CDRL_Attachment.pdf
PDF 78 KB Posted
- Attached to
- CO2 Scrubber, skid A
- Solicitation number
- N0010419QF026
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00104-19-Q-F026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRIPER REFURB INST 5320-012-0728 REV G Chg-1, Enclosure (2)
CONTRACT DATA REQUIREMENTS LIST
A. CONTR. LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
XX TDP TM OTHER
D. SYSTEM/ITEM
CO2 Scrubber
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUHORITY (Data Item Descript) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF
FIRST
SUBMISSION
14. DISTRIBUTION
DR - DRAFT
8. APP CODE 11. AS OF
DATE
13. SUBSEQUENT
SUBMISSION
RG - REGULAR
RP - REPRO
15. REMARKS
1.
A001
2. Receipt Inspection Report 3.
4. Para 7.1 5. Para 7.1
6. SUBMEPP
7. 9. 10. 12. 14. DISTRIBUTION
SD As
Required
See 13 b. Copies
8.
11.
See 13
13. NLT 2 weeks after receipt of GFM
D R
R G
R P
15. REMARKS SUBMEPP 1831 1
To be in contractor’s own format.
TOTAL 1
1.
A002
2. Maintenance, Condition and Performance Report
3.
4. , Para 7.2 5. Para 7.2 6. SUBMEPP
LT As
Required
13. NLT 10 days after completion of final testing
D R
R G
R P
15. REMARKS SUBMEPP 1831 1
To be in contractor’s own format.
TOTAL 1
1.
A003
2. Welding Procedures 3.
4. DI-MISC-80875 and 80876 5. Para 7.3
DD 0 Time See 13 b. Copies 8.
A
11.
See 13
13. Acceptance required prior to performing welding.
D R
R G
R P
16. REMARKS Prior to welding, the vendor welding procedures must be submitted and approved.
SUBMEPP 1831 1
Necessary only if production or repair welding is required. Approval may be extended if contractor submits letter referencing prior approval authority.
TOTAL 1
G. PREPARED BY
//S// J. B. Bouchard 1846JB
H. DATE
3/5/19
I. APPROVED BY
//S// S.A. Woodley 1831SW
J. DATE
3/5/19
DD Form 1423, JUN 90 Previous editions are obsolete Enclosure (2) Page 1 of 4 Pages
C. CATEGORY:
XX TDP TM OTHER
D. SYSTEM/ITEM
1.
A004
2.
Unplanned Parts Usage Report
4. Para 7.4 5. Para 7.4 6. SUBMEPP
LT As
Required
13.As required during refurbishment
D R
R G
R P
15. REMARKS SUBMEPP 1831 1
To be in contractor’s own format.
TOTAL 1
A005
2.Provisioning Technical Documentation 3.
4.MIL-P-15137 Method B 5. Para 7.6 6. SUBMEPP
DD As
Required
13.NLT 60 days after contract award
D R
R G
R P
15. REMARKS SUBMEPP 1831 1
Required only if changes are made that affect the provisioning of the unit
TOTAL 1
G. PREPARED BY
//S// J. B. Bouchard 1846JB
H. DATE
3/5/19
I. APPROVED BY
//S// S.A Woodley 1831SW
J. DATE
DD Form 1423, JUN 90 Previous editions are obsolete Enclosure (2) Page 2 of 4 Pages
C. CATEGORY:
XX TDP TM OTHER
D. SYSTEM/ITEM
A006
2. Certification of Compliance
3. Certification of Compliance
4. DI-MISC-80678
5. Para 7.7
7. SD 9. 10. 12. 14. DISTRIBUTION
As Req’d See 13 b. Copies
13. NLT 10 days prior to hardware acceptance
R G
R P
15. REMARKS Certifying that each unit has been refurbished in accordance with this Refurb. Instruction. One report for each unit, identifiable to the
SUBMEPP Code 1831 1
Rotatable Pool serial number. Include a positive statement indicating if welding Copy in crate 1 or NDT were accomplished, identify the procedures used , & identify any welding accomplished that that did not require weld procedure qualification tests per NAVSEA S9074-AR-GIB-010/278 para 4.2.1.1.”
TOTAL 2
A007
2. Test Procedures N/A
3. NDT Procedures
4. DI-NDTI-80603 5. Para 7.8
DD 0 Time
b. Copies
13. Acceptance required prior to performing NDT
R G
R P
16. REMARKS SUBMEPP 1831 1
Prior to NDT, the vendor’s NDT procedures must be submitted and approved. Required for split ring groove inspection or when production and repair welding is accomplished.
TOTAL 1
1.
A008
2. Test/Inspection Reports N/A
3. NDT Test Reports
4. DI-NDTI-80809 5. Para 7.9 6. SUBMEPP
SD As required. See 13 b. Copies
13. Prior to shipment of material
D R
R G
R P
15. REMARKS SUBMEPP 1831 1
Reports shall be identifiable to each unit by a unique serial number. NDT reports shall reflect approved procedure number and Rev.
COPY IN CRATE 1
Required only if NDT is accomplished.
TOTAL 4
G. PREPARED BY
//S// J. B. Bouchard 1846JB
H. DATE
3/5/19
I. APPROVED BY
//S// S.A. Woodley 1831SW
J. DATE
DD Form 1423, JUN 90 Previous editions are obsolete Enclosure (2) Page 3 of 4 Pages
C. CATEGORY:
XX TDP TM OTHER
D. SYSTEM/ITEM
A009
2.Final Inspection Report 3.
4. Para 7.10 5. Para 7.10 6.
SUBMEPP
7. 9. 10. 12. 14. DISTRIBUTION
LT As
Required
13. NLT 10 days prior to hardware acceptance
D R
R G
R P
15. REMARKS SUBMEPP 1831 1
Use Enclosure (3) Copy in crate 1
TOTAL 2
1. 2.
4.
5.
6.
13 D
R G
R P
16. REMARKS
TOTAL
R G
R
R G
R
G. PREPARED BY
//S// J. B. Bouchard 1846JB
H. DATE
3/5/19
3. APPROVED BY
//S// S.A Woodley 1831SW
J. DATE
DD Form 1423, JUN 90 Previous editions are obsolete Enclosure (2) Page 4 of 4 Pages
File details come from the government source that posted it.