1.04_CDRLS DD 1423_N0010425QF025_25YRA42.pdf
PDF 196 KB Posted
- Attached to
- Repair of qty 2, CO2 Scrubber, Skid B
- Solicitation number
- N0010425QF025
About this file
This is a Contract Data Requirements List (CDRL) for a CO2 Scrubber refurbishment contract under TRIPER REFURB INST 5320-012-0728 REV G Chg-5. The document outlines nine required data deliverables (A001 through A009) that the contractor SUBMEPP must submit throughout contract performance, including receipt inspection reports, maintenance and performance reports, welding procedures, unplanned parts usage reports, provisioning technical documentation, certification of compliance, NDT procedures and test reports, and final inspection/operational test reports.
All deliverables must be submitted "as required" via the Wide Area Work Flow (WAWF) system to the maximum extent possible, with distribution to SUBMEPP Code 1831, NAVSUP WSS N742, and NAVSUP WSS N9751. Key requirements include welding procedures that must receive acceptance prior to welding and meet specific NAVSEA standards, NDT procedures complying with NAVSEA T9074-AS-GIB-010/271, provisioning documentation due within 60 days of contract award if changes affect unit provisioning, and certification documentation traceable to Rotatable Pool Serial Numbers. The document is prepared by B. Matthews and approved by S.A. Woodley, with copies required in shipping crates for certain deliverables.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3.01_SolicitationN0010425QF025_25YRA42.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRIPER REFURB INST 5320-012-0728 REV G Chg-5, Enclosure (2)
CONTRACT DATA REQUIREMENTS LIST
A. CONTR. LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
XX TDP TM OTHER
D. SYSTEM/ITEM
CO2 Scrubber
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUHORITY (Data Item Descript) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ. 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF
FIRST
SUBMISSION
14. DISTRIBUTION
DR - DRAFT
8. APP CODE 11. AS OF
DATE
13. SUBSEQUENT
SUBMISSION
RG - REGULAR
RP - REPRO
15. REMARKS
1. A001 2. SUBMEPP RECEIPT INSPECTION REPORT 3. RECEIPT INSPECTION REPORT
4. DI-MGMT-80389C (SUBRIR) 5. RI 5230-012-0728 Rev G Chg 5 6. SUBMEPP
7. DD 9. DIST
STATEMENT
REQUIRED
D
10. AS
REQUIRED
12. AS REQUIRED 14. DISTRIBUTION
b. Copies
8. N/A
11. 0 13. AS REQUIRED D
R
R G
R P
15. REMARKS SUBMEPP Code 1831 1 Certification documentation must be submitted via WAWF (Wide Area Work Flow) to the maximum extent possible See Enclosure 1.
NAVSUP WSS N742 1
NAVSUP WSS N9751 1
TOTAL 3
1. A002 2. SUBMEPP Maintenance, Condition and Performance Report
3. Maintenance, Condition and Performance Report
4. DI-MGMT-82048 (SUBCR) 5. RI 5230-012-0728 Rev G Chg 5 6. SUBMEPP
7. DD 9. DIST
STATEMENT
REQUIRED
D
10. AS
REQUIRED
12. AS REQUIRED 14. DISTRIBUTION
b. Copies 8.
N/A
11. 0
13. AS REQUIRED D
R G
R P
15. REMARKS SUBMEPP Code1831 1 Certification documentation must be submitted via WAWF (Wide Area Work Flow) to the maximum extent possible. Contractor own format is acceptable.
NAVSUP WSS N742 1
NAVSUP WSS N9751 1
TOTAL 3
1. A003 2. SUBMEPP Welding Procedures 3. Welding Procedures
4. DI-MISC-80875A (SUBWP) 5. RI 5230-012-0728 Rev G Chg 5 6. SUBMEPP
STATEMENT
REQUIRED
D
10. AS
REQUIRED
12. AS REQUIRED 14. DISTRIBUTION
b. Copies 8.
Acceptance Required prior to welding
11. 0 13. AS REQUIRED
D
R G
R P
16. REMARKS
Certification documentation must be submitted via WAWF (Wide Area Work Flow) to the NAVSUP WSS N742 1 maximum extent possible. Weld procedures are required to meet the requirements within NAVSUP WSS N9751 1
TOTAL 2
G. PREPARED BY
//S// B. Matthews 1846BM
H. DATE I. APPROVED BY
//S// S.A Woodley 1831SW
J. DATE
DD Form 1423, JUN 90 Previous editions are obsolete Enclosure (2) Page 1 of 4 Pages
DD Form 1423, JUN 90 Previous editions are obsolete Enclosure (2) Page 2 of 4 Pages
A. CONTR. LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
XX TDP TM OTHER
D. SYSTEM/ITEM
CO2 Scrubber
E. CONTRACT/PR NO. F. CONTRACTOR
1. A004 2. SUBMEPP Unplanned Parts Usage Report
3. Unplanned Parts Usage Report
4. DI-MISC-82386 (SUBUPUR) 5. RI 5230-012-0728 Rev G Chg 5 6. SUBMEPP
7. DD 9. DIST
STATEMENT
REQUIRED
10. AS
REQUIRED
12. AS REQUIRED 14. DISTRIBUTION
b.
