Solicitation Amendment N0010426RK0060002 SF 30.pdf
PDF 594 KB Posted
- Attached to
- 5935 - 01-678-7255 SWA5 ADAPTER, CONNECTOR, ETHERNET CAPABILITY/CONNECTIVITY RECEPTACLE CONNECTOR ASSEMBLY
- Solicitation number
- N0010426RK006
About this file
This document is a Standard Form 30 (SF-30) Amendment of Solicitation/Modification of Contract for a Navy contract (N0010426RK006) issued by NAVSUP Weapon Systems Support. The amendment modifies clause 52.209-3 First Article Approval - Contractor Testing, requiring the contractor to test 4 units of Lot/Item 0001AB with destructive testing per Drawing 6990510. The contractor must submit a first article test report within 180 calendar days to NAVSUP WSS Code N772, with the government having 60 calendar days to provide conditional approval, approval, or disapproval.
The amendment also includes detailed requirements for cyber security assessments under NIST SP 800-171, mandating contractors to conduct and report on their information system security plans. Contractors must complete a Basic, Medium, or High Assessment of their covered contractor information systems, with summary level scores to be posted in the Supplier Performance Risk System (SPRS). Subcontractors must also complete at least a Basic NIST SP 800-171 DoD Assessment within the last 3 years for all covered contractor information systems relevant to the offer.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
Created On:
22 Oct 2025, 17:30 PM Greenwich Mean Time
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section I - Contract Clauses
Miscellaneous text in this section has been modified to:
SECTION I
FAR 52.242-2 PRODUCTION PROGRESS REPORTS DD Form 375 OR EQUIVALENT
(a) The contractor shall prepare and submit a Production Progress Report (DD Form 1423, sequence number, A005) for the following contract items:
"ALL CONTRACT LINE ITEMS"
(b) The report shall be submitted via mailed or emailed on or before the 5th day of each month. The report shall be distributed as set forth in paragraph (c).
(c) The Production Progress Report shall be distributed as follows:
Addressee No. of Copies
Commanding Officer
NAVSUP Weapon Systems Support (WSS) 1
N772; McKenzy Harris
5450 Carlisle Pike, suite 410
Mechanicsburg, PA 17050-2411
Administrative Contracting Officer 1
Block 6 of Standard Form 26
NAVSUP Ammunition Logistics Center (ALC) 1
A151; Richard Rzomp
5450 Carlisle Pike, suite 407N, B3
Mechanicsburg, Pa 17050-2411
N0010426RK0060002
NUWC Newport Division
Attn: Code 8554
1176 Howell Street
(d) The report shall contain the following information:
(1) The problem, actual or potential and its cause;
(2) Items and quantities affected;
(3) When the delinquency started or will start;
(4) Action taken to overcome the delinquency;
(5) Estimated recovery date; and/or
(6) Proposed schedule revision.
SECTION I
FAR 52.209-3 FIRST ARTICLE APPROVAL - CONTRACTOR TESTING (Sep 1989)
Preproduction required IAW FAR 52.209-3 and the following:
1. Destructive Testing: YES
2. Sample Size: 4 VENDOR TESTED IAW DRAWING 6990510
3. Sample Disposition: CONTRACTOR TO PERFORM FAILURE ANALYSIS IF DISCREPANT
4. Acceptance Activity: NUWC NEWPORT, CODE 8554
5. DCMA: Normal QA Action
7. Inspection Required: COMPAT: XX ENVIR: XX FUNCT: XX EXAM: XX
8. Required in Drawing: YES IAW 6990510
9. Test/Inspection Procedure Required: YES Approved: NUWC DIV NEWPORT
10. Test/Inspection Report Required: YES Approved: NUWC DIV NEWP
(a) The Contractor shall test unit(s) of Lot/Item as specified in this contract. At least calendar days before the beginning of first4 EA 0001AB 30 article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
(b) The Contractor shall submit the first article test report within calendar days from the date of this contract to 180 NAVSUP WSS Code N772 marked " " Within calendar days after the Government receives the testFirst Article Test Report: Contract No. _______, Lot/Item No. _______ 60 report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing.
All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) of this subsection. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) of this subsection, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
Alternate I (Jan 1997). As prescribed in 9.308-1(a)(2) and (b)(2), add the following paragraph (i) to the basic clause:
(i) The Contractor shall produce both the first article and the production quantity at the same facility.
AMPLIFICATIONS:
Inspection and acceptance of the supplies or services to be furnished here under shall be performed by representatives of the Government (normally the Defense Contract Administration Command) at the contractor's or sub-contractors plant. The cognizant' inspector shall be notified when material is ready for inspection. When the contract provides for Government procurement quality assurance actions at source, the place or places designated for such actions may not be changed without authorization of the Contracting Officer.
Additional FAR Clauses Incorporated by Full Text:
N0010426RK0060002
https://acquisition.gov/far/current/html/Subpart%209_3.html#wp1078466
52.204-21 Basic Safeguarding of Covered Contractor Information Systems (Nov 2021)
(a)Definitions. As used in this clause--
Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.
Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).
Safeguarding means measures or controls that are prescribed to protect information systems.
(b)Safeguarding requirements and procedures.
(1)The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:
(i)Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii)Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii)Verify and control/limit connections to and use of external information systems.
(iv)Control information posted or processed on publicly accessible information systems.
(v)Identify information system users, processes acting on behalf of users, or devices.
(vi)Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.
(vii)Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.
(viii)Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.
(ix)Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.
(x)Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.
(xi)Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.
(xii)Identify, report, and correct information and information system flaws in a timely manner.
(xiii)Provide protection from malicious code at appropriate locations within organizational information systems.
(xiv)Update malicious code protection mechanisms when new releases are available.
(xv)Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.
(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.
(c)Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial products or commercial services, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.
(End of clause)
Additional DFARS Clauses Incorporated by Full Text:
252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023)
(a)Definitions.
Basic Assessment" means a contractor's self-assessment of the contractor's implementation of NIST SP 800-171 that--
(1) Is based on the Contractor's review of their system security plan(s) associated with covered contractor information system(s);
(2) Is conducted in accordance with the NIST SP 800-171 DoD Assessment Methodology; and
(3) Results in a confidence level of "Low" in the resulting score, because it is a self-generated score.
"Covered contractor information system" has the meaning given in the clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this contract.
"High Assessment" means an assessment that is conducted by Government personnel using NIST SP 800-171A, Assessing Security Requirements for Controlled Unclassified Information that--
(1) Consists of--
(i) A review of a contractor's Basic Assessment;
(ii) A thorough document review;
(iii) Verification, examination, and demonstration of a Contractor's system security plan to validate that NIST SP 800-171 security requirements have been implemented as described in the contractor's system security plan; and
(iv) Discussions with the contractor to obtain additional information or clarification, as needed; and
(2) Results in a confidence level of "High" in the resulting score.
"Medium Assessment" means an assessment conducted by the Government that--
(1) Consists of--
(i) A review of a contractor's Basic Assessment;
(ii) A thorough document review; and
(iii) Discussions with the contractor to obtain additional information or clarification, as needed; and
(2) Results in a confidence level of "Medium" in the resulting score.
(b)Applicability. This clause applies to covered contractor information systems that are required to comply with the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, in accordance with Defense Federal Acquisition Regulation System (DFARS) clause at 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this contract.
(c) Requirements. The Contractor shall provide access to its facilities, systems, and personnel necessary for the Government to conduct a Medium or High NIST SP 800-171 DoD Assessment, as described in NIST SP 800-171 DoD Assessment Methodology athttps://www.acq.osd.mil/asda/dpc/cp/cyber/docs/safeguarding/NIST-SP-800-171-Assessment-Methodology- Version-1.2.1-6.24.2020.pdf , if necessary.
(d)Procedures. Summary level scores for all assessments will be posted in the Supplier Performance Risk System (SPRS) () to provide DoD Components visibility into the summary level scores of strategic assessments.
(1)Basic Assessments. A contractor may submit, via encrypted email, summary level scores of Basic Assessments conducted in accordance with the NIST SP 800-171 DoD Assessment Methodology to for posting to SPRS.
(i) The email shall include the following information:
(A) Version of NIST SP 800-171 against which the assessment was conducted.
(B) Organization conducting the assessment (e.g., Contractor self-assessment).
(C) For each system security plan (security requirement 3.12.4) supporting the performance of a DoD contract--
(1) All industry Commercial and Government Entity (CAGE) code(s) associated with the information system(s) addressed by the system security plan; and
(2) A brief description of the system security plan architecture, if more than one plan exists.
(D) Date the assessment was completed.
(E) Summary level score (e.g., 95 out of 110, NOT the individual value for each requirement).
(F) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.
(ii) If multiple system security plans are addressed in the email described at paragraph (b)(1)(i) of this section, the Contractor shall use the following format for the report:
System Security Plan
CAGE Codes supported by this plan
Brief description of the plan architecture
Date of assessment
Total Score
Date score of 110 will be achieved
(2) Medium and High Assessments. DoD will post the following Medium and/or High Assessment summary level scores to SPRS for each system security plan assessed:
(i) The standard assessed (e.g., NIST SP 800-171 Rev 1).
(ii) Organization conducting the assessment, e.g., DCMA, or a specific organization (identified by Department of Defense Activity Address Code (DoDAAC)).
(iii) All industry CAGE code(s) associated with the information system(s) addressed by the system security plan.
(iv) A brief description of the system security plan architecture, if more than one system security plan exists.
(v) Date and level of the assessment, i.e., medium or high.
(vi) Summary level score (e.g., 105 out of 110, not the individual value assigned for each requirement).
(vii) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.
(e)Rebuttals.
(1) DoD will provide Medium and High Assessment summary level scores to the Contractor and offer the opportunity for rebuttal and adjudication of assessment summary level scores prior to posting the summary level scores to SPRS (see SPRS User's Guidehttps://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf).
(2) Upon completion of each assessment, the contractor has 14 business days to provide additional information to demonstrate that they meet any security requirements not observed by the assessment team or to rebut the findings that may be of question.
(f)Accessibility.
(1) Assessment summary level scores posted in SPRS are available to DoD personnel, and are protected, in accordance with the standards set forth in DoD Instruction 5000.79, Defense-wide Sharing and Use of Supplier and Product Performance Information (PI).
(2) Authorized representatives of the Contractor for which the assessment was conducted may access SPRS to view their own summary level scores, in accordance with the SPRS Software User's Guide for Awardees/Contractors.
(3) A High NIST SP 800-171 DoD Assessment may result in documentation in addition to that listed in this clause. DoD will retain and protect any such documentation as "Controlled Unclassified Information (CUI)" and intended for internal DoD use only. The information will be protected against unauthorized use and release, including through the exercise of applicable exemptions under the Freedom of Information Act (e.g., Exemption 4 covers trade secrets and commercial or financial information obtained from a contractor that is privileged or confidential).
(g) Subcontracts.
(1) The Contractor shall insert the substance of this clause, including this paragraph (g), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products or commercial services (excluding commercially available off-the-shelf).
(2) The Contractor shall not award a subcontract or other contractual instrument, that is subject to the implementation of NIST SP 800-171 security requirements, in accordance with DFARS clause 252.204-7012 of this contract, unless the subcontractor has completed, within the last 3 years, at least a Basic NIST SP 800-171 DoD Assessment, as described inhttps://www.acq.osd.
N0010426RK0060002
https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf mil/asda/dpc/cp/cyber/docs/safeguarding/NIST-SP-800-171-Assessment-Methodology-Version-1.2.1-6.24.2020.pdf , for all covered contractor information systems relevant to its offer that are not part of an information technology service or system operated on behalf of the Government.
(3) If a subcontractor does not have summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) posted in SPRS, the subcontractor may conduct and submit a Basic Assessment, in accordance with the NIST SP 800-171 DoD Assessment Methodology, to webptsmh@navy.mil for posting to SPRS along with the information required by paragraph (d) of this clause.
(End of clause)
N0010426RK0060002
mailto:webptsmh@navy.mil
| IDCode: J |
| Page: 1 |
| Pages: 11 |
| AmendNo: 0002 |
| EffDate: 22 Oct 2025 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N00104 |
| AdmCode: |
| IssuedBy: NAVSUP WEAPON SYSTEMS SUPPORT MECH |
P O BOX 2020, 5450 CARLISLE PIKE
MECHANICSBURG, PA 17050-0788
UNITED STATES
MCKENZY HARRIS, Email: mckenzy.s.harris.civ@us.navy.mil Telephone: 7176051368 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N0010426RK006 |
| SolDate: 17 Oct 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The purpose of this amendment is to correct clause 52.209-3 First Article Approval - Contractor Testing. |
| ContNameTitle: |
| CoNameTitle: |
| ContDate: |
| CODate: |