This document is Attachment 3 to a Request for Proposals (RFP) establishing Area of Interest (AOI) guidance for a competitive prototype development procurement under Other Transaction (OT) authority.
The procurement seeks innovative technical solutions for SSN(X) System Arrangement Concept Design and a hydrostatically balanced Whole-Ship Submarine Concept Design (SCD). The solicitation employs a three-phase competitive process: Phase I requires submission of a white paper (maximum five pages, 11-point Times New Roman font) describing the technical solution, company viability, cost estimates, and schedule, with no Government reimbursement of proposal costs. Phase II, available to companies with adequate Phase I submissions, consists of an in-person or virtual pitch (up to 90 minutes) at a Government site in the Washington D.C. metropolitan area, plus submission of a preliminary Statement of Work (SOW), cost estimate, and schedule, again with no Government cost reimbursement. Phase III involves invitation to submit a full Prototype Proposal in response to a Request for Prototype Proposal (RPP) for companies whose Phase I and II submissions merit consideration for award. All submissions must be classified at the Controlled Unclassified Information (CUI) level maximum. Companies must demonstrate compliance with 10 U.S.C. § 4022(d) eligibility requirements, which mandate that at least one non-traditional defense contractor or nonprofit research institution participate significantly, or all significant participants are small businesses or non-traditional contractors, or at least one-third of total project cost is funded by non-Federal sources. Prime vendors must maintain Facility Security Clearance at the SECRET level. Award is a Prototype OT with potential for one or more agreements. The Government reserves rights to cancel at any phase, limit participating companies, engage with external advisors under non-disclosure agreements, and award any, all, or none of selected proposals. Successful completion criteria include meeting key technical goals, satisfying incorporated success metrics, or achieving particularly favorable results demonstrated in deliverables.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SSN(X) Multi Step SI Concept Design AOI Question Answer_Uploaded_11.24.26.xlsx | XLSX spreadsheet | |
| (4) SSN(X) SI Concept Design AOI Security Questionnaire.pdf | ||
| (1) SSN(X) SI Concept Design TOU Agreement.pdf | ||
| (5) SSN(X) SI Concept Design AOI Question Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 3: Area of Interest Guidance
SSN(X) Concept Design
N00135-27- R-6277
The procedures herein apply to the Area of Interest (AOI) to advance the design of a novel
SSN(X) System Arrangement Concept Design and reduce technical risk associated with its integration within a hydrostatically balanced Whole-Ship Submarine Concept Design (SCD).
SECTION 1 – INTRODUCTION & OVERVIEW
1.1 Mission Background & Problem Statement
The initiative and problem statement are described in Attachment 2: AOI
1.2 Solicitation Procedure
The competitive procedures to respond to this AOI comprise Phases I, II, III as follows:
Phase I – White Papers: Companies shall submit a White Paper in response to the SSN(X)
System Arrangement Concept Design and Whole-Ship SCD AOI as specified in Section 3.2 of this document. The Government will evaluate Phase I submissions against the criteria outlined in
Section 3.2 of this document and the AOI. The Government will not reimburse companies for costs associated with Phase I submissions.
Phase II – Pitches and Statement of Work (SOW): If the Government evaluates a Phase I submission to be adequate, the Company may be invited to do the following:
• Pitch: Provide a Phase II Pitch to the Government following the instructions provided in
Section 3.3 of this document. The Government will evaluate Pitches against the criteria outlined in Section 3.3 of this document and the AOI. The Government reserves the right to limit the number of Companies invited to provide a Pitch. As such, a technical solution may be evaluated to be Adequate in Phase I but not invited to provide a Pitch. The
Government may release additional information to all companies selected for Phase II, including CLASSIFIED Annexes. The Government will not reimburse companies for costs associated with a Pitch.
• Preliminary SOW, cost, schedule: Provide a complete preliminary SOW, data rights, cost, and schedule to prototype the Company’s technical solution following the instructions provided in Section 3.3 of this document.
• Companies will be evaluated based on information and deliverables from both Phases I and II. The Government will evaluate Phase II submissions against the criteria outlined in
Section 3.3 of this document. The Government will not reimburse companies for costs associated with Phase II.
Phase III – Prototype Proposal: Companies whose Phase I submission and Phase II Pitch evaluated by the Government to be of merit and are selected for potential award of a Prototype
Other Transaction (OT) may, if funding is available, be invited to submit a full written Prototype
Proposal following the instructions provided in Section 3.4 of this document. The Government will evaluate Prototype Proposals in accordance with the solicited Request for Prototype
Proposal (RPP). The Government will not reimburse companies for costs associated with an RPP response (e.g., provision of data/information, proposal development, or negotiations) in Phase
III.
SECTION 2 – DEFINITIONS
“Area of Interest” means an announcement which may result in the award of an Other
Transaction Agreement.
“Company” includes affiliates, business units, the Prime Contractor, and all members of any formal teaming arrangement performing under an OT.
“Innovative” means any new technology, process, or business practice; or any new application of an existing technology, process, or business practice that is directly relevant to enhancing the mission effectiveness of personnel of the Department of War (DoW) or improving platforms, systems, components, or materials proposed to be acquired or developed by the DoW, or to improvement of platforms, systems, components, or materials in use by the armed forces.
“Nontraditional Defense Contractor” is defined in 10 U.S.C. § 4022 as an entity that is not currently performing and has not performed, for at least the one-year period preceding the solicitation of sources by the DoW for the procurement or transaction, any contract or subcontract for the DoW that is subject to full coverage under the cost accounting standards prescribed pursuant to 41 U.S.C. § 1502 and the regulations implementing such section.
"Other Transaction” or “Prototype OT” refers to the Prototype OT Agreement that may be awarded. This type of OT is authorized by 10 U.S.C. § 4022.
“Prototype Project” is defined at 10 U.S.C. § 4022(e)(5) as a project that addresses:
a) proof of concept, model, or process, including a business process;
b) reverse engineering to address obsolescence;
c) a pilot or novel application of commercial technologies for defense purposes;
d) agile development activity;
e) the creation, design, development, or demonstration of operational utility; or
f) any combination of subparagraphs (A) through (E).
“Small Business” is defined under Section 3 of the Small Business Act (15 U.S.C. § 632).
“Adequate” is defined as the technical solution is considered to meet program objectives and eligibility requirements set forth in the AOI Guidance.
“Inadequate” is defined as the technical solution is not considered to viably meet program objectives or eligibility requirements set forth in the AOI Guidance.
SECTION 3 - THE COMPETITIVE PROCESS – A PHASED APPROACH
3.1 PHASE I - White Paper Submission Guidelines
1. The Government does not desire unnecessarily elaborate brochures or proposals in Phase I.
2. The Government strongly encourages use of diagram(s) or figure(s) to depict the essence of the technical solution.
3. A Company shall submit a single Phase I submission for the SSN(X) System Arrangement
Concept Design solution and for a Whole-Ship SCD solution.
4. If submitted as a team, the Title page of the submission must clearly list each Company involved, the Prime Vendor, and a single point of contact for the entire team.
5. Submissions shall identify clearly and up-front the technical design solution that is being addressed.
6. Technical data with military application may require appropriate approval, authorization, or license for lawful exportation.
7. All Phase I submissions shall be classified up to the Controlled Unclassified Information
(CUI) level. Any submission containing data that is not to be disclosed to the public for any purpose or used by the Government except for evaluation purposes shall include the following sentences on the cover page:
“This submission includes data that shall not be disclosed outside of the Government, except to authorized non-Government personnel for evaluation purposes, and shall not be duplicated, used, or disclosed -- in whole or in part -- for any purpose other than to evaluate this submission. If, however, an agreement is awarded to this
Company resultant of -- or in connection with – the submission of this data, the
Government shall have the right to duplicate, use, or disclose the data to the extent agreed upon by both parties in the resulting agreement. This restriction does not limit the Government's right to use the information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets].”
Each restricted data sheet should be marked as follows:
“Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this submission.”
8. Upon prototype award, several key documents are only releasable to eligible businesses with ownership in the United States. The ability to be awarded an Agreement shall depend upon the ability of the business to obtain necessary clearances and approvals to obtain prescribed information.
