N0010422RK054.0006.pdf
PDF 653 KB Posted
- Solicitation number
- N0010422RK054
About this file
This document is a solicitation amendment for a firm fixed price contract to procure GGU-15A/A Gas Generators, Dry Bay Fire Extinguishers. The amendment removes the previous IDIQ parameters and creates a firm fixed price solicitation with an option. Several clauses have been added or revised, and the response date has been changed to 24 July 2024.
The solicitation includes a Statement of Objectives, required Contractor Testing, First Article Testing, and Lot Acceptance Testing. There are multiple Contract Line Items for the gas generators, investigative units, and option quantities. Pricing includes step-ladder pricing for the option quantities. The solicitation contains detailed requirements for packaging, marking, configuration control, inspection, and acceptance. Shipment and delivery terms are specified, including provisions for "ship in place" for Foreign Military Sales. The solicitation is restricted to the incumbent contractor, General Dynamics.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0010422RK054.0007.pdf | ||
| N0010422RK054.0006_conformed.pdf | ||
| GfpAttachmentTemplate.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0010422NB006
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. This amendment removes the IDIQ parameters from this solicitation and creates a firm f ixed price solicitation w ith an option several clauses have been added/removed for this purpose as show n on the follow ing pages. Several clauses show n have been revised due to the amount of time that has passed since the original solicitation w as posted.
2. Section I - clause 52.204-27 is added by reference.
3. Section J - GFP attachments are incoprorated.
4. Due date for offers is 02:00 PM Eastern time on 24 July 2024.
1. CONTRACT ID CODE PAGE OF PAGES
1 74
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Jun-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0010422RK054
X 9B. DATED (SEE ITEM 11)
08-Jun-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Jun-2024
CODE
NAVSUP WEAPON SYSTEMS SUPPORT
ASHLEY LEONARD, CODE N772.09
5450 CARLISLE PIKE SUITE 410
MECHANICSBURG PA 17050-2411
N00104 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0010422RK054
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SF30
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 21-Oct-2022 02:30 PM to 24-Jul-2024 02:00 PM.
SECTION B - SUPPLIES OR SERVICES AND PRICES
Global Changes
CLIN 0001 -- SUBCLIN 0002AD
The IDC type has changed from Indefinite Quantity to N/A.
CLIN 0001
The CLIN extended description has changed from:
Government Testing, See SECTION E – PRODUCTION LOT TEST SAMPLES (NSWC IHD TESTING)Nomenclature: GGU-15A/A Gas Generator, Dry Bay Fire Extinguisher Drawing: General Dynamics P/N
33300-301NAVAIR DWG 838AS243
To:
Nomenclature GGU-15A/A Gas Generator, Dry Bay Fire Extinguisher Drawing: General Dynamics P/N 33300-
301NAVAIR DWG 838AS243
SUBCLIN 0001AB
Government Testing, See SECTION E – PRODUCTION LOT TEST SAMPLES (NSWC IHD TESTING)Production Lot Size consists up to 500 each plus test samples. Maximum lot size is 500 each PLUS an additional 10 each PER lot for test (8 each for test and 2 each for investigative purposes). Note: Production Lot Quantity and total number of Production Lot Test Samples TBD at time of award. Ownership Code 3
To:
PRODUCTION LOT TEST SAMPLES CONSISTS OF - 5 TOTAL LOTS
4 LOTS OF 500 EACH NET, PLUS AN ADDITIONAL 10 EACH PER LOT FOR TEST. (8 EACH FOR TEST
AND 2 EACH FOR INVESTIGATIVE PURPOSES.)
1 LOT OF 486 EACH NET, PLUS AN ADDITIONAL 10 EACH PER LOT FOR TEST. (8 EACH FOR TEST
AND 2 EACH FOR INVESTIGATIVE PURPOSES.)
Ownership Code 3
The pricing detail quantity has changed from UNDEFINED to 40.00.
SUBCLIN 0001AC
Production Lot Size consists up to 500 each plus test samples. Maximum lot size is 500 each PLUS an additional 10 each PER lot for test (8 each for test and 2 each for investigative purposes). Ownership Code 3
CONSISTS OF - 5 TOTAL LOTS
4 LOTS OF 500 EACH NET, PLUS AN ADDITIONAL 10 EACH PER LOT FOR TEST. (8 EACH FOR TEST
AND 2 EACH FOR INVESTIGATIVE PURPOSES.)
1 LOT OF 486 EACH NET, PLUS AN ADDITIONAL 10 EACH PER LOT FOR TEST. (8 EACH FOR TEST
AND 2 EACH FOR INVESTIGATIVE PURPOSES.)
Ownership Code 3
The pricing detail quantity has changed from UNDEFINED to 10.00.
SUBCLIN 0001AD
Nomenclature: GGU-15A/A Gas Generator, Dry Bay Fire Extinguisher Drawing: General Dynamics P/N 33300- 301NAVAIR DWG 838AS243See attached pricing matrix for stepladder pricing
FY22 PANMC
OWNERSHIP CODE 5
The pricing detail quantity has decreased by 12,504.00 from 14,414.00 to 1,910.00.
CLIN 0002
Contractor Testing - see SECTION E – PRODUCTION LOT TEST SAMPLES (CONTRACTOR TESTING)Nomenclature: GGU-15A/A Gas Generator, Dry Bay Fire Extinguisher Drawing: General Dynamics P/N
33300-301NAVAIR DWG 838AS243
Nomenclature GGU-15A/A Gas Generator, Dry Bay Fire Extinguisher Drawing: General Dynamics P/N 33300-301
NAVAIR DWG 838AS243
IF NO UNIT PRICES ARE SUBMITTED FOR ITEM 0002, THEN THE UNIT PRICE SUBMITTED FOR ITEM
0001 WILL BE CONSIDERED THE UNIT PRICE FOR ALL STEPLADDERS. OFFERORS MAY SUBMIT
VARYING PRICES FOR THE OPTION STEPLADDERS. THE OPTION VALIDITY PERIOD IS 270 DAYS
AFTER THE DATE OF CONTRACT AWARD.
The option status has changed from No Status to Option.
SUBCLIN 0002AA
The CLIN description has changed from DODIC: SS49 TECHNICAL DATA to OPTION DODIC SS49.
– See DD Form 1423, Exhibit A
TECHNICAL DATA – See DD Form 1423, Exhibit A
SUBCLIN 0002AB
The CLIN description has changed from DODIC: SS49 PRODUCTION LOT TEST SAMPLES to
OPTION DODIC SS49.
The CLIN extended description has changed from:
Contractor Testing - see SECTION E – PRODUCTION LOT TEST SAMPLES (CONTRACTOR TESTING)Production Lot Size consists up to 500 each plus test samples. Maximum lot size is 500 each PLUS an additional 10 each PER lot for test (8 each for test and 2 each for investigative purposes). Note: Production Lot Quantity and total number of Production Lot Test Samples TBD at time of award. Ownership Code 3
PRODUCTION LOT TEST SAMPLES
QUANTITY RANGE 1000 - 1999 REQUIRES 4 LOTS WITH 8 LAT AND 2 INVESTIGATIVE UNITS
QUANTITY RANGE 2000 - 3274 REQUIRES 7 LOTS WITH 8 LAT AND 2 INVESTIGAVIE UNITS
The pricing detail quantity has changed from UNDEFINED to 56.00.
SUBCLIN 0002AC
The CLIN description has changed from DODIC: SS49 INVESTIGATIVE UNIT(S) to OPTION DODIC
SS49.
The CLIN extended description has changed from:
Production Lot Size consists up to 500 each plus test samples. Maximum lot size is 500 each PLUS an additional 10 each PER lot for test (8 each for test and 2 each for investigative purposes). Ownership Code 3
INVESTIGATIVE UNITS
QUANTITY RANGE 1000 - 1999 REQUIRES 4 LOTS WITH 8 LAT AND 2 INVESTIGATIVE UNITS
QUANTITY RANGE 2000 - 3274 REQUIRES 7 LOTS WITH 8 LAT AND 2 INVESTIGAVIE UNITS
The pricing detail quantity has changed from UNDEFINED to 12.00.
SUBCLIN 0002AD
The CLIN description has changed from DODIC: SS49 to OPTION DODIC SS49.
The CLIN extended description has changed from:
Nomenclature: GGU-15A/A Gas Generator, Dry Bay Fire Extinguisher Drawing: General Dynamics P/N 33300-301 NAVAIR DWG 838AS243See attached pricing matrix for stepladder pricing
OPTION STEPLADDERS
The pricing detail quantity has decreased by 11,140.00 from 14,414.00 to 3,274.00.
The option status has changed from No Status to Option.
The following stepladder pricing structure has been added:
STEPLADDER NAME ITEM NO FROM QUANTITY TO QUANTITY UNIT PRICE
SS49 OPTION
STEPLADDER
0002AD 1,000.00 1,999.00
2,000.00 3,274.00
SUBCLIN 0001AE is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AE 360 Each
DODIC: SS49
FFP
FMS CASE KU-P-PAK 22P12KU 037
OWNERSHIP CODE 8
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
NSN: 1377-01-448-9910
PSC CD: 1377
NET AMT
SUBCLIN 0001AF is added as follows:
0001AF 108 Each
DODIC: SS49
FFP
FY21 F/A-18E
OWNERSHIP CODE 5
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
SUBCLIN 0001AG is added as follows:
0001AG 36 Each
DODIC: SS49
FFP
FY21 F/A-18F
OWNERSHIP CODE 5
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
SUBCLIN 0001AH is added as follows:
0001AH 60 Each
DODIC: SS49
FFP
FY22 F/A-18F
OWNERSHIP CODE 5
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
SUBCLIN 0001AJ is added as follows:
0001AJ 12 Each
DODIC: SS49
FFP
FY23 F/A-18F
OWNERSHIP CODE 5
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
The following have been modified:
SECTION B NOTES
SOLICITATION NOTES:
1. Faxed offers will NOT be accepted.
2. NECO bids will NOT be accepted.
3. Because the Government intends to award without discussion, any exceptions to the requirements of this solicitation should be raised prior to submission of an offer.
