N0010417RK123_Amendment_4.docx

DOCX document 57 KB Posted

Attached to
FW98 FLU-8B/P and BY81 FLU9-B/P Infltion Devices
Solicitation number
N0010417RK123
Issued by

About this file

Amendment 4

View the file

Other files

File Type Posted
18ck026ja_Redacted.pdf PDF
N0010417RK123_Amendment_1.pdf PDF
ADC_MASTER_Rev_11.pdf PDF
17RK123_CDRLS.pdf PDF
N0010417RK123.pdf PDF
CADPAD_Marking_Instruction_Version_1_2_revised_432016.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0010417RK123

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 13-Dec-2017 02:00 PM to 21-Dec-2017 02:00 PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

SECTION B NOTES

SOLICITATION NOTES:

1. Pre-award survey will include saftey and quality.

1. Faxed offers will NOT be accepted.

1. Since the Government intends to award without discussion, any exceptions to the requirements of this solicitation should be raised prior to submission of an offer.

1. This item is a CSI – Critical Safety Item.

1. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.

1. Electronic submission of an offer may be accomplished by attaching your offer to an email directed to ashley.leonard@navy.mil. The size limitation of an email through the NAVSUP WSS mail server is 10 MB. All files designated as .zip files will be stripped from any email sent. Files larger than the server limitation may be segregated and sent via several emails as long as they are clearly identified as such. It is highly recommended that the Offeror request email delivery confirmation or other form of acknowledgement to verify that the proposal submission was received.

Vendor Solicitation Questions and Government Answers:

1. In reference to the TDP (MIL-DTL-32087C(OS):

a. On page 7, can overbuilds be included in the reference to retain units? Could it be changed to read “retain or overbuild units can be used to continue testing with the approval of the Government Design Activity…”

Government Answer: Overbuilds cannot be included in the testing. The specification calls out a specific max lot size of 1200 and 32 test units and 2 retains. If the overbuilds were to be used, it would push the lot size over 1200 and require an increase in sample size. A variance will have to be submitted to use overbuilds for testing or to be used as deliverables in the lot should the need arise.

b. On page 8, in reference to Table II changes, requirement 3.9.2 (test method 4.6.10.2/class M109) has been moved to Table III. It is believed the requirement 3.9.1 (test method 4.6.10.1/class M108) should be also be moved to Table III.

Government Answer: Yes that lever operation test with and without the CO2 cylinder should be part of the LAT and not the lot inspection. But, a manual lever operation of every single inflation device should be part of the lot inspection. This change will be made to the specification via ECP, which is expected in the next 12 months.

c. On page 9, part 4.6.3-inclusion of “Change per summary on page 6…” it appears the reference should be changed to page 4 vice 6?

Government Answer: The approved RFV (FY16-V088R1) actually has the summary on page 7 due to the addition of the RFV cover page. The ECP will have the summary items numbered so the reference will be more specific. The ECP is expected within the next 12 months.

d. On page 14, part 4.6.12.1.3 referencing the piercing pin, can the following language be included “Verification test shall be performed when complete stroke and lockout cannot be visually verified via external components without device disassembly?”

Government Answer: The intent of inspection listed in paragraph 4.6.12.1.3 is to prevent reuse of an expended inflation device. The lockout requirement prevents installation of a new CO2 cylinder without puncturing it. The device has a visual indication that the inflation device has actuated and should be disposed of. This paragraph is only highlighting that the indicator should be observed to verify that the inflator has actuated. So for the FLU-8 and FLU-9 only a visual verification is required and a pin-push test similar to the one done on the FLU-12/P is not required.

2. The solicitation/proposal states that a LAT lot sample size will be determined using ASQ Z1.4, normal inspection, single sampling plan, and inspection level II, AQL shall be 1.0. This would require a lot sample size of 80 plus 2 retain units. Would the government consider the “reduced” inspection table, single sampling plan, and inspection level II with an AQL of 1.0 based on historical acceptance rates?

Government Answer: LAT sample size remains as is in the solicitation.

3. Per Section E, part 2: Production Lot Test Samples- it is not possible to provide ALL finalized documentation to the QAR at the time of LAT as the WAWF RR and WARP ADC’s are generated post LAT completion/success. We have met DCMA QAR resistance in the past and respectfully request that this requirement be amended to reflect the current sequence of documentation submission.

Government Answer: Preliminary documents are still required per the solicitation. Final documents are not due until the date listed in Section F. X-rays should still be sent to NSWC IHEODTD for review prior to LAT testing.

4. Per Section E, part 9: CAD/PAD Inspection and Acceptance – MIL DTL 32087C; Inflation Device, Automatic, FLU 8B/P and FLU 9B/P; Paragraph 3.12 states: The inflation devices shall be free of imperfections when examined in accordance with paragraph 4.6.5. Paragraph 4.6.5 states: Each inflation device shall be radiographically examined in accordance with ASTM E1742; any observable imperfections in assembly shall be cause for rejection. Request the radiographs be produced without the use of RQI’s and IQI’s.

Government Answer: Section E paragraph 9 has been updated as shown.

SECTION E - INSPECTION AND ACCEPTANCE

The following have been modified:

SECTION E

SECTION E – PRODUCTION LOT TEST SAMPLES (CONTRACTOR TESTING) (MAR 2015)

1. Test samples are required from each production lot and are to be tested in accordance with the approved test plan. A production lot shall consist of net deliverable quantity, plus additional lot test sample units and any retained sample units for investigative purposes as may be required by Section B.

2. The production lot(s) must be manufactured and presented to the Government Quality Assurance Representative (QAR) with all documentation required by section B. The documentation (WAWF-RRs and Ammunition Data Card printed from WARP) accompanying the production lot test samples shall contain the contract number, item, lot number identification, DODIC, NSN, and serial numbers. The samples shall be selected, at random, from each production lot, by the QAR within 2 workdays for resident QARs, or 7 workdays for non-resident QARs after presentation of the lot.

3. Sample units removed for testing from different lots shall not be commingled.

4. Production lot testing shall be performed by the Contractor within 30 calendar days of production lot sample selection. Production lot testing shall be witnessed by a representative of the engineering activity and/or the cognizant QAR. The Contractor shall provide written notification to the Contracting Officer, with concurrent notification to the engineering activity, and the QAR, at least 20 calendar days prior to the planned testing date.

NOTE: If a failure occurs during testing and an engineering activity representative is not present, all testing shall be halted and the engineering activity and contracting officer shall be notified within 24 hours. A Government representative shall be allowed to participate in the failure investigation in accordance with applicable CDRLs. Contractor testing shall resume upon notification by the Contracting Officer.

5. Disposition of Production Lot Test Samples – Production Lot Testing Samples are subject to destructive testing. These units cannot be used to meet the total contract quantity.

6. A production lot test report is required and shall be forwarded in accordance with the DD 1423 sequence number A007_requirements to the address shown in Block 14. The test report shall include all results of testing conducted in accordance with the approved test plan.

7. Acceptance, shipment, and payment shall not be accomplished until the production lot test samples have been tested, the required report approved, and the lot has been released for service use. The retained samples, if applicable, shall be shipped to the address provided in Section F of the contract after the lot has been released for service use.

8. The only valid and contractually binding notification of production lot approval, conditional approval, or disapproval shall be in writing and issued by the Contracting Officer. This notification shall be made to the Contractor within 30 calendar days after the Contracting Officer receives the production lot test report(s) and all applicable CDRL requirements. Upon receipt of the written approval accepting a production lot(s) and final approval of the Material Inspection Receiving Report in IRAPT, the Contractor shall ship the production lot(s) as soon as possible and no later than fifteen (15) calendar days after receipt of such notice. Final acceptance of the production lot(s) shall be the responsibility of the cognizant DCMA QAR, but shall not occur unless and until the production lot approval has been issued in writing by the Contracting Officer.

a.Any notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.
b.A notice of conditional approval may state any further action required of the Contractor. In the event the test sample fails to meet the requirements of the specification or drawing, the Contractor shall submit a Failure Analysis and Corrective Action Report (DD Form 1423, sequence number, A004) with all associated costs and expenses to be borne solely by the Contractor.
c.A notice of disapproval may cite reasons for such. If the production lot test report(s) is disapproved by the Contracting Officer, the QAR may be required to select an additional production lot test sample(s) for testing. This direction may be given by the Contracting Officer in the notice of disapproval. The Contractor shall furnish such additional test sample(s) under the terms and conditions and within the time specified in the notification. The cost of each additional approval test, and all costs related to such test(s), shall be borne by the Contractor. Upon approval of the production lot test sample(s) and report(s), the Contracting Officer may, at his/her discretion, equitably adjust the delivery schedule of the contract for only the lot represented by such sample(s). The Government reserves the right to require an equitable decrease of the contract price for any extension of the delivery schedule necessitated by additional test(s) or for any additional costs incurred by the Government due to the need for additional approval test(s).

9. If the Contractor fails to deliver any production lot test sample(s) within the time or times specified, or if the Contracting Officer disapproves any production lot test report(s), the contract may be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract may be subject to termination for default. In such an event, failure of the Government to terminate this contract for default shall not relieve the Contractor of the responsibility to meet the delivery schedule for production quantities.

SECTION E – INSPECTION AND ACCEPTANCE OF TEST PLANS / PROCEDURES (MAR 2005)

1. The Contractor shall submit a test plan/procedure for Government approval/disapproval as specified in the Contract Data Requirements List (DD Form 1423, sequence number, A006). The test plan shall be submitted within sixty (60) calendar days after contract award date. The Acceptance Test Plan shall identify that test fixtures are available for use at the Contractor’s Facility.

2. Notification of test plan approval, conditional approval, or disapproval shall be provided via IRAPT. This notification may be made within 30 calendar days after receipt of the Production plan/procedure.

3. The notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.

4. A notice of conditional approval may state any further action required of the Contractor.

5. A notice of disapproval shall cite the reasons for such. If the plan or procedure is disapproved by the Government, the Contractor may be required, at the option of the Government, to submit a revised plan or procedure for evaluation. After each notification by the Government to submit a revised plan or procedure, the Contractor shall, at no additional cost to the Government, make any necessary revisions or modifications to the plan or procedure. Such revisions shall be furnished in accordance with terms and conditions and within the time specified in the notification. The Government may take action on the resubmitted plan or procedure within the time specified above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule necessitated by resubmission of the plan or procedure.

6. If the Contractor fails to deliver the plan or procedure within the time specified, or if the Contracting Officer disapproves any plan or procedure, the Contractor shall be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract shall be subject to termination for default. However, failure of the Government in such an event to terminate the contract shall not relieve the Contractor of the responsibility to meet all requirements of the contract including delivery of any first article sample(s), data requirements, and/or production quantities.

7. There is hereby created an option for the Government to waive the requirement for submission of a plan or procedure. If the offeror has had its plan previously approved by the Government, the following information shall be furnished:

Approved by__________________________ Date of approval___________________ Contract number and Contractor under which plan/procedure was approved__________________.

Test Plan number, revision date and NSN for which the item was previously approved_____________.

8. If the submission of the plan or procedure is waived, the previously approved plan or procedure shall apply to the contract.

SECTION E – CAD/PAD INSPECTION AND ACCEPTANCE (MAY 2015)

1. Inspection and acceptance shall be in accordance with DWG849AS153, 849AS221 and MIL-DTL-32087.

2. The Government reserves the right to invoke the requirement for First Article Testing (FAT) if there is a change in process, facilities, materials, equipment, or production of the item; if two years or more have passed since the item was last manufactured, or if the item has developed a problem. Process is defined as the steps or tasks that are performed to create a product. Facilities is defined as location or buildings where the process(es) are performed to manufacture a product. Materials is defined as all the raw ingredients that are used in the manufacturing of the item. Equipment is defined as all the tools used to manufacture a product. Production is defined as to make, manufacture, or create a product.

3. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed twenty four (24) months based on the original manufacturing date; unless otherwise noted in the detail specification of the item being procured. Propellant manufactured shall be in accordance with the required specifications of paragraph one. Any government furnished material provided in conjunction with the contract are considered acceptable for meeting the requirement. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (http://www.pmddtc.state.gov/regulations_laws/itar.html). Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed six months since date of manufacture and comply with original manufacture's specification or military standard. The Government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the Government) provided the Contractor furnishes all details of the reason for the waiver and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance (COA/COC) of the subject materials or components. The waiver shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer analysis and/or dehumidification at Contractor's cost.

4. The Contractor shall provide and maintain a quality program acceptable to the Government and modeled on ISO 9001:2008 with Technical Corrigendum 1or an equivalent quality system. If the quality program is not modeled on ISO 9001:2008 with Technical Corrigendum 1 the offeror/prospective Contractor shall indicate the quality system proposed along with how it is equivalent, under separate letter submitted with the offer/proposal.

ISO 9001:2008 Other This quality system along with program specific production documentation shall be made available for review by the Government’s representative upon request, at the Contractor’s facility at no cost to the Government.

5. Due to the critical nature and safety application of these items, the Contractor and the QAR are cautioned that it is mandatory to ensure the correct identification and nomenclature are assigned for all items and shipping containers prior to shipment including CAGE codes. CAD/PAD Devices are exempt from MIL-STD-129 shelf life markings on packaging; however, they shall have a minimum of 85% of the shelf life remaining at time of delivery. Any delivery from a contractor not having at least 85% shelf-life remaining shall normally be considered non-conforming.

NOTE: The shelf life for CLIN 0001 is: 14 years and 0 months.

CLIN 0002 is: 9 years and 0 months.

6. Radiographic equipment and procedures shall meet the standards stipulated in the latest revisions of the following specifications: ASTM E1742, ASTM E748, and ASTM E545.

7. Radiographers shall be qualified and certified accordance with the requirements described in specification NAS 410.

8. In order to fulfill contractual requirements, the Contractor must submit acceptable radiographs. Radiographs not conforming to the requirements specified herein will not be reviewed by NSWC IHEODTD. Disposition of nonconforming radiographs will be by mutual agreement of the parties.

9. Radiographic test technique and sample images for X-rays and N-rays, as applicable, shall be submitted with the First Article Test (FAT) samples to the activity cited below. If there is no FAT requirement, the radiographic test technique and sample images for X-rays and N-rays, as applicable, shall be submitted 45 days before the production lot delivery date to the activity below.

NSWC IHEODTD

CAD/PAD DEPARTMENT BLDG 1557

ATTN: AMS Per Section H

4393 BENSON ROAD

INDIAN HEAD MD 20640-5092

a. Test technique information for ALL radiographs is specified in section 6 of ASTM E1742, refer to DD 1423 sequence number A006. The radiographic images shall display a number of units representative of a production lot. On sample plates/images units shall be positioned on the radiographic plate at the areas of minimum and maximum geometric distortion. Sample Images shall be of the same size and type as used for the production lot. Film densities below 1.5 are permitted when agreed upon between the cognizant engineering organization and the NDT facility.

10. The Contractor shall submit radiographic film as marked (X) below:

X-RAYS ( per applicable spec )
N-RAYS ( per ASTM E748 )
Sample / LOT Description

X

Test Technique Required

First Article Sample

X

LOT Acceptance Test Samples

X

Production Lot Units

Explosive Sub-Assemblies (i.e., NON-GFM CTGS, Booster Sleeves, etc.)

a. Radiographs of Production Lot Units shall include Lot Acceptance Testing (LAT) samples.

11. Radiographs may be produced using film (conventional x-ray), or non-film (digital) techniques such as Digital Detector Array (DDA), or Computed Radiography (CR), with the understanding that the Contractor must be qualified and given prior approval to use digital radiography by NSWC IHEODTD. If digital radiographs are submitted, they shall be in the form of raw data that is Digital Imaging and Communication in Nondestructive Evaluation (DICONDE) compliant. In addition to the raw DICONDE data, 16 bit Tagged Image Format (TIF) images of the digital radiographs must be submitted. The qualification of non-film techniques will be done IAW the latest versions of standards referenced in the latest version of ASTM E1742 (currently ASTM E1742/E1742M-12), such as ASTM E2698 and ASTM E2737 (for the qualification of Digital Detector Array (DDA) detectors), or ASTM E2033 and ASTM E2445 (for the qualification of Computed Radiography (CR) systems). A qualification plan must be submitted to the Level III Radiographer at NSWC Indian Head EODTD for review prior to qualification of the digital x-ray system. Once the qualification plan has been reviewed and approved, the Level III Radiographer at NSWC Indian Head EODTD will conduct a site visit (i.e. audit) to witness the qualification of the digital x-ray system. The results of the tests performed during the digital x-ray system qualification will be documented in a qualification document, which will be submitted to the Level III Radiographer at NSWC Indian Head EODTD. An official approval letter will then be issued by the Commanding Officer, NSWC Indian Head EODTD, which authorizes the use of the digital system. Follow up audits at regular intervals (i.e. annually) may be conducted to assure the long term stability and performance of the digital x-ray system.

12. The Contractor shall submit a DR or CR sample plate and technique, and also a conventional film sample plate and technique representative of the production lot. The sample plates and techniques will be reviewed by a NSWC IHEODTD Level III Radiographer, to ensure that the image quality of the digital radiograph is comparable to film. Formal acceptance of the DDA or CR Technique and sample plate review results will be provided via iRAPT. All DR or CR radiographs shall be provided in CD or DVD format containing uncompressed digital images, as previously approved per the applicable Radiographic Test Technique (RTT) and sample plate. After approval of the RTT and sample plate is granted by the government, only DR or CR radiographs will be required. The Contractor may submit conventional film sample plates, if they chose to submit production x-rays on film, instead of using a digital technique.

13. Notification of approval/rejection of the sample images shall be made by the Contracting Officer after receipt of the RTT and sample images at NSWC IHEODTD in iRAPT. Written notification of rejection will be provided by the Contracting Officer. Approval of the sample images must be received prior to performing radiographic inspection of the production lot units. The Contractor shall then follow the approved technique to produce subsequent radiographs with the same quality as the approved sample images. Any change in the approved radiographic technique or equipment requires submittal and approval of new radiographic sample images at the Contractor's expense.

a.There is hereby created an option for the Government to waive the requirement for submission of a radiographic test technique and sample images. The Contractor may only request a waiver for the submission of the sample plate and RTT as long as the Cognizant Engineering Organization (CEO), which is NSWC IHEODTD, has an approved sample plate and RTT on file from a previous contract, and the x-ray equipment or RTT has not changed since the referenced contract, the following information shall be furnished:
Approved by ____________________________Date of approval __________________

Contract number under which approved ________________________________

b.If the submission of the RTT and sample plate is waived, the previously approved technique shall apply to the contract.
c.If the Contractor requests waiver of submission of the RTT and sample plate after time of award, an offer of adequate consideration shall accompany the request.

14. An acceptable radiographic sample image is required for each line item on this contract.

15. When submitting the radiographic images, the Contractor shall also submit a report of radiographic inspection. This report shall clearly indicate the units subjected to radiographic inspection by the following data:

Item Nomenclature and DODICGovernment drawing or part number
Complete lot numberSpan of serial numbers displayed
Complete contract numberNonconforming units by serial number
and reason for rejection

Missing units by serial number Any units found to be nonconforming shall be clearly identified. The specific nature of the non-conformance shall be cited, as well as any assignable cause or analysis related to the occurrence.

16. When undergoing radiographic inspection, each unit in the sample or lot shall be permanently serialized in consecutive numerical order per MIL-STD-1168 before radiographic inspection. Serial numbers shall not be repeated on items with the same part number regardless of changes in the lot number. The numbering shall be from left to right, top to bottom with the first item on the left of each row having the lowest serial number. All annotation must be represented using a method which leaves a permanent image on the film, such as placing lead letters on the film cassette or digital detector prior to each exposure. It is NOT acceptable to use adhesive labels, or to write annotation on the film using a marker or other writing instrument. Units that are missing on a radiograph must be indicated by identifying the serial number of the unit immediately preceding, and immediately following, the missing unit(s).

All units shall be arranged on trays or boards in consecutive numerical order. Radiographs shall reveal internal components. This may require using various techniques which may include multiple exposures, multiple speeds of film being loaded for each exposure, or additional orientation of unit(s) i.e. 0 degree and 90 degree exposures. Any discontinuities in the serial numbers displayed shall be clearly marked on the representative radiographic image. Specific reasons for the missing serial number(s) and all rejects from the Contractor and QAR inspections prior to radiographic inspection shall be recorded on the radiographic inspection report as described in paragraph 11 and forwarded with the LAT sample. Row-unit-quantities shall be consistent except the ending row of the production lot, which may vary. In addition, serial numbers shall appear at the end of each row when more than 100 units appear on one radiograph image; these serial numbers may appear on tape and be affixed to the radiograph.

17. This radiographic image and report shall be shipped prepaid. The radiographic image and report may be sent prior to or concurrently with the first article or lot acceptance test samples, under separate cover, delivery in accordance with Contract Data Requirement List (CDRL) DD Form 1423, sequence number A007. The film shall be placed in film envelopes or sleeves. Radiographic film shall be place into an appropriate shipping container that will not damage the film. The film envelopes shall be placed in either a fiberboard, cardboard, or wooden box. X-rays or N-ray film shall not be placed directly into a shipping container (i.e. FedEx or UPS box). X-ray or N-ray film shall not be rolled up and place in a shipping tube. The film should be flat, and not folded, bent, or otherwise mutilated.

18. All radiographic images shall be retained by the Government. All radiographic images shall display a permanent identification of the following information:

Item Nomenclature and DODICGovernment Drawing or Part Number
Complete Lot NumberSpan of Serial Numbers Displayed
Complete Contract NumberName of radiographic facility

Date of radiograph

19. All documentation, i.e., packing slip, invoice, WAWF-RR, etc., accompanying the radiographic images shall clearly indicate, as a minimum, the following information:

Contract NumberItem Nomenclature
National Stock Number (NSN)Department of Defense Identification Code (DODIC)

Lot Number

20. Due to the critical nature and safety application of these items, the Contractor and the QAR are cautioned that it is mandatory to assure the correct identification and nomenclature are assigned for all item and shipping containers prior to shipment.

21. The Contractor shall have the ballistic test fixtures and/or capabilities to assure that the item being procured meets the specification requirements.

22. The Contractor shall provide upon Government request and at Contractor’s own cost, copies of all certificates of compliance for all materials (mechanical properties, alloying) and all quality conformance tests (Hydrostatic, X-ray, Protective Finish, Magnetic Particle, Dye Penetrant).

SECTION E – AMMUNITION DATA CARDS AND MATERIAL INSPECTION AND RECEIVING REPORT (JAN 2005)

1. Under the direction of MIL-STD-1168, the Contractor shall furnish Ammunition Data Cards (ADC) for each shipment (test and production) as generated using the Worldwide Ammunition-data Repository Program (WARP). Preparation instructions are found in DI-MISC-80043B and on the WARP website in the WARP User's Manual. Additional guidance for completion of ADC can be found at the Attachment “Ammunition Data Card Master.” This attachment is incorporated by reference with the same force and effect as if contained herein.

All components and subassemblies shall be listed on the ADC per DI-MISC-80043B, paragraph 3, in accordance with DD 1423 sequence number A008_. A printed copy of the ADC from WARP shall be included with each Shipment.

NOTE: The WARP system for Ammo Data Cards requires Contractors to hold a certificate to access the system and communicate with the secure DoD server.

The site to obtain ECA Access Certificate is: http://www.identrust.com/warp/index.html The WARP login website is: https://mhpwarp.redstone.army.mil

2. Lot numbers for all explosive components and explosive subassemblies shall be in accordance with MIL-STD-1168 (Ammunition Lot Numbering and Ammunition Data Card), and shall be included in the components section of the Ammunition Data Card.

3. In accordance with the DFARS clause at 252.246-7000, Material Inspection and Receiving Report, the Contractor shall complete an IRAPT Receiving Report (WAWF-RR) at the time of each delivery (Lot Acceptance or First Article test samples and production lot). Preparation instructions are found in the DFAR Supplement Appendix F.

If the date cited in WAWF-RR is an estimated "ship date", the Contractor shall make distribution of a corrected WAWF-RR indicating the "actual ship date" within 24 hours after actual shipment. The following additional data shall be furnished on the WAWF-RR:

a. Complete lot number, lot expiration date (month and year)

b. Total lot size (consists of net, test, and investigative).

c. Serial numbers of units shipped to consignee.

d. Net quantity shipped to destination.

1. Item quantity shipped to consignee

2. Total item quantity shipped to consignee

3. Item quantity due consignee

4. The Contractor shall make distribution of the ADC and WAWF-RR in accordance with the information provided in Section H no later than 24 hours after shipment. When Item 0001, 0002, etc. is indicated under the designator, the Contractor shall furnish all shipping documents for all SUBCLINs under that line item.

(End of Summary of Changes) image1.wmf