9. Phase I submissions must demonstrate compliance with the eligibility requirements in accordance with 10 U.S.C. § 4022(d), which states at least one of the following conditions must be satisfied:
a) There is at least one non-traditional defense contractor or nonprofit research institution participating to a significant extent in the prototype project;
b) All significant participants are small businesses or non-traditional defense contractors; or
c) At least one third of the total cost of the prototype project is to be paid out of funds provided by sources other than the Federal Government.
10. Partnership and teaming agreements are encouraged to allow for the strengths and specializations of individual Companies to be integrated toward a complete systems engineering design approach.
11. Each Phase I submission must be sent in accordance with the instructions provided herein.
12. The Government will not evaluate submissions sent through other channels not indicated herein, or after the Phase I deadline.
13. The Government will notify companies chosen for the Phase II Pitch as soon as practicable.
3.2 PHASE I – White Paper
PHASE I WHITE PAPER
A White Paper submission shall not exceed five (5) written pages using 11-point Times New
Roman font on 8.5x11 inch paper. Smaller types may be used in figures and tables but should be clearly legible. Margins on all sides (top, bottom, left, and right) shall be at least 1 inch. Each
White Paper submission shall meet the following page count limits and structure:
(1) Title Page (one page maximum and will not count toward the page limit), including:
• Company Name
• Submission Date
• Point of Contact Name
• Title
• E-Mail Address
• Phone Number
• Company Address
(2) Affirmation of Business Status Certification (the certification shall be attached to the White
Paper and will not count toward the page limit), including:
• Name of Business Entity;
• North American Industry Classification Standard (NAICS) Code(s);
• CAGE Code;
• SAM Expiration Date;
• Business Address;
• Business POC Name, Title, Phone Number, and E-mail Address; and
• Business Status - Non-Traditional Defense Contractor (NDC), Traditional Defense
Contractor, or means for complying with the 10 USC § 4022(d) NDC restriction.
(3) Data Rights Assertions (one page maximum and will not count toward the page limit), including:
1. A table identifying any intellectual property, patents, and inventions involved in the technical solution and the data rights license, computer software license and computer software documentation that will be offered to the Government. A basis must be provided for each assertion. See DFARS 252.227-7013 and -7014 for guidance and template for the Identification and Assertion of Restrictions on the Government’s Use, Release, or
Disclosure of Technical Data.
(4) White Paper Body (5 page maximum), including:
2. Technical Solution Concept:
o A Phase I submission shall provide only one technical solution comprising the
SSN(X) System Arrangement Concept Design and a Whole-Ship SCD. The
Government will not accept Phase I submissions that include multiple solution variants. Companies are encouraged to propose their best technical solution offering for each problem set (SSN(X) System Arrangement Concept Design and
Whole-Ship SCD).
o SSN(X) System Arrangement Concept Design and Whole-Ship SCD design task objectives (listed within the AOI) that are claimed for the technical solution and description of how the minimum and desired attributes are met (listed within
Attachment 2: AOI).
o A description of the unique aspects of the technical solutions and the work related to the solution.
o Identification as to whether the effort includes the pilot or demonstration of existing commercial technical solutions (identified as commercially ready and viable technology), or the development of technology solutions for potential defense applications. If development or adaptation is described, include a suggested path to mature the technology. Include proprietary markings, as applicable.
3. Company Viability:
o A brief overview of the Company with a brief summary of financial readiness or a summary of the top line (gross sales/revenues) as applicable to the technical solution.
4. Cost Estimates: Include a cost estimate to develop a prototype design for the SSN(X)
System Arrangement Concept Design and the Whole-Ship SCD technical solution. The cost estimate should assume the System Arrangement Concept Design is complete prior to the start of the Whole-Ship SCD.
5. Schedule: Include a schedule estimate from Prototype OT award to technical solution.
(5) Vendor Security Questionnaire (Attachment 4)
6. The Prime Vendor must have personnel, storage, and Facility Security Clearance (FCL) commensurate with the SECRET level of classified access required for Agreement performance. Provide a completed vendor security questionnaire (Attachment 4) to confirm the level(s) of security clearance(s) maintained by the Prime Vendor.
7. If the Prime Vendor proposes a teaming arrangement, provide a completed vendor security questionnaire (Attachment 4) to confirm the level(s) of security clearance(s) maintained by the other Companies.
PHASE I WHITE PAPER
The Government will evaluate Phase I submissions for the technical solution (SSN(X) System
Arrangement Concept Design and Whole-Ship SCD) against the following criteria:
1. Evaluation of the technical solution described in the Phase I submission to meet or exceed the program objectives, including the minimum requirements and desired attributes of each System Arrangement concept design and the SCD.
2. Evaluation of the company’s ability to meet eligibility requirements identified in section
3.1.
The Government maintains the right to, but is not obligated to, engage with any Offeror at its discretion to get clarity on any aspect of the proposal. The decision to engage will be based on the best interest of the Government.
Phase I submissions will not be compared against each other.
3.3 PHASE II – Pitch and Preliminary SOW Content
PHASE II PITCH CONTENT
In Phase II, invited Companies shall provide an in-person or virtual Pitch of their technical solution at a Government decided site in the greater Washington D.C. metropolitan area, and provide additional supplementary data as required by this AOI, including a preliminary SOW, cost, and schedule. The Pitch and supplementary data shall demonstrate and provide further details on the concept/technical solution in Phase I and the technical and business viability of that solution. The Government may elect to use external market research to evaluate a
Company’s viability. In addition to the Pitch, the Government, at its discretion, may request additional written submission(s) to further supplement the information provided in the Phase I submission. The Government may provide additional information and Government Furnished
Information (GFI) at the start of Phase II to support vendor participation in the phases.
During Phase II Pitch, the Company must address, at a minimum:
• Organizational breakdown:
o Explain the team structure and subject matter expertise within the team.
• Technical Solution:
o Overview of the requirements and AOI Objectives which will be met by the solution.
o Design concept maturity and past operational history (if applicable).
o Software past performance (if applicable).
• Producibility and Sustainability Considerations:
o Explain how the proposed design approach incorporates producibility, manufacturability, and lifecycle sustainment considerations early in the design process.
o Relevant Government or commercial past performance (if applicable).
• Estimated Costs/Schedules:
o Data to support the cost estimates, including non-Government cost sharing, as applicable, and notional prototyping and production schedules submitted in the Phase
I submission.
o If revisions have been made to the Phase I submission ROM(s), provide an explanation or clarification for each revision.
• Data Rights Assertions:
o Identify any Intellectual Property (IP) involved in the effort and any associated restrictions on the Government’s use of that IP.
PHASE II PRELIMINARY SOW, COST, SCHEDULE DELIVERABLE CONTENT
In Phase II invited companies shall provide a preliminary SOW for their technical solution with a corresponding schedule and cost. The Government may provide additional information and
Government Furnished Information (GFI) at the start of Phase II to support vendor execution of phases.
Companies should note that there are certain terms and conditions the Government is unable to accept. However, prototype projects awarded through this process are flexible to adopt customary industry standards where otherwise legal and meet the Government’s needs.
The preliminary SOW should include, at a minimum:
• Title Page:
o Company Name o Title o Company Point of Contact Name o E-Mail Address o Phone Number o Address o List of any subcontractors or team members o Date of submission
• Abstract statement providing a concise description of the Preliminary SOW.
• Details of the technical solution:
o Describe the background and objectives of the work, Company approach, deliverables, and the resources needed to execute. Include the nature and extent of the anticipated results. Include ancillary and operational issues such as certifications, algorithms, and any engineering/software development methodologies to be used. Detail prototyping and other activities to be performed and associated deliverables, as well as a detailed project schedule that outlines the various phases of work to be accomplished within the proposed period of performance. Companies may refer to the Phase I submission. The preliminary
SOW must clearly demonstrate traceability between the work activities, schedule, and proposed cost/price.
• Government Support Required:
o Identify the type of support, if any, the Company requests of the Government such as facilities, equipment, data, and/or information or materials.
The technical schedule, at a minimum, should include traceability of key Government and
Company engagements, reviews, tests, and other events necessary to accomplish the SOW;
demonstration of accomplishment of all SOW tasks within the proposed schedule; and accomplishment of the SSN(X) System Arrangement Concept Design prior to completion of the
Whole-Ship SCD. The proposed schedule shall be resource-loaded and realistic with traceability to the direct labor proposed in the Company’s cost estimate.
This estimated price shall include, at a minimum, the estimated costs for labor, material/equipment, other direct costs, subcontracts, and profit. The estimated price should trace to the preliminary SOW and schedule. The price narrative shall provide details and the basis on the following cost categories for the proposal submission:
• Direct Labor Costs: Provide the basis for which the estimated labor rates and hours were calculated, including labor categories, estimated rates and hours for those individuals.
Provide any Forward Pricing Rate Agreement or Forward Pricing Rate Recommendation with the Defense Contract Management Agency if any.
• Material/Equipment: Provide a list of the materials/equipment required to meet the technical solution as described in the White Paper and the estimated cost.
• Indirect Costs: Provide an estimate of the total indirect costs and provide data supporting how the estimate was calculated, including any estimated costs other than labor and material/equipment (i.e., overhead, G&A, etc.).
PHASE II BASIS OF EVALUATION
Voting Members will evaluate Pitches and supplemental data against the following factors:
1. Technical solution demonstrates a clear understanding of requirements;
2. SOW, cost estimate, and notional schedule are clear, traceable, and realistic;
3. Demonstrated ability to successfully prototype the technical solution for the SSN(X)
System Arrangement Concept Design and Whole-Ship SCD; and
4. The extent to which the company meets or exceeds the program’s objectives.
The Government may record Pitches. Pitches may address both CUI and SECRET-level topics;
however, only the CUI portion will be recorded. A Pitch may be up to 90 minutes, which includes up to 60 minutes for a Pitch and up to 30 minutes for a Q&A session. The Company will provide the Pitch onsite in the greater Washington D.C. metropolitan area at a location specified by the Government.
Upon completion of Phase II evaluations, the Agreements Officer (AO) will notify the Company that either:
1. The concept/technical solution has been selected for possible award of a Prototype OT, and the Company is invited to submit a full Prototype Proposal;
2. The concept/technical solution is of interest, but not eligible for Phase III due to limited availability of Government resources; or
3. The concept/technical solution is not of interest to the SSN(X) program.
If the concept/technical solution is of interest to the SSN(X) program but not immediately selected due to availability of Government resources, the Government may contact the Company within 365 calendar days from the Pitch date. If after 365 calendar days from the Pitch date (or earlier, if notified), Government resources are not identified to formally move a Company into
Phase III, the Company will no longer be eligible for an award under the AOI.
The AO will provide a Phase III transition letter to companies that transition to Phase III. This letter will include details on Phase III submissions and next steps.
3.4 PHASE III – Prototype Proposal
PHASE III PROTOTYPE PROPOSAL CONTENT
Based upon the evaluations detailed above, the Government may issue a Request for Prototype
Proposal (RPP) to one or more Companies. The Government will invite a Company to develop and submit a Prototype Proposal in response to the RPP. Companies may discuss ideas and details of the Prototype Proposal with the Government during the proposal writing process.
SECTION 4 – PROTOTYPE OT AWARD(S)
4.1 General Guidelines
Upon favorable review and the availability of sufficient funds, the Government may choose to award one (1) or more Prototype OTs. The AO may collaborate with Companies directly on the
Prototype OT, including milestone payments, if any, and will execute the OT on behalf of the
Government. Only an AO has the authority to enter or modify a binding agreement on behalf of the Government.
If the Government is unable to reach an agreement with any Company during negotiations, the
Government reserves the right to enter into negotiations with a Company which submitted a proposal that was previously notified that the proposed concept solution of interest was not eligible for proposal due to availability of Government resources or exclusion from the negotiation selection. The Government reserves the right to award any, all, or none of the selected proposals that proceed to negotiations.
Companies must have a CAGE Code and must be registered in the System of Award
Management (SAM) to receive an award. Companies are advised to commence SAM registration upon receipt of an RPP.
Companies must also register in the prescribed Government invoicing system (e.g., Wide Area
Workflow (WAWF)). The Government will aid those Companies from whom a full Phase III
Prototype Proposal is requested in obtaining WAWF access.
Prior to award, the AO must find the Company to be responsible, and the Company must not be suspended or debarred from award by the Federal Government nor be prohibited by Presidential
Executive Order and/or law from receiving award.
Selection to proceed to Phase III does not guarantee that a Company will receive an award. The
Government reserves the right, at any point prior to award of a Prototype OT, to cancel an RPP.
4.2 Comptroller General Access to Information
In projects that provide for payments in a total amount exceeding $5,000,000, the Agreement will include a mandatory clause that provides for the Comptroller General the ability to examine the records of any party to the Agreement or any entity that participates in the performance of the
Agreement.
4.3 Procurement Integrity Act (PIA)
As required by 10 U.S.C. § 4022, all Agreements awarded under AOI shall be treated as Federal
Agency procurements for purpose of 41 U.S.C. Chapter 21. Accordingly, the competitive AOI process and awards made thereof must adhere to the ethical standards required by the PIA.
4.4 OT Supply Chain Data Transparency
Each OT shall include a requirement for performers to deliver the following data each month during performance:
• Executed sub-agreements, purchase orders, or other sub-tier agreements;
• Objective measurement and reporting of sub-performer performance, to include variance to established schedule and price baselines; and
• In the case of cost-reimbursable sub-agreements, purchase orders, or other sub-tier arrangements, reporting on costs incurred by sub-performers.
OTs shall be structured in such a way to enable objective measurement of value obtained for consideration provided. Clear, objective, and appropriately valued performance milestones and anticipated outcomes shall be incorporated into all sub-agreements to ensure optimized return on investment and business arrangements reflective of best commercial practices.
SECTION 5 - ITERATIVE PROTOTYPING
Prototype OT(s) awarded will allow for an iterative prototyping process. An iterative prototyping process will allow the Government to modify, by mutual agreement, the work in a prototype project to allow the adaptation and modification of the technical solution being prototyped to meet additional unique and discrete purposes. These additional unique and discrete purposes can be generated by the original Government customer.
SECTION 6 – SUCCESSFUL COMPLETION
A Prototype OT is complete upon the written determination of the appropriate approving officials (Program Manager and AO) that efforts conducted under the Prototype OT:
1) Met the key technical goals of the project;
2) Satisfied success metrics incorporated into the Prototype OT; or
3) Accomplished a particularly favorable or unexpected result that are demonstrated in project deliverables.
Furthermore, successful completion can occur prior to the conclusion of a prototype project to allow the Government to transition any aspect of the prototype project determined to provide utility into practice while other aspects of the prototype project have yet to be completed. Any
Prototype OT shall contain a provision that sets forth the conditions that define successful completion.
SECTION 7 – NON-GOVERNMENT ADVISORS
The Evaluation Board may leverage non-Government advisors in the evaluation of White Papers, Pitches, the SOW, negotiations, and throughout the Prototype OT execution. Non-Government advisors will have signed non-disclosure agreements (NDA) with the Government. Companies may enter specific NDAs directly with the non-Government advisors or their corporate entities.
Any submission in response to this AOI will constitute a grant of authority by the submitting
Company to the Government to allow the use of non-Government advisors to participate in evaluations of all phases of this process.
The Government understands that information provided in response to the AOI is presented in confidence and may contain trade secret or commercial or financial information, and it agrees to protect such information from unauthorized disclosure to the maximum extent permitted or required by Law, to include:
• 18 U.S.C. § 1905 (Trade Secrets Act);
• 18 U.S.C. § 1831 et seq. (Economic Espionage Act);
• 5 U.S.C. § 552(b)(4) (Freedom of Information Act);
• Executive Order 12600 (Pre-disclosure Notification Procedures for Confidential
Commercial Information); and,
• Any other statute, regulation, or requirement applicable to Government employees.
It is the Government’s policy to treat all submissions as controlled information and to disclose their content only for the purpose of evaluation. Restrictive notices notwithstanding, during the evaluation process, submissions may be handled by support contractors for administrative purposes and/or by non-Government advisors to assist with technical evaluation.
Submissions will not be returned. The original copy of each submission received may be retained and all other non-required copies destroyed.
File details come from the government source that posted it. Updated .