18Q0321_0001_sol.pdf
PDF 385 KB Posted
- Attached to
- EMI Testing Federal contract opportunity
- Solicitation number
- N0016418Q0321
About this file
18Q0321_0001_sol
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 18Q0321_sol.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0016418Q0321
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Reason for Amendment is to update the SOW attached.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0016418Q0321
X 9B. DATED (SEE ITEM 11)
21-Sep-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Sep-2018
CODE
NAVAL SURFACE WARFARE CENTER CRANE DIV
J. DORSEY (812-854-1090)
BLDG 121
300 HWY 361
CRANE IN 47522-5001
N00164 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SAP - SAP CONTINUATION SHEET
The following have been modified:
SOW
STATEMENT OF WORK (SOW)
FOR ELECTROMAGNETIC INTERFERENCE (EMI)
HOST INTERFACE UNIT (HIU)
1.0 SCOPE
This Statement of Work (SOW) cites the requirements for the deliverables, schedule of completion, period of performance, safety, security and reporting requirements for the EMI testing of two EMI Shielded Cabinets for the Next Generation Jammer (NGJ) Pod Control System (PCS). The two shielded cabinets will be referred to as Host Interface Units (HIU) 1 and HIU 2 and will house electrical/electronic and Radio Frequency (RF) test equipment.
These cabinets will be used in a lab environment. Specific tasks for this effort is as defined below and shall be performed within the costs and schedule requirements as authorized in this SOW.
2.0 APPLICABLE DOCUMENTS
The documents cited below form a part of this SOW to the extent specified in the subsequent sections of the SOW.
2.1 GOVERNMENT DOCUMENTS
MIL-STD-461G Requirements for the Control of EMI Characteristics of Subsystems and Equipment MIL-STD-464C Electromagnetic Environmental Effects Requirements For Systems
2.2 NON‐GOVERNMENT STANDARDS
EIA-310 CABINETS, RACKS, PANELS, AND ASSOCIATED
EQUIPMENT
2.3 ORDER OF PRECENDENCE
In the event of a conflict between the test of this document and the references cited herein, the test of this document takes precedence.
Nothing in this document supersedes applicable Federal, State or Local Laws and regulations unless a specific exemption has been obtained.
3.0 REQUIREMENTS
3.1 GENERAL REQUIREMENTS
Contractor shall furnish all materials, equipment, facilities, and labor by qualified personnel to perform the task or work described in this SOW issued by the Government within the authorized funding and period of performance.
The Contractor shall not perform any task or work unless identified herein or otherwise authorized by the Government prior to work and cost being incurred.
The contractor shall provide a load to terminate the power at the end of the cables coming from HIU 1 and HIU 2.
EMI tests shall be tested in accordance with MIL-STD-461G and the methods chosen based on the Government’s requirements.
3.1.1 EMI TESTING
The contractor shall perform EMI tests on two separate EMI shielded HIUs while encompassed with several electronic subsystems.
EMI Test to be performed on the HIUs shall be in accordance with MIL-STD-461G:
1. CE 102 –Conducted Emissions, radio frequency potential, power leads 10 Kilo Hertz (kHz) to 10 Mega
(M) Hz on the input power lines from the facility power grid
2. RE 101 –Emissions, Magnetic field 30 Hz to 100 kHz per the limit line of Figure RE 101-2
3. RE 102 –Radiated Emissions, electric field 2 MHz to 18 GHz per Navy Ground limit line of Figure RE
102-4
4. RS 103 –Radiated Susceptibility, electric field 30 MHz to 18 GHz
5. CS 101 –Conducted Susceptibility, power leads 30 Hz to 150 kHz on the input power lines
HIU 1 is a 19” wide x 36” deep cabinet and provides the following three interfaces to the NGJ-MB Pod:
The first interface is the High Speed Data Network (HSDN) fiber cables leading to J1 on the Pod shown in
Figure 1. These signals shall be terminated by use of a cap or any other means that the Contractor may have to terminate signals. The mating connector is D38999/26WE8PN and terminus type is M29504/04-4231.
The second interface consists of the Pod power, 28 Volts Direct Current (VDC), 5 Amps (A) to power the radiation for the Radio Frequency (RF), 115 Volts Alternating Current (VAC), 400 Hz, 3-phase, 3.45 KVA, transmission signals, 2 interlocks, 4 sense lines, Inter-Range Instrumentation Group (IRIG), external RF coax, control and status discrete signals leading to J2 on the Pod shown in Figure 1. The Contractor shall provide a load to this cable to test for EMI. The mating connector to J2 is D38999/26WJ46PA. For RS-103 Radiation Susceptibility testing, J2 interface shall be capped during the BIT test.
The third interface consists of 28 VDC and 3A to feed both the Pod formatter and the Solid State Recorder (SSR) circuitry leading to J3 on the Pod shown in Figure 1. The Contractor shall provide a load to the end of this cable to test for EMI. The mating connector to J3 is D38999/26WJ35PB. For RS-103 Radiation Susceptibility testing, J3 interface shall be capped during the BIT test.
Figure 1: H The other e that no noi HIU 1 con
Po R D Pl Et H In T E
PC
Tw
HIU 2 is 24 Po
The HIUs H H
3.1.2 T
Task requi of complet applicable.
perform th period of p The test fa chamber ro HIUs to all connected the EMI te signals.
HIU 1 and 2 enclo external cables ise is present on sists of the foll ower Control P
Remote Comma Discrete I/O Un latform Simula thernet Switch
HSDN Switch nterlock Relay emperature Mo MI filter C Keyboard an wo -28 VDC P 4” wide and 36 ower Control P 15 Volts Altern will need to be
HIU1 -208 VAC
HIU2 -208 VAC
Task Require rements shall b tion or period o . Contractor sh he task or work performance. T cilities will be oom and could low for cable i to the Next Ge esting. The Gov osures with asso s shown in Figu n the cables. N lowing compon Panel ander nit ator h
Switch onitor nd Monitor Power Supplies 6” deep and co Panel nating Current e powered up to C 60 Hertz (Hz C 60 Hz 3 phas ements be performed b of performance hall furnish all m described in th The Contractor using an Oper d be up to 200 f nterfacing show eneration Jamm vernment Test ociated cables ures 1 and 2 sh
Note: The Ether nents:
s onsists of the fo
(VAC) Power o accurately te
z) 3 phase 20 A se 30A by the Contract e, safety, securi material, equip he SOW issued shall not perfo rating Control I
ft. away. There wn in Figure 1 mer (NGJ) pod Team is plann hall be capped a rnet switch has ollowing comp r Supply st for EMI. Th
Amps (A) tor as specified ity and reportin pment, loads, fa d by Governme orm any task or Interface (OCI e is an external . The external system, but th ing to cap the c at the end of ea s a total 8 fiber onents:
he power requir d herein includ ng requiremen facilities, and la ent Test Team r work unless i I) to control/mo disconnect pan cables identifi he NGJ pod wil cables inside o ach cable whil r cables.
rements for the ding required de nts associated fo abor by qualifi within the auth identified herei onitor the syste anel located on ied in the diagr ll not be availa of the chamber
N0016418Q
Page e testing to ver e HIUs are:
eliverables, sch for each test as ed personnel to horized fundin in.
em outside of t the side of bot ram are typical able at the time to keep track o
Q0321 rify hedule o ng and the th lly e of of its
The Contractor shall provide a resistive load to perform MIL-STD-461G testing for the power supplies. The load requirement for HIU 1 is 28 VDC, 5A and is powered by 120 VAC 60 Hz single phase if just the power supply, or 208 VAC, 60 Hz, 3-phase, 20A if the whole shelf is used. For HIU 2, the load requirement is 115 VAC, 400 Hz, 10A per phase and is powered by 208 VAC, 60 Hz, 30A per phase. The data sheets to both power supplies are attached.
There will be a total of 22 cables to test including the following:
1. Pod J1 HSDN D38999/26WE8PN
2. Pod J2 D38999/20WJ46PA
3. Pod J3 Instrumentation D38999/26WJ35PB
4. 208 VAC, 3P, 60 Hz, 20A, Amphenol ACC00F24-53RP003
5. 115 VAC 3P, 400 Hz, 3.45KVA, PCP remote D38999/20WG16P
6. GPS D38999 11-02 Fiber Ethernet # 1 D38999/20WB2S
7. GPS D38999 11-02 Fiber Ethernet # 2 D38999/20WB2S
8. GCS D38999 11-02 Fiber Ethernet # 1 D38999/20WB2SA
9. GCS D38999 11-02 Fiber Ethernet # 2 D38999/20WB2SA
10. OCI #1 and #2, Ethernet, DTU, Lab HSDN, Spare Fiber D38999/20WJ29SA 25-29 Fiber Ethernet
11. RF Generator Input D38999/20WG75S Series III RF
12. IRIG D38999/20WG75SA Series III RF
13. GPS Power Interlock #1 D38999/20WC98S Series III Copper
14. GPS Power Interlock #2 D38999/20WC98S Series III Copper
15. GCS Power Interlock #1 D38999/20WC98SA Series III Copper
16. GCS Power Interlock #2 D38999/20WC98SA Series III Copper
17. Chamber door, control Room Red Button Interlock D38999/20WE26SN
18. Test Input D8999/20WC35SN 13-35 Series III Copper
19. HIU2 11-02 Fiber Ethernet D38999/20WB2SB
20. RF Monitor D38999 11-02 Fiber Ethernet D38999/20WB2SC
21. RF Monitor D38999 11-02 Fiber Ethernet D38999/20WB2SC
22. 208 VAC, 3P, 60 Hz, 30A, Amphenol ACC00F24-53RP003
Note that the Pod, Ground Power System (GPS), or the Ground Cooling System (GCS) will not be present.
