17NB028_TDP_20160720_MD66.pdf

PDF 3 MB Posted

Attached to
13, 1377-01-063-3165, MD66, CCU-44/B Impulse Cartridge
Solicitation number
N0010416QK057
Issued by

View the file

Other files

File Type Posted
16QK057B028.pdf PDF
16QK057B028.pdf PDF
16QK057_mod2.pdf PDF
CADPAD_Marking_Instruction_-_Version_1-2_revised_4_3_2016.pdf PDF
ADC_MASTER_Rev_11.pdf PDF
16QK057_mod.pdf PDF
17NB028_MD66_CDRLs_SEND.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9/28/2010

INDIAN HEAD DIVISION

NAVAL SURFACE WARFARE CENTER APPROVED BY APPROVAL DATE

INDIAN HEAD MD 20640

YDL5184850Data List: DL REV: ECP: 10E2BEMH041

NOMENCLATURE: CARTRIDGE, IMPULSE, ASSEMBLY CCU-44/B TOP ASSEMBLY DRAWING: 5184850

DODIC: MD66

S Z

DOCUMENT

NUMBER

CAGE DOCUMENT

DATE

REV NO.

SHT

ECPR REV SHTSDOCUMENT TITLE DOC

REF

SCDOC

SYM

Total: 1PRODUCT SPECIFICATIONS

CARTRIDGE, IMPULSE, CCU-44/B81349 MIL-DTL-82724 A 9/18/2003 11

Total: 1*DATA LISTS

CLOSED BOMB ASSEMBLY FOR TESTING

IGNITION ELEMENTS IN STORES

RELEASE CARTRIDGES

14083 DL838AS123 F 8/17/2010

Total: 16DRAWINGS

IGNITION ELEMENT LOADED ASSEMBLY53711 D 5184831 H 8/11/2010 1 U U 10E25CW006

CASE53711 D 5184832 B 8/11/2010 1 U U 10E25CW006

CUP, CLOSURE53711 D 5184833 C 8/11/2010 1 U U 10E25CW006

HEADER, GLASS SEALED ASSEMBLY53711 D 5184834 D 8/11/2010 1 U U 10E25CW006

HEADER AND BRIDGEWIRE ASSEMBLY53711 D 5184835 D 8/11/2010 1 U U 10E25CW006

IGNITION CHARGE53711 D 5184837 F 8/11/2010 1 U U 10E25CW006

DISC53711 D 5184838 C 8/11/2010 1 U U 10E25CW006

PROPELLANT, DOUBLE BASE53711 D 5184839 B 8/11/2010 1 S U U 10E25CW006

DL5184850 9/28/2010 1:33:34 PM

S Z

DOCUMENT

NUMBER

CAGE DOCUMENT

DATE

REV NO.

SHT

ECPR REV SHTSDOCUMENT TITLE DOC

REF

SCDOC

SYM

FILM, POLYESTER53711 D 5184840 C 8/11/2010 1 S U U 10E25CW006

ELECTRODE53711 D 5184841 B 8/11/2010 1 U U 10E25CW006

HEADER53711 D 5184842 B 8/11/2010 1 U U 10E25CW006

INSULATION, GLASS53711 D 5184843 F 8/11/2010 1 S U U 10E25CW006

SEALANT, EPOXY53711 D 5184844 C 8/11/2010 1 S U U 10E25CW006

CARTRIDGE, IMPULSE, ASSEMBLY CCU-

44/B

53711 C 5184850 D 9/16/2003 1 U U 035230B013

RESIN, EPOXY30003 D 707AS114 K 8/11/2010 1 S U U 10E25CW006

CHARGEHOLDER30003 D 844AS286 E 8/11/2010 1 U U 10E25CW006

Total: 2SPECIAL PACKAGING INSTRUCTIONS

SPECIAL PACKAGING INSTRUCTION FOR

CARTRIDGE, CCU-44/B

98747 F01-063-3164 J 5/19/2004 4 U U ----

SPECIAL PACKAGING INSTRUCTION FOR

CARTRIDGE, CCU-44/B

98747 F01-063-3165 P 7/11/2006 4 U U ----

Total: 2*GOVERNMENT INSPECTION EQUIPMENT DOCUMENTS

CARTRIDGE CASE AND IGNITION

ELEMENT ASSEMBLY (MODIFIED)

53711 D 5184845 B 8/11/2010 1 E U U 10E25CW006

CLOSED BOMB ASSEMBLY FOR TESTING

IGNITION ELEMENTS IN STORES

RELEASE CARTRIDGES

30003 D 838AS123 A 6/12/1980 1 E U U

Total: 5*MILITARY STANDARDS (BOOK FORM)

CLASSIFICATION OF CHARACTERISTICS96906 DOD-STD-2101

DOCUMENT

NUMBER

CAGE DOCUMENT

DATE

REV NO.

SHT

ECPR REV SHTSDOCUMENT TITLE DOC

REF

SCDOC

SYM

AMMUNITION LOT NUMBERING AND

AMMUNITION DATA CARD

96906 MIL-STD-1168

MILITARY MARKING FOR SHIPMENT

AND STORAGE

96906 MIL-STD-129

DOD MATERIEL, PROCEDURES FOR

DEVELOPMENT AND APPLICATION OF

PACKAGING REQUIREMENTS

96906 MIL-STD-2073

PROPELLANTS, SOLID: SAMPLING,

EXAMINATION AND TESTING

96906 MIL-STD-286

Total: 15*MILITARY SPECIFICATIONS

BARIUM NITRATE81349 MIL-B-162

BOTTLE, POLYMER, IN A COMBINATION

CONTAINER, SHIPPING AND STORAGE,

AIR ELIGIBLE

81349 MIL-B-26701

CANS, HERMETIC SEALING, METAL,

LIGHT GAGE, TEAR-STRIP TYPE

81349 MIL-C-10464

DESIGN AND EVALUATION OF

CARTRIDGES FOR STORES SUSPENSION

EQUIPMENT

81349 MIL-D-81303

ETHYL CENTRALITE (CARBAMITE)81349 MIL-E-255

GRAPHITE, DRY (FOR USE IN

AMMUNITION)

81349 MIL-G-155

INSULATION TAPE, ELECTRICAL,

PLASTIC, PRESSURE-SENSITIVE

81349 MIL-I-24391

NITROGLYCERIN81349 MIL-N-246

PALLETS, MATERIAL HANDLING, WOOD

POST CONSTRUCTION, 4-WAY ENTRY

81349 MIL-P-15011

POTASSIUM NITRATE81349 MIL-P-156

POTASSIUM PERCHLORATE81349 MIL-P-217

DOCUMENT

NUMBER

CAGE DOCUMENT

DATE

REV NO.

SHT

ECPR REV SHTSDOCUMENT TITLE DOC

REF

SCDOC

SYM

PLASTIC MATERIAL, CELLULAR,

POLYSTYRENE (FOR BUOYANCY

APPLICATIONS)

81349 MIL-P-40619

PARTS, MOLDED, PLASTIC FOAM,

POLYSTYRENE (FOR USE WITH

AMMUNITION)

81349 MIL-P-60312

PROPELLANT GRAINS, NOSOL-31881349 MIL-P-82739

ZIRCONIUM (GRANULAR AND

POWDERED)

81349 MIL-Z-399

Total: 1*MILITARY SPECIFICATIONS (DTL)

NITROCELLULOSE81349 MIL-DTL-244

Total: 4*FEDERAL SPECIFICATIONS

CUSHIONING MATERIAL, CELLULOSIC,

PACKAGING

81348 A-A-1898

PANELS, WOOD/WOOD BASED;

CONSTRUCTION AND DECORATIVE

81348 A-A-55057

ETHYL ALCOHOL (FOR ORDNANCE USE)81348 A-A-59342

INSULATION TAPE, ELECTRICAL,

PRESSURE SENSITIVE ADHESIVE AND

PRESSURE SENSITIVE THERMOSETTING

ADHESIVE

81348 A-A-59770

Total: 1*CODE OF FEDERAL REGULATIONS

TRANSPORTATION04ZY2 CFR-TITLE-49

Total: 1*WEAPONS REQUIREMENTS

PREPARATION OF QUALITY ASSURANCE

PROVISIONS (INCLUDING

CLASSIFICATION OF CHARACTERISTICS)

10001 WR-43 A 6/14/1965 19

DL5184850 9/28/2010 1:33:35 PM

DOCUMENT

NUMBER

CAGE DOCUMENT

DATE

REV NO.

SHT

ECPR REV SHTSDOCUMENT TITLE DOC

REF

SCDOC

SYM

Total: 1*WEAPON SPECIFICATION

PROPELLANT, SHEET STOCK, NOSOL-31810001 WS13986

Total: 1*AMERICAN NATIONAL STANDARDS INSTITUTE

SAMPLING PROCEDURES AND TABLES

FOR INSPECTION BY ATTRIBUTES

80204 ANSI/ASQC-Z1.4

Total: 20*AMERICAN SOCIETY FOR TESTING AND MATERIALS

STANDARD SPECIFICATION FOR STEEL

BAR, CARBON AND ALLOY, COLD-

FINISHED

81346 ASTM-A108

STANDARD PRACTICE FOR CLEANING,

DESCALING, AND PASSIVATION OF

STAINLESS STEEL PARTS, EQUIPMENT,

AND SYSTEMS

81346 ASTM-A380

STANDARD SPECIFICATION FOR FREE-

MACHINING STAINLESS AND HEAT-

RESISTING STEEL BARS, HOT-ROLLED

OR COLD-FINISHED

81346 ASTM-A582

DRAWN OR ROLLED NICKEL-CHROMIUM

AND NICKEL-CHROMIUM-IRON ALLOYS

FOR ELECTRICAL HEATING ELEMENTS

81346 ASTM-B344

TEAR RESISTANCE (GRAVES TEAR) OF

PLASTIC FILM AND SHEETING

81346 ASTM-D1004

DENSITY OF PLASTICS BY THE DENSITY-

GRADIENT TECHNIQUE

81346 ASTM-D1505

STATIC AND KINETIC COEFFICIENTS OF

FRICTION OF PLASTIC FILM AND

SHEETING

81346 ASTM-D1894

PROPAGATION TEAR RESISTANCE OF

PLASTIC FILM AND THIN SHEETING BY

PENDULUM METHOD

81346 ASTM-D1922

METHODS OF CLOSING, SEALING, AND

REINFORCING FIBERBOARD BOXES

81346 ASTM-D1974

FOLDING ENDURANCE OF PAPER BY THE

M.I.T. TESTER

81346 ASTM-D2176

DOCUMENT

NUMBER

CAGE DOCUMENT

DATE

REV NO.

SHT

ECPR REV SHTSDOCUMENT TITLE DOC

REF

SCDOC

SYM

STANDARD SPECIFICATION FOR

STRAPPING, FLAT STEEL AND SEALS

81346 ASTM-D3953

CORRUGATED AND SOLID FIBERBOARD

SHEET STOCK (CONTAINER GRADE) AND

CUT SHAPES

81346 ASTM-D4727

STANDARD PRACTICE FOR

FABRICATION OF FIBERBOARD

SHIPPING BOXES

81346 ASTM-D5118

STANDARD SPECIFICATION FOR

PRESSURE-SENSITIVE TAPE FOR

PACKAGING, BOX CLOSURE, AND

SEALING

81346 ASTM-D5486

DEFORMATION OF PLASTICS UNDER

LOAD

81346 ASTM-D621

COEFFICIENT OF LINEAR THERMAL

EXPANSION OF PLASTICS BETWEEN -30

DEG. C AND 30 DEG. C WITH A VITREOUS

SILICA DILATOMETER

81346 ASTM-D696

BURSTING STRENGTH OF PAPER81346 ASTM-D774

NONRIGID VINYL CHLORIDE POLYMER

TUBING USED FOR ELECTRICAL

INSULATION

81346 ASTM-D876

TENSILE PROPERTIES OF THIN PLASTIC

SHEETING

81346 ASTM-D882

STANDARD PRACTICE FOR

RADIOGRAPHIC EXAMINATION

81346 ASTM-E1742

Total: 3*AMERICAN SOCIETY OF MECHANICAL ENGINEERS

ENGINEERING DRAWING PRACTICES05047 ASME-Y14.100 -04 9/6/2005 45

ENGINEERING DRAWING PRACTICES05047 ASME-Y14.100 -00 11/23/2001 55

DIMENSIONING AND TOLERANCING05047 ASME-Y14.5M -94 1/23/1995 250

Total: 4*SOCIETY OF AUTOMOTIVE ENGINEERS

DOCUMENT

NUMBER

CAGE DOCUMENT

DATE

REV NO.

SHT

ECPR REV SHTSDOCUMENT TITLE DOC

REF

SCDOC

SYM

ELECTROLESS NICKEL COATINGS81343 SAE-AMS-C-

26074

IRON-NICKEL ALLOYS FOR SEALING TO

GLASSES AND CERAMICS

81343 SAE-AMS-I-23011

ALUMINUM ALLOY, BAR, ROD, AND

WIRE, ROLLED, DRAWN, OR COLD

FINISHED, 1100

81343 SAE-AMS-QQ-A-

225/1

NICKEL PLATING (ELECTRODEPOSITED)81343 SAE-AMS-QQ-N-

TOTAL DOCUMENTS: 78

------------------- Symbols in DOC SYM Column: ------------------- --------------------------- Symbols in R Column: ---------------------------

A = ALTERED ITEM S = SOURCE CONT L = LIMITED RIGHTS U = UNLIMITED

C = SPEC CONTROL V = VENDOR ITEM

-------------------------- Symbols in SC Column --------------------------

E = GAGE & TEST EQPT

F = INTFC CONTROL C = CONFIDENTIAL S = SECRET

I = PRODUCTION TOOLING U = UNCLASSIFIED T = TOP SECRET

# INDICATES DATA NOT AVAILABLE

* INDICATES DOCUMENTS NOT SUPPLIED WITH TECHNICAL DATA PACKAGE AND MAY BE OBTAINED THRU THE AGENCY

REF INDICATES DRAWINGS NOT REQUIRED TO DEFINE, PROCURE OR INSPECT THE END ITEM

REQUEST FOR VARIANCE

(RFV)

BELOW TO BE COMPLETED BY THE APPROVING ACTIVITY

24. ORIGINATOR

23. CONTRACTING

OFFICER

22. CONTRACT

INFORMATION

12. CLASSIFICATION

OF DEFECT(S)

8. SYSTEM

INFORMATION

1. DATE PREPARED

(DD-MMM-YYYY)

OMB No.

0704-0188

2. PROCURING ACTIVITY NUMBER (PAN):

3. RFV NUMBER:

a. NAME: b. ADDRESS (Street, City, State and ZIP Code):

6. VARIANCE PRE-OR POST-PRODUCTION:

Pre-Production Post-Production

5. RFV PRIORITY:

E - Emergency U - Urgent R - Routine

7. BASELINE AFFECTED:

a. MODEL/TYPE DESIGNATION (ex: M-16):

c. END ITEM CAGE CODE:

ProductAllocatedFunctional

11.a. OTHER EXTERNAL SYSTEM AFFECTED:

Yes No

4. TITLE OF VARIANCE:

a. CONTRACTOR:

b. SYSTEM/CONFIGURATION ITEM NOMENCLATURE (ex.: Rifle):

c. DOCUMENT DEFINING DEFECT CLASS:b. DEFECT NO.a. DEFECT CLASSIFICATION:

MajorCritical Minor

9. AFFECTED ITEM NOMENCLATURE (ex: Bracket): 10. PART NUMBER(S). OF AFFECTED ITEM(S):

18. EFFECTIVITY (Quantity affected, Lot Number affected, Serial Numbers, Dates) :

19. PER UNIT COST IMPACT:

17. RECURRING VARIANCE:

NoYes

21. EFFECT ON DELIVERY SCHEDULE IF REJECTED:

16. EFFECT ON PERFORMANCE, FUNCTION, RELIABILITY, DURABILITY, INTEGRATED LOGISTICS SUPPORT, INTERFACE OR SOFTWARE:

13. DESCRIPTION OF VARIANCE:

14. NEED FOR VARIANCE:

15. CORRECTIVE ACTION TAKEN:

25.a. SUBMITTING ACTIVITY: b. NAME AND TITLE: c. AUTHORIZED SIGNATURE:

DD FORM 1694, MAR 2013

20. TOTAL COST IMPACT:

c. RFV ORIGINATOR CAGE CODE: d. TELEPHONE:

e. E-MAIL:

b. CONTRACT NO. AND LINE ITEM:

b. TELEPHONE: c. E-MAIL:a. NAME:

b. IF BLOCK 11.a. IS YES, LIST OTHER SYSTEMS OR CONFIGURATION ITEMS AFFECTED:

Adobe Designer 9.0

DISTRIBUTION STATEMENT:

d. SIGNATUREc. DATE SIGNED

(DD-MMM-YYYY)

b. NAME AND TITLE:

26.a. RECOMMENDATIONS Approval DisapprovalApproval with Modification

d. SIGNATUREc. DATE SIGNED

(DD-MMM-YYYY)

b. NAME AND TITLE

27.a. DISPOSITION (Configuration Change Authority) Approved DisapprovedApproved with Modification

The public reporting burden for this collection of information is estimated to average 2 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Executive Services Directorate, Information Management Division, 4800 Mark Center Drive, Alexandria, VA 22350-3100 (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THIS ADDRESS. RETURN COMPLETED FORM TO THE GOVERNMENT ISSUING CONTRACTING OFFICER FOR THE CONTRACT/PROCURING ACTIVITY NUMBER LISTED IN ITEM 2 OF THIS FORM.

24-JUN-2016

N00104

FY15-D051R1

Correction To SPI F01-063-3165 Quantity Unit Pack (QUP)

MD66 A-4, F-16, F-18, H-1, S-3, T-45

CCU-44/B Impulse Cartridge

30003

5184850

Change the quantity unit pack (QUP) on page 1 of SPI F01-063-3165 FROM "001" TO "010".

The QUP listed on page 1 of the special packaging instruction is in error and contradicts the quantity of 10 listed on page 2, note 1. The divider tray on page 3 also reflects spaces for 10 cartridges. This R1 RFV revision changes block 22b to reflect a new PR since the previous PR was canceled.

Special Packaging Instructions Retrieval and Exchange System (SPIRES) support has been notified of the error and will make necessary changes.

None.

4353 Benson Road, Bldg 1557 Indian Head, MD 20640

N0010417NB028

N/A N/A N/A

N/A N00104-17-N-B028

717-605-4048 royce.hoffman@navy.mil

Courtney D. Gamble

301-744-2128 14083 courtney.gamble@navy.mil

Royce Hoffman

NSWC IHEODTD Edgardo Hernandez, Manager, ISE Branch REESE.MILTON.L.JR.1254219068

2016.07.06 15:13:00 -04'00'

Robert Hastings, Tech. Warrant Holder 08-Jul-2016

HASTINGS.ROBERT.C.J

R.1228788097

Digitally signed by HASTINGS.ROBERT.C.JR.1228788097 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USN, cn=HASTINGS.ROBERT.C.JR.1228788097 Date: 2016.07.08 07:40:20 -04'00'

NOTE: THE ABOVE POP MARKINGS

ARE FOR DOD USE ONLY.

Should be "010"

Packaging configuration is for 10 ea.

REQUEST FOR VARIANCE

(RFV)

BELOW TO BE COMPLETED BY THE APPROVING ACTIVITY

24. ORIGINATOR

23. CONTRACTING

OFFICER

22. CONTRACT

INFORMATION

12. CLASSIFICATION

OF DEFECT(S)

8. SYSTEM

INFORMATION

1. DATE PREPARED

(DD-MMM-YYYY)

OMB No.

0704-0188

2. PROCURING ACTIVITY NUMBER (PAN):

3. RFV NUMBER:

a. NAME: b. ADDRESS (Street, City, State and ZIP Code):

6. VARIANCE PRE-OR POST-PRODUCTION:

Pre-Production Post-Production

5. RFV PRIORITY:

E - Emergency U - Urgent R - Routine

7. BASELINE AFFECTED:

a. MODEL/TYPE DESIGNATION (ex: M-16):

c. END ITEM CAGE CODE:

ProductAllocatedFunctional

11.a. OTHER EXTERNAL SYSTEM AFFECTED:

Yes No

4. TITLE OF VARIANCE:

a. CONTRACTOR:

b. SYSTEM/CONFIGURATION ITEM NOMENCLATURE (ex.: Rifle):

c. DOCUMENT DEFINING DEFECT CLASS:b. DEFECT NO.a. DEFECT CLASSIFICATION:

MajorCritical Minor

9. AFFECTED ITEM NOMENCLATURE (ex: Bracket): 10. PART NUMBER(S). OF AFFECTED ITEM(S):

18. EFFECTIVITY (Quantity affected, Lot Number affected, Serial Numbers, Dates) :

19. PER UNIT COST IMPACT:

17. RECURRING VARIANCE:

NoYes

21. EFFECT ON DELIVERY SCHEDULE IF REJECTED:

16. EFFECT ON PERFORMANCE, FUNCTION, RELIABILITY, DURABILITY, INTEGRATED LOGISTICS SUPPORT, INTERFACE OR SOFTWARE:

13. DESCRIPTION OF VARIANCE:

14. NEED FOR VARIANCE:

15. CORRECTIVE ACTION TAKEN:

25.a. SUBMITTING ACTIVITY: b. NAME AND TITLE: c. AUTHORIZED SIGNATURE:

DD FORM 1694, MAR 2013

20. TOTAL COST IMPACT:

c. RFV ORIGINATOR CAGE CODE: d. TELEPHONE:

e. E-MAIL:

b. CONTRACT NO. AND LINE ITEM:

b. TELEPHONE: c. E-MAIL:a. NAME:

b. IF BLOCK 11.a. IS YES, LIST OTHER SYSTEMS OR CONFIGURATION ITEMS AFFECTED:

Adobe Designer 9.0

DISTRIBUTION STATEMENT:

d. SIGNATUREc. DATE SIGNED

(DD-MMM-YYYY)

b. NAME AND TITLE:

26.a. RECOMMENDATIONS Approval DisapprovalApproval with Modification

d. SIGNATUREc. DATE SIGNED

(DD-MMM-YYYY)

b. NAME AND TITLE

27.a. DISPOSITION (Configuration Change Authority) Approved DisapprovedApproved with Modification

The public reporting burden for this collection of information is estimated to average 2 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Executive Services Directorate, Information Management Division, 4800 Mark Center Drive, Alexandria, VA 22350-3100 (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THIS ADDRESS. RETURN COMPLETED FORM TO THE GOVERNMENT ISSUING CONTRACTING OFFICER FOR THE CONTRACT/PROCURING ACTIVITY NUMBER LISTED IN ITEM 2 OF THIS FORM.

24-JUN-2016

N00104

FY16-V036R1

MIL-Z-399D Zirconium Powder Subsieve Particle Size

MD66 A-4, F-16, F-18, H-1, S-3, T-45

CCU-44/B Impulse Cartridge

30003

5184850

Zirconium powder manufactured by Rockwood Lithium does not meet the subsieve size requirements of MIL-Z-399, Type II, Class 1 per drawing 5184837.

See attached.

To create a weapons spec or a source control drawing for the Zirconium powder that will specify the current subseive particle size being manufactured by Rockwood Lithium.

None expected. Performance testing of ignition element loaded assemblies, DWG 5184831, using Rockwood Lithium supplied zirconium powder will verify the units meet the requirements of MIL-DTL-82724A, Section 3.3.2.

4353 Benson Road, Bldg 1557 Indian Head, MD 20640

N0010417NB028

N/A N/A Units cannot be manufactured

N/A N00104-17-N-B028

717-605-4048 royce.hoffman@navy.mil

Courtney D. Gamble

301-744-2128 14083 courtney.gamble@navy.mil

Royce Hoffman

NSWC IHEODTD Edgardo Hernandez, Manager, ISE Branch REESE.MILTON.L.JR.1254219068

2016.07.06 15:14:32 -04'00'

Robert Hastings, Tech. Warrant Holder 8-Jul-2016

HASTINGS.ROBERT.C.J

R.1228788097

Digitally signed by HASTINGS.ROBERT.C.JR.1228788097 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USN, cn=HASTINGS.ROBERT.C.JR.1228788097 Date: 2016.07.08 07:36:56 -04'00'

MIL-DTL-82724A

3.8 Workmanship. Cartridges shall be constructed and finished in a manner to assure compliance with all requirements of this specification. Particular attention should be directed to dimensions, finishes and assembly operations.

4. VERIFICATION

4.1 Classification of inspections. The inspection requirements specified herein are classified as follows:

a. First article inspection (see 4.3)

b. Quality conformance inspection (see 4.5)

4.2 Inspection conditions. Unless otherwise specified, all inspections shall be performed in accordance with the test conditions specified in 4.6 and 4.7.

4.3 First article inspection. First article inspection shall be performed after award of contract and prior to production at a location acceptable to the Government. First article inspection shall be performed on sample units which have been produced with equipment and procedures normally used in production.

First article approval is valid only on the contract under which it is granted, unless extended by the Government to other contracts.

4.3.1 Sample size. Unless otherwise specified (see 6.2), 25 header glass assemblies, 25 loaded ignition element assemblies and 94 cartridge assemblies shall be submitted for first article inspection.

4.3.2 Inspection routine.

4.3.2.1 Header glass seal assembly. The header glass seal assembly shall be tested as specified in 4.6.1.

4.3.2.2 Ignition element loaded assemblies. The ignition element loaded assemblies shall be loaded into modified cartridge cases conforming to Drawing 5184845 and tested as specified in 4.6.2.

4.3.2.3 Cartridge assembly. The cartridges shall undergo the tests of 4.6.3 following environmental exposure as described in MIL-D-81303. Tolerance on temperatures shall be ± 5° F. The environmental exposures shall be as follows: temperature and humidity (18), vibration (12), 20 "g" shock (12), 6-foot drop (6), 70°F (12), −65°F (12), and 200° F (12). The number in parentheses denotes number of cartridges. Temperature conditioning at the extremes shall be no less than 6 hours and no more than 24 hours. Firings shall be conducted in the variable volume test fixture. No cartridge shall produce results outside the limits of 3.5.1 through 3.5.4 and no cartridge shall fail to meet the limits of 3.5.5.

4.3.3 Failures. The failure of any cartridge to meet the requirements as stated above shall cause rejection of the first article sample. If more than 5 cartridges fail the leak test specified in 4.6.3.3 the first article sample shall be rejected.

4.4 Classification of characteristics. The characteristics verified by the tests and examinations herein are classified as Critical, Major or Minor in accordance with DOD-STD-2101. Tests and examinations that verify critical characteristics are identified by the symbol (C) and major characteristics by the symbol (M). The number following the classification symbol indicates the serial number of test or examination.

Tests and examinations which are not annotated with a classification code are classified minor.

4.5 Quality conformance inspection. Quality conformance inspection shall consist of verification of the characteristics classified on the drawings of DL 5184850 and the following:

See ECP for details of change.

NOTE: THE ABOVE POP MARKINGS

ARE FOR DOD USE ONLY.

MUNITION NOTICES

NOTICE 1: CLASS 1 (EXPLOSIVE) MATERIAL OWNED BY THE DEPARTMENT OF DEFENSE (DOD) PACKAGED PRIOR TO JANUARY 1, 1990 IN ACCORDANCE WITH THE PACKAGING REQUIREMENTS IN EFFECT AT THAT TIME ARE EXCEPTED FROM THE REQUIREMENTS OF PERFORMANCE ORIENTED PACKAGING (POP) PROVIDED THE PACKAGINGS HAVE MAINTAINED THEIR INTEGRITY AND THE GOODS ARE DECLARED AS GOVERNMENT OWNED GOODS PACKAGED PRIOR TO JANUARY 1, 1990. THIS CLAUSE DOES NOT APPLY TO COMMERCIAL AIR SHIPMENTS. (REF DLAD 4145.41/AFJI 24-210.)

NOTICE 2: FOR LEVEL A PACKING REQUIREMENTS: THE LEVEL B PACKS SHALL BE OVERBOXED IN A CONTAINER AS LISTED IN MIL-STD-2073. MARK THE OUTSIDE OF THE OVERBOX "INSIDE (INNER) PACKAGES COMPLY WITH 4G/Y2/S/**." THE SIZE AND WEIGHT OF THE OVERBOX WILL VARY DEPENDING ON THE NUMBER OF ITEMS BEING SHIPPED. USE FILLER PAD OF

ASTM-D4727, CF, DOM, GR 275 (OR EQUAL) TO ASSURE A TIGHT FIT IN THE OVERBOX.

NOTICE 3: VARIATIONS TO THE PACKAGING REQUIREMENTS OF THE SPI ARE AUTHORIZED IN ACCORDANCE WITH TITLE 49

CFR 178.601(G)(4), VARIATION 4.

NOTICE 4: ASSETS PACKAGED IN ACCORDANCE WITH PREVIOUS EDITIONS OF THIS SPI DO NOT REQUIRE REPACKAGING IF

THE INTEGRITY OF THE SPI IS MAINTAINED.

EUROPEAN UNION (EU) REQUIREMENTS NOTICES

NOTICE 1: LUMBER AND PACKAGING/CONTAINER STATEMENT - "ALL WOODEN LUMBER CONTAINERS PRODUCED ENTIRELY OR IN PART OF NON-MANUFACTURED SOFTWOOD SPECIES SHALL BE CONSTRUCTED FROM HEAT TREATED (HT) MATERIAL (HT TO 56 DEGREES CENTIGRADE OR 133 DEGREES FAHRENHEIT FOR 30 MINUTES). CERTIFICATION IS REQUIRED BY AN ACCREDITED AGENCY RECOGNIZED BY THE AMERICAN LUMBER STANDARDS COMMITTEE (ALSC). CONSTRUCTION AND CERTIFICATION SHALL BE IN ACCORDANCE WITH NON-MANUFACTURED WOOD PACKING POLICY AND NON-MANUFACTURED WOOD PACKING ENFORCEMENT REGULATIONS, BOTH DATED MAY 30, 2001." THESE DOCUMENTS CAN BE FOUND AT

WWW.APHIS.USDA.GOV.

NOTICE 2: WOODEN PALLET STATEMENT - "ALL WOODEN PALLETS PRODUCED ENTIRELY OR IN PART OF NON-MANUFACTURED SOFTWOOD SPECIES SHALL BE CONSTRUCTED FROM HEAT TREATED (HT) MATERIAL (HT TO 56 DEGREES CENTIGRADE OR 133 DEGREES FAHRENHEIT FOR 30 MINUTES). CERTIFICATION IS REQUIRED BY AN ACCREDITED AGENCY RECOGNIZED BY THE AMERICAN LUMBER STANDARDS COMMITTEE (ALSC). CONSTRUCTION AND CERTIFICATION SHALL BE IN ACCORDANCE WITH NON-MANUFACTURED WOOD PACKING POLICY AND NON-MANUFACTURED WOOD PACKING ENFORCEMENT REGULATIONS, BOTH DATED MAY 30, 2001." THESE DOCUMENTS CAN BE FOUND AT WWW.APHIS.USDA.GOV.

NOTICE 3: HARDWOOD SPECIES STATEMENT - "ALL WOODEN PALLETS PRODUCED ENTIRELY OF NON-MANUFACTURED HARDWOOD SPECIES SHALL BE IDENTIFIED BY A PERMANENT MARKING OF "NC" (NON-CONIFEROUS), 1.25 INCHES OR GREATER IN HEIGHT, ACCOMPANIED BY THE CAGE CODE OF THE CONTRACTED MANUFACTURER AND THE MONTH AND YEAR OF THE CONTRACT. ON PALLETS, THE MARKING SHALL BE APPLIED TO THE STRINGER OR BLOCK ON OPPOSITE SIDES AND

ENDS OF THE PALLET AND BE CONTRASTING AND CLEARLY VISIBLE."

INCH-POUND

18 September 2003

SUPERSEDING

MIL-C-82724

9 February 1983

DETAIL SPECIFICATION

CARTRIDGE, IMPULSE, CCU-44/B

This specification is approved for use by all Departments and Agencies of the Department of Defense.

1. SCOPE

1.1 Scope . This specification covers the CCU-44/B Impulse Cartridge. (See 6.1).

2. APPLICABLE DOCUMENTS

2.1 General. The documents listed in this section are specified in sections 3 and 4 of this specification.

This section does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements documents cited in sections 3 and 4 of this specification, whether or not they are listed.

2.2 Government documents.

2.2.1 Specifications and standards. The following specifications and standards form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplements thereto, cited in the solicitation (see 6.2).

SPECIFICATIONS

DEPARTMENT OF DEFENSE

MIL-D-81303 Design and Evaluation of Cartridges for Stores Suspension Equipment

STANDARDS

DEPARTMENT OF DEFENSE

DOD-STD-2101 Classification of Characteristics

Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to the Commander, Indian Head Division, Naval Surface Warfare Center, Engineering Documentation Branch (Code 4230), 101 Strauss Avenue, Indian Head, MD 20640-5035, by using the Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by sending a letter.

AMSC N/A 1377

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

(Unless otherwise indicated, copies of the above specifications, standards, and handbooks are available from the Standardization Document Order Desk, 700 Robbins Avenue, Bldg. 4D, Philadelphia, PA 19111-5094.)

2.2.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation (see 6.2).

DRAWINGS

NAVAL SEA SYSTEMS COMMAND

DL 5184850 Cartridge, Impulse, Assembly CCU-44/B

5184831 Ignit ion Element Loaded Assembly

5184834 Header, Glass Seal Assembly

5184839 Propellant, Double Base

5184845 Cartridge Case and Ignition Element Assembly Modified

5184850 Cartridge, Impulse, Assembly CCU-44/B

5184851 Cartridge, Impulse, CCU-44/B Packaging Assembly

5184852 Container, Inner Assembly

UNITED STATES AIR FORCE AIR LOGISTICS COMMAND

TPO 01-063-3164 Packaging Assembly, CCU-44/B (80 Pack)

TPO 01-063-3165 Packaging Assembly, CCU-44/B (10 Pack)

NAVAL AIR SYSTEMS COMMAND

DL 838AS123 Closed Bomb Assembly for Ignition Elements Used for Stores Release Cartridges

PUBLICATIONS

NAVAL SEA SYSTEMS COMMAND

OP 5 Ammunition and Explosives Ashore

(Application for copies should be addressed to: Commander, Indian Head Division, Naval Surface Warfare Center, Engineering Documentation Branch (Code 4230), Indian Head, MD 20640-5035.)

2.3 Non-Government publications and drawings. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of the documents which are DOD adopted are those listed in the issue of the DODISS cited in the solicitation. Unless otherwise specified, the issues of documents not listed in DODISS are the issues of the documents