24SNC17_specnote_0001.pdf

PDF 312 KB Posted

Attached to
REQUEST FOR INFORMATION/SOURCES SOUGHT (RFI/SS) – AN/ALE-47 DISPENSER HOUSINGS AND CABLE ASSEMBLY
Solicitation number
N0016424SNC17
Issued by

About this file

This document is a Request for Information/Sources Sought (RFI/SS) issued by the Naval Surface Warfare Center, Crane Division (NSWC Crane) for the manufacturing of dispenser housings, cable assemblies, and associated connector items used in the AN/ALE-47 system. NSWC Crane is seeking potential sources with the technical capabilities to perform this work. The effort includes items such as dispenser housings, cable assemblies, and connectors specified in the attached drawings. While no funding is currently available, the government is conducting market research, assessing small business participation, and promoting competition. Interested parties must be registered in SAM and JCP to receive the controlled drawings. Responses should address the vendor's capabilities, ability to meet the draft Statement of Work requirements, pricing, lead times, and delivery quantities. Responses are due by 3:00 PM EDT on September 6, 2024. The current requirement is being fulfilled under contract N0016420DWR01 awarded to Roselm Industries Inc.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0016424SNC17 – REQUEST FOR INFORMATION/SOURCES SOUGHT (RFI/SS) –

AN/ALE-47 DISPENSER HOUSINGS AND CABLE ASSEMBLY – PSC 1680 – NAICS

332510

Issue Date: 08 AUG 2024 – Closing Date: 06 SEPT 2024 3:00 PM EDT

Amendment 0001:

The purpose of the RFI/Sources Sought amendment is to:

Extend the due date for responses to the RFI/ Sources Sought. The due date for the receipt of responses is 6 September 2024.

Description:

This RFI/SS is being issued by Naval Surface Warfare Center, Crane Division (NSWC Crane), located in Crane, Indiana. NSWC Crane is seeking potential sources with the technical capabilities to perform the manufacturing of dispenser housings, cables assemblies and associated connector items used in the AN/ALE-47 system. The Government owned technical drawings can be found as a controlled attachment to this RFI/SS announcement. Quantities will vary with each Delivery Order. A DRAFT Statement of Work is provided as an attachment to this RFI/SS. This requirement is currently being fulfilled under N0016420DWR01 awarded to

Roselm Industries INC on 14 May 2020.

In accordance with Department of Defense FAR Supplement (DFARS) Procedures, Guidance, and Information (PGI) 213.104, the Government is seeking companies with the capabilities to meet the requirements as described herein. This effort will include the following:

Item 1: Dispenser, Countermeasures Chaff-Flare D-66 (NAVAIR Drawing 3268AS500)

Item 2: Dispenser, Countermeasures Chaff-Flare D-67 (NAVAIR Drawing 3646AS500)

Item 3: Cable Assembly (NAVAIR Drawing 3268AS414)

Item 4: Cable Assembly (NAVAIR Drawing 3646AS414)

Item 5: Connector, 48 Contact (NAVAIR Drawing 3268AS403)

Item 6: Receptacle (NAVAIR Drawing 3268AS420)

Interested parties must be properly registered in the Government System for Award Management database (SAM) and the Joint Certification Program (JCP) to receive the controlled attachment.

Interested parties may obtain information on SAM registration and annual confirmation of requirements by calling 1-866-606-8220, or via the internet at www.sam.gov.

This is a RFI/ (SS) announcement to determine the availability and technical capability of businesses to provide the manufacturing of dispenser housings, cables assemblies and associated connector items used in the AN/ALE-47 system. Additionally, this notice is being published with the intent to conduct market research, determine the availability of small business concern participation as either prime or subcontractors and promote competition.

At the current time, NO FUNDING IS AVAILABLE for contractual efforts. RFI/SS does not constitute an Invitation for Bids (IFB), a Request for Quote (RFQ), or a Request for Proposal

(RFP) and it should not be construed as a commitment of any kind by the Government to issue a formal solicitation or ultimately award a contract. The US Government is in no way liable to pay for or reimburse any companies or entities that respond to this announcement. Sources choosing to respond to this notice are wholly responsible for any costs/expenses associated with submitting a response. Any costs incurred by interested companies in response to this announcement will NOT be reimbursed.

Respondents will not be notified of the results of this RFI/SS notice. The information obtained from submitted responses may be used in development of an acquisition strategy and future solicitation. When/if the Government issues a solicitation for this effort, interested parties will be expected to thoroughly address the requirements thereof regardless of the circumstances surrounding this RFI/SS.

Responses:

Written responses shall be submitted via e-mail to the point of contacts listed below by the closing date.

NSWC-CR

Mr. Clayton Raber – Code 0243

Crane, Indiana 47522-5001 clayton.l.raber.civ@us.navy.mil

NSWC-CR

Ms. Becky Minks – Code 0243

Crane, Indiana 47522-5001 becky.a.minks.civ@us.navy.mil

Responses to the RFI/SS shall include the following:

Submitter’s Name

Street Address, City, State, Zip Code

Business Size

Point of Contact (POC)

POC Telephone

POC Email

Announcement Number: N0016424SNC17

All interested parties are encouraged to submit company and product literature, a white paper addressing the vendor’s capabilities and relevant past performance as it relates to meeting the

Government requirement, estimated quotes based on work described above and/or other pertinent information. This white paper should not exceed 10 pages.

At a minimum, vendor responses shall include the following information:

1. Capability Statement, which includes the vendor’s ability to perform the requirement based on the Government-furnished TDP provided with the announcement and any past performance examples of similar projects.

2. It is anticipated that a First Article will be required before a contractor is authorized to manufacture production quantities. The First Article will be required to be delivered within 180 days after contract award. If this is not possible, a recommended delivery of the First Article after the issuance of the contract award is requested.

3. Address the requirements by task provided in 3.2 thru 3.8 of the DRAFT Statement of

Work, specifically addressing which work an offeror can perform themselves and which portions of the work would need to be subcontracted out to other companies. The contemplated percentages for organic/subcontracted resources for each task shall also be provided.

4. Provide specific comments or concerns by SOW paragraph number, as applicable;

indicate areas of the SOW that would prohibit submission of a proposal.

5. It is anticipated that the contract length is 5 years. Address if the vendor is willing to provide FFP pricing for 5 years. If not, state the number of years the vendor is willing to provide pricing.

6. Provide Production Lead Time and Quantity of initial delivery; Delivery Quantity of units per month thereafter, and suggested quantity break points.

Responses to this RFI/SS or questions may be submitted to the Technical Point of Contact any time prior to the expiration of this announcement with a copy to the Contracting Point of Contact

(POC). The Technical POC for this effort is Savannah Aiman

(savannah.l.aiman.civ@us.navy.mil). The Contracting POC is Clay Raber

(clayton.l.raber.civ@us.navy.mil). Interested vendors should provide information regarding this announcement no later than 3:00PM EST on or before 06 SEPT 2024 to NSWC Crane.

All information marked as proprietary information will be safeguarded to prevent disclosures to non-government personnel and entities. Your interest in the response is appreciated.

Reference announcement number N0016424SNC17 in all correspondence and communications.

Attachments:

Attachment 1: DRAFT Statement of Work

Attachment 2: Drawings

File details come from the government source that posted it. Updated .