CDRLS_N3598A25NA005.pdf

PDF 134 KB Posted

Attached to
5935-01-678-7255 SWA5 ADAPTER, CONNECTOR, ETHERNET CAPABILITY/CONNECTIVITY RE
Solicitation number
N0010425QK039
Issued by

About this file

The document is a Contract Data Requirements List (CDRL) for a Department of the Navy contract involving two data item submissions: a Failure Analysis/Corrective Action Report (A001) and a Contractor's Progress, Status and Management Report (A002). The contract is specifically for a 5935-01-678-7255 SWA5 Adapter, Connector with Ethernet Capability/Connectivity, and is restricted to NewVac, LLC.

The CDRL outlines specific reporting requirements, including a Failure Analysis/Corrective Action Report due within 10 days of lot failure notification and a final report due 30 days after lot failure notification. The monthly progress report must be submitted via mail or email by the 5th day of each month after contract award. The requiring office is NUWC KEYPORT, and distribution includes the Contract Administration Office, NAVSUP WSS Contracting Officer, NAVSUP ALC, and NUWC-Newport. The document was prepared and approved on 22 October 2024 by Richard Rzomp and Philip Lindley, respectively.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Je erson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting O icer for the Contract/PR No.

listed in Block E.

A. CONTRACT LINE ITEM

NO.

B. EXHIBIT

C. CATEGORY:

TDP ☐ TM ☐ OTHER ☐

D. SYSTEM/ITEM

4T – 5935-01-678-7255

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA

ITEM NO.

A001

2. TITLE OF DATA ITEM

Failure Analysis/Corrective Action Report

3. SUBTITLE

17. PRICE

GROUP

4. AUTHORITY (Data Acquisition Document No.)

DID-80255

5. CONTRACT REFERENCE

Section E

6. REQUIREING OFFICE

NUWC KEYPORT

18.

ESTIMATED

TOTAL PRICE

7. DD 250

REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

SEE BLOCK 16

12. DATE OF

FIRST

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

11. AS OF DATE Final

8. ADP

CODE

13. DATE OF

SUBSEQUENT

SUBMISSION

SEE BLOCK 16

Draft

Reg Repro

16.REMARKS

BLK 5: INCLUDE AND TAKE ACTION ON SECTION I IF FAT IS

REQUIRED.

BLK 10: FREQUENCY - IS DETERMINED BY NUMBER OF FAT/LAT

FAILURES.

BLK 12: DATE OF FIRST SUBMISSION – NLT AN INTERIM REPORT

IS DUE NLT

10 DAYS AFTER NOTIFICATION OF LOT FAILURE. A FINAL REPORT

IS DUE 30

DAYS AFTER NOTIFICATION OF LOT FAILURE.

BLK 13: DATE OF SUBSEQUENT SUBMISSION – NLT 10 DAYS

AFTER FAT

COMPLETION OF SECOND FAILED LOT AND BEYOND.

BLK 14: Distribution List

1. Contract Administration O ice (CAO)

2. NAVSUP WSS Contracting O icer N772

3. NAVSUP ALC, Code A151

4. NUWC-Newport Code 8554

See section H for distribution POC’s and their emails.

SEE BLOCK 14 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY

Richard Rzomp

H. DATE

22 October

I. APPROVED BY

Philip Lindley

J. DATE

22 October 2024

DD FORM 1423-1, FEB 2001

PREVIOUS EDITION MAY BE

USED.

Page 1 of 2 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Je erson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting O icer for the Contract/PR No.

listed in Block E.

A. CONTRACT LINE ITEM

NO.

B. EXHIBIT

C. CATEGORY:

TDP ☐ TM ☐ OTHER ☐

D. SYSTEM/ITEM

4T – 5935-01-678-7255

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA

ITEM NO.

A002

2. TITLE OF DATA ITEM

Contractor’s Progress, Status and Management Report

3. SUBTITLE

17. PRICE

GROUP

4. AUTHORITY (Data Acquisition Document No.)

DID-81928

5. CONTRACT REFERENCE

6. REQUIREING OFFICE

NUWC KEYPORT

18.

ESTIMATED

TOTAL PRICE

7. DD 250

REQ

LT

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

MNTHLY

12. DATE OF

FIRST

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. ADP

CODE

11. AS OF DATE

13. DATE OF

SUBSEQUENT

Draft

Final

Reg Repro

16. REMARKS

BLK 11, 12,14: THE DD-375 REPORT SHALL BE SUBMITTED VIA

MAIL OR EMAIL ON OR BEFORE THE 5TH DAY OF EAC MONTH

AFTER CONTRACT AWARD.

BLK 14: Distribution List

1. Contract Administration O ice (CAO)

SEE BLOCK 14 0 1 0

2. NAVSUP WSS Contracting O icer N772

3. NAVSUP ALC, Code A151

4. NUWC-Newport Code 8554

See section H for distribution POC’s and their emails.

15. TOTAL

G. PREPARED BY

Richard Rzomp

H. DATE

22 October

I. APPROVED BY

Philip Lindley

J. DATE

22 October 2024

DD FORM 1423-1, FEB 2001

PREVIOUS EDITION MAY BE

USED.

Page 2 of 2 Pages

File details come from the government source that posted it. Updated .