4. This item is a CSI – Critical Safety Item.
5. Electronic submission of an offer may be accomplished by attaching your offer to an email directed to ashley.l.leonard4.civ@us.navy.mil. The size limitation of an email through the NAVSUP WSS mail server is 10 MB. All files designated as .zip files will be stripped from any email sent. Files larger than the server limitation may be segregated and sent via several emails as long as they are clearly identified as such. It is highly recommended that the Offeror request email delivery confirmation or other form of acknowledgement to verify that the proposal submission was received.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
SECTION C
SECTION C – DESCRIPTION AND SPECIFICATIONS
NOTE 1: NON-ANTICIPATION OF INITIAL DEVIATIONS ON AWARDS
Offerors are reminded that any resultant contract will require performance in strict compliance with the specifications set forth therein, and that prices offered should not be predicated upon Contractor anticipation of Government authorization of deviations, even though such deviations may have been granted previously under other contracts for the same item.
NOTE 2: SPECIFICATIONS THAT DO NOT INDICATE SPECIFIC REVISION LEVELS ARE TO BE
MADE TO THE REVISION LEVELS LISTED ON THE DEPARTMENT OF DEFENSE INDEX OF
SPECIFICATION AND STANDARDS IN EFFECT AT THE TIME OF SOLICITATION ISSUANCE.
1. DATA LIST / PART NUMBERS / DRAWING NUMBERS:
CLIN DATA LIST / PART OR DRAWING NUMBERS REVISION REVISION DATE
0001-0002 NAVAIR DL838AS243 B 6/30/2021
2. SPECIFICATIONS:
CLIN SPECIFICATIONS REVISION REVISION DATE
0001-0002 MIL-DTL-32027(OS) - 10/22/1998
a. EXCEPTION to Specification MIL-DTL-32027(OS) Approved ECP FY13E25JF016 - For details refer to Technical Data Package (TDP).
3. For Contractor part number, Contractor SHALL submit Product Baseline in accordance with DD1423, sequence number A001. Any revisions to an approved Product Baseline require resubmission in accordance with DD1423, sequence number A001.
4. Obsolescence Alert Notice: The contractor shall notify the USG that a pending and/or emergent obsolescence issue exists by submitting a Obsolescence Alert Notice in accordance with DD1423, sequence number A002.
SECTION C – CONFIGURATION CONTROL: SAE EIA-649 (NAVY STOCK CLASS 1377)
1. Configuration Control - The Contractor shall maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration shall be provided to the Government in electronic format.
a. All contractor configuration changes that occurred between contract awards shall be submitted to the Government for approval within 45 days of contract award.
b. Any configuration changes after contract award shall be submitted within 45 days of contract award.
c. All configuration changes shall be submitted at least 60 days prior to Lot Acceptance Testing.
2. Variances – Requests for Variance (RFV) - RFVs shall be designated as Critical, Major, or Minor. The Contractor shall submit RFVs using RFV DD Form 1694 and shall include information as outlined in SAE EIA-649, Configuration Management Standard, and MIL-HDBK-61, Configuration Management Guidance, for additional guidance on preparation of RFVs.
Note: A copy of the required RFV Form DD Form 1694 is available at:
https://www.esd.whs.mil/Directives/forms/dd1500_1999/ Additional guidance for completion of RFV can be found at the Attachment “RFV Form DD1694 Example Only dated 02/14/2023”. This attachment is incorporated by reference with the same force and effect as if contained herein.
The Contractor's assigned RFV number shall use the following numbering format:
a. The last seven alpha-numeric characters of the contract number followed by a dash (-).
b. The letter "V", followed by consecutively assigned numeric characters beginning with 001.
Definitions of RFV Classifications: (See current SAE EIA 649 and MIL-HDBK-61, Configuration Management Guidance, for additional guidance on critical, major and minor classifications.)
Critical: Critical variances impact safety, health, environment, or other critical requirement. A departure from a requirement classified as critical in configuration documentation.
Major: Major variances have significant impacts such as performance or operational limits, structural strength, interchangeability, reliability, survivability, maintainability, durability of the item or repair parts, supportability, cost, effective use or operation, weight or size, or appearance. A departure from a requirement classified as major in configuration documentation.
Minor: Minor variances are issued when departure does not involve any of the factors listed for critical or major variance. Minor variances have little or no impact and are generally associated with non-functional factory defects that can be dispositioned locally as: “use as is” or “after suitable repair”. A departure from a requirement classified as minor in configuration documentation.
3. Engineering Change Proposal (ECP) - ECPs shall be designated as Major (Class I) or Minor (Class II).The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the end-item and its sub-assemblies. Minor (Class II) and Major (Class I) ECP changes shall be approved by the Navy Configuration Control Board (CCB) and technical approval authority prior to implementation. The DD Form 1692 is the preferred format for ECP submissions. ECPs may also be prepared in Contractor format, provided it fulfils the requirements of DD Form 1692, and shall include information outlined in SAE EIA-649 and MIL-HDBK-61, which provides additional guidance for preparation of ECPs.
ECPs submitted using DD Form 1692 shall use the following numbering format:
a. The last seven alpha-numeric characters of the contract number followed by a dash (-).
b. The letters "ECP", followed by consecutively assigned numeric characters beginning with 001.
Definitions of ECP Classifications: (See current SAE EIA 649 and MIL-HDBK-61 for additional guidance on Major (Class I) and Minor (Class II) classifications.)
Major (Class I):
a. A change that affects specified and approved requirements for product attributes, including safety, reliability, and supportability.
b. A change, after establishment of the product baseline, that affects compatibility with interfacing products, including such products as test equipment, support equipment, software, and products furnished by a customer or that affects one or more of the following:
- required calibration to the extent that product identification should be changed
- interchangeability or substitutability of replaceable products, assemblies, or components
- change to add a previously non-qualified supplier, where supplier selection is specified
- requires retrofit of delivered products
c. A change that affect the form, fit, and/or function, and/or requirements, performance, interoperability, supportability, maintainability, cost, safety, addition of a vendor, or a vendor moves facility and the item has not been qualified at that site.
Definitions of form, fit and/or function:
Form: the shape, external size, and marking which uniquely characterizes an item.
Fit: the ability of an item to physically interface or interconnect with and become an integral part of a higher level assembly.
Function: the action[s] that an item is designed to perform including performance, durability and safety.
The following are examples of Major (Class I) changes with regard to function
a. Change to energetic material
b. Change to component material or material properties
c. Change to electrical characteristics.
d. Change in ballistic performance.
Minor (Class II):
a. Affects configuration documentation (released design information), product or processes but does not affect Major Change Criteria.
b. Changes that do not affect the form, fit, or function.
If the Navy technical approval authority does not approve the ECP submitted by the Contractor, then the Contractor is required to revert to the Government approved revision of the drawing per the approved product baseline or to the revision used in the prior lot accepted by the Government. The Government reserves the right to invoke First Article Testing (FAT) per paragraph 2 of “Section E-CAD/PAD Inspection and Acceptance”, or require the Contractor to undergo qualification testing.
4. Contractors do not have Material Review Board (MRB) authority. Authorization to accept “as-is”, rework, or repair any nonconformance is specifically retained by the Contracting Officer. The contractor's MRB shall not make any use "as-is", "rework" or “repair” disposition on any nonconformance, and the MRB recommendations shall be submitted per paragraph seven (7) below.
5. Rework and Repair are defined as follows:
a. Rework: The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
b. Repair: The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
6. Prior to submission of the lot to the Government for inspection and acceptance, all parts, subassemblies, and even the end item that undergo in-process screening for defects can be reworked under the direction of the contractor to ensure all parts meet the requirements of the Technical Data Package (TDP) and/or detailed specification.
If the contractor recommends, through an internal MRB, to process non-conforming parts, subassemblies, or the end item for use "as-is" or “repaired”, then the contractor will be required to submit a Request for Variance (RFV) to the Government for disposition. If a non-conformance is discovered, which results in a failure of the item to meet the requirements of the TDP or detailed specification after the lot has been presented to the Government, then the contractor will be required to provide to the Government documentation such as RFVs, Discrepancy Reports(DR) related to contractor's MRBs, and/or rework procedures used to correct the deficiency (if applicable). Rework of a lot to correct a deficiency after it has been presented to the Government may require the lot number and all the associated records to be changed, per the requirements of MIL-STD-1168.
7. The Contractor shall submit an electronic copy of any ECP or RFV to the Contracting Officer, Local DCMA QAR, and the technical activity below:
a. Local DCMA QAR
b. NAVSUP WSS Contracting Officer
c. NSWC IHD CAD/PAD Division Acquisition Management Specialist (AMS)
8. Technical approval authority for RFVs and ECPs is NSWC IHD
9. Final approval of any ECP and/or RFV shall be in writing, by the Contracting Officer, NAVSUP Weapon
Systems Support.
SECTION C - IDENTIFICATION OF COVERED DEFENSE INFORMATION (In Reference to 252.204-
7012)
1. In accordance with the DFARS clause at 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, the Contractor shall provide adequate security for all government and contractor owned Technical Data Packages (TDPs), drawings and item detail specifications on all covered defense information systems that support the performance of work under this contract.
SECTION D - PACKAGING AND MARKING
SECTION D
SECTION D – UID CAD/PAD ITEM MARKING INFORMATION
Unless otherwise specified in the Technical Data Package (TDP), CAD/PAD items shall meet the Human Readable Information (HRSI) marking requirements of paragraph 3.1 of the attachment “CAD/PAD Item Marking Instruction Version 1.5”. The Machine Readable Information (MRI) Data Construct, paragraph 3.2, and Placement of Unique Identification (UID), paragraph 4, are mandatory requirements.
NOTE: UID marking is REQUIRED for investigative units (also known as retains). UID reporting under the WAWF DD250s is not required for investigative units.
SECTION D – PACKING, MARKING, AND TRANSPORTATION
1. Preservation, packaging, packing, and marking shall be in accordance with MIL-STD-129, MIL-STD-2073, CFR
49 171-178, MIL-STD-130, DLAR 4145.41, and Section Five (5) of Specification MIL-DTL-85097E (OS).
2. Packaging and packing for production lots, first article samples and lot acceptance samples shall be IAW the following by item:
CLIN QUP IAW
0001-0002 1 NAVAIR DWG 3205AS199
NOTE: Quantity per Unit Pack (QUP) is defined as the first tie, wrap, or container applied to a single item, or a quantity thereof, or to a group of items of a single stock number, preserved or unpreserved, which constitutes a complete or identifiable package.
3. Labels for Human Readable Information (HRI) and Machine Readable Information (MRI) shall meet the requirements for a Grade A, Style 2, Composition (b) label as specified in MIL-PRF-61002. The performance requirements for solvent and detergent resistance are not required. The label should be the pressure sensitive adhesive type.
