About this file

This document is a federal solicitation amendment (Amendment 0003) for a requirements contract for naval electronic and electrical components. The solicitation (N0010422RB001) is a 3-year requirements contract with two 1-year option periods, sole-sourced to DRS Naval Power Systems (CAGE 27192). The contract covers 57 National Stock Numbers (NSNs) for various electrical and electronic components, including relays, contactors, switches, transformers, indicators, and other specialized parts used in naval systems.

Key modifications in this amendment include reducing the total NSN count from 83 to 57, updating specific NSNs, and modifying contract periods into three separate 1-year base periods followed by two option years. The estimated quantities represent combined projected demand across base and option years. The contract includes detailed specifications for each item, with specific ordering periods for each contract year, and requires delivery orders to be determined per contract period. The solicitation is issued by the Department of the Navy Naval Supply Systems Command and is structured as a lowest-priced, technically acceptable procurement method.

View the file

Other files

File Type Posted
N0010422RB0010005.pdf PDF
N0010422RB0010004.pdf PDF
N0010422RB0010002.pdf PDF
N0010422RB0010001.pdf PDF
N0010422RB0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00104-22-R-B001 AMEND: 0003 PAGE 3 OF 171

NOTE:

3 YEAR BASE IS NOW SEPARATED INTO THREE 1 YEAR BASE PERIODS. CLINS AND SLINS

UPDATED.

THE QUANTITY REQUESTED HAS BEEN UPDATED FOR EACH NSN.

THE FOLLOWING NIINS HAVE BEEN REMOVED: 012381622,012491056, 012491077, 012498060, 012887602, 013754903, 013798231, 014394702, 014421401, 014429060, 014437347, 014444591, 014463488, 014464521, 014464548, 014465061, 014957593, 014991252, 015126689, 015626714, 015126754, 016084716, 016309203, 016309221, 016309233, 016309234, 016333283, 016527327, 016575751, 016620613, 016653910, 016653915, 016653971, 016782456, 016862946.

THE FOLLOWING NIINS HAVE ALSO BEEN ADDED TAKING THE NUMBER OF NSNs TO BE PROCURED

FROM 83 to 57: 011445716, 012420853, 014737693, 016408926, 016431291, 016683642, 016686773, 016686776, 016718282.

THE FOLLOWING CLAUSES HAVE BEEN UPDATED:

52.252-2, 52.204-8, 252.247-7023, 252.225-7036, 52.252-1, 252.215-7010

THE FOLLOWING PROVISIONS AND CLAUSES HAVE BEEN ADDED:

WSSTERMCZ05, WSSTERMHZ04, WSSTERMHZ05, WSSTERMHZ11, NAVSUPWSSIA21LN, 52.204-30,

52.223-23, 52.226-8, 52.240-1, 52.204-29, WSSTERMLZ10, 252.204-7024

THE FOLLOWING CLAUSES HAVE BEEN INCORPORTATED BY REFERENCE:

52.204-27, 252.225-7056, 252.225-7059, 252.225-7060, 252.225-7064

THE FOLLOWING PROVISIONS AND CLAUSES HAVE BEEN RESERVED OR REMOVED:

252.216-7006, 52.204-4, 52.222-21, 52.222-22, 52.222-25, 52.222-26, 52.223-6, 52.223-18, 252.223-7004, 252.225-7037, 252.225-7038, SUPTXT232-9401(1-92)

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

N00104-22-R-B001 OF 171

NAME OF OFFEROR OR CONTRACT

ITEM NO

SUPPLIES/SERVICES

NSN: 1HM 5999 012497973 X3

CONTACT,ELECTRICAL

SHELF LIFE 0-00

ESTIMATED

QUANTITY

UNIT

EA

UNIT PRICE

AMOUNT

*ESTIMATED QUANTITY REPRESENTS COMBINED PROJECTED DEMAND FOR BASE YEARS 1-3 AND OPTION YEARS 1-2.

PACKAGING CODE:

HM QUP ICQ PMT CD PM WM CUD CT UC LP IC

N 001 AAA 41 1 00 BA BG X BE A EC

UCL SP MK PACK UNIT PKWT UNIT PKCU OPI

O 39 EQQ 0.8 .028 M

0004AA YEAR 1 BASE PERIOD OF CONTRACT

Ship to: To be determined per

Delivery order.

Quantity to be determined per

The ordering period for year one of the base period will be from the date of the contract to the twelfth month after the date of the contract.

0004AE

YEAR 2 BASE PERIOD OF CONTRACT

two of the base period will be from the thirteenth month after the date of the contract through the twenty-fourth months after the date of the contract.

0004AF YEAR 3 BASE PERIOD OF CONTRACT

three of the base period will be from the twenty-fifth month after the date of the contract through thirty-six months after

0004AB

CONTRACT DATA REQUIREMENTS

SEE DD1423, EXHIBIT A

LO

0004AC

OPTION YEAR 1 OF CONTRACT

The ordering period for the first option year will be from the thirty-seventh month after the date of the contract to the forty-eighth month after

0004AD OPTION YEAR TWO OF CONTRACT

second option year will be from the forty-ninth month after the date of the contract to the sixtieth month after

SUPPLIES/SERVICES

NSN: 1HM 5360 012498076 X3

INDICATOR,LIGHT

N 001 AAA 33 1 00 FA 00 0 BE A ED

O 00 EQQ 0.8 .028 O

0006AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0006AE

from the thirteenth month after the date of the contract through the twenty-fourth

0006AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0006AB

0006AC

from the thirty-seventh month after the date of the contract

0006 AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5945 012553385 X5

RELAY,ELECTROMAGNET

N 001 000 51 1 00 EA NA D BS A EC

O 03 EQQ 18.0 .139 M

0007AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0007AE

from the thirteenth month after the date of the contract through the twenty-fourth

0007AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0007AB

0007AC

from the thirty-seventh month after the date of the contract

0007AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HD 5945 012639267 X5

N 001 000 51 1 00 JA GH H ED A 00

B 03 EFF 2.5 0.146 M

0008AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0008AE

from the thirteenth month after the date of the contract through the twenty-fourth

0008AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0008AB

0008AC

from the thirty-seventh month after the date of the contract

0008AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HD 6110 012689325 X5

CONTACTOR,MAGNETIC

N 001 000 51 1 00 00 NA X ED A 00

O 03 EQQ 11.0 .333 M

0009AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0009AE

from the thirteenth month after the date of the contract through the twenty-fourth

0009AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0009AB

0009AC

from the thirty-seventh month after the date of the contract

0009AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5999 013609457 X3

HEATER,THERMAL RELE

N 001 000 41 1 00 00 BG 0 ED A 00

O 00 EQQ 0.5 .040 M

0011AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0011AE

from the thirteenth month after the date of the contract through the twenty-fourth

0011AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0011AB

0011AC

from the thirty-seventh month after the date of the contract

0011AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HD 6110 013628191 X3

N 001 000 41 1 00 00 NA X ED A 00

O 00 EQQ 30.0 2.185 M

0012AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0012AE

from the thirteenth month after the date of the contract through the twenty-fourth

0012AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0012AB

0012AC

from the thirty-seventh month after the date of the contract

0012AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5945 013634396 X3

RELAY,THERMAL

N 001 000 41 1 00 00 NA A ED A 00

O 00 EQQ .050 M

0013AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0013AE

from the thirteenth month after the date of the contract through the twenty-fourth

0013AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0013AB

0013AC

from the thirty-seventh month after the date of the contract

0013AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5945 013634398 X3

O 00 EQQ 3.0 .016 M

0014AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0014AE

from the thirteenth month after the date of the contract through the twenty-fourth

0014AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0014AB

0014AC

from the thirty-seventh month after the date of the contract

0014AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5999 013765507 X3

HEATER,THERMAL RELE

N 001 AAA 41 1 00 FA 00 0 BE A EC

O 00 EQQ 0.3 .007 O

0016AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0016AE

from the thirteenth month after the date of the contract through the twenty-fourth

0016AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0016AB

0016AC

from the thirty-seventh month after the date of the contract

0016AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 6110 013940023 X5

N 001 000 41 1 00 00 NA B ED A 00

O 00 EQQ 15.0 .667 M

0018AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0018AE

from the thirteenth month after the date of the contract through the twenty-fourth

0018AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0018AB

0018AC

from the thirty-seventh month after the date of the contract

0018AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5945 014346311 X3

ELECTROMECH RELAY

N 001 AAA 41 1 00 FA NA X XX A ED

O 00 EQQ 1.4 .069 M

0019AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0019AE

from the thirteenth month after the date of the contract through the twenty-fourth

0019AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0019AB

0019AC

from the thirty-seventh month after the date of the contract

0019AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5999 014394698 X3

N 001 AAA 33 1 00 FA 00 0 BE A EC

O 00 EQQ 0.1 .005 M

0020AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0020AE

from the thirteenth month after the date of the contract through the twenty-fourth

0020AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0020AB

0020AC

from the thirty-seventh month after the date of the contract

0020AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5999 014394700 X3

O 00 EQQ .003 M

0021AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0021AE

from the thirteenth month after the date of the contract through the twenty-fourth

0021AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0021AB

0021AC

from the thirty-seventh month after the date of the contract

0021AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5950 014394701 X3

COIL,ELECTRICAL

N 001 000 10 1 00 EA BG F EC A 00

O 00 EQQ 0.8 .019 M

0022AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0022AE

from the thirteenth month after the date of the contract through the twenty-fourth

0022AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0022AB

0022AC

from the thirty-seventh month after the date of the contract

0022AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5360 014394703 X3

SPRING,HELICAL,EXTE

O 00 EQQ .002 M

0024AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0024AE

from the thirteenth month after the date of the contract through the twenty-fourth

0024AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0024AB

0024AC

from the thirty-seventh month after the date of the contract

0024AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5999 014410810 X3

O 00 EQQ .001 M

0025AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0025AE

from the thirteenth month after the date of the contract through the twenty-fourth

0025AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0025AB

0025AC

from the thirty-seventh month after the date of the contract

0025AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5999 014410811 X3

O 00 EQQ .004 M

0026AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0026AE

from the thirteenth month after the date of the contract through the twenty-fourth

0026AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0026AB

0026AC

from the thirty-seventh month after the date of the contract

0026AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5999 014417369 X3

O 00 EQQ .004 M

0027AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0027AE

from the thirteenth month after the date of the contract through the twenty-fourth

0027AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0027AB

0027AC

from the thirty-seventh month after the date of the contract

0027AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5999 014417371 X3

CONTACT ASSEMBLY,EL

O 00 EQQ 0.2 .014 M

0028AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0028AE

from the thirteenth month after the date of the contract through the twenty-fourth

0028AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0028AB

0028AC

from the thirty-seventh month after the date of the contract

0028AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5999 014417373 X3

CONTACT ASSEMBLY,EL

O 00 EQQ 0.2 .014 M

0029AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0029AE

from the thirteenth month after the date of the contract through the twenty-fourth

0029AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0029AB

0029AC OPTION YEAR 1 OF CONTRACT

from the thirty-seventh month after the date of the contract

0029AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5930 014421400 X3

SWITCH,PUSH

N 001 AAA ZZ 1 00 ZZ ZZ Z ZZ A ED

O 00 EQQ .032 A

PKG MIL-S-28786

0030AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0030AE

from the thirteenth month after the date of the contract through the twenty-fourth

0030AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0030AB

0030AC OPTION YEAR 1 OF CONTRACT

from the thirty-seventh month after the date of the contract

0030AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5930 014439740 X3

O 00 EQQ 0.4 .167 A

PKG MIL-S-28786

0034AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0034AE

from the thirteenth month after the date of the contract through the twenty-fourth

0034AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0034AB

0034AC OPTION YEAR 1 OF CONTRACT

from the thirty-seventh month after the date of the contract

0034AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HD 6110 014456113 X3

CONTACTOR,MAGNETIC

SHELF LIFE 0-00

ESTIMATED QUANTITY REPRESENTS COMBINED PROJECTED DEMAND FOR BASE YEARS 1-3 AND OPTION YEARS 1-2.

N 001 000 41 1 00 FA JC 0 ED A 00

B 24 EFF 45.0 .750 M

0036AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0036AE

from the thirteenth month after the date of the contract through the twenty-fourth

0036AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0036AB

0036AC

from the thirty-seventh month after the date of the contract

0036AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5940 014464519 X3

TERMINAL BOARD

N 001 AAA 33 1 00 FA 00 0 XX A ED

O 99 EQQ M

0038AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0038AE

from the thirteenth month after the date of the contract through the twenty-fourth

0038AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0038AB

0038AC

from the thirty-seventh month after the date of the contract

0038AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5340 014464535 X3

RESET ASSEMBLY

O 00 EQQ 0.3 .072 M

0040AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0040AE

from the thirteenth month after the date of the contract through the twenty-fourth

0040AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0040AB

0040AC

from the thirty-seventh month after the date of the contract

0040AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 6210 014466634 X3

LIGHT,INDICATOR

N 001 AAA 33 1 00 FA 00 0 XX A ED

O 00 EQQ 0.5 .013 M

0043AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0043AE

from the thirteenth month after the date of the contract through the twenty-fourth

0043AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0043AB

0043AC

from the thirty-seventh month after the date of the contract

0043AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5920 014484858 X3

FUSEHOLDER,EXTRACTO

O 00 EQQ .003 A

PKG PER IRPOD

0044AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0044AE

from the thirteenth month after the date of the contract through the twenty-fourth

0044AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0044AB

0044AC OPTION YEAR 1 OF CONTRACT

from the thirty-seventh month after the date of the contract

0044AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5945 014492594 X3

RELAY,THERMAL

SHELF LIFE 0-00

N 001 AAA 33 1 00 FA 00 0 00 A ED

O 00 EQQ 0.4 .032 M

0045AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0045AE

from the thirteenth month after the date of the contract through the twenty-fourth

0045AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0045AB

0045AC

from the thirty-seventh month after the date of the contract

0045AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5945 014628452 X3

O 00 EQQ 0.6 .006 M

0046AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0046AE

from the thirteenth month after the date of the contract through the twenty-fourth

0046AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0046AB

0046AC

from the thirty-seventh month after the date of the contract

0046AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5950 014685431 X3

TRANSFORMER,POWER

N 001 000 ZZ 1 00 ZZ ZZ Z ZZ A 00

O ZZ EQQ 0.3 .017 A

ZZ = PKG PER IRPOD

0047AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0047AE

from the thirteenth month after the date of the contract through the twenty-fourth

0047AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0047AB

0047AC OPTION YEAR 1 OF CONTRACT

from the thirty-seventh month after the date of the contract

0047AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5930 014957602 X3

N 001 000 41 1 00 EA BG A ED A 00

O 00 EQQ .062 0

0049AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0049AE

from the thirteenth month after the date of the contract through the twenty-fourth

0049AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0049AB

0049AC OPTION YEAR 1 OF CONTRACT

from the thirty-seventh month after the date of the contract

0049AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 6110 014991250 X3

N 001 AAA 41 1 00 EA NA X XX A ED

O 00 EQQ 6.6 .475 O

0050AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0050AE

from the thirteenth month after the date of the contract through the twenty-fourth

0050AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0050AB

0050AC

from the thirty-seventh month after the date of the contract

0050AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 6110 014991251 X3

N 001 AAA 41 1 00 EA NA X XX A ED

O 00 EQQ 4.0 .097 O

0051AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0051AE

from the thirteenth month after the date of the contract through the twenty-fourth

0051AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0051AB

0051AC

from the thirty-seventh month after the date of the contract

0051AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5920 015127181 X3

ABSORBER,OVERVOLTAG

N 001 AAA 31 1 00 EA BG Z ZZ A ED

O 00 EQQ 0.6 .036 O

0055AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0055AE

from the thirteenth month after the date of the contract through the twenty-fourth

0055AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0055AB

0055AC

from the thirty-seventh month after the date of the contract

0055AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5910 015235568 X3

CAPACITOR,FIXED,MET

O 00 EQQ .074 A

ZZ = MIL-C-39028

0056AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0056AE

from the thirteenth month after the date of the contract through the twenty-fourth

0056AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0056AB

0056AC

from the thirty-seventh month after the date of the contract

0056AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5945 015235579 X3

N 001 AAA 33 1 00 EA BG X XX A ED

O 00 EQQ .174 O

0057AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0057AE

from the thirteenth month after the date of the contract through the twenty-fourth

0057AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0057AB

0057AC

from the thirty-seventh month after the date of the contract

0057AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5999 015260414 X3

THERMOPAD

N 001 AAA 33 1 00 00 00 0 B2 A ED

O 00 EQQ .031 O

0058AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0058AE

from the thirteenth month after the date of the contract through the twenty-fourth

0058AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0058AB

0058AC

from the thirty-seventh month after the date of the contract

0058AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 7030 015925035 X3

PLC APP

N 001 000 41 1 00 EA NA M ED A 00

O 00 EQQ O

0060AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0060AE

from the thirteenth month after the date of the contract through the twenty-fourth

0060AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0060AB

0060AC OPTION YEAR 1 OF CONTRACT

from the thirty-seventh month after the date of the contract

0060AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 7030 015925037 X3

MICA HMI

N 001 000 41 1 00 EA NA M ED A 00

O 00 EQQ O

0061AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0061AE

from the thirteenth month after the date of the contract through the twenty-fourth

0061AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0061AB

0061AC

from the thirty-seventh month after the date of the contract

0061AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 7030 015992259 X3

ETC HMS INSTL DISC

N 001 000 41 1 00 EA NA A ED A 00

O 00 EQ O

0062AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0062AE

from the thirteenth month after the date of the contract through the twenty-fourth

0062AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0062AB

0062AC

from the thirty-seventh month after the date of the contract

0062AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 7 HH 6130 016084755 X3

UPS BATTERY DRAWER

N 001 000 41 1 00 EA AD 0 F7 A 00

A 17 EQ M

0064AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0064AE

from the thirteenth month after the date of the contract through the twenty-fourth

0064AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0064AB

0064AC

from the thirty-seventh month after the date of the contract

0064AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 7HH 5998 016084771 X5

VCB DRAWER ASSY

N 001 000 10 1 00 EA AD 0 F7 A 00

A 17 EQ O

0065AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0065AE

from the thirteenth month after the date of the contract through the twenty-fourth

0065AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0065AB

0065AC

from the thirty-seventh month after the date of the contract

0065AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5935 016683641 X3

MICRO RIBBON,60 POS

**MINIMUM ORDERING QUANITITY FOR THE MICRO RIBBON,60 POS IS 31 EA.

PACKAGING CODE:

N 001 000 41 1 00 EA NA B EC A 00

O 00 EQ 2.0 .020 O

0077AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0077AE

from the thirteenth month after the date of the contract through the twenty-fourth

0077AF YEAR 3 BASE PERIOD OF CONTRACT

be from the twenty-fifth month after the date of the contract

0077AB

0077AC

from the thirty-seventh month after the date of the contract

0077AD OPTION YEAR TWO OF CONTRACT

from the forty-ninth month after the date of the contract

SUPPLIES/SERVICES

NSN: 1HM 5935 016683644 X3

MICRO RIBBON,80 POS

**MINIMUM ORDERING QUANITITY FOR THE MICRO RIBBON,80 POS IS 30 EA.

PACKAGING CODE:

N 001 000 41 1 00 EA NA B EC A 00

O 00 EQ 2.0 .020 O

0078AA YEAR 1 BASE PERIOD OF CONTRACT

from the date of the contract to the twelfth month after

0078AE

from the thirteenth month after the date of the contract through the twenty-fourth months

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .