SECTION I

DFAR 252.223-7007 SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND

EXPLOSIVES (SEP 1999)

(a) Definition - "Arms, ammunition, and explosives (AA&E)," as used in this clause, means those items within the scope (chapter 1, paragraph C 1.2) of DoD 5100.76-M, Physical Security of Sensitive Conventional Arms, Ammunition, and Explosives.

(b) The requirements of DoD 5100.76-M apply to the following items of AA&E being developed, produced, manufactured or purchased for the Government, or provided to the Contractor as Government-furnished property under this contract:

NALC, NOMENCLATURE NATIONAL STOCK NUMBER SENSITIVITY RISK CATEGORY

TH01, Igniter, MK 288, MOD 1

1356-01-294-6889 IV

(c) The Contractor shall comply with the requirements of DoD 5100.76-M, as specified in the statement of work. The edition of DoD 5100.76-M in effect on the date of issuance of the solicitation for this contract shall apply.

(d) The Contractor shall allow representatives of the Defense Security Service (DSS), and representatives of other appropriate offices of the Government, access at all reasonable times into its facilities and those of its subcontractors, for the purpose of performing surveys, inspections, and investigations necessary to review compliance with the physical security standards applicable to this contract.

(e) The Contractor shall notify the cognizant DSS field office of any subcontract involving AA&E within 10 days after award of the subcontract.

(f) The Contractor shall ensure that the requirements of this clause are included in all subcontracts, at every tier--

(1) For the development, production, manufacture, or purchase of AA&E; or

(2) When AA&E will be provided to the subcontractor as Government-furnished property.

(g) Nothing in this clause shall relieve the Contractor of its responsibility for complying with applicable Federal, state, and local laws, ordinances, codes, and regulations (including requirements for obtaining licenses and permits) in connection with the performance of this contract.

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A.CONTRACT LINE ITEM NO.

B.EXHIBIT

C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

IGNITER ASSEMBLY MK288 MOD1

E.CONTRACT/PR NO.

F.CONTRACTOR

1. DATA ITEM NO.

A001

2.TITLE OF DATA ITEM

Test Procedure

3.SUBTITLE

17.PRICE GROUP

4. AUTHORITY (Data Acquisition Document No.) 5.CONTRACT REFERENCE

6.REQUIRING OFFICE 18.ESTIMATED

TOTAL PRICE

DI-NDTI-80603A ALL DRAWINGS NUWC Newport ISEA

7.DD250 REQ

DD

9.DIST STATEMENT

REQUIRED

10.FREQUENCY

ONE TIME

12.DATE OF FIRST

SUBMISSION

14.DISTRIBUTION

D

30 DAC

a. ADDRESSEE

b. COPIES

8.ADP CODE

A

11.AS OF

DATE

13.DATE OF SUBSEQUENT

Draft

Final

Reg Repro

16.REMARKS SEE BLOCK 16 0 1 0

THE PLAN IS TO SPECIFY PROCESS CONTROL INSTRUCTIONS AND INSPECTION

PROCEDURES NEEDED TO ENSURE PRODUCT CONFORMANCE TO DRAWINGS,

SPECIFICATIONS, AND CONTRACT REQUIREMENTS IAW ANSI/ASQC Q9000-2000 OR

EQUIVALENT. THE PLAN IS TO INCLUDE FIRST ARTICLE AND PRODUCTION LOT

QUALITY CONFORMANCE INSPECTION PROCEDURES IAW DI-NDTI-80603A ALONG

WITH ALL APPLICABLE DATA ENTRY SHEETS TO BE USED TO DOCUMENT PROCESS

INSPECTIONS.

BLK 14: DISTRIBUTION ADDRESS

N00104

COMMANDING OFFICER

NAVSUP WEAPON SYSTEMS SUPPORT

ATTN: CODE N742.13

5450 CARLISLE PIKE

P.O. BOX 2020

MECHANICSBURG, PA 17055-0788

KIRSTEN.BARNES@NAVY.MIL

15.TOTAL 0 1 0

G. PREPARED BY:

Warren Eslinger

H. DATE

26 Oct 16

I. APPROVED BY:

Jeremy Hilliker

J. DATE

26 Oct 16

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 4 Pages

The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A.CONTRACT LINE ITEM NO.

D. SYSTEM/ITEM

A002

2.TITLE OF DATA ITEM

Test/Inspection Report

3.SUBTITLE

Pre-Production & Production Test

DI-NDTI-80809B ALL DRAWINGS NUWC Newport ISEA

REQUIRED

10.FREQUENCY

PER LOT

SEE BLOCK 16

a. ADDRESSEE

b. COPIES

8.ADP CODE

Reg Repro

16.REMARKS SEE BLOCK 16 0 1 0

THE REPORT IS TO VERIFY PRODUCTION LOT CONFORMANCE TO THE APPLICABLE

DRAWINGS, SPECIFICATIONS, AND CONTRACT REQUIREMENTS. THE REPORT

CONSISTS OF THE PLAN (A001) CONTAINING ALL REQUIRED INSPECTION

RESULTS DOCUMENTED ON THE PLAN’S DATA ENTRY SHEETS. IN ADDITION, THE

REPORT IS TO INCLUDE MATERIAL CERTIFICATIONS AND ALL OTHER PERTINENT

OBJECTIVE QUALITY EVIDENCE. THE REPORT MUST BE APPROVED BY NAVSUP

WSS CONTRACTING OFFICER BEFORE FINAL ACCEPTANCE OF THE LOT.

BLK 12: DATE OF PRE-PRODUCTION TEST REPORT SUBMISSION – DD MTH YR.

DATE OF FIRST SUBMISSION FOR PRODUCTION – NLT 15 DAYS AFTER LOT

ACCEPTANCE TESTING OF FIRST LOT.

BLK 13: DATE OF SUBSEQUENT SUBMISSION – NLT 15 DAYS AFTER LOT

ACCEPTANCE TESTING OF SECOND LOT AND BEYOND.

BLK 14: DISTRIBUTION ADDRESS

N00104

COMMANDING OFFICER

NAVSUP WEAPON SYSTEMS SUPPORT

ATTN: CODE N742.13

5450 CARLISLE PIKE

P.O. BOX 2020

Warren Eslinger

H. DATE

26 Oct 16

I. APPROVED BY:

Jeremy Hilliker

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 4 Pages

The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A.CONTRACT LINE ITEM NO.

D. SYSTEM/ITEM

A003

2.TITLE OF DATA ITEM

Failure Analysis/Corrective Action Report

DI-SESS-81315B Section B, E & I NUWC Newport ISEA

LT

REQUIRED

10.FREQUENCY

SEE BLOCK 16

12.DATE OF FIRST

a. ADDRESSEE

SEE BLOCK 16 Reg Repro

16.REMARKS SEE BLOCK 16 0 1 0

BLK 5: INCLUDE AND TAKE ACTION ON SECTION I IF FAT IS REQUIRED.

BLK 10: FREQUENCY - IS DETERMINED BY NUMBER OF FAT/LAT FAILURES.

BLK 12: DATE OF FIRST SUBMISSION – NLT AN INTERIM REPORT IS DUE NLT

10 DAYS AFTER NOTIFICATION OF LOT FAILURE. A FINAL REPORT IS DUE 30

DAYS AFTER NOTIFICATION OF LOT FAILURE.

BLK 13: DATE OF SUBSEQUENT SUBMISSION – NLT 10 DAYS AFTER FA

COMPLETION OF SECOND FAILED LOT AND BEYOND.

BLK 14: DISTRIBUTION ADDRESS

N00104

COMMANDING OFFICER

NAVSUP WEAPON SYSTEMS SUPPORT

ATTN: CODE N742.13

5450 CARLISLE PIKE

P.O. BOX 2020

Warren Eslinger

H. DATE

26 Oct 16

I. APPROVED BY:

Jeremy Hilliker

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 3 of 4 Pages

The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A.CONTRACT LINE ITEM NO.

0001AA

D. SYSTEM/ITEM

1.DATA ITEM NO.

A004

2.TITLE OF DATA ITEM

Ammo Data Card (ADC)

4.AUTHORITY (Data Acquisition Document No.) 5.CONTRACT REFERENCE

DI-MISC-80043B Section C NUWC Newport ISEA

REQUIRED

10.FREQUENCY

ASREQ

ASREQ

a. ADDRESSEE

When Revised Reg Repro

16.REMARKS SEE BLOCK 16 0 1 1

BLK 4: DATA CARD SHALL BE PREPARED IN ACCORDANCE WITH MIL-STD-1168,

AS CHANGED BY ADL EXCEPTIONS AND THE CONTRACT DOCUMENT LIST BY

ACCESSING THE WORLDWIDE AMMUNITION-DATA REPOSITORY (WARP) WHICH IS

LOCATED: https://mhpwarp.redstone.army.mil. AN ACCESS REQUEST FORM

MUST BE COMPLETED BEFORE WARP CAN BE ACCESSED. QUESTIONS SPECIFIC TO

WARP SHOULD BE ADDRESSED TO ONE OF THE RESPECTIVE POCs AS LISTED ON

THE WEBSITE.

BLK 10,12,13: DATA CARDS PROVIDED TO NAVSEA PMS-404 AND THOSE SENT

WITH SHIPMENTS SHALL BE HARDCOPY PRINTOUTS GENEREATED WITH THE WARP

PROGRAM AND SHALL BE SIGNED AND DATED BY THE GOVERNMENT INSPECTOR.

NAVSEA PMS-404 SUMISSIONS SHALL ALSO INCLUDE HARDCOPY PRINTOUT OF

SAMPLES CARDS (SEE MIL-STD-1168, PARA 4.3.1.4)

BLK 14: DISTRIBUTION ADDRESS

N00104

COMMANDING OFFICER

NAVSUP WEAPON SYSTEMS SUPPORT

ATTN: CODE N742.13

5450 CARLISLE PIKE

P.O. BOX 2020

15.TOTAL 0 1 4

Warren Eslinger

H. DATE

26 Oct 16

I. APPROVED BY:

Jeremy Hilliker

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 4 of 4 Pages

INSTRUCTION FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory

Item B. Self-explanatory

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as Provisioning, Configuration Management, etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award)

Item F. Self-explanatory (to be filled in after contract award)

Item G. Signature of preparer of CDRL

Item H. Date CDRL was prepared

Item I. Signature of CDRL approval authority

Item J. Date CDRL was approved

Item 1. See DoD FAR Supplement Subpart 4 71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry)

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-1 (AMSDL), or one-time DID number, that defines data content and format requirements

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g, Statement of Work paragraph number)

Item 6. Enter technical office responsible for ensuring adequacy of the data item

Item 7. Specify requirement for inspection/acceptance of the data item by the Government

Item 8. Specify requirement for approval of a draft before preparation of the final data item

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref DoDD 5230.24)

Item 10. Specify number of times data items are to be delivered

Item 11. Specify as-of date of data item, when applicable

Item 12. Specify when first submittal is required

Item 13. Specify when subsequent submittals are required, when applicable

Item 14. Enter addresses and number of draft/final copies to be delivered to each addressee.

Explain reproducible copies it Item 16

Item 15. Enter total number of draft/final copies to be delivered

Item 16. Use of additional clarifying information for items 1 through 15. Examples are:

Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;

Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423

a. Group I. Definition - Data which is not otherwise essential to the contractors performance of the primary contracted effort (production development, testing, and administration) but which is required by DD Form 1423

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirement, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which s estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if not data were required.

The estimated data prices shall not include any amount for rights in data. The Government’s right to use the data shall be governed by the pertinent provisions of the contract