Copies
R G
R P
15. REMARKS SUBMEPP Code 1831 1
Certification documentation must be submitted via WAWF (Wide Area Work Flow) to the maximum extent possible. Contractor own format is
NAVSUP WSS N742 1
acceptable. Report data to be traceable to Rotatable Pool Serial No. NAVSUP WSS N9751 1
Unplanned parts listed shall include prices TOTAL 3
1. A005 2. SUBMEPP Provisioning Technical Documentation
3. Provisioning Technical Documentation
4. DI-MISC-82386 (SUBMTR) 5. RI 5230-012-0728 Rev G Chg 5 6. SUBMEPP
7. DD 9. DIST
STATEMENT
REQUIRED
D
10. As Required
12. As Required
14. DISTRIBUTION
b. Copies
8. 11. 0 13.NLT 60 days after contract award
D R
R G
R P
15. REMARKS SUBMEPP Code 1831 1 Required only if changes are made that affect the provisioning of the unit NAVSUP WSS N742 1
NAVSUP WSS N9751 1
TOTAL 3
G. PREPARED BY
//S// B. Matthews 1846BM
H. DATE I. APPROVED BY
//S// S.A Woodley 1831SW
C. CATEGORY:
XX TDP TM OTHER
D. SYSTEM/ITEM
1. A006 2. SUBMEPP Certification of Compliance
3. Certification of Compliance
4. DI-MISC-82386 (SUBCC)
5. RI 5230-012-0728 Rev G Chg 5 6. SUBMEPP
STATEMENT
REQUIRED
10. AS
REQUIRED
12. AS REQUIRED 14. DISTRIBUTION
b. Copies
8. N/A 11. 0 13. AS REQURIED D
R R G
R P
15. REMARKS Certification documentation must be submitted via WAWF (Wide Aera Work Flow) SUBMEPP Code 1831 1 to the maximum extent possible. Contractor own format is acceptable Certifying that each Item has NAVSUP WSS N742 been refurbished per para 5 & tested per para 6. One report for each Item, identifiable to the unique NAVSUP WSS N9751 1
Ser. Nos. Include a positive statement indicating if welding or NDT were accomplished, identify the COPY IN CRATE 1 procedures used used & identify any welding accomplished that that did not require weld procedure qualification tests
TOTAL 4
1. A007 2. SUBMEPP Test Procedures
3. NDT Procedures
4. DI-MISC-82386 (SUBNDT) 5. RI 5230-012-0728 6. SUBMEPP
7. LT 9. DIST
STATEMENT
REQUIRED
D
10. AS
REQUIRED
12. AS REQUIRED 14. DISTRIBUTION
8. N/A 11. 0 13. AS REQUIRED
D
R G
R P
16. REMARKS SUBMEPP Code 1831 1 Certification documentation must be submitted via WAWF (Wide Area Work NAVSUP WSS N742 1
Work Flow) to the maximum extent possible. NDT procedures are required to meet the requirements within NAVSEA T9074-AS-GIB-010/271.
NAVSUP WSS N9751 1
TOTAL 3
1. A008 2. SUBMEPP Test/Inspection Reports 3. NDT Test Reports
4. DI-NDTI-80809B (SUBNDTR) 5. RI 5230-012-0728 Rev G Chg 5 6. SUBMEPP
7. DD 9. DIST
STATEMENT
REQUIRED
D
10. AS
REQUIRED
12. AS REQUIRED 14. DISTRIBUTION
R G
R P
15. REMARKS SUBMEPP Code1831 1 Certification documentation must be submitted via WAWF (Wide Area Work Flow) to the maximum extent possible.
NAVSUP WSS N742 1
NAVSUP WSS N9751 1
TOTAL 3
G. PREPARED BY
//S// B. Matthews 1846BM
H. DATE I. APPROVED BY
//S// S.A Woodley 1831SW
DD Form 1423, JUN 90 Previous editions are obsolete Enclosure (2) Page 3 of 4 Pages
C. CATEGORY:
XX TDP TM OTHER
D. SYSTEM/ITEM
1.
A009
2.Final Inspection and Operational Test Report 3.
4. DI-QCIC-81068 (SUBFIR) 5. RI 5230-012-0728 Rev G Chg 5 6. SUBMEPP
STATEMENT
REQUIREMENT
D
10. AS
REQUIRED
12. AS REQUIRED 14. DISTRIBUTION
R G
R P
15. REMARKS Certification documentation must be submitted via WAWF (Wide Area Work Flow) to the maximum extent possible. Use Enclosure (2)
SUBMEPP Code 1831 1
NAVSUP WSS N742 1
NAVSUP WSS N9751
COPY IN CRATE 1
TOTAL 4
1. 2.
3.
4.
5.
6.
7. 9. 10. 12. 14. DISTRIBUTION
8.
11.
13 D
R G
R P
16. REMARKS
TOTAL
b. Copies
8. 11. 13 D
R R G
R
8.
11.
13 D
R G
R
G. PREPARED BY
//S// B. Matthews 1846BM
H. DATE I. APPROVED BY
//S// S.A Woodley 1831SW
DD Form 1423, JUN 90 Previous editions are obsolete Enclosure (2) Page 4 of 4 Pages
File details come from the government source that posted it. Updated .