CODE

(Hour)

PAGE(S)

until 02:00 PM local time 16 May 2019

X

A X B X C X D

E X X

G F 50 - 58

59 - 63 X H 64 - 65 donald.fischer@navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO-A6 1 65

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE 15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00104 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and electronically conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

DONALD P. FISCHER 717-605-6289

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 6

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

7 - 8 9 - 10

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

11 - 15

16 - 18 X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 19 - 21 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 22 - 23 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL: TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

24 - 48

PART II - CONTRACT CLAUSES

NAVSUP WEAPON SYSTEMS SUPPORT

DONALD FISCHER, CODE N772.10

5450 CARLISLE PIKE SUITE 410

MECHANICSBURG PA 17050-2411 717-605-6289

717-605-2807 FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.

N3598A19NA038

5. DATE ISSUED

12 Apr 2019

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0010419RK101

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

CWDV MK 53 Mod 2 Cell Replacement Kit

FFP

NSN: 6T 6160-01-406-1563 CWDV

NOMEN: Kit, Cell Replacement Cell Battery MK 53 Mod 2 IAW DWG: Drawing Number PL6915995 and all other Associated Drawings & Specifications

PURCHASE REQUEST NUMBER: N3598A19NA038

NET AMT

0001AA 1 Set NSP CWDV MK 53 Mod 2 Cell Replacement Kit

FFP

NSN: 6T 6160-01-406-1563 CWDV

NOMEN: Kit, Cell Replacement Cell Battery MK 53 Mod 2 Contract Data Requirements List Technical Data, See DD Form 1423 Data items A001 through A007

FOB: Destination

PSC CD: 6160

Not Separately Priced

0001AB 3 Each NSP CWDV MK 53 Mod 2 Cell Replacement Kit

FFP

NSN: 6T 6160-01-406-1563 CWDV

NOMEN: Kit, Cell Replacement Cell Battery MK 53 Mod 2 First Article (Preproduction) Test Samples (See FAR 52.209-3)

FOB: Destination

0001AC 1 Each NSP CWDV MK 53 Mod 2 Cell Replacement Kit

FFP

NSN: 6T 6160-01-406-1563 CWDV

NOMEN: Kit, Cell Replacement Cell Battery MK 53 Mod 2 Production Lot (Periodic) Test Samples.

Consists of: 1 Lots of 15 EA net, plus an additional 1 EA per lot for test.

0001AD 15 Each CWDV MK 53 Mod 2 Cell Replacement Kit

FFP

NSN: 6T 6160-01-406-1563 CWDV

NOMEN: Kit, Cell Replacement Cell Battery MK 53 Mod 2

RX: N0002419RX00150

FOB: Origin

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Origin (Shipping Point)

OPTION CWDV MK 53 Mod 2 Cell Replacement Kit

FFP

NSN: 6T 6160-01-406-1563 CWDV

NOMEN: Kit, Cell Replacement Cell Battery MK 53 Mod 2 100% OPTION Requirement

FOB: ORIGIN

PURCHASE REQUEST NUMBER: TBD

Option quantity up to 100% of base quantity valid for up to 365 days after the date of contract award.

Stepladder: Unit Price:

9 – 11 ___________

12 - 15 ___________

SECTION B NOTES

SOLICITATION NOTES:

1. Faxed offers will NOT be accepted.

2. Because the Government intends to award without discussion, any exceptions to the requirements of this solicitation should be raised prior to submission of an offer.

3. The Government will supply ALL the silver required to perform this contract. For evaluation purposes, the cost of ALL GFM silver to manufacture the First Article Samples (If Required), Production Units, and Production Lot test samples will be added to the total of the proposal using the LBMA (London Bullion Market Association) silver spot price on the day the solicitation closes.

Provide Troy Ounces of Silver Required for Each Line:

Base Quantity Requirement Required Silver

15 Production Lot Units, 1 Production Lot Sample Troy Ounces

3 First Article Test Samples Troy Ounces

Potential Option Quantity (Up to 100%)

15 Production Lot Units, 1 Production Lot Sample Troy Ounces

Note: The potential option quantity is based on the highest step ladder quantity.

4. Electronic submission of an offer may be accomplished by attaching your offer to an email directed to donald.fischer@navy.mil. The size limitation of an email through the NAVSUP WSS mail server is 10 MB. All files designated as .zip files will be stripped from any email sent. Files larger than the server limitation may be segregated and sent via several emails as long as they are clearly identified as such. It is highly recommended that the Offeror request email delivery confirmation or other form of acknowledgement to verify that the proposal submission was received.

5. If no unit prices are submitted for CLIN 0002, the unit prices submitted for CLIN 0001 will be considered the unit price for CLIN 0002 and the respective step ladders. Offerors are encouraged to supply a unit price for each step ladder quantity shown above. Failure to do so could result in an option exercised for a relatively small quantity at the basic contract unit price.

Section C - Descriptions and Specifications

SECTION C

PROCUREMENT SPECIFICATION

I. NSN: 6T 6160-01-406-1563 CWDV

NOMENCLATURE Kit, Cell Replacement Cell Battery MK 53 Mod 2

Assembly Level Baseline – Sequential

Drawing Revision Nomenclature 53711-6915995 C Kit, Cell Replacement Battery MK 53 Mod 2

53711-PL6915995 E

10001-1664833 L Hinge 10001-1664834 L Hinged Hasp with Swivel Hasp 10001-1873770 G Connector Plug and Receptacle, Electrical 53711-6915954 D Wire Harness, Starboard 53711-6915955 D Wire Harness, Port 53711-6915956 C Plate, Identification 53711-6915959 D Connector, Inter-Cell 53711-6915960 D Connector, Inter-Cell 53711-6915961 D Connector, Inter-Row 53711-6915962 D Connector, Step #1 53711-6915963 D Connector, Step #2 53711-6915965 D Connector, Inter-Unit 53711-6915968 E Nut, Terminal 53711-6915969 C Shim, End 53711-6915972 B Spacer 53711-6915975 C Lug, Terminal 53711-6915992 C Handle, Lifting 53711-6915993 D Lug, Terminal, Ring Tongue 53711-6915998 B Battery MK 53 Mod 2 Cells, Shipping Condition 53711-6916000 K Battery MK 53 Mod 2 Elctlt and Misc parts, Shpng Condtn 53711-6916003 B Electrolyte 950cc 53711-7449662 G Bag, Plastic 53711-7521424 A Bag, Plastic with Wire Tie Closure 53711-7521434 A Plastic Molding and Extrusion Materials, Polysulfone

53711-PL6915998 C

10001-WS12633/37 J Battery, Mark 53 Mod 2

10001-WS12633 AB Batteries, Underwater Mine 53711-WS15896 J Environmental Conditioning Test Procedures

CONFIGURATION CONTROL – ANSI/EIA–649

1. Any Engineering Change Proposal (ECP) or Request for Variation (RFV) affecting an item being procured under this contract shall be in accordance with ANSI/EIA-649. Final approval of any ECP and/or RFV shall be in writing, by the Contracting Officer, NAVSUP Weapon Systems Support. If any such approval affects the cost of Performance of this contract, an equitable adjustment shall be made in the contract price in accordance with the provisions of the "Changes" clause of this contract.

2. RFVs shall be issued using information outlined in ANSI/EIA-649 section 5.3.4.1. The use of DD Form 1694 is a required form for RFV submissions. MIL-HDBK-61 provides additional guidance for preparation of RFVs.

3. ECPs shall be issued using information outlined in ANSI/EIA-649 section 5.3.1.4. The use of DD Form 1692 is a required form for ECP submissions. MIL-HDBK-61 provides additional guidance for preparation of ECPs.

4. The contractor's assigned RFV number shall use the following numbering format:

a. The last four alpha-numeric characters of the contract number followed by a dash (-).

b. The letter "V", followed by consecutively assigned numeric characters beginning with 001.

5. The contractor's assigned ECP number shall use the following numbering format:

a. The last four alpha-numeric characters of the contract number followed by a dash (-).

b. The letters "ECP", followed by consecutively assigned numeric characters beginning with 001.

6. The contractor shall submit an electronic copy of any ECP or RFV to the Contracting Officer, Administrating Contracting Officer, and the activity below:

A. Contract Administration Office (CAO), (for review and comment to PCO)

B. NAVSUP WSS Contracting Officer N772.10, Email: donald.fischer@navy.mil

C. NAVSUP ALC, Code A112, Email: margaret.bowerman@navy.mil; richard.rzomp@navy.mil

D. NSWC Panama City Division, Code A12, Email: anne.brown@navy.mil; tina.baxter@navy.mil

7. Technical approval authority for RFVs and ECPs is ISEA and POC’s.

8. Authorization to accept non-conforming supplies is specifically retained by the Contracting Officer.

CLAUSES INCORPORATED BY REFERENCE

252.211-7005 Substitutions for Military or Federal Specifications and

Standards

NOV 2005

mailto:donald.fischer@navy.mil mailto:margaret.bowerman@navy.mil mailto:richard.rzomp@navy.mil mailto:anne.brown@navy.mil mailto:tina.baxter@navy.mil

Section D - Packaging and Marking

SECTION D

Packaging, Packing, Preservation and Transportation

1. Preservation, Packaging, and Packing shall be in accordance with all associated drawings and specification listed herein.

2. Transportation Data:

a. COG/NSN/NALC: 6T 6160-01-406-1563 CWDV

b. Nomenclature: Kit, Cell Replacement Cell Battery

c. GBL Freight Description: N/A

d. NMFC Number: 060880

e. UFCC Number: 34210

f. Hazard Classification (Class, Division and Storage Compatibility): 8

g. UN Number: 1814 Competent Authority Approval (CAA): N/A Exemption number: N/A

h. Container Markings: IAW all associated drawings and specifications as listed herein.

i. Performance Oriented Packaging Certification Marking: UN 1A2/Y93.2/S/** USA/DOD/DLA

j. Label: IAW all associated drawings and specifications as listed herein.

k. CIIC (Controlled Inventory Item Code): 7

l. Hazardous materials shall be offered for transportation in full compliance with Title 49 Code of Federal Regulations (49 CFR).

m. GFM is not hazardous: Hazardous GFM is identified if any: Battery MK53 Mod 2

Remarks: For hazardous and explosive material the above transportation data must be updated within 30 days prior to marking and labeling because of the lead-time between the initiation of the procurement and the actual shipping timeframe. Please contact the contracting officer (donald.Fischer@navy.mil) at the NAVSUP Weapon Systems Support, Mechanicsburg, PA for updated data.

mailto:donald.Fischer@navy.mil

MIL-STD-1168C – AMMUNITION LOT NUMBERING & AMMUNITION DATA CARD

Ammunition lot numbers shall be formatted in accordance with the current version of MIL-STD 1168 and include all lot number elements as reflected in the standard. The lot number shall be documented on the Ammunition Data Card and include associated data in accordance with the current version of MIL-STD 1168:

(1) Manufacturer’s Identification symbol: Only the approved Manufacturer’s Identification symbol for the contractor or manufacturer is to be used in the lot number. Requests for approval of a Manufacturer’s Identification symbol are to be submitted via the Government Inspector. Refer to MIL-HDBK-1461 for guidance, which is available on the WARP Website (https://mhpwarp.redstone.army.mil).

https://mhpwarp.redstone.army.mil/

Section E - Inspection and Acceptance

SECTION E

PRODUCTION LOT TEST SAMPLES (CONTRACTOR TESTING)

1. Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001AA Technical Data See DD1423 See DD1423 See DD1423 See DD1423 0001AB First Article Testing Contractor Government Contractor Government 0001AC Lot Acceptance Testing Contractor Government Contractor Government 0001AD Production Units Contractor Government Contractor Government

If supplies will be packaged at a location different from the offeror address indicated on the solicitation, the offeror shall provide the name and street address of the packaging location:

Packaging House Address

PRODUCTION LOT TEST SAMPLES (CONTRACTOR TESTING)

2. Test samples are required from each production lot and are to be tested in accordance with the approved test plan.

A production lot shall consist of net deliverable quantity, LOT test sample units, and any retained sample units for investigative purposes as may be required by Section B.

3. The production lot(s) must be manufactured and presented to the Government Quality Assurance Representative (QAR) with all documentation required by section B. The documentation (WAWF-RRs and Ammunition Data Card printed from WARP) accompanying the production lot test samples shall contain the contract number, item, lot number identification, DODIC, NSN, and serial numbers. The presentation of the lot shall be made to the QAR 180 calendar days after First Article Approval. If FAT is required then presentation of lot samples shall be made IAW timetable in Section F. The samples shall be selected, at random, from each production lot, by the QAR within 48 hours for resident QARs, or 7 calendar days for non-resident QARs after presentation of the lot.

4. Sample units removed for testing from different lots shall not be commingled.

5. Production lot testing shall be performed by the Contractor within 30 calendar days of production lot sample selection. Production lot testing shall be witnessed by a representative of the engineering activity and/or the cognizant QAR. The Contractor shall provide written notification to the Contracting Officer, with concurrent notification to the engineering activity, and the QAR, at least 20 calendar days prior to the planned testing date.

NOTE: If a failure occurs during testing and an engineering activity representative is not present, all testing shall be halted and the engineering activity and contracting officer shall be notified within 24 hours. A government representative shall be allowed to participate in the failure investigation in accordance with applicable CDRLs. Contractor testing shall resume upon notification by the Contracting Officer.

6. Disposition of Production Lot Test Samples The production lot samples are subjected to non-destructive testing. Sample units which meet test and contract requirements may be delivered as part of the total contract quantity.

7. Retained samples, if applicable, shall be sent to the address shown in Section F after lot release.

8. A production lot test report is required and shall be forwarded in accordance with the DD 1423 sequence number A002 requirements to the address shown in Block 14. The test report shall include all results of testing conducted in accordance with the approved test plan.

9. Acceptance, shipment, and payment shall not be accomplished until the production lot test samples have been tested, the required report approved, and the lot has been released for service use. The retained samples, if applicable, shall be shipped to the address provided in Section F of the contract after the lot has been released for service use.

10. The only valid and contractually binding notification of production lot approval, conditional approval, or disapproval shall be in writing and issued by the Contracting Officer. This notification may be made to the Contractor within 40 calendar days after the Contracting Officer receives the production lot test report(s) and all applicable CDRL requirements. Upon receipt of the written approval accepting a production lot(s), the Contractor shall ship the production lot(s) as soon as possible and no later than 15 calendar days after receipt of such notice.

Final acceptance of the production lot(s) shall be the responsibility of the cognizant DCMA QAR, but shall not occur unless and until the production lot approval has been issued in writing by the Contracting Officer.

a) Any notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.

b) A notice of conditional approval shall state any further action required of the Contractor. In the event the test sample fails to meet the requirements of the specification or drawing, the Contractor shall submit a Failure Analysis and Corrective Action Report (DD Form 1423, sequence number, A003) with all associated costs and expenses to be borne solely by the Contractor.

c) A notice of disapproval may cite reasons for such. If the production lot test report(s) is disapproved by the Contracting Officer, the QAR may be required to select an additional production lot test sample(s) for testing.

This direction may be given by the Contracting Officer in the notice of disapproval. The Contractor shall furnish such additional test sample(s) under the terms and conditions and within the time specified in the notification. The cost of each additional approval test, and all costs related to such test(s), shall be borne by the Contractor. Upon approval of the production lot test sample(s) and report(s), the Contracting Officer may equitably adjust the delivery schedule of the contract for only the lot represented by such sample(s). The Government reserves the right to require an equitable decrease of the contract price for any extension of the delivery schedule necessitated by additional test(s) or for any additional costs incurred by the Government due to the need for additional approval test(s).

11. If the Contractor fails to deliver any production lot test sample(s) within the time or times specified, or if the Contracting Officer disapproves any production lot test report(s), the contract may be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract may be subject to termination for default. In such an event, failure of the Government to terminate this contract for default shall not relieve the Contractor of the responsibility to meet the delivery schedule for production quantities.

INSPECTION AND ACCEPTANCE OF TEST PLANS / PROCEDURES

1. The Contractor shall submit a test plan/procedure for Government approval/disapproval as specified in the Contract Data Requirements List (DD Form 1423, sequence number, A001). The test plan shall be submitted within 60 calendar days after contract award date. The Acceptance Test Plan shall identify that test fixtures are available for use at the Contractor’s Facility.

2. Notification of test plan approval, conditional approval, or disapproval shall be provided via WAWF. This notification may be made within 40 calendar days after receipt of the Production plan/procedure.

3. The notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.

4. A notice of conditional approval shall state any further action required of the Contractor.

5. A notice of disapproval shall cite the reasons for such. If the plan or procedure is disapproved by the Government, the Contractor may be required, at the option of the Government, to submit a revised plan or procedure for evaluation. After each notification by the Government to submit a revised plan or procedure, the Contractor shall, at no additional cost to the Government, make any necessary revisions or modifications to the plan or procedure. Such revisions shall be furnished in accordance with terms and conditions and within the time specified in the notification. The Government may take action on the resubmitted plan or procedure within the time specified above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule necessitated by resubmission of the plan or procedure.

6. If the Contractor fails to deliver the plan or procedure within the time specified, or if the Contracting Officer disapproves any plan or procedure, the Contractor shall be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract shall be subject to termination for default.

However, failure of the Government in such an event to terminate the contract shall not relieve the Contractor of the responsibility to meet all requirements of the contract including delivery of any first article sample(s), data requirements, and/or production quantities.

7. There is hereby created an option for the Government to waive the requirement for submission of a plan or procedure. If the offeror has had its plan previously approved by the Government, the following information shall be furnished:

Approved by__________________________ Date of approval___________________

Contract number and contractor under which plan/procedure was approved__________________.

Test Plan number, revision date and NSN for which the item was previously approved_____________.

8. If the submission of the plan or procedure is waived, the previously approved plan or procedure shall apply to the contract.

INSPECTION AND ACCEPTANCE

Production Quality Assurance of all items to be furnished hereunder shall be made by the cognizant Government Inspector at the contractor's or sub-contractor's plant. Quality Assurance Inspection System to be in accordance with ISO-9001, ANSI/ASQC Q9001, or MIL-Q-9858.

NOTE: Acceptance or rejection shall be accomplished by the cognizant GQAR based upon his own inspection(s) and the results of the First Articles or Periodic Production and/or Acceptance Samples from the testing activity to the GQAR via Procurement Contracting Officer (PCO).

QUALITY ASSURANCE REQUIREMENTS

An inspection lot shall consist of items manufactured under essentially the same conditions and at essentially the same time. Prior to submittal of each inspection lot to the Government Representative, the contractor shall provide inspection/or test records that assure the units presented have passed all inspections and tests required by the applicable drawings, specifications and quality assurance documentation. Unless specified otherwise, as a minimum this inspection and testing shall be in accordance with MIL-STD-105 (MIL-STD-1916), latest revision at issue date of solicitation, inspection Level II, with 100% inspection for critical characteristics, 1.0 AQL (Acceptance Quality Level), for major characteristics and 2.5 AQL for all other characteristics. All defects of the same class will be considered collectively when determined compliance with applicable AQL.

A Quality Assurance System Manual is required (A006). To be submitted for approval no later than 30 days after First Article Approval, or 90 days prior to delivery of first production lot if first articles are waived. Submit QA Systems Manual to:

Commanding Officer NSWC-PCD; Code A12 110 Vernon Ave Panama City, FL 32407-7001

A Quality Assurance Inspection Plan is required (A007). It is to be submitted for approval no later than 30 days after First Article Approval, or 90 days prior to delivery of first production lot if first articles are waived. Submit QA Inspection Plan to:

Commanding Officer NSWC-PCD; Code A12 110 Vernon Ave Panama City, FL 32407-7001

AMMUNITION DATA CARDS AND MATERIAL INSPECTION AND

RECEIVING REPORT

1. Under the direction of the current version of MIL-STD-1168, the Contractor shall furnish Ammunition Data Cards (ADC) for each shipment (test and production) as generated using the Worldwide Ammunition-data Repository Program (WARP). Preparation instructions are found in DI-MISC-80043B and on the WARP website in the WARP User's Manual.

All components and subassemblies shall be listed on the ADC per DI-MISC-80043B, paragraph 3, in accordance with DD 1423 sequence number A004. A printed copy of the ADC from WARP shall be included with each Shipment.

NOTE: The WARP system for Ammo Data Cards requires contractors to hold a certificate to access the system and communicate with the secure DoD server.

The site to obtain ECA Access Certificate is: http://www.identrust.com/warp/index.html

The WARP login website is: https://mhpwarp.redstone.army.mil

2. Lot numbers for all explosive components and explosive subassemblies shall be in accordance with the current version of MIL-STD-1168 (Ammunition Lot Numbering and Ammunition Data Card), and shall be included in the components section of the Ammunition Data Card.

3. In accordance with the DFAR clause at 252.246-7000, Material Inspection and Receiving Report, the Contractor shall prepare and furnish to the Government a WAWF Receiving Report (WAWF-RR) at the time of each delivery (test and production). Preparation instructions are found in the DFAR Supplement Appendix F.

If the date cited in WAWF-RR is an estimated "ship date", the Contractor shall make distribution of a corrected WAWF-RR indicating the "actual ship date" within 24 hours after actual shipment. The following additional data shall be furnished on the WAWF-RR:

a. Complete lot number

b. Total lot size (consists of net, test, and investigative).

c. Serial numbers of units shipped to consignee.

http://www.identrust.com/warp/index.html https://mhpwarp.redstone.army.mil/

d. Net quantity shipped to destination.

1) Item quantity shipped to consignee

2) Total item quantity shipped to consignee

3) Item quantity due consignee

4. The contractor shall make distribution of the ADC and WAWF-RR in accordance with the information provided in Section H no later than 24 hours after shipment. When Item 0001, 0002, etc. is indicated under the designator, the Contractor shall furnish all shipping documents for all SUBCLINs under that line item.

52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.246-16 Responsibility For Supplies APR 1984

CLAUSES INCORPORATED BY FULL TEXT

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

ISO-9001:2015

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph

(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

Section F - Deliveries or Performance

SECTION F

DELIVERIES OR PERFORMANCE

Unless otherwise indicated in this contract, accelerated deliveries are desirable and acceptable at no additional cost to the Government. The addresses for the activities designated to receive supplies are listed below:

LINE / SUBLINE ITEM and QTY SHIP TO:

0001AB 3 Contractor Testing Site (Contractor Facility) 0001AC 1 Contractor Testing Site (Contractor Facility)

0001AD 15

UIC: N41869

NAVUNSEAWARCEN

Detachment Hawthorne HWAD Post 7 Building 104-14 (Code 352) Hawthorne, NV 89415

NOTES: Please contact NAVSUP WSS Contracting Officer (Code N772.10) 60 days prior to shipment to confirm delivery destination. QAR is not authorized to approve items for shipment; approval for shipment is only authorized after the test validation reports have been reviewed and approved by the NAVSUP WSS PCO.

52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-29 F.O.B. Origin FEB 2006 52.247-30 F.O.B. Origin, Contractor's Facility FEB 2006 52.247-34 F.O.B. Destination NOV 1991 52.247-52 Clearance and Documentation Requirements-Shipments to

DOD Air or Water Terminal Transshipment Points

FEB 2006

52.247-55 F.O.B. Point For Delivery Of Government-Furnished Property

JUN 2003

52.247-58 Loading, Blocking, And Bracing Of Freight Car Shipment APR 1984 52.247-59 F.O.B Origin--Carload and Truckload Shipments APR 1984 52.247-65 F.O.B. Origin, Prepaid Freight--Small Package Shipments JAN 1991 252.247-7023 Transportation of Supplies by Sea FEB 2019 252.247-7028 Application for U.S. Government Shipping

Documentation/Instructions

JUN 2012

FAR 52.211-8 TIME OF DELIVERY

(a) The Government requires delivery to be made according to the following schedule:

FIRST ARTICLE REQUIRED DELIVERY SCHEDULE

Item Quantity Days Item Quantity Days

0001AB 3 EA (FAT) 180 DADC 0001AA (CDRLs) 1 Lot A/R 0001AC 1 EA (LOT) 180 DAFATA A001 (Test Procedure) 1 Set A/R 0001AD 15 EA 240 DAFATA A002 (Test Report) 1 Set A/R

A003 (Failure Analysis) 1 Set A/R A004 (ADC) 1 Set A/R A005 (PPR) 1 Set A/R A006 (QASM) 1 Set A/R A007 (QAIP) 1 Set A/R

KEY: DADC = Days After Date of Contract DAFATA = Days After First Article Test Approval

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above will be considered non-responsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFERORS PROPOSED DELIVERY SCHEDULE – First Article Required Delivery Schedule

KEY: DADC = Days After Date of Contract DAFATA = Days After First Article Test Approval

OFFERORS PROPOSED DELIVERY SCHEDULE – First Article Waived Delivery Schedule

KEY: DADC = Days After Date of Contract DAFATA = Days After First Article Test Approval DANLATA = Days After Notification of LAT Approval

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered non-responsive and rejected.

252.223-7003 CHANGE IN PLACE OF PERFORMANCE - AMMUNITION AND EXPLOSIVES (DEC 1991)

(a) The Offeror shall identify, in the "Place of Performance" provision of this solicitation, the place of performance of all ammunition and explosives work covered by the Safety Precautions for Ammunition and Explosives clause of this solicitation. Failure to furnish this information with the offer may result in rejection of the offer.

(b) The Offeror agrees not to change the place of performance of any portion of the offer covered by the Safety Precautions for Ammunition and Explosives clause contained in this solicitation after the date set for receipt of offers without the written approval of the Contracting Officer. The Contracting Officer shall grant approval only if there is enough time for the Government to perform the necessary safety reviews on the new proposed place of performance.

(c) If a contract results from this offer, the Contractor agrees not to change any place of performance previously cited without the advance written approval of the Contracting Officer.

Section G - Contract Administration Data

SECTION G

SECTION G – ACCOUNTING DATA

Accounting data will be cited at time of award.

Payment Instructions (Per PGI 204.7108 - For Government Use Only) https://www.acq.osd.mil/dpap/dars/pgi/pgi_htm/current/PGI204_71.htm#payment_instructions

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and https://www.acq.osd.mil/dpap/dars/pgi/pgi_htm/current/PGI204_71.htm#payment_instructions https://www.sam.gov/

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

Combo unless Contractor’s business systems do not allow. In that event an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) may be used.

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

See Section E Inspection and Acceptance

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table (SF30) Field Name in iRAPT (WAWF) Data to be entered in iRAPT (WAWF) Pay Official DoDAAC See Block 12 of Award Issue By DoDAAC See Block 5 of Award Admin DoDAAC See Block 6 of Award Inspect By DoDAAC See Block 6 of Award Ship To Code See Section F Ship From Code See Section F Mark For Code See Section F https://wawf.eb.mil/ https://wawf.eb.mil/

Service Approver (DoDAAC) See Block 6 of Award Service Acceptor (DoDAAC) See Block 6 of Award Accept at Other DoDAAC See Block 6 of Award LPO DoDAAC Data to be entered in iRAPT (WAWF) DCAA Auditor DoDAAC See Block 12 of Award Other DoDAAC(s) See Block 5 of Award

Routing Data Table (DD1155)

Field Name in iRAPT (WAWF) Data to be entered in iRAPT (WAWF) Pay Official DoDAAC See Block 15 of Award Issue By DoDAAC See Block 6 of Award Admin DoDAAC See Block 7 of Award Inspect By DoDAAC See Block 7 of Award Ship To Code See Section F Ship From Code See Section F Mark For Code See Section F Service Approver (DoDAAC) See Block 7 of Award Service Acceptor (DoDAAC) See Block 7 of Award Accept at Other DoDAAC See Block 7 of Award LPO DoDAAC Data to be entered in iRAPT (WAWF) DCAA Auditor DoDAAC See Block 15 of Award Other DoDAAC(s) See Block 6 of Award

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact. navsupwawf.wss.fct@navy.mil

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

mailto:navsupwawf.wss.fct@navy.mil

Section H - Special Contract Requirements

SECTION H

SECTION H – GOVERNMENT FURNISHED PROPERTY (APR 2017)

1. The Government will furnish the following property to the Contractor for use in performance of this contract:

2. Attachment 1, Consolidated Listing of Government Furnished Property, shall be completed by the Contracting Officer and uploaded to Electronic Document Access (EDA) as an attachment. Additional information can be found at DFARS PGI (245.103 & 245.201-70).

PROPERTY QTY Date Battery, MK 53 Mod 2, Tray, Subassembly, PL6916002 3 Silver, NSN 9660-00-106-9432 TBD

3. The property will be delivered, at the Government's expense, at or near:

POC:

Address:

4. The Contractor shall notify the Contracting Officer, in writing, with a concurrent copy to the cognizant DCMA office at least thirty (30) days prior to the need for the Government Furnished Property (GFP).

The GFP request shall clearly indicate the following information:

a. Contract Number

b. End Item Nomenclature and DODIC

c. Quantity of GFP required

d. Complete address to which GFP is to be delivered

e. Date GFP is required

5. Only the property listed above, in the quantity shown, will be furnished by the Government. The total quantity of GFP provided will include First Article/Preproduction Testing, if required, lot acceptance, and normal attrition.

6. The Contractor shall notify the Contracting Officer, in writing, within thirty (30) days after GFP is determined to be lost, damaged, destroyed, no longer usable, or no longer needed for the performance of the contract.

7. All other property required for performance of this contract shall be furnished by the Contractor.

8. The contractor shall use a DD Form 1149, Requisition and Invoice Shipping Document for transfer of GFP.

9. DISPOSITIONING - The Contractor shall request disposition instructions from the Contracting Officer for any residual GFP. Any residual GFP must be in a container clearly marked with the NSN and lot number. It must also be free from any hazardous waste. Contents and marking shall be verified by the Government QAR.

Residual GFP shall be dispositioned within thirty (30) days after acceptance of the final production lot.

Additionally, the Contractor shall notify the receiving activity, in writing, at least thirty (30) days prior to shipment. A detailed list of material being returned shall be provided. Failure to comply may result in rejection of the material at the destination. Any costs associated with return of unauthorized shipments shall be borne by the Contractor.

ADMINISTRATIVE POINTS OF CONTACT (MARCH 2016)

1) Inquiries and correspondence directed to the Administrative Point of Contact at NAVSUP should be addressed as follows:

Name: Donald Fischer Code: N772.10 Phone: 717-605-6289 Email: donald.fischer@navy.mil

2) Inquiries and correspondence directed to the Program Analyst should be addressed as follows:

Name: Richard Rzomp Code: A112 Phone: 717-605-4390 Email: richard.rzomp@navy.mil mailto:richard.rzomp@navy.mil

3) If the inquiry involves technical questions, (drawing, specifications, etc.) inquiry should be submitted in accordance with the procurement specification. All telephone inquiries pertaining to technical questions must be confirmed in writing with the above Program Analyst and Contract Specialist within 48 hours.

SPECIAL DISTRIBUTION

NOTE 1: Use of the Wide Area Work Flow Receipt and Acceptance (WAWF-RR) electronic form is required. See clause 252.246-7000 Material Inspection and Receiving Report (MAR 2008) and 252.232-7003 Electronics Submission of Payment Requests and Receiving Reports (JUN 2012).

NOTE 2: When using WAWF-RR to submit Contract Data Requirements List (CDRL) data and “Not Separately Priced” items, the following information shall be listed in the “Comments” field of the WAWF electronic form:

Shipping company, shipment tracking number, and date shipped.

WAWF-RR documents accompanying the shipment are to be attached as follows (Type of Shipment - Location):

1. Carload or truckload - Affix to the shipment where it will be readily visible and available upon request.

2. Less than carload or truckload - Affix to container number one or container bearing lowest number.

3. Mail, including parcel post - Attach to outside or include in the package. Include a copy in each additional package of multi-package shipments.

Activity Number of Copies

Commanding Officer 1 NAVSUP Weapon Systems Support Attn: Code N772.10 Mechanicsburg, PA 17055-0788 donald.fischer@navy.mil

Officer In Charge 1

NAVSUP AMMUNITION LOGISTIC’S CENTER

Attn: Code A112 Bldg. 407N Mechanicsburg, Pa 17055-0735 richard.rzomp@navy.mil

Administrative Contracting Officer (ACO) 1 (Indicated in block 6 of SF 26)

Commanding Officer NSWC PCD; Code A12 1 110 Vernon Ave Panama City, FL 32407-7001 anne.brown@navy.mil; tina.baxter@navy.mil

Section I - Contract Clauses

SECTION I

FAR 52.242-2 PRODUCTION PROGRESS REPORTS DD Form 375 OR EQUIVALENT

(a) The contractor shall prepare and submit a Production Progress Report for the following contract items:

"ALL CONTRACT LINE ITEMS"

(b) The report shall be submitted via mailed or emailed on or before the 5th day of each month. The report shall be distributed as set forth in paragraph (c) and IAW CDRL A005.

(c) The Production Progress Report shall be distributed as follows:

Addressee No. of Copies Commanding Officer 1 NAVSUP Weapon Systems Support Attn: Code N772.10 5450 Carlisle Pike Mechanicsburg, PA 17055-0788 donald.fischer@navy.mil

Administrative Contracting Officer 1 Block 6 of Standard Form 26

Officer In Charge 1

NAVSUP AMMUNITION LOGISTICS CENTER

Attn: Code A112 5450 Carlisle Pike Bldg. 407N Mechanicsburg, PA 17055-0735 richard.rzomp@navy.mil

Commanding Officer NSWC PCD; Code A12 1 110 Vernon Ave Panama City, FL 32407-7001 anne.brown@navy.mil; tina.baxter@navy.mil

(d) The report shall contain the following information:

(1) The problem, actual or potential and its cause;

(2) Items and quantities affected;

(3) When the delinquency started or will start;

(4) Action taken to overcome the delinquency;

(5) Estimated recovery date; and/or

(6) Proposed schedule revision.

mailto:tina.baxter@navy.mil

52.209-3 -- First Article Approval -- Contractor Testing (Sep 1989)

(a) The Contractor shall test __3__ unit(s) of Lot/Item _0001__as specified in this contract. At least 15 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within 210 calendar days from the date of this contract to Commanding Officer, NAVSUP Weapons System Support, ATTN: Code N772.10, 5450 Carlisle Pike, Mechanicsburg, PA 17055-0788 marked “First Article Test Report: Contract No. _______, Lot/Item No. _______” Within 30 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph

(b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

(End of Clause)

Alternate I (Jan 1997). As prescribed in 9.308-1(a)(2) and (b)(2), add the following paragraph (i) to the basic clause:

(i) The Contractor shall produce both the first article…