3.2 GOVERNMENT FURNISHED EQUIPMENT (GFE)
The Government Test Team will accompany the Contractor at the testing location to control and monitor the OCI during testing. To verify that the COTS equipment is functional during and after EMI testing, the Built-In-Test (BIT) shall run before testing and the equipment shall be tested periodically during EMI tests.
Government Test Team shall provide the Contractor the following GFE shown in Figure 2:
HIU 1 with subsystems and cabling HIU 2 with subsystems and cabling Interface cabling
OCI
Breakout box
Figure 2: H There shall subject for
3.3 D
3.3.1 D
Data delive All data de deliverable the SOW a most recen Data delive
E A
3.3.2 E
The Gover upon comp Equipment
H H O C B
3.4 A
3.4.1 A
All deliver review and deemed co
High Level Diagr l be a final gov r review and in
DELIVERABLE
Data Deliver erables associa eliverables shal es shall be subm and referenced nt Microsoft W erables shall al MI test proced
A001 and A002 quipment D rnment shall sh pletion of the E t to ship includ
HIU 1
HIU 2
OCI
abling reakout box
ACCEPTANCE
Acceptance rables provided d inspection for omplete upon re ram vernment Qual spection for fin
ES
ables ated with this S ll be submitted mitted via ema in the next mo
Word compatible lso include:
dures, conduct o
Deliverables hip all equipme EMI testing.
des:
CRITERIA
d in performanc r final acceptan eceipt and veri ity Assurance nal acceptance
SOW shall be m d within the tim ail and/or by em onth’s status re e format.
of the testing, a s ent to the Contr ce of funded ta nce by the Gov ification of con
(QA) and acce prior to the po made in Contra meframes/dates mail notificatio port. All data d and provide a t ractor’s facility asking under th vernment prior ntent to the requ eptance for all s oint of return o actor format, un s identified or e on to the approp deliverables sh test report for E y and ship the e his contract Ag to submission quired specifica services provid of materials.
nless otherwise earlier as requi priate distribut hall be submitte
EMI testing of equipment bac greement, shall
n. Final accepta ations defined i
N0016418Q
Page ded. Test repo e specified bel red. All data tion as provide ed via email in f the HIU (CDR ck to NSWC Cr be subject for ance shall be in the SOW.
Q0321 orts are ow.
ed by n the
RL
rane r
3.5 SPECIAL REQUIREMENTS
The following will comply with the Contractor procedures specified in the performance of the tasks of this SOW.
3.5.1 Security Classification
Testing will be conducted at the unclassified level.
Access to classified information is limited by individuals’ security clearance level and “need to know” requirements.
All classified material shall be handled in accordance with U.S. Government approved security practices and procedures.
3.5.2 Travel
As applicable, travel required in the performance of this SOW must be authorized prior to individual trip and must be funded within this SOW prior to be incurred. All travel and incurrence of other Direct Costs associated with travel shall be authorized in advance and adequately funded to be allowable and reimbursable.
3.5.3 Place of Performance
This effort shall be performed at the contractor facility:
TBD
3.5.4 Safety
Contractor is responsible for their personnel being trained in the area of ergonomic/back injury awareness as described in the NSWC Crane instruction 5100.5A-12. Contractor shall follow OSHA regulations and is responsible for submitting a safety plan to the Government for submission to NSWC Crane.
3.5.5 Point of Contact
Technical point of Contact for Government Test Team and Contractor is:
Government Contractor NSWC Crane TBD 300 Highway 361 Crane, IN 47522
Tawana Willis Kumar Kulatilake
(812) 854-6884 (812) 854-8505 tawana.willis@navy.mil Kumar.kulatilake@navy.mil
3.5.6 Period of Performance
The test scheduling shall be coordinated between the government and contractor with mutual agreement.
(End of Summary of Changes)
File details come from the government source that posted it.