4. Human Readable Information (HRI) markings shall be applied to ammunition, explosives containers and units loads IAW the applicable provisions of MIL-STD-129.
a. At a minimum, inner container markings for CLIN 0001 shall include:
National Stock Number and (DoD) Code: (see Section “B” for applicable CLIN) Item Nomenclature: (see Section “B” for applicable CLIN) Item Assembly Drawing Number: (see Section “B” for applicable CLIN) Quantity: As Applicable Lot Number: IAW MIL-STD-1168 Serial Number: Required ( x ) N/A ( )
b. At a minimum, outer container markings for CLIN 0001 shall include:
National Stock Number and (DoD) Code: (see Section “B” for applicable CLIN) Item Nomenclature: (see section “B” for applicable CLIN) Item Assembly Drawing Number: (see Section “B” for applicable CLIN) Quantity: As Applicable Lot Number: IAW MIL-STD-1168 Serial Number: Required ( x) N/A ( ) Gross Weight and Cube: As Applicable DoD Contract Number: As Applicable
POP Markings: (see Section “D” – Packaging, Marking and Transportation paragraph 6a – below.)
UN Proper Shipping Name, UN Number, Hazard Class, Compatibility Code, Net Explosive Weight, and EX Number: (see TABLE 1 below for applicable CLIN)
CAA: USG DOT 'EX NUMBER'
(see TABLE 1 EX NUMBER COLUMN below for applicable CLIN) Example CAA: USG DOT 880832
TABLE 1: United Nations Shipping / Storage Information
CLIN NUM
UN PROPER SHIPPING
NAME
UN
NUMBE
R
HAZARD
CLASS
COMPA.
CODE
NET
EXPLOSIVE
WT (lbs)
EX
NUMBER
0001-
Cartridges, Power Devices
0276 1.4 C 0.425780 1998070117
5. Machine Readable Information (MRI) markings shall be applied to ammunition, explosive containers and unit loads IAW the following coded elements of data from MIL-STD-129. MRI labels shall able to be read and interpreted by automatic bar code reading devices (scanners). MRI markings shall contain the minimum data elements identified below:
a. Inner container:
(N) National Stock Number: (see Section “B” for applicable CLIN)
(4R) Department of Defense identification code (DODIC): (see Section “B” for applicable CLIN)
(1P) Item Assembly Drawing Number: (see Section “B” for applicable CLIN)
(1T) Lot Number: IAW MIL-STD-1168
(S) Serial Number: Required ( x) N/A ( )
b. Outer container:
(N) National Stock Number: (see Section “B” for applicable CLIN)
(4R) Department of Defense identification code (DODIC): (see Section “B” for applicable CLIN)
(1P) Item Assembly Drawing Number: (see Section “B” for applicable CLIN)
(7Q) Quantity: As Applicable
(1T) Lot Number: IAW MIL-STD-1168
(S) Serial Number: Required (x) N/A ( )
NOTE: The parenthesis surrounding the data elements are NOT encoded in the 2D(PDF417) bar code.
6a. Shipment of hazardous material (which includes devices containing energetic and explosive material) is subject to the requirements of Title 49, Code of Federal Regulations (CFR), the International Maritime Organization’s International Maritime Dangerous Goods (IMDG) Code, and the International Civil Aviation Organization (ICAO) Technical Instructions for the safe transport of hazardous goods. The contractor shall make all shipments of hazardous material in packaging approved by Performance Oriented Packaging (POP) testing within its recertification period. If packaging used exceeds a single periodic retest period as regulated in 49 CFR 178.601 or comes from multiple manufacturers, multiple or additional POP Test Reports covering all periods of manufacture/manufacturers are required.
6b. For special packaging instructions (SPI) of USAF origin, the contractor may inquire about receiving a copy of the latest DOD performed POP test. Inquiry shall be in writing to the contracting officer a minimum of 30 days prior to need.
NOTE: Foreign Military Sales (FMS) Shipments: As applicable, all outer containers should be clearly marked with the FMS Case Designation, Requisition Number and Project Code, and Country Specific EX Numbers for NOA required shipments- See Section "F" for proper identification.
7. Traceable seals are required for all ammunition and ordnance items, including inert configuration items.
Traceable seals provide an indication of security, integrity and certification of material serviceability. Traceable seals ensure that the ammunition, ordnance and/or inert item is not pilfered or tampered with after being placed in each shipping container at the time of packaging. The shipping container will normally be the outer container.
The Contractor shall ensure one of the below traceable seals are properly affixed depending on the type of shipping container.
a. Type 1 TRACEABLE SEALS (WIRE SEALS): Type 1 seals are the preferred seals for containers having provisions or means for application of the seals, e.g., metal, plastic, fiberglass, or wood containers with lids or hinged covers, latches, brackets or flanges. A Type 1 seal is, typically, a wire length with an aluminum disk or pellet which is crimped or crushed using a die which imprints a “U.S.” symbol on one side of the disk/pellet with an individual’s traceable serial number on the reverse side of the disk/pellet.
b. Type 2 SEALS (LABEL SEALS): Type 2 seals are the preferred seals for fiberboard or Styrofoam containers or for metal, plastic, fiberglass or wood containers that will not readily accept Type 1 seals. Type 2 seals are, typically, nonmetallic labels with pressure sensitive backing. They may be pre-printed, stamped or marked with a “U.S.”
symbol. Type 2 seals shall be applied such that the label must be cut or defaced in order to open a container.
Adhesives shall adhere well enough to prevent peeling during shipping conditions and well enough to prevent lifting and replacement of the label. Particular consideration shall be given to label seals required to adhere to wood and fiberboard surfaces.
8. Restrictions Involving Non-Manufactured Wood Packaging (NMWP) and Pallets (per Defense Logistics Agency Directive subpart 47.305-1(c)(90): “All wooden pallets and wood containers produced of non-manufactured wood shall be constructed from Heat Treated (HT to 56 degrees Centigrade for 30 minutes) material and certified by an accredited agency recognized by the American Lumber Standards Committee (ALSC) in accordance with Non-manufactured Wood Packing Policy and Non-manufactured Wood Packing Enforcement Regulations, both dated May 30, 2001.”
SECTION D – PALLETIZATION
Production Lot units shall be palletized in accordance MIL-STD-1322, MIL-STD-1322-1000, MIL-STD-129, MIL- STD-130, and CFR 49 171-178 with the following exceptions:
a. Edge protectors shall be used under all strapping.
b. Navy items shall be palletized on Mark 3 Mod 0 pallets conforming to the requirements of MIL-P-23312.
a.) Navy items pertain to CLIN(s): TBD
SECTION E
SECTION E – PRODUCTION LOT TEST SAMPLES (CONTRACTOR TESTING)
1. Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001AA / 0002AA Technical Data See DD1423 See DD1423 See DD1423 See DD1423 0001AB / 0002AB Lot Acceptance Testing 0001AC / 0002AC LAT Investigative Units
Contractor Contractor
Government Government
Contractor Contractor
Government Government
0001AD – 0001AJ Production Units Contractor Government Contractor Government 0002AD – TBD Production Units Contractor Government Contractor Government
If supplies will be packaged at a location different from the offeror address indicated on the solicitation, the offeror shall provide the name and street address of the packaging location:
Packaging House
Address
2. Test samples are required from each production lot and are to be tested in accordance with the approved test plan.
A production lot shall consist of the net deliverable quantity plus additional lot test samples and any retained sample units for investigative purposes (if applicable) as detailed in section B.
3. The contractor is allowed to pre-select no more than 30% of the required production lot test samples per lot which have minor external cosmetic defects such as nicks, dings, scratches, paint blemishes, plating blemishes, and small burrs. These units can be used as pre-selected production lot test samples as long as the defects do not create an interference with the form, fit, or function of the unit and/or test fixture. The selection of the production lot test samples shall be noted in a discrepancy report (DR) identifying the item part number, DODIC, contract, lot number, serial numbers of the pre-selected units, and the cosmetic defects of each serial number. A copy of the DR shall be submitted to the Contracting Officer. A second copy of the DR shall be submitted to DCMA/QAR when presenting the production lot for random selection of the remaining lot test samples as stated in paragraph 4 below. The contractor shall also annotate the DR number in the remarks section of the ADC for the applicable production lot. This clause is only applicable to the production lot test samples and the external cosmetic defects mentioned above. If additional units with minor external cosmetic defects are part of the deliverable lot and the contractor would like for the government to accept those units "as is", then a RFV shall be submitted to the Contracting Officer for the determination of disposition for those non-compliant deliverable units.
4. The production lot(s) must be manufactured and presented to the Government Quality Assurance Representative (QAR) with all applicable. The documentation (WAWF-RRs and Ammunition Data Card printed from WARP) accompanying the production shall contain the contract number, item, lot number identification, DODIC, NSN, and serial numbers. The production lot test samples shall be selected, at random(unless following the exception noted in paragraph 3), from each production lot, by the QAR. The retains are considered part of the production lot test samples and shall also be selected, at random, from each production lot, by the QAR and identified as such.
NOTE: Sample units removed for testing from different lots shall not be commingled.
5. Production lot testing shall be performed by the Contractor within 30 calendar days of production lot sample selection. Production lot testing shall be witnessed by at least the cognizant QAR. A representative of the engineering activity may also elect to witness testing, therefore; the Contractor shall provide written notification to the Contracting Officer, with concurrent notification to the AMS in Section H, and the QAR, at least 10 working days prior to the planned testing date citing the lot number that is ready to be tested. If testing is cancelled within the 10 working day period, the contractor shall provide notification to the Contracting Officer, with concurrent notification to the engineering activity. At a minimum, cancellation notification shall be sent no later than two days prior to planned test date.
NOTE: If a failure occurs during testing and an engineering activity representative is not present, all testing shall be halted and the engineering activity and Contracting Officer shall be notified within 24 hours.
A Government representative shall be allowed to participate in the failure investigation in accordance with applicable CDRLs. Contractor testing shall resume upon notification by the Contracting Officer.
6. Disposition of Production Lot Test Samples – The production lot samples are subjected to Non-Destructive Test (NDT) depending on the requirements delineated by the TDP and/or item specification specified in section C.
The production lot test samples are also subjected to destructive testing. These units cannot be used to meet the total contract quantity.
