK

A004 DI-MISC-80508B Severe Hazard Exposure 4.5 As Required A005 DI-SAFT-82188 Accident/Incident Report 6.5 As Required A006 DI-SAFT-82188 Damage Reporting 6.7 As Required A007 DI-MISC-80508B Quality Control Plan 4.3.1 Prior to NTP A008 DI-MISC-80508B Production Report 4.1 Daily

A009 DI-MISC-80508B Waste Management Plan 4.5 NLT 10 working days after the PAK

A010 DI-MISC-80508B Hazardous Material Clean-Up 4.5 As Required A011 DI-MGMT-82372 Certificate of Disposal 4.5 As Required A012 DI-MISC-80508B Warranty Management Plan 4.8 10 days prior to pre-warranty meeting

A013 DI-MISC-80508B Asbestos Containing Building Material Report

4.6.1 NLT 5 working

days prior to BOD

A014

DI-MISC-81489B Real Property Facilities As-Built Drawings

4.0, 4.7 Within 5 days of Final Inspection

A015 DI-MISC-80508B Submittal Register 4.1 As Required

A016 DI-MISC-80508B Schedule 4.1 Post Award Kickoff

A017 DI-MISC-80508B Permits 4.1 As Required A018 DI-SAFT-82112 Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities

4.6.1 As Required

A019 DI-MISC-80508B Maintenance Manuals 4.3 5 working days prior to BOD

A022 DI-MISC-81508B Weekly Certified Payroll 4.1 Weekly

A021 DI-ADMN-

81250C Meeting Agenda and Meeting Minutes

4.1 Weekly

6.0 SPECIAL CONDITIONS

6.1 Contracting Officer’s Representative (COR)

The COR is the point of contact for non-substantiated communications of a technical nature. Only the Contracting Officer has the authority to change the requirements of this order(s).

6.2 Requiring Technical Activity (RTA)

The RTA contacts are Functional Managers, Task Managers, and project leads. RTAs do not have the authority to direct Contractor personnel or change the requirements of this order(s) or change the requirements of any TO(s).

RTA’s shall be copied on each CDRL deliverable identified.

6.3 Hazardous Materials

6.4.1 The Contractor will provide a responsible party for the handling of the hazardous materials and the respective SDS. This responsibility includes proper training in the handling and disposal of the hazardous materials.

6.4.2 Smoke detectors containing Americium-241 or other commodities that contain radioactive material shall be turned over to the NSWC Crane Radiation Safety Office (phone 812-854-6839 or 812-854-1888) for disposal through the Navy Low Level Radioactive Waste program.

6.4 Control of Contractor Personnel

Contractor personnel shall physically access government facilities and installations for purposes of site visitation, meeting attendance, supervisory and work performance within government spaces (either temporary or permanent).

Individuals supporting these efforts shall comply with the latest security regulations applicable to the government facility/installation.

a) Depending on the facility/installation regulations, Contractor personnel shall present a proper form of identification(s) and vehicle proof of insurance or vehicle rental agreement.

b) All Contractor persons engaged in work while on government property shall be subject to inspection of their vehicles at any time by the government, and shall report any known or suspected security violations to the local host Security Department.

c) All persons engaged in work while on Government property shall be subject to search of their persons (no bodily search) and vehicles at any time by the Government, and shall report any known or suspected security violations to the NSWC Crane Security Department.

d) Assignment, transfer, and reassignment of Contractor personnel shall be at the discretion of the Contractor. However, when the Government directs, the Contractor shall remove from contract performance any person who endangers life, property, or national security through improper conduct.

e) All Contractor personnel engaged in work while on Government property shall be subject to the Standards of Conduct contained in SECNAVINST 5370.2J (Standards of Conduct and Government Ethics).

f) Prior to conducting work under this contract, the Contractor shall provide a list of employees that will be working on site. The employee list shall contain full names, security clearance levels, social security numbers, job titles, and official birth certificates. This list shall be updated within forty-eight hours after changes occur.

g) Any photography on base is not permitted without prior approval and photography permit request submitted to the COR. Permit request must be approved and signed by the COR prior to any photos being taken. All photos taken, after approval, must be analyzed and approved prior to release.

h) Restricted Areas - visitor control and surveillance of personnel in a restricted area requires security consciousness and is the responsibility of all personnel working in the area.

6.5 Accident Reporting

The Contractor shall maintain an accurate record of and shall report all accidents to the COR within 10 minutes after incident occurs. (CDRL A005)

For Navy Projects, complete a near miss report (CDRL A005). Near miss reports are considered positive and proactive Contractor safety management actions.

6.6 Smoking Regulations

Smoking on NSWC Crane, Crane, IN premises shall be in approved areas only in accordance with NSACRANEINST 5100.13A (NSA Crane Smoking and Tobacco Use). Smoking in vehicles is prohibited.

6.7 Damage Reporting

The Contractor shall maintain an accurate record of and shall report to the COR (within 10 minutes) all damages to Government Owned Equipment and Facilities as prescribed by OPNAVINST 5102.1. (CDRL A006)

6.8 Investigations

Contractor employees shall cooperate with Government investigative agencies conducting criminal or administrative investigations.

6.9 Government Observations

Government personnel, such as Inspector General or higher headquarters staff, are authorized to observe Contractor operations. Efforts will be made to minimize the degree of disturbance on Contractor performance.

6.10 Hours of Operation

NSWC Crane core duty hours for on-site Contractor personnel and the Contractor’s liaison facility personnel assigned to this effort are 0900 to 1430 hours, Monday through Friday, during regular Government workdays.

Government personnel are afforded a flextime schedule that allows a starting time between the hours of 0600 and 0900, with a quitting time between the hours of 1430 and 1800 depending on the applicable work schedule.

Contractors are required to work during Government work hours in accordance with company timekeeping policies.

The RTA will need to coordinate individually with each building POC where work is to be performed to arrange contractor available working times. Exceptions may be approved by the COR if requested by the Contractor.

6.11 Closed Days

All closed days will be designated by the Commander, NSA Crane. Closed days will be associated with holidays, National Security, and/or inclement weather/dangerous conditions. The Contractor will not be allowed to work on NSA Crane during designated closed days.

6.12 Inclement Weather

When the Government Agency is closed by the Commander because of inclement weather conditions and/or dangerous conditions, notification of the closing will be broadcast over local radio and television stations.

6.13 Licenses, Certifications, and Training

The Contractor shall provide capable personnel with qualifications, experience levels, security clearances, and necessary licenses, certifications, and training required by Federal, State, and Local laws and regulations. Training necessary to ensure that personnel performing under this contract maintain the knowledge and skills to successfully perform the required functions is the responsibility of the Contractor. Training necessary to maintain professional certification is the responsibility of the Contractor.

6.14 Contractor Identification

This contract is for non-personal services as defined by FAR Subpart 37.104. As such, Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence. Contractor shall provide a Contractors Personnel Roster. (CDRL A001)

6.15 Post Award Meetings

A Post Award Meeting with the successful offeror will be conducted within 15 working days after award of the contract. The meeting will be held at (to be identified at award). The Contractor will be given at least five working days’ notice prior to the date of the meeting by the Contracting Officer. The requirement for a Post Award meeting shall, in no event, constitute grounds for excusable delay by the Contractor in performance of any provisions of the contract. A second post award meeting may, if necessary, be held after the receipt of the first invoice to assure that adequate documentation has been received to substantiate the validity of the invoice for the stated period of performance, in accordance with C-242-H002. The Contractor will be given at least five (5) working days’ notice prior to the date of the meeting by the Contract Specialist.

7.0 Place of Performance

The primary work site will be Naval Surface Warfare Center Crane Division, Bldg. 2036, Crane, IN.

8.0 Performance Standards

All contractor proposals submitted for the contract effort will be evaluated based on the following criteria:

Sec on M Evalua ons Factors for Award

52.212-2, Evalua on - Commercial Items (OCT 2014), significant evalua on factors are technical capability, past performance, schedule and cost. Technical capability shall include a design narra ve that must demonstrate the Offeror's understanding of the requirements and the feasibility of the approach to meet those requirements. Technical capability, past performance and schedule are significantly more important than cost. Quality, delivery, and customer service will be evaluated under past performance. The Government may make award without discussions; therefore, the offeror’s ini al offer should contain their best pricing. Award will be based on the best value to the Government considering the evalua on factors listed above. Best value may be determined using tradeoffs among the evalua on factors, so that award may be made to other than the lowest-priced or highest technically-rated proposal. Please note that all offers which fail to furnish required representa ons and cer fica ons or past performance informa on or reject the terms and condi ons of the solicita on may be excluded from considera on for award;

TECHNICAL CAPABILITY: Contractor shall submit proof of capability to perform the work involved in within scope of work. The design narra ve must demonstrate the Offeror's understanding of the requirements and the feasibility of the approach to meet those requirements. (MAXIUM THREE PAGES)

PAST PERFORMANCE – Contractor must have 10 years of experience plus performing construc on or construc on design work with federal, state, or local government property. Contractors must iden fy previous federal, state, and local governments and private contracts that they have completed and that are similar size, value, and type to the contract being evaluated. Contractor shall submit two projects executed that have similar features of work. The two projects submi ed must be self-performed and within the last 3 years.

for evalua on.

SCHEDULE: Should include all milestones referred to in the statement of work. Contractor must provide a comprehensive master schedule that demonstra ons the complete understanding of the scope and requirements, iden fies the cri cal path, and provides aggressive but achievable melines.

COST: Contractor shall submit their firm fixed price proposal to complete the scope of work for this effort.

Ra ng factors are Excellent, Good, Acceptable, Marginal and Unacceptable.

Ra ng Scale:

Excellent - The proposal meets requirements in all stated areas and exceeds requirements in many areas. The proposal contains several strengths most of which are significant, may contain minimal minor weaknesses which do not require discussions, and contains no deficiencies. Based on informa on provided, there is li le doubt that the contractor demonstrates an excep onal understanding of the services required to exceed most contract requirements. The highest quality of contract performance is an cipated with li le or no risk of unsuccessful contract performance.

Good- The proposal meets all stated requirements. The proposal contains strengths, some of which may be significant, may contain minimal weaknesses which do not require discussions, and contains no deficiencies. Based on the informa on provided, the contractor demonstrates a good understanding of the services required to exceed some contract requirements. There is a high probability of success with li le risk of unsuccessful contract performance.

Acceptable - The proposal meets all stated requirements. The proposal may or may not contain strengths, whether significant or not and may contain some weaknesses that will not prevent successful comple on of the contract, and contains no deficiencies. Based on the informa on provided, the contractor demonstrates the minimum level of understanding of the services required to meet contract requirements. There is a fair probability of success with a moderate degree of acceptable risk.

Marginal - The proposal does not make clear that it meets all stated requirements. The proposal contains deficiencies that could be addressed with changes to the proposal, and/or contains a number of significant weaknesses that may prevent successful comple on of the contract, but could contain strengths. Based on informa on provided, there is doubt that the contractor understands the services required to meet the contract requirements.

Requirement/services can be met only with major changes to the proposal. There is a low probability of success with mul ple minor risks or one or more major risks that, if not mi gated, will likely impede successful performance.

Unacceptable - The proposal fails to meet the stated requirements. The proposal has one or more deficiencies, gross omissions, and/or significant weaknesses. The proposal demonstrates the contractor's failure to understand much of the scope of work necessary to perform the required tasks, failure to provide a reasonable, logical approach to fulfilling much of the government's requirements or failure to meet many requirements in the solicita on. One or more areas would have to be completely revised in order to a empt to make it other than unacceptable. Proposal presents an unacceptably high degree of risk to successful contract performance.

8.0 Contract Required Completion Date (CRCD)

The CRCD for this contract effort is: 31 March 2025.