13RJR34_0003.pdf

PDF 22 KB Posted

Attached to
MK-179 Mod 0 and MK-180 Mod 0 DEMOLITION CHARGE
Solicitation number
N0016413RJR34
Issued by

About this file

13RJR34_0003

View the file

Other files

File Type Posted
13RJR34_0005.pdf PDF
13RJR34_0004.pdf PDF
13RJR34_0002.pdf PDF
13RJR34_0001.pdf PDF
13RJR34_sol.pdf PDF
13RJR34_syn.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide information in response to industry questions and to extend the offer period to 19-Nov-2013 02:00 PM. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Oct-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00164-13-R-JR34

X 9B. DATED (SEE ITEM 11)

26-Sep-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Oct-2013

CODE

NAVAL SURFACE WARFARE CENTER CRANE DIV

A. SEAMAN (812-854-8296)

BLDG 3422

300 HIGHWAY 361

CRANE IN 47522-5002

N00164 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N00164-13-R-JR34

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 29-Oct-2013 02:00 PM to 19-Nov-2013 02:00 PM.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been added by full text:

NOTICE TO INDUSTRY (2)

Question 1:

Booster Charge Drawing 8324778, Note 1 specifies dimensions for the booster charge. In order to assemble this to the priming well(s) per drawings 8324782 (Container, Charge, Demolition MK179 MOD 0 and 8324776 (Container, Charge, Demolition MK180 MOD 0 Assembly, this will have to be slit to be installed. Are these dimensions prior to the assembly of the booster charge? Are they to be measured after slitting the booster charge?

Answer to Question 1:

Booster charge dimensions may be measured prior to slitting and installing the booster charge.

Question 2:

Booster Charge Drawing 8324778, Note 2 specifies minimum density as being 1.49G/CC. Specification MIL- PRF46676B, Table I, page 3 specifies minimum density as being 1.4 G/CC? Which is correct? Or is it two (2) different requirements?

Answer to Question 2:

The minimum density required by Drawing 8324778 is more than that required by MIL-PRF-46676. The stricter requirement of the drawing applies.

Question 3:

Drawings 8215651 and 8215652, Note 9 for each drawing specifies the marking to be a “C1” (critical defect).

Normally marking defects are not classified as Critical and this defect is also not listed in the “Classification of Characteristics” table on either drawing. Is this in error?

Answer to Question 3:

Marking on the packaging is a critical requirement as shown on the drawings. The Classification of Characteristics block is incorrect on the drawings. The drawing will be revised to reflect the correct classification.

Question 4:

Please confirm that the USG will provide a Final Hazard Classification (FHC) or an Interim Hazard Classification (IHC) to allow delivery of the MK 179 and MK 180.

Answer to Question 4:

The Government will provide the FHC for delivery of the finished MK179 Mod 0 and MK180 Mod 0 demolition charges.

Drawing 8324778:

Drawing 8324778 Revision A Note B states a range for NITROCELLULOSE (NC) of 8.3 to 12.3 percent.

N00164-13-R-JR34

Pending Change to Drawing and ADL:

The Drawing and ADL will be revised to reflect a range of 6.3 to 12.8 percent for Nitrocellulose.

Drawing 8324778:

Drawing 8324778 Revision A Note B states a range for ACETYL TRIBUTYL CITRATE (ATC) of 19 to 24 percent.

Pending Change to Drawing and ADL:

The Drawing and ADL will be revised to reflect a range of 18.5 to 21.5 percent for Acetyl Tributyl Citrate.

End Note:

An additional amendment to the Request for Proposal (RFP) is anticipated to be released to reflect changes to the ADL(s), drawings, and specifications.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .