1.06_CDRLS_N3598A24NA058.pdf
PDF 738 KB Posted
- Solicitation number
- N0010425RK033
About this file
This document is a Contract Data Requirements List (CDRL) for a federal contract involving an impulse cartridge (CCU-114/M) with the system item number 2E-1377-01-300-3579-MT99. The CDRL outlines seven specific data items the contractor must provide during the contract, including:
- Test Procedure (A001): A plan specifying process control instructions and inspection procedures to ensure product conformance to drawings and specifications. 2. Test/Inspection Report (A002): Verification of first article and production lot conformance, including material certifications and quality evidence. 3. Engineering Change Proposal (A003): Documentation describing proposed engineering changes and their impacts. 4. Request for Deviation (A004): Proposed departures from contractually-specified configuration documentation. 5. Ammo Data Card (A005): Prepared according to MIL-STD-1168 and submitted per lot. 6. Failure Analysis/Corrective Action Report (A006): Required when lot failures occur. 7. Radiographic Test Technique Report (A008): X-ray film and inspection reporting. The requiring office is NSWC Indian Head EOD Tech Division, with distribution to various Navy contracting and administrative offices.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25RK0330004.pdf | ||
| 25RK0330003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A.CONTRACT LINE ITEM NO.
B.EXHIBIT
C.CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
2E-1377-01-300-3579-MT99
E.CONTRACT/PR NO.
F.CONTRACTOR
1.DATA ITEM NO.
A001
2.TITLE OF DATA ITEM
Test Procedure
3.SUBTITLE
17.PRICE
GROUP
4.AUTHORITY (Data Acquisition Document No.) 5.CONTRACT REFERENCE
6.REQUIRING OFFICE 18.ESTIMATED
TOTAL PRICE
DI-NDTI-80603 ALL DRAWINGS NSWC Indian Head EOD Tech Division
7.DD250 REQ
LT
9.DIST STATEMENT
REQUIRED
10.FREQUENCY
ONE TIME
12.DATE OF FIRST
SUBMISSION
14.DISTRIBUTION
D
60 DAC
a. ADDRESSEE
b. COPIES
8.ADP CODE
A
11.AS OF
DATE
13.DATE OF SUBSEQUENT
Draft
Final
Reg Repro
16.REMARKS SEE BLOCK 16 0 1 0
THE PLAN IS TO SPECIFY PROCESS CONTROL INSTRUCTIONS AND INSPECTION
PROCEDURES NEEDED TO ENSURE PRODUCT CONFORMANCE TO DRAWINGS,
SPECIFICATIONS, AND CONTRACT REQUIREMENTS IAW ANSI/ASQC Q9000-2000 OR
EQUIVALENT. THE PLAN IS TO INCLUDE FIRST ARTICLE AND PRODUCTION LOT
QUALITY CONFORMANCE INSPECTION PROCEDURES IAW DI-NDTI-80603A ALONG
WITH ALL APPLICABLE DATA ENTRY SHEETS TO BE USED TO DOCUMENT PROCESS
INSPECTIONS.
BLK 14: DISTRIBUTION ADDRESS
1. Contract Administration Office (CAO)
2. NAVSUP WSS Contracting Officer N772
3. NAVSUP ALC, Code A151
4. NUWC-Indian Head E24JC See section H for distribution POC’s and their emails.
15.TOTAL 0 1 0
G. PREPARED BY:
Robert Kovach
H. DATE
4 September 24
I. APPROVED BY:
Lisa Hardman
J. DATE
4 September 24
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 7 Pages
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
D. SYSTEM/ITEM
A002
2.TITLE OF DATA ITEM
Test/Inspection Report
3.SUBTITLE
Pre-Production & Production Test
DI-NDTI-80809 ALL DRAWINGS NSWC Indian Head EOD Tech Division
7.DD250 REQ
SS
9.DIST STATEMENT
REQUIRED
10.FREQUENCY
PER LOT
SEE BLOCK 16
a. ADDRESSEE
b. COPIES
8.ADP CODE
16.REMARKS SEE BLOCK 16 0 1 0
THE REPORT IS TO VERIFY BOTH FIRST ARTICLE AND PRODUCTION LOT CONFORMANCE TO THE
APPLICABLE DRAWINGS, SPECIFICATIONS, AND CONTRACT REQUIREMENTS. THE REPORT
CONSISTS OF THE PLAN (A001) CONTAINING ALL REQUIRED INSPECTION
RESULTS DOCUMENTED ON THE PLAN’S DATA ENTRY SHEETS. IN ADDITION, THE
REPORT IS TO INCLUDE MATERIAL CERTIFICATIONS AND ALL OTHER PERTINENT
OBJECTIVE QUALITY EVIDENCE. DCMC REVIEWIS REQUIRED PRIOR TO SUBMITTAL
TO NUWC DIVISION KEYPORT. THE REPORT MUST BE APPROVED BY NAVSEA
KEYPORT BEFORE FINAL ACCEPTANCE OF THIS LOT IN WAWF.
BLK 12: DATE OF PRE-PRODUCTION TEST REPORT SUBMISSION – NLT 15 DAYS
AFTER FIRST ARTICLE TEST COMPLETION.
BLK 13: DATE OF SUBSEQUENT SUBMISSION – NLT 15 DAYS AFTER LOT
ACCEPTANCE TESTING OF SECOND LOT AND BEYOND.
3. NAVSUP ALC, Code A151
Robert Kovach
H. DATE
4 September 24
I. APPROVED BY:
Lisa Hardman
4 September 24
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 7 Pages
(2 Data Items)
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
D. SYSTEM/ITEM
A003
2.TITLE OF DATA ITEM
Engineering Change Proposal (ECP)
17.PRICE GROUP
DI-CMAN-80639C Section C NSWC Indian Head EOD Tech Division
REQUIRED
10.FREQUENCY 12.DATE OF FIRST
ASREQ ASREQ
a. ADDRESSEE
11.AS OF DATE
When Revised Reg Repro 16.REMARKS See Block 16 0 1 1 An Engineering Change Proposal (ECP) provides the documentation in which the engineering change is described. It includes change impacts to systems, configuration items and other associated configuration documentation affected by the proposed change.
1. NUWC-Indian Head E24JC
15.TOTAL 1 1
A004
2.TITLE OF DATA ITEM
Request for Deviation (RFD)
4.AUTHORITY (Data Acquisition Document No.)
DI-CMAN-80640C
5.CONTRACT REFERENCE
Section C
6.REQUIRING OFFICE
NSWC Indian Head EOD Tech Division
18.ESTIMATED
TOTAL
PRICE
7.DD 250 REQ
LT
9.DIST STATEMET
REQUIRED
10.FREQUENCY
ASREQ
ASREQ
14 DISTRIBUTION
A
11.AS OF DATE
When Revised
Reg Repro 16.REMARKS See Block 16 0 1 1 A Request for Deviation describes a proposed departure from (a non-conformance with) the contractually-specified configuration documentation for a specific number of units or for a specified period of time.
1. NUWC-Indian Head E24JC
15.TOTAL 1 1
G.PREPARED BY H.DATE I.APPROVED BY J.DATE
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
D. SYSTEM/ITEM
A005
2.TITLE OF DATA ITEM
Ammo Data Card (ADC)
DI-MISC-80043B Section C NUWC DIV KEYPORT CODE 423
SD
REQUIRED
10.FREQUENCY
PER LOT
PER LOT
a. ADDRESSEE
PER LOT Reg Repro
16.REMARKS SEE BLOCK 16 0 1 0
BLK 4: DATA CARD SHALL BE PREPARED IN ACCORDANCE WITH MIL-STD-1168,
AS CHANGED BY ADL EXCEPTIONS AND THE CONTRACT DOCUMENT LIST BY
ACCESSING THE WORLDWIDE AMMUNITION-DATA REPOSITORY (WARP) WHICH IS
LOCATED: https://mhpwarp.redstone.army.mil. AN ACCESS REQUEST FORM
MUST BE COMPLETED BEFORE WARP CAN BE ACCESSED. QUESTIONS SPECIFIC TO
WARP SHOULD BE ADDRESSED TO ONE OF THE RESPECTIVE POCs AS LISTED ON
THE WEBSITE.
BLK 10,12,13: DATA CARDS PROVIDED TO NAVSEA PMS-404 AND THOSE SENT
WITH SHIPMENTS SHALL BE HARDCOPY PRINTOUTS GENEREATED WITH THE WARP
PROGRAM AND SHALL BE SIGNED AND DATED BY THE GOVERNMENT INSPECTOR.
NAVSEA PMS-404 SUBMISSIONS SHALL ALSO INCLUDE HARDCOPY PRINTOUT OF
SAMPLES CARDS (SEE MIL-STD-1168, PARA 4.3.1.4)
3. NAVSUP ALC, Code A151
4. NUWC-Keyport Code N321
Robert Kovach 4 September 24 Lisa Hardman 4 September 24
DD Form 1423-2, AUG 96 PREVIOUS EDITION MAY BE USED Page 3 of 7 Pages
Robert Kovach
H. DATE
4 September 2024
I. APPROVED BY:
Lisa Hardman
J. DATE
4 September
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 4 of 7 Pages
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
D. SYSTEM/ITEM
A006
2.TITLE OF DATA ITEM
Failure Analysis/Corrective Action Report
DID-80255 Section E NSWC Indian Head EOD Tech Division
REQUIRED
10.FREQUENCY
SEE BLOCK 16
12.DATE OF FIRST
SEE BLOCK 16 Reg Repro
16.REMARKS SEE BLOCK 16 0 1 0
BLK 5: INCLUDE AND TAKE ACTION ON SECTION I IF FAT IS REQUIRED.
BLK 10: FREQUENCY - IS DETERMINED BY NUMBER OF FAT/LAT FAILURES.
BLK 12: DATE OF FIRST SUBMISSION – NLT AN INTERIM REPORT IS DUE NLT
10 DAYS AFTER NOTIFICATION OF LOT FAILURE. A FINAL REPORT IS DUE 30
DAYS AFTER NOTIFICATION OF LOT FAILURE.
BLK 13: DATE OF SUBSEQUENT SUBMISSION – NLT 10 DAYS AFTER FAT
COMPLETION OF SECOND FAILED LOT AND BEYOND.
3. NAVSUP ALC, Code A151
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A.CONTRACT LINE ITEM NO. B.EXHIBIT
D. SYSTEM/ITEM
1. DATA ITEM NO.
A007
2.TITLE OF DATA ITEM
Production Line Of Balance Status
3.SUBTITLE
Production Progress Report
4. AUTHORITY (Data Acquisition Document No.) 5.CONTRACT REFERENCE 6.REQUIRING OFFICE 18.ESTIMATED
DI-MGMT-80034 See Block 16 NSWC Indian Head EOD Tech Division
9.DIST STATEMENT
AS REQUIRED
10.FREQUEN
CY
MTHLY
N/A
16.REMARKS See Block 16 0 1 1 (Block 5) Contractor shall submit a monthly progress report (DD Form 375) describing the contractor's current progress in a graphic form by comparison of planned objectives for flow of materials and Components into manufacturer of end items as related to delivery requirements.
(Block 12) Date for First Submission: 30 days after start of production.
Report shall be submitted to:
COMMANDING OFFICER
(Block 16) Date of Subsequent Submission: Subsequent reports to be submitted no later than the 5th day of the month (for the month proceeding). Local DCASMA verification required on all Status reports.
3. NAVSUP ALC, Code A151
15.TOTAL 0 1 1
G. PREPARED BY
Robert Kovach
H. DATE
4 September 2024
I.APPROVED BY
Lisa Hardman
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page
Robert Kovach
H. DATE
4 September 2024
I. APPROVED BY:
Lisa Hardman
4 September 2024
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 5 of 7 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER X
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
RADIOGRAPHIC TEST TECHNIQUE
3. SUBTITLE
X-RAY TECH, FILM & INSPECTION
REPORT
4. AUTHORITY (Data Acquisition Document No.)
SEE BLOCK 16
5. CONTRACT REFERENCE
SEE BLOCK 16
6. REQUIRING OFFICE
NSWC Indian Head EOD Tech Division
7. DD 250 REQ
SS
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
8. APP CODE
N/A
11. AS OF DATE 13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4 Authority - Section E - Inspection and Acceptance paragraph 5.a.
Block 5 Contract Reference - Section E - Inspection and Acceptance paragraph
5.a. ASTM E1742 Section 6.
Block 9. - DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests shall be referred to (NSWC IHEODTD
Code E26).
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended.
Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Block 10 Frequency - ONE /R with sample plate film. Block 12 Date of First Submission -
With sample plate film.
Block 13 Date of Subsequent Submission - Section E - Inspection and Acceptance paragraph 12.
X-Rays must be reviewed by Indian Head EOD Tech Division before LAT testing can be conducted.
Block 14. Distribution Addresses
1. NUWC-Indian Head E24JC
Cognizant DCMA (Indicated in Block 6 of SF26) LT with report only.
SEE BLOCK 16 0 1 1
15. TOTAL 0 1 1
G. PREPARED BY
Robert Kovach
H. DATE
I. APPROVED BY
Lisa Hardman
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 7 of 7 Pages
File details come from the government source that posted it. Updated .