AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is to provide responses to industry questions, update the attachments table, and to extend the solicitation closing date to February 3, 2014 at 2:00 pm EST.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Jan-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00164-14-R-JR02
X 9B. DATED (SEE ITEM 11)
19-Dec-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Jan-2014
CODE
NAVAL SURFACE WARFARE CENTER CRANE DIV
K. WAGONER (812-854-3990)
BLDG 3422
300 HIGHWAY 361
CRANE IN 47522-5001
N00164 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00164-14-R-JR02
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES (REVISED)
The closing date of the solicitation has been extended from January 28, 2014 at 2:00 pm local time to February 3, 2014 at 2:00 pm local time.
INDUSTRY QUESTIONS
1.) OES-PRF-0105 par 4.5.2.1, Table 1 Note 1, and par 3.4.2
QUESTION 1a.) 95 psi has been the standard water pressure immersion requirement for all Navy Shock Tube Assemblies. The M81 firing assembly was never intended by the Army during the original design efforts to be submerged, in fact, during the MDI Verification testing the entire initiation system was left out of the water. The M81 firing assembly is not a watertight device, and would most likely have water penetration which could restrict movement of the firing pin.
ANSWER: For items using the M81 style firing device, the device will be installed after water immersion, immediately prior to function
QUESTION 1b.) Pyrotechnic Lead Shall not separate from the in line initiator.
On other pyrotechnic lead assemblies supplied to the US Navy, this requirement has been achieved through the use of multiple crimps applied to the in line initiator at the pyrotechnic lead interface. The fielded design for the inline initiator uses a single crimp. The inline initiator does not have sufficient length to support multiple crimps.
ANSWER: This requirement will remain.
QUESTION 1c.) The Pyrotechnic Lead VOD 6,000 ft/sec min (recommended levels for MK 165 and MK 166 5,900 ft/sec min) The construction of the pyrotechnic lead used for the MK 165 and MK 166 uses an outer jacket material which has a thickness and shrink rate different than 0.118” pyrotechnic lead. The layer thickness and shrink rate affect the core confinement which ultimately has an impact on shock tube VOD. The fielded material for MK 165 and MK 166 exhibits a minimum shock tube VOD of 5,900 ft/sec.
ANSWER: The Pyrotechnic Lead minimum VOD will be changed to 5,900 ft/sec.
QUESTION 2.) OES-PRF-0105 Par 3.4.4 The in line initiator outer diameter was amended to 0.400” max during the previous amendment. We respectfully request that this dimension be increased to Max 0.455”.
ANSWER: The in line initiator outer diameter will be changed to 0.455” max.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
ATTACHMENTS
Exhibit “A” - Contract Data Requirements List (CDRL):
Description Date No. of Pages CDRL A001 (Ammunition Data Card – Ammunition and Explosive Technical Data)
17 September 13 1
CDRL A002 (Management Plan - SPC) 17 September 13 1
CDRL A003 (Management Plan - Quality Program Requirements) 17 September 13 1 CDRL A004 (Test Procedure – First Article Inspection Procedures) 17 September 13 1 CDRL A005 (Test/Inspection Report – First Article Inspection and Tests)
17 September 13 1
CDRL A006 (Test Procedure – Production Acceptance Inspection and Test Procedures)
17 September 13 1
CDRL A007 (Test/Inspection Reports – Production Acceptance Inspection and Test Reports)
17 September 13 1
CDRL A008 (Engineering Change Proposal - ECP) 17 September 13 1 CDRL A009 (Request for Deviation - RFD) 17 September 13 1 CDRL A010 (Critical Safety Item, Characteristice – and Critical Defect Report)
17 September 13 1
CDRL A011 (Failure Analysis and Corrective Action Report) 17 September 13 1
Exhibit “B” - Specification:
Description Date No. of Pages Specification – OES-PRF-0105 Rev D 23 January 14 16
Exhibit “C” - Drawings:
Description No. of Pages Drawings for ADL 53711-8502199A 12913875 Rev A 1 2151776 Rev D 1 6214102 Rev A 5 6570662 Rev D 1 6702816 Rev A 1 7350893 Rev C 1 8215648 Rev B 1 8324682 1 8324799 Rev A 1 8324802 1 8502199 2 8502200 1 8502202 2 8502203 1 8502204 1 8794342 Rev F 1 8822504 Rev N 1 Drawings for ADL 53711-8502199-1A 12913875 Rev A 1 2151776 Rev D 1 6214102 Rev A 5 6570662 Rev D 1 6702816 Rev A 1 7350893 Rev C 1 8215648 Rev B 1 8324682 1 8324799 Rev A 1 8324802 1 8502199 2 8502200 1 8502205 Rev A 2 8502206 Rev A 1
8502207 1 8794342 Rev F 1 8822504 Rev N 1 Drawings for ADL 53711-8502210A 12913875 Rev A 1 2151776 Rev D 1 6214102 Rev A 5 7350893 Rev C 1 8324682 1 8502201 1 8502209 2 8502210 2 8502211 1 8502212 Rev A 1 8794342 Rev F 1 Drawings for ADL 53711-8502210-1A 12913875 Rev A 1 2151776 Rev D 1 6214102 Rev A 5 7350893 Rev C 1 8324682 1 8502201 1 8502209 2 8502210 2 8502211 1 8502212 Rev A 1 8794342 Rev F 1 Drawings for ADL 53711-8502210-2A 12913875 Rev A 1 2151776 Rev D 1 6214102 Rev A 5 7350893 Rev C 1 8324682 1 8502201 1 8502209 2 8502210 2 8502211 1 8502212 Rev A 1 8794342 Rev F 1 Drawings for ADL 986AS106F
986AS106C 1
986AS107E 2
986AS108D 2
986AS109C 2
986AS110D 1
986AS111C 1
986AS112C 1
986AS113C 1
986AS114C 1
986AS115C 1
986AS116C 1
986AS117C 1
986AS118C 1
986AS119A 1
986AS120C 1
986AS121A 1
9347108F 1 Drawing for ADL 10001-564200P
564200AB 2
Exhibit “D” - Quality Assurance:
Description No. of Pages Quality Assurance Provisions (QAP) – QAP-JXRT-01 14 Supplementary Quality Assurance Provisions (SQAP) – SQAP-JXRT-
Exhibit “E” - Automated Data List (ADL):
Description No. of Pages
ADL 53711-8502199A 8
ADL 53711-8502199-1A 8
ADL 53711-8502210A 6
ADL 53711-8502210-1A 6
ADL 53711-8502210-2A 6
ADL 986AS106F 5
ADL 10001-564200P 4
Associated Documents Data Item Descriptions (DIDs)
(1) DI-MISC-80043B
(2) DI-MGMT-80004A
(3) DI-QCIC-81722
(4) DI-NDTI-80603A
(5) DI-NDTI-80809B
(6) DI-CMAN-80639C
(7) DI-CMAN-80640C
(8) DI-SAFT-80970A
(9) DI-SESS-81315A
(End of Summary of Changes)