7. A production lot test report is required and shall be submitted in accordance with the contract data requirement list (CDRL) DD Form 1423, sequence number A003. The test report shall include all results of testing conducted in accordance with the approved test plan.
8. Acceptance, shipment, and payment shall not be accomplished until the production lot test samples have been tested, the required CDRLs received, and the lot has been released for service use. The retains for investigation purposes, if applicable, shall be shipped to the address provided in Section F of the contract after the lot has been released for service use.
9. The only valid and contractually binding notification of production lot approval, conditional approval, or disapproval shall be in writing and issued by the Contracting Officer. This notification shall be made to the Contractor within fifteen 15 calendar days after the Contracting Officer receives all applicable CDRLs. Any CDRLs provided by the Contractor deemed to be inaccurate and/or incomplete after engineering review will automatically reset the notification of production lot approval, conditional approval, or disapproval. Upon receipt of the written approval accepting a production lot(s) and final approval of the Material Inspection Receiving Report in Wide Area Workflow (WAWF), the Contractor shall ship the production lot(s) as soon as possible and no later than fifteen
(15) calendar days after receipt of such notice. Final acceptance of the production lot(s) shall be the responsibility of the cognizant DCMA QAR, but shall not occur unless and until the production lot approval has been issued in writing by the Contracting Officer.
a. Any notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.
b. A notice of conditional approval may state any further action required by the Contractor.
c. A notice of disapproval may cite reasons for such. In the event of a failure, the Contractor shall submit a Failure Analysis and Corrective Action Report (DD Form 1423, sequence number, A004) with all associated costs and expenses to be borne solely by the Contractor. “Failure” is defined as follows:
i. Any of the test samples failing to meet the requirements of the specification and/or drawing,
ii. Any of the test samples fracturing and/or exhibiting any cracks post-firing unless specifically designed to do so,
iii. A non-ignition or failure to fire.
10. At a minimum, the following is required:
a. Failure date
b. Failed part number (e.g. national stock number (NSN), logistics control number, work unit code)
c. Test or mission being performed when the failure occurred(LAT/FAT)
d. Failure symptoms and description of detection or diagnosis methods (e.g. Built In Test)
e. Failure effects (e.g. none, degradation, abort)
f. Repair action (e.g. remove/replace)
g. Failure mode description
h. Failure mechanism/cause of failure
i. Contributing factors, including multiple factor interactions, or secondary effects of the failure
j. Corrective action required to mitigate the failure mode, including:
- Identification of the failure mode
- The recommended process or process control changes, when the failure cause is due to workmanship defects -Proposals for retrofit of all equipment already delivered or assembled, including recommended effectivity, in accordance with the contract
- Disposition of all defective material and material rendered obsolete because of any necessary redesign, to assure their exclusion from production items -Identification of previous functional and environmental qualification tests, if any, invalidated by the corrective action changes and recommendation of those tests that should be repeated, in accordance with the terms of the contract, to demonstrate the corrective action’s effectiveness.
11. If the production lot test sample is disapproved by the Contracting Officer, the QAR may be required to select an additional production lot test sample(s) for testing. This direction may be given by the Contracting Officer in the notice of disapproval. The Contractor shall furnish such additional production lot test sample(s) under the terms and conditions and within the time specified in the notification. The cost of each additional approval test, and all costs related to such test(s), shall be borne by the Contractor. Upon approval of the production lot test sample(s) and all required CDRLs, the Contracting Officer may, at his/her discretion, equitably adjust the delivery schedule of the contract for only the lot represented by such sample(s). The Government reserves the right to require an equitable decrease of the contract price for any extension of the delivery schedule necessitated by additional test(s) or for any additional costs incurred by the Government due to the need for additional approval test(s).
12. If the Contractor fails to deliver any production lot test sample(s) within the time or times specified, or if the Contracting Officer disapproves any of the required CDRLs, the contract may be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract may be subject to termination for default. In such an event, failure of the Government to terminate this contract for default shall not relieve the Contractor of the responsibility to meet the delivery schedule for production quantities.
SECTION E – INSPECTION AND ACCEPTANCE OF TEST PLANS / PROCEDURES
1. The Contractor shall submit a test plan/procedure for Government approval/disapproval as specified in the Contract Data Requirements List (DD Form 1423, sequence number, A005). The test plan shall be submitted within sixty (60) calendar days after contract award date. The Acceptance Test Plan shall identify that test fixtures are available for use at the Contractor’s Facility. Any revisions to an approved Test Plan / Procedure require resubmission in accordance with DD1423, sequence number A005).
2. Notification of test plan approval, conditional approval, or disapproval shall be provided via Wide Area Workflow (WAWF). This notification may be made within 30 calendar days after receipt of the Test Plan/Procedure.
3. The notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.
4. A notice of conditional approval may state any further action required of the Contractor.
5. A notice of disapproval shall cite the reasons for such. If the plan or procedure is disapproved by the Government, the Contractor may be required, at the option of the Government, to submit a revised plan or procedure for evaluation. After each notification by the Government to submit a revised plan or procedure, the Contractor shall, at no additional cost to the Government, make any necessary revisions or modifications to the plan or procedure. Such revisions shall be furnished in accordance with terms and conditions and within the time specified in the notification. The Government may take action on the resubmitted plan or procedure within the time specified above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule necessitated by resubmission of the plan or procedure.
6. If the Contractor fails to deliver the plan or procedure within the time specified, or if the Contracting Officer disapproves any plan or procedure, the Contractor shall be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract shall be subject to termination for default.
However, failure of the Government in such an event to terminate the contract shall not relieve the Contractor of the responsibility to meet all requirements of the contract including delivery of any first article sample(s), data requirements, and/or production quantities.
7. There is hereby created an option for the Government to waive the requirement for submission of a plan or procedure. If the offeror has had its plan previously approved by the Government, the following information shall be furnished:
Approved by__________________________ Date of approval___________________
Contract number and Contractor under which plan/procedure was approved__________________.
Test Plan number, revision date and NSN for which the item was previously approved_____________.
8. If the submission of the plan or procedure is waived, the previously approved plan or procedure shall apply to the contract.
SECTION E – CAD/PAD INSPECTION AND ACCEPTANCE
1. Inspection and acceptance shall be in accordance with DL 838AS243 and MIL-DTL-32027.
2. The Government reserves the right to invoke the requirement for First Article Testing (FAT) if there is a change in process, facilities, materials, equipment, or production of the item. “Process” is defined as the steps or tasks that are performed to create a product. An example of a process change that could invoke FAT is implementation of a new production line. “Facilities” is defined as location or buildings where the process(es) are performed to manufacture a product. An example of a facility change that could invoke FAT is a physical relocation of complex production operations. “Materials” is defined as all the raw ingredients that are used in the manufacturing of the item. An example of a material change that could invoke FAT is a new energetic material supplier, which will need to meet the requirements of the applicable specification. “Equipment” is defined as all the tools used to manufacture a product. An example of an equipment change that could invoke FAT is a machine upgrade that changes energetic material processing technique. “Production” is defined as to make, manufacture, or create a product. An example of a production change that could invoke FAT is a revised method to manufacture delay composition. FAT can also be invoked if two years or more have passed since the item was last manufactured, or if the item has developed a manufacturing or performance related issue that can affect form, fit, or function such as changes to technical requirements, performance, interoperability, supportability, maintainability, or safety.
If there is a desire to have predetermination of a potential change to the process, facilities, materials, equipment, or production of the item, a proposal describing the change and any supporting documentation should be written in a formal letter and provided to the Contracting Officer. The Contracting Officer will provide the letter with the supporting documentation of the proposed changes to the cognizant engineering activity. A formal response on the determination of whether an FAT is required may be provided within fifteen (15) business days after receipt from the Contracting Officer.
Note: The examples provided above are not meant to be all inclusive. The Government shall have the final decision if FAT is invoked based on the proposed change submitted by the contractor as well as the Technical Data Package and/or item specification incorporated by reference in Section C.
3. The Contractor shall provide and maintain a quality program acceptable to the Government and modeled on ISO 9001:2015 or an equivalent quality system. If the quality program is not modeled on ISO 9001:2015 the offeror/prospective Contractor shall indicate the quality system proposed along with how it is equivalent, under separate letter submitted with the offer/proposal.
ISO 9001:2015 Other
This quality system along with program specific production documentation shall be made available for review by the Government’s representative upon request, at the Contractor’s facility at no cost to the Government.
4. Due to the critical nature and safety application of these items, the Contractor and the QAR are cautioned that it is mandatory to ensure the correct identification and nomenclature are assigned for all items and shipping containers prior to shipment including CAGE codes. CAD/PAD Devices are exempt from MIL-STD-129 shelf life markings on packaging; however, they shall have a minimum of 85% of the shelf life remaining at time of delivery. Any delivery from a contractor not having at least 85% shelf-life remaining shall be considered non-conforming.
NOTE: The shelf life for CLIN 0001 is: 11 years and 0 months.
5. Radiographic equipment and procedures shall meet the standards stipulated in the latest revision specification ASTM E1742. Neutron radiography (N-rays), when required for a specific item, shall meet the requirements of ASTM E748 and ASTM E545.
6. Radiographers shall be certified level II or III and qualified in accordance with the requirements described in specification NAS 410.
7. Radiographic Test Technique (RTT) shall include variables which affect the exposure, such as x-ray source, kV or MeV (voltage), mA (current), SFD (Source to Film Distance), or SDD (Source to Detector Distance), exposure time, and film type/detector, and include a diagram or photo of the test setup.
8. Radiographic Test Technique for X-rays and N-rays, as applicable, shall be submitted with the First Article Test (FAT) samples to the activity cited below. If there is no FAT requirement, the radiographic test technique for X-rays and N-rays, as applicable, shall be submitted to the activity below as described in paragraphs 8a and 8b herein.
**(NO EXPLOSIVES TO BE SENT TO THIS ADDRESS)**
NSWC IHD
CAD/PAD DIVISION
ATTN: AMS Per Section H
a. Test technique information for ALL radiographs is specified in section 6 of ASTM E1742, refer to Contract Data Requirement List (CDRL) DD Form 1423 sequence number A006.
The radiographic images shall display a number of units representative of a production lot. Units shall be positioned on the radiographic plate at the areas of minimum and maximum geometric distortion.
9. Notification of approval of the RTT shall be provided via Wide Area Workflow (WAWF). Written notification of rejection will be provided by the Contracting Officer.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .