N0010418RK117.pdf
PDF 1 MB Posted
- Solicitation number
- N0010418RK117
About this file
N772.08. Paper copies will not be provided. Competitive 100% Small Business Set-a-Side. Drawings are available. Drawings are NOT available on CD. The solicitation contains FAT, LAT, CDRLs, FOB Origin.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 18RK117_Amend_003.pdf | ||
| 18RK117_Amend_002.pdf | ||
| 18RK117_Amend_001.pdf | ||
| N0010418RK117.pdf | ||
| CDRLsN5006318NA003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 31 Aug 2018
X
A X B X C X D
E X X
G F 43 - 49
50 - 54 X H 55 - 56 aaron.heit@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-A6 1 56
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE 15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00104 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and electronically conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
AARON R. HEIT 717-605-2430
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 6
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
7 - 9 10 - 11
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
12 - 16 17 - 20
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 21 - 23 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 24 - 25 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL: TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
26 - 41
PART II - CONTRACT CLAUSES
NAVSUP WEAPON SYSTEMS SUPPORT
AARON HEIT, CODE N772.08
5450 CARLISLE PIKE
P.O. BOX 2020
MECHANICSBURG PA 17055
717-605-2430
717-605-2807 FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.
N5006318NA003
5. DATE ISSUED
30 Jul 2018
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0010418RK117
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CWQC
FFP
NOMEN: FLEX HOSE AND LEADER ASSEMBLY (IMPROVED) WITH
ENCAPSULATED LEAD TAPE
IAW DWG: 8243440 Rev B and all other Associated Drawings & Specifications
NSN: 1355-01-580-4509
PURCHASE REQUEST NUMBER: N5006318NA003
NET AMT
0001AA 1 Set NSP Contract Data Requirements List
FFP
Technical Data, See DD Form 1423
Data items A001 through A004.
FOB: Destination
NET AMT NSP
0001AB 5 Each NSP First Article (Preproduction) Test
FFP
Samples (See FAR 52.209-3)
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
0001AC 50 Each NSP Production Lot (Periodic) Test Samples
FFP
Consists of: 10 Lots of 54 EA. From each production lot of 54 that have passed the quality conformance tests of Table I, a sample of 5 EA per lot to be selected at random IAW 8243441 Rev A para 4.2.1.2 for a total quantity of 50.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
0001AD 216 Each
NSN: 4T-1355-01-580-4509-CWQC
FFP
NOMEN: FLEX HOSE AND LEADER ASSEMBLY (IMPROVED) WITH
ACRN: TBD
RX: TBD
TAC: NSTS
FOB: ORIGIN
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
0001AE 162 Each
NSN: 4T-1355-01-580-4509-CWQC
FFP
unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
0001AF 162 Each
NSN: 4T-1355-01-580-4509-CWQC
FFP
unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
SECTION B NOTES
SOLICITATION NOTES:
1. Faxed offers will NOT be accepted.
2. Since the Government intends to award without discussion, any exceptions to the requirements of this solicitation should be raised prior to submission of an offer.
3. This item is a CSI – Critical Safety Item.
4. Electronic submission of an offer may be accomplished by attaching your offer to an email directed to aaron.heit@navy.mil. The size limitation of an email through the NAVSUP WSS mail server is 10 MB. All files designated as .zip files will be stripped from any email sent. Files larger than the server limitation may be segregated and sent via several emails as long as they are clearly identified as such. It is highly recommended that the Offeror request email delivery confirmation or other form of acknowledgement to verify that the proposal submission was received.
mailto:x.x@navy.mil
Section C - Descriptions and Specifications
SECTION C
PROCUREMENT SPECIFICATION
I. NSN: 4T-1355-01-580-4509-CWQC
FLEX HOSE AND LEADER ASSEMBLY (IMPROVED) WITH ENCAPSULATED LEAD TAPE
Assembly Level Baseline – Sequential
Drawing Revision Nomenclature
5944469 E SPRING
5944470 E TMD INSERT
5944471 G HOUSING
5944472 E FERRULE
5944473 F SPINDLE
5944487 F SHIPPING/PACKAGING CONDITION
5944538 D FERRULE, LARGE
7339971 D TIN PLATED LEAD TAPE
7339972 - STRAIGHT 4 PRONG FASTENER
8243437 - ENCAPSULATED LEAD TAPE ASSEMBLY
8243438 - IMPROVED FLEX-HOSE
8243439 - IMPROVED FLEX-HOSE ASSEMBLY
8243440 B IMPROVED FLEX-HOSE AND LEADER ASSEMBLY (W/ ENCAPSULATED LEAD TAPE)
8243441 A CRTICAL ITEM PRODUCT FABRICATION SPECIFICATION
Reference Documents for Assembly (References with Approved Replacements in Parentheses)
DOCUMENT NUMBER
MIL-STD 129P
MIL-STD 130N
Y14.5M-1994
ASQC-Z1.4
MIL-HDBK-454B
ASTM D257 ASTM D638 ASTM D746 ASTM D4181
ASTM D1238 ASTM D1505 ASTM D 1531 ASTM D1693
ASTM B339
A-A-208C A-A-56032D
NAS 844
SAE-AS478
DESCRIPTION AND SPECIFICATIONS
NOTE 1: NON-ANTICIPATION OF INITIAL DEVIATIONS ON AWARDS
Offerors are reminded that any resultant contract will require performance in strict compliance with the specifications set forth therein, and that prices offered should not be predicated upon contractor anticipation of government authorization of deviations, even though such deviations may have been granted previously under other contracts for the same item.
CONFIGURATION CONTROL – ANSI/EIA–649
1. Any Engineering Change Proposal (ECP) or Request for Variance (RFV) affecting an item being procured under this contract may be in accordance with ANSI/EIA-649. Final approval of any ECP and/or RFV shall be in writing, by the Contracting Officer, NAVSUP Weapon Systems Support. If any such approval affects the cost of Performance of this contract, an equitable adjustment shall be made in the contract price in accordance with the provisions of the "Changes" clause of this contract.
2. RFVs shall be issued using information outlined in ANSI/EIA-649 section 5.3.4.1. The use of DD Form 1694 is a required form for RFV submissions. MIL-HDBK-61 provides additional guidance for preparation of RFVs.
3. ECPs shall be issued using information outlined in ANSI/EIA-649 section 5.3.1.4. The use of DD Form 1692 is a required form for ECP submissions. MIL-HDBK-61 provides additional guidance for preparation of ECPs.
4. The contractor's assigned RFV number shall use the following numbering format:
a. The last four alpha-numeric characters of the contract number followed by a dash (-).
b. The letter "D", followed by consecutively assigned numeric characters beginning with 001.
5. The contractor's assigned ECP number shall use the following numbering format:
a. The last four alpha-numeric characters of the contract number followed by a dash (-).
b. The letters "ECP", followed by consecutively assigned numeric characters beginning with 001.
6. The contractor shall submit an electronic copy of any ECP or RFV to the Contracting Officer, Administrating Contracting Officer, and the activity below:
a. Contract Administration Office (CAO), (for review and comment to PCO)
b. NAVSUP WSS Contracting Officer N772.08
Email: aaron.heit@navy.mil
c. NAVSUP GLS, Code 4511 Email: warren.eslinger@navy.mil mailto:aaron.heit@navy.mil mailto:warren.eslinger@navy.mil
7. Technical approval authority for RFVs and ECPs is NUWC Newport (doreen.cornellier@navy.mil and patrick.faerber@navy.mil).
8. Authorization to accept non-conforming supplies is specifically retained by the Contracting Officer
CLAUSES INCORPORATED BY REFERENCE
252.211-7005 Substitutions for Military or Federal Specifications and
Standards
NOV 2005
mailto:doreen.cornellier@navy.mil mailto:patrick.faerber@navy.mil
Section D - Packaging and Marking
SECTION D
Packaging, Packing, Preservation and Transportation
PR: N5006318NA003
1. Preservation, Packaging, and Packing shall be in accordance with all associated drawings and specification listed herein.
2. Transportation Data:
a. NSN/NALC: 4T-1355-01-580-4509-CWQC
b. Nomenclature: FLEX HOSE AND LEADER ASSEMBLY (IMPROVED) WITH ENCAPSULATED LEAD TAPE
c. GBL Freight Description: N/A
d. NMFC Number: N/A
e. UFCC Number: N/A
f. Hazard Classification (Class, Division and Storage Compatibility): N/A
g. UN Number: N/A Competent Authority Approval (CAA): N/A Exemption Number: N/A
h. Container Markings: IAW all associated drawings and specifications as listed herein.
i. Performance Oriented Packaging Certification Marking: N/A
j. Label: IAW all associated drawings and specifications as listed herein.
k. CIIC (Controlled Inventory Item Code): 7
l. Hazardous materials shall be offered for transportation in full compliance with Title 49 Code of Federal Regulations (49 CFR).
m. GFP: No GFM Provided
Remarks: For hazardous and explosive material the above transportation data must be updated within 30 calendar days prior to marking and labeling because of the lead-time between the initiation of the procurement and the actual shipping timeframe. Please contact the contracting officer (aaron.heit@navy.mil) at the NAVSUP Weapon Systems Support, Mechanicsburg, PA for updated data.
MIL-STD-1168C – AMMUNITION LOT NUMBERING & AMMUNITION DATA CARD
Ammunition lot numbers shall be formatted in accordance with the current version of MIL-STD-1168C and include all lot number elements as reflected in the standard. The lot number shall be documented on the Ammunition Data Card and include associated data in accordance with the current version of MIL-STD-1168C:
(1) Manufacturer’s Identification symbol: Only the approved Manufacturer’s Identification symbol for the contractor or manufacturer is to be used in the lot number. Requests for approval of a Manufacturer’s Identification symbol are to be submitted via the Government Inspector. Refer to MIL-HDBK-1461 for guidance, which is available on the WARP Website (https://mhpwarp.redstone.army.mil).
SERIAL/REGISTER NUMBER REQUEST
Serial Numbers Required. Contractor to complete this request form as provided. Submit to NUWC Newport as per this request form instructions.
ITEM: 4T-1355-01-580-4509-CWQC
DWG: 8243440 Rev B
ACTIVITY CONTRACTOR:
CAGE: ____________
NAME: ________________________________
ADDRESS: ______________________________
PHONE: ______________________
FAX: _________________________
VENDOR POC: ___________________
CONTRACT: _______________________
QUANTITY OF PARTS TO BE PRODUCED THIS CONTRACT/MODIFICATION: _______
REQUESTOR SIGNATURE: ______________________________ DATE: ___________
FAX or EMAIL REQUEST TO:
COMMANDER
NAVAL UNDERSEA WARFARE CENTER DIVISION NEWPORT
1176 HOWELL STREET
NEWPORT, RI 02841
ATTN: CODE 8554
PRIMARY POC: NUWC_NPT_SerialNumbers@navy.mil
ENSURE COPY OF REQUEST IS FORWARDED TO NAVSUP WSS CONTRACTING OFFICER, aaron.heit@navy.mil, warren.eslinger@navy.mil and MECH_NOLSC_PRP@navy.mil.
https://mhpwarp.redstone.army.mil/ mailto:NUWC_NPT_SerialNumbers@navy.mil mailto:aaron.heit@navy.mil mailto:MECH_NOLSC_PRP@navy.mil
Section E - Inspection and Acceptance
SECTION E
INSPECTION AND ACCEPTANCE
1. Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001AA Technical Data See DD1423 See DD1423 See DD1423 See DD1423 0001AB First Article Testing Contractor Government Contractor Government 0001AC Production Lot Testing Contractor Government Contractor Government 0001AD – 0001AF Production Units Contractor Government Contractor Government
If supplies will be packaged at a location different from the offeror address indicated on the solicitation, the offeror shall provide the name and street address of the packaging location:
Packaging House
Address
PRODUCTION LOT TEST SAMPLES (CONTRACTOR TESTING)
1. Test samples are required from each production lot and are to be tested in accordance with the approved test plan. A production lot shall consist of net deliverable quantity, LOT test sample units, and any retained sample units for investigative purposes as may be required by Section B.
2. The production lot(s) must be manufactured and presented to the Government Quality Assurance Representative (QAR) with all documentation required by Section B. The documentation (WAWF-RRs and Ammunition Data Card printed from WARP) accompanying the production lot test samples shall contain the contract number, item, lot number identification, DODIC, NSN and serial numbers. The presentation of the lot shall be made to the QAR 150 calendar days after date of contract to select the production test samples. If FAT is required then presentation of lot samples shall be made IAW timetable in Section F. The samples shall be selected, at random, from each production lot, by the QAR within 48 hours for resident QARs or 7 calendar days for non-resident QARs after presentation of the lot.
3. Sample units removed for testing from different lots shall not be commingled.
4. Production lot testing shall be performed by the Contractor within 30 calendar days of production lot sample selection. Production lot testing shall be witnessed by a representative of the engineering activity and/or the cognizant QAR. The Contractor shall provide written notification to the Contracting Officer, with concurrent notification to the engineering activity, and the QAR, at least 20 calendar days prior to the planned testing date.
NOTE: If a failure occurs during testing and an engineering activity representative is not present, all testing shall be halted and the engineering activity and contracting officer shall be notified within 24 hours. A government representative shall be allowed to participate in the failure investigation in accordance with applicable CDRLs. Contractor testing shall resume upon notification by the Contracting Officer.
5. Disposition of Production Lot Test Samples – The production lot samples are subjected to non-destructive testing. Sample units which meet test and contract requirements may be delivered as part of the total contract quantity.
6. Retained samples, if applicable, shall be sent to the address shown in Section F after lot release.
7. A production lot test report is required and shall be forwarded in accordance with the DD Form 1423 sequence number A002 requirements to the address shown in Block 14. The test report shall include all results of testing conducted in accordance with the approved test plan.
8. Acceptance, shipment, and payment shall not be accomplished until the production lot test samples have been tested, the required report approved and the lot has been released for service use. The retained samples, if applicable, shall be shipped to the address provided in Section F of the contract after the lot has been released for service use.
9. The only valid and contractually binding notification of production lot approval, conditional approval, or disapproval shall be in writing and issued by the Contracting Officer. This notification may be made to the Contractor within 15 calendar days after the Contracting Officer receives the production lot test report(s) and all applicable CDRL requirements. Upon receipt of the written approval accepting a production lot(s), the Contractor shall ship the production lot(s) as soon as possible and no later than 7 calendar days after receipt of such notice.
Final acceptance of the production lot(s) shall be the responsibility of the cognizant DCMA QAR, but shall not occur unless and until the production lot approval has been issued in writing by the Contracting Officer.
a) Any notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.
b) A notice of conditional approval shall state any further action required of the Contractor. In the event the test sample fails to meet the requirements of the specification or drawing, the Contractor shall submit a Failure Analysis and Corrective Action Report (DD Form 1423, sequence number, A003) with all associated costs and expenses to be borne solely by the Contractor.
c) A notice of disapproval may cite reasons for such. If the production lot test report(s) is disapproved by the Contracting Officer, the QAR may be required to select an additional production lot test sample(s) for testing. This direction may be given by the Contracting Officer in the notice of disapproval. The Contractor shall furnish such additional test sample(s) under the terms and conditions and within the time specified in the notification. The cost of each additional approval test, and all costs related to such test(s), shall be borne by the Contractor. Upon approval of the production lot test sample(s) and report(s), the Contracting Officer may equitably adjust the delivery schedule of the contract for only the lot represented by such sample(s). The Government reserves the right to require an equitable decrease of the contract price for any extension of the delivery schedule necessitated by additional test(s) or for any additional costs incurred by the Government due to the need for additional approval test(s).
10. If the Contractor fails to deliver any production lot test sample(s) within the time or times specified, or if the Contracting Officer disapproves any production lot test report(s), the contract may be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract may be subject to termination for default. In such an event, failure of the Government to terminate this contract for default shall not relieve the Contractor of the responsibility to meet the delivery schedule for production quantities.
INSPECTION AND ACCEPTANCE OF TEST PLANS / PROCEDURES
1. The Contractor shall submit a test plan/procedure for Government approval/disapproval as specified in the Contract Data Requirements List (DD Form 1423, sequence number, A001). The test plan shall be submitted within 30 calendar days after contract award date. The Acceptance Test Plan shall identify that test fixtures are available for use at the Contractor’s Facility.
2. Notification of test plan approval, conditional approval, or disapproval shall be provided via IRAPT. This notification may be made within 30 calendar days after receipt of the Production Plan/Procedure.
3. The notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.
4. A notice of conditional approval shall state any further action required of the Contractor.
5. A notice of disapproval shall cite the reasons for such. If the plan or procedure is disapproved by the Government, the Contractor may be required, at the option of the Government, to submit a revised plan or procedure for evaluation. After each notification by the Government to submit a revised plan or procedure, the Contractor shall, at no additional cost to the Government, make any necessary revisions or modifications to the plan or procedure. Such revisions shall be furnished in accordance with terms and conditions and within the time specified in the notification. The Government may take action on the resubmitted plan or procedure within the time specified above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule necessitated by resubmission of the plan or procedure.
6. If the Contractor fails to deliver the plan or procedure within the time specified, or if the Contracting Officer disapproves any plan or procedure, the Contractor shall be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract shall be subject to termination for default.
However, failure of the Government in such an event to terminate the contract shall not relieve the Contractor of the responsibility to meet all requirements of the contract including delivery of any first article sample(s), data requirements, and/or production quantities.
7. There is hereby created an option for the Government to waive the requirement for submission of a plan or procedure. If the offeror has had its plan previously approved by the Government, the following information shall be furnished:
Approved by__________________________ Date of approval___________________
Contract number and contractor under which plan/procedure was approved__________________.
Test Plan number, revision date and NSN for which the item was previously approved_____________.
8. If the submission of the plan or procedure is waived, the previously approved plan or procedure shall apply to the contract.
INSPECTION AND ACCEPTANCE
Production Quality Assurance of all items to be furnished hereunder shall be made by the cognizant Government Inspector at the contractor's or sub-contractor's plant. Quality Assurance Inspection System to be in accordance with ISO-9001, ANSI/ASQC or
MIL-I- 45208.
NOTE: Acceptance or rejection shall be accomplished by the cognizant GQAR based upon his own inspection(s) and the results of the First Articles or Periodic Production and/or Acceptance Samples from the testing activity to the GQAR via Procurement Contracting Officer (PCO).
QUALITY ASSURANCE REQUIREMENTS
An inspection lot shall consist of items manufactured under essentially the same conditions and at essentially the same time. Prior to submittal of each inspection lot to the Government Representative, the contractor shall provide inspection/or test records that assure the units presented have passed all inspections and tests required by the applicable drawings, specifications and quality assurance documentation. Unless specified otherwise, as a minimum this inspection and testing shall be in accordance with MIL-STD-105 (MIL-STD-1916), latest revision at issue date of solicitation, inspection Level II, with 100% inspection for critical characteristics, 1.0 AQL (Acceptance Quality Level), for major characteristics and 2.5 AQL for all other characteristics. All defects of the same class will be considered collectively when determined compliance with applicable AQL.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A N/A
0001AA N/A N/A N/A Government
0001AB N/A N/A N/A Government
0001AC N/A N/A N/A Government
0001AD N/A N/A N/A Government
0001AE N/A N/A N/A Government
0001AF N/A N/A N/A Government
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996
52.246-16 Responsibility For Supplies APR 1984
CLAUSES INCORPORATED BY FULL TEXT
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
ISO-9001:2015
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph
(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
Section F - Deliveries or Performance
52.242-15 Stop-Work Order AUG 1989
52.242-17 Government Delay Of Work APR 1984
52.247-29 F.O.B. Origin FEB 2006
52.247-30 F.O.B. Origin, Contractor's Facility FEB 2006
52.247-34 F.O.B. Destination NOV 1991
52.247-58 Loading, Blocking, And Bracing Of Freight Car Shipment APR 1984
52.247-59 F.O.B Origin--Carload and Truckload Shipments APR 1984
52.247-61 F.O.B. Origin--Minimum Size Of Shipments APR 1984
52.247-65 F.O.B. Origin, Prepaid Freight--Small Package Shipments JAN 1991
252.247-7023 Transportation of Supplies by Sea APR 2014
252.247-7028 Application for U.S. Government Shipping
Documentation/Instructions
JUN 2012
SECTION F
FAR 52.211-8 TIME OF DELIVERY
a) The Government requires delivery to be made according to the following schedule:
FIRST ARTICLE REQUIRED DELIVERY SCHEDULE
Item Quantity Days Item Quantity Days
0001AB 5 EA (FAT) 150 DADC 0001AC 5 EA (PLT Lot 7) 330 DAFATA
0001AC 5 EA (PLT Lot 1) 150 DAFATA 0001AD 54 EA (Lot 7) 404 DAFATA
0001AD 54 EA (Lot 1) 224 DAFATA 0001AC 5 EA (PLT Lot 8) 360 DAFATA
0001AC 5 EA (PLT Lot 2) 180 DAFATA 0001AE 54 EA (Lot 8) 434 DAFATA
0001AE 54 EA (Lot 2) 254 DAFATA 0001AC 5 EA (PLT Lot 9) 390 DAFATA
0001AC 5 EA (PLT Lot 3) 210 DAFATA 0001AF 54 EA (Lot 9) 464 DAFATA
0001AF 54 EA (Lot 3) 284 DAFATA 0001AC 5 EA (PLT Lot 10) 420 DAFATA
0001AC 5 EA (PLT Lot 4) 240 DAFATA 0001AD 54 EA (Lot 10) 494 DAFATA
0001AD 54 EA (Lot 4) 314 DAFATA
0001AC 5 EA (PLT Lot 5) 270 DAFATA A001 (Test Procedure) 1 Set 30 DADC
0001AE 54 EA (Lot 5) 344 DAFATA A002 (Test Report) Per Lot A/R
0001AC 5 EA (PLT Lot 6) 300 DAFATA A003 (Failure Analysis) A/R A/R
0001AF 54 EA (Lot 6) 374 DAFATA A004 (Progress Reports) Monthly A/R
KEY: DADC = Days After Date of Contract DAFATA = Days After First Article Test Approval
FIRST ARTICLE WAIVED DELIVERY SCHEDULE
0001AC 5 EA (PLT Lot 1) 150 DADC 0001AC 5 EA (PLT Lot 7) 330 DADC
0001AD 54 EA (Lot 1) 224 DADC 0001AD 54 EA (Lot 7) 404 DADC
0001AC 5 EA (PLT Lot 2) 180 DADC 0001AC 5 EA (PLT Lot 8) 360 DADC
0001AE 54 EA (Lot 2) 254 DADC 0001AE 54 EA (Lot 8) 434 DADC
0001AC 5 EA (PLT Lot 3) 210 DADC 0001AC 5 EA (PLT Lot 9) 390 DADC
0001AF 54 EA (Lot 3) 284 DADC 0001AF 54 EA (Lot 9) 464 DADC
0001AC 5 EA (PLT Lot 4) 240 DADC 0001AC 5 EA (PLT Lot 10) 420 DADC
0001AD 54 EA (Lot 4) 314 DADC 0001AD 54 EA (Lot 10) 494 DADC
0001AC 5 EA (PLT Lot 5) 270 DADC A001 (Test Procedure) 1 Set 30 DADC
0001AE 54 EA (Lot 5) 344 DADC A002 (Test Report) Per Lot A/R
0001AC 5 EA (PLT Lot 6) 300 DADC A003 (Failure Analysis) A/R A/R
0001AF 54 EA (Lot 6) 374 DADC A004 (Progress Reports) Monthly A/R
KEY: DADC = Days After Date of Contract
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above will be considered non-responsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFERORS PROPOSED DELIVERY SCHEDULE – FIRST ARTICLE REQUIRED DELIVERY SCHEDULE
KEY: DADC = Days After Date of Contract DAFATA = Days After First Article Test Approval
OFFERORS PROPOSED DELIVERY SCHEDULE – FIRST ARTICLE WAIVED DELIVERY SCHEDULE
KEY: DADC = Days After Date of Contract
b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically.
(The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered non-responsive and rejected.
SECTION F
DELIVERIES OR PERFORMANCE
Unless otherwise indicated in this contract, accelerated deliveries are desirable and acceptable at no additional cost to the Government. The addresses for the activities designated to receive supplies are listed below:
LINE / SUBLINE ITEM and QTY SHIP TO:
0001AB 5 EA (FAT) Contractor Testing Site (Contractor Facility)
0001AC 50 EA (PLT) Contractor Testing Site (Contractor Facility)
0001AD 216 EA
Naval Undersea Warfare Center Division
UIC: N44944
Submarine Torpedo IMA 15th St West Loch NB, Bldg 440 Ewa Beach, HI 96706-3381
0001AE 162 EA
NUWC Keyport
UIC: N00253
ATTN: Receiving Office Bldg 893/144 610 Dowell Street Keyport, WA 98345-7610
0001AF 162 EA
Naval Submarine Torpedo Facility
UIC: N68842
ATTN: Supply Dept Warehouse Bldg 1818 Yorktown, VA 23691
NOTES:
Please contact NAVSUP WSS Contracting Officer (Code N742.13) 60 days prior to shipment to confirm delivery destination. QAR is not authorized to approve items for shipment; approval for shipment is only authorized after the test validation reports have been reviewed and approved by the NAVSUP WSS PCO.
Shipment/Performance Notice Distribution - The cognizant DCMA office shall provide automated Shipment/Performance Notice (PJJ card) to the Commanding Officer, Attn: Code 4511, NAVSUP Logistics Operations Center, Mechanicsburg, PA 17055-0735 DOD Address Code N49935 (Routing ID Code NCB), (Communications ID RUSAACM), in support of the Ordnance Information System- Wholesale (OIS-W, formerly CAIMS).
Section G - Contract Administration Data
SECTION G
SECTION G – ACCOUNTING DATA
Accounting data will be cited at time of award.
Payment Instructions (Per PGI 204.7108 - For Government Use Only) https://www.acq.osd.mil/dpap/dars/pgi/pgi_htm/current/PGI204_71.htm#payment_instructions
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause—
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area
WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and
Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training
Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data
Interchange, or File Transfer Protocol.
https://www.acq.osd.mil/dpap/dars/pgi/pgi_htm/current/PGI204_71.htm#payment_instructions http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm https://www.acquisition.gov/ https://wawf.eb.mil/ https://wawf.eb.mil/
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
Combo unless Contractor’s business systems do not allow. In that event an “Invoice” (stand-alone) and “Receiving
Report” (stand-alone) may be used.
(Contracting Officer: Insert applicable document type(s). Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in
WAWF, as specified by the contracting officer.
See Section E Inspection and Acceptance
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in iRAPT (WAWF) Data to be entered in iRAPT (WAWF)
Pay Official DoDAAC See Block 12 of Award
Issue By DoDAAC See Block 5 of Award
Admin DoDAAC See Block 6 of Award
Inspect By DoDAAC See Block 6 of Award
Ship To Code See Section F
Ship From Code See Section F
Mark For Code See Section F
Service Approver (DoDAAC) See Block 6 of Award
Service Acceptor (DoDAAC) See Block 6 of Award
Accept at Other DoDAAC See Block 6 of Award
LPO DoDAAC Data to be entered in iRAPT (WAWF)
DCAA Auditor DoDAAC See Block 12 of Award
Other DoDAAC(s) See Block 5 of Award
(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send
Additional Email Notifications” field of WAWF once a document is submitted in the system.
See Section H – Special Distribution
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s
WAWF point of contact. navsupwawf.wss.fct@navy.mil mailto:navsupwawf.wss.fct@navy.mil
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
Section H - Special Contract Requirements
SECTION H
ADMINISTRATIVE POINTS OF CONTACT (MARCH 2016)
1. Inquiries and correspondence directed to the Administrative Point of Contact at NAVSUP should be addressed as follows:
Name: Aaron Heit Code: N772.08
Phone: 717-605-2430 Email: aaron.heit@navy.mil
2. Inquiries and correspondence directed to the Acquisition Management Specialist (AMS) should be addressed as follows:
Name: Warren Eslinger Code: 4511
Phone: 717-605-8242 Email: warren.eslinger@navy.mil
3. If the inquiry involves technical questions, (drawing, specifications, etc.) inquiry should be submitted in accordance with the procurement specification. All telephone inquiries pertaining to technical questions must be confirmed in writing with the above AMS and PCO within 48 hours.
SPECIAL DISTRIBUTION
NOTE 1: Use of the Wide Area Work Flow Receipt and Acceptance (WAWF-RR) electronic form is required. See clause 252.246-7000 Material Inspection and Receiving Report (MAR 2008) and 252.232-7003 Electronics Submission of Payment Requests and Receiving Reports (JUN 2012).
NOTE 2: When using WAWF-RR to submit Contract Data Requirements List (CDRL) data and “Not Separately Priced” items, the following information shall be listed in the “Comments” field of the WAWF electronic form:
Shipping company, shipment tracking number, and date shipped.
WAWF-RR documents accompanying the shipment are to be attached as follows (Type of Shipment - Location):
1. Carload or truckload - Affix to the shipment where it will be readily visible and available upon request.
2. Less than carload or truckload - Affix to container number one or container bearing lowest number.
3. Mail, including parcel post - Attach to outside or include in the package. Include a copy in each additional package of multi-package shipments.
Activity Number of Copies
Commanding Officer NAVSUP Weapon Systems Support Attn: Code N772.08 P.O. Box 2020 Mechanicsburg, PA 17055-0788 aaron.heit@navy.mil
NAVSUP Global Logistics Support Attn: Code 4511 Bldg. 407N Mechanicsburg, Pa 17055-0735 warren.eslinger@navy.mil MECH_NOLSC_PRP@navy.mil
Administrative Contracting Officer (ACO) (Indicated in block 6 of SF 26)
NUWC Newport Division Attn: Code 8554 1176 Howell Street Newport, RI 02841 doreen.cornellier@navy.mil patrick.faerber@navy.mil mailto:Warren.eslinger@navy.mil mailto:doreen.cornellier@navy.mil mailto:patrick.faerber@navy.mil
Section I - Contract Clauses
SECTION I
FAR 52.242-2 PRODUCTION PROGRESS REPORTS DD Form 375 OR EQUIVALENT
a) The contractor shall prepare and submit a Production Progress Report for the following contract items:
"ALL CONTRACT LINE ITEMS"
b) The report shall be submitted via mailed or emailed on or before the 5th day of each month. The report shall be distributed as set forth in paragraph (c).
c) The Production Progress Report shall be distributed as follows:
Addressee No. of Copies
Commanding Officer NAVSUP Weapon Systems Support Attn: Code N772.08 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, PA 17055-0788 aaron.heit@navy.mil
Administrative Contracting Officer Block 6 of Standard Form 26
NAVSUP Global Logistics Support Attn: Code 4511 5450 Carlisle Pike Bldg. 407N Mechanicsburg, PA 17055-0735 warren.eslinger@navy.mil MECH_NOLSC_PRP@navy.mil
d) The report shall contain the following information:
(1) The problem, actual or potential and its cause;
(2) Items and quantities affected;
(3) When the delinquency started or will start;
(4) Action taken to overcome the delinquency;
(5) Estimated recovery date; and/or
(6) Proposed schedule revision.
mailto:Warren.eslinger@navy.mil
FAR 52.209-3 FIRST ARTICLE APPROVAL - CONTRACTOR TESTING (Jan 1997)
a) The Contractor shall test 5 EA unit(s) of Lot/Item 0001AB as specified in this contract. At least 30 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
b) The Contractor shall submit the first article test report within 150 calendar days from the date of this contract to NAVSUP WSS Code N742.13 marked “First Article Test Report: Contract No. _______, Lot/Item No. _______”.
Within 30 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) of this subsection. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
f) If the Government does not act within the time specified in paragraph (b) or (c) of this subsection, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
Alternate I (Jan 1997). As prescribed in 9.308-1(a)(2) and (b)(2), add the following paragraph (i) to the basic clause:
(i) The Contractor shall produce both the first article and the production quantity at the same facility.
52.202-1 Definitions NOV 2013
52.203-3 Gratuities APR 1984
52.203-5 Covenant Against Contingent Fees MAY 2014
52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006
52.203-7 Anti-Kickback Procedures MAY 2014
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
APR 2014
52.204-2 Security Requirements AUG 1996
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2016
52.204-13 System for Award Management Maintenance OCT 2016
52.204-18 Commercial and Government Entity Code Maintenance JUL 2016
52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-22 Alternative Line Item Proposal JAN 2017
52.204-23 Prohibition on Contracting for Hardware, Software, and
Services Developed or Provided by Kaspersky Lab and Other
Covered Entities.
JUL 2018
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
OCT 2015
52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
JUL 2013
52.209-10 Prohibition on Contracting With Inverted Domestic
Corporations
NOV 2015
52.211-5 Material Requirements AUG 2000
52.211-15 Defense Priority And Allocation Requirements APR 2008
52.215-2 Audit and Records--Negotiation OCT 2010
52.215-8 Order of Precedence--Uniform Contract Format OCT 1997
52.215-14 Integrity of Unit Prices OCT 2010
52.215-14 Alt I Integrity of Unit Prices (Oct 2010) - Alternate I OCT 1997
52.219-6 Notice Of Total Small Business Set-Aside NOV 2011
52.219-8 Utilization of Small Business Concerns NOV 2016
52.219-14 Limitations On Subcontracting JAN 2017
52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013
52.222-3 Convict Labor JUN 2003
52.222-4 Contract Work Hours and Safety Standards - Overtime
Compensation
MAY 2018
52.222-19 Child Labor -- Cooperation with Authorities and Remedies JAN 2018
52.222-20 Contracts for Materials, Supplies, Articles, and Equipment
Exceeding $15,000
MAY 2014
52.222-21 Prohibition Of Segregated Facilities APR 2015
52.222-26 Equal Opportunity SEP 2016
52.222-37 Employment Reports on Veterans FEB 2016
52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons MAR 2015
52.222-54 Employment Eligibility Verification OCT 2015
52.223-6 Drug-Free Workplace MAY 2001
52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008
52.227-1 Authorization and Consent DEC 2007
52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
DEC 2007
52.229-3 Federal, State And Local Taxes FEB 2013
52.232-1 Payments APR 1984
52.232-8 Discounts For Prompt Payment FEB 2002
52.232-11 Extras APR 1984
52.232-17 Interest MAY 2014
52.232-18 Availability Of Funds APR 1984
52.232-23 Assignment Of Claims MAY 2014
52.232-25 Prompt Payment JAN 2017
52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014
52.233-3 Protest After Award AUG 1996
52.233-4 Applicable Law for Breach of Contract Claim OCT 2004
52.242-5 Payments to Small Business Subcontractors JAN 2017
52.242-13 Bankruptcy JUL 1995
52.243-1 Changes--Fixed Price AUG 1987
52.243-7 Notification Of Changes JAN 2017
52.244-5 Competition In Subcontracting DEC 1996
52.244-6 Subcontracts for Commercial Items JUL 2018
52.246-23 Limitation Of Liability FEB 1997
52.247-1 Commercial Bill Of Lading Notations FEB 2006
52.248-1 Value Engineering OCT 2010
52.249-2 Termination For Convenience Of The Government (Fixed-
Price)
APR 2012
52.249-8 Default (Fixed-Price Supply & Service) APR 1984
52.253-1 Computer Generated Forms JAN 1991
252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-
Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013
252.204-7000 Disclosure Of Information OCT 2016
252.204-7002 Payment For Subline Items Not Separately Priced DEC 1991
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7005 Oral Attestation of Security Responsibilities NOV 2001
252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
OCT 2016
252.204-7015 Notice of Authorized Disclosure of Information for Litigation
Support
MAY 2016
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of
Terrorism
OCT 2015
252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010
252.223-7004 Drug Free Work Force SEP 1988
252.223-7008 Prohibition of Hexavalent Chromium JUN 2013
252.225-7001 Buy American And Balance Of Payments Program-- Basic DEC 2017
252.225-7002 Qualifying Country Sources As Subcontractors DEC 2017
252.225-7005 Identification Of Expenditures In The United States JUN 2005
252.225-7007 Prohibition on Acquisition of United States Munitions List
Items from Communist Chinese Military Companies
SEP 2006
252.225-7009 Restriction on Acquisition of Certain Articles Containing
Specialty Metals
OCT 2014
252.225-7012 Preference For…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.