QALI_for_PR17NB049_SS13 _SS14 _SS15 _SS16.pdf

PDF 152 KB Posted

Attached to
13, 1377-01-441-2278, SS15, SMDC, 1377-01-441-0090, SS16, 1377-01-441-2386, SS14, SMDC, 1377-01-441-2310, SS13, SMDC
Solicitation number
N0010417RK043
Issued by

About this file

Qali

View the file

Other files

File Type Posted
17NB049 _SS13-16_CDRLS_SIGNED.pdf PDF
17rk043.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract No. PR No.

Date Contract Awarded Contractor Name

Final Delivery Date (FDD) CAGE code

Program Name DCMA QAR Reviewer

Part Number Date Review Completed

DODIC Date Issued to Contractor

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

AMS Date

Prepared by:

E25 Engineer Date

Approved by:

E25 / E25 Team Leader Date

Concurrence Signature by QAR/DCMA QAR/DCMA Date

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

milton.reese Typewritten Text milton.reese Typewritten Text

Sheet1

Contract No:
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: Shielded Mild Detonation Cord
Part Number: 857AS400
DODIC: SS13, SS14, SS15, SS16
undefined: V
undefined_2: V
undefined_3: V
undefined_4: M
undefined_5: M
undefined_6: M
undefined_7: M
undefined_8: M
undefined_9: M
undefined_10:
undefined_11:
undefined_12:
Text1: N00104-17-N-B049
Text2:
Text3:
Text4:
Text5:
Text6:
2016-07-08T10:39:32-0400
BRADY.LINDA.A.1229404608
2016-07-14T13:20:51-0400
KERLIN.BENJAMIN.MILES.1513235263
2016-07-14T15:43:24-0400
ANDINO.MELINA.M.1376531968
Text7: 07/08/16
Text8: 14 JUL 2016
Text9: 07/14/2016
Text10:
Text11: 1) Det Cord Inspection
Text12: 2) Assy inspection
Text13: 3) X-Ray & N-Ray
Text14: 4) Select LAT Samples
Text15: 5) LAT (if tested at contractor's site)
Text16: 6) Preparation for Shipment
Text17: 7) Review AMMO Data Cards
Text18: 8) Shippers (DD250, DD1149, Reports)
Text19: 9) Verify Packaging & Marking (PPP&M)
Text20:
Text21:
Text22:
Text23: 1) Core load, Detonation velocity IAW AS4562, paragraphs 4.5.4.2 and 4.5.4.3

2) Visual inspection, leak test IAW AS4562, paragraphs 4.5.1 and 4.5.2

3)Ensure film labeling correct. Radiograph identification IAW ASTM E1742/E1742M paragraph 6.4, Radiograph report IAW ASTM E1742/E1742M paragraph 6.27.2 DCMA not required to interpret film. DCMA should verify the use of IQI and IQI placement are in accordance with Radiographic Technique approved by the Navy. DCMA does not need to verify the proper quality level (i.e. 2-2T) for film submitted to Indian Head. Acceptance of film based on quality level will be at the discretion of the radiographer/film interpreter at Indian Head.

7) PA in WARP for data review, accept in WARP after lot release by CO

File details come from the government source that posted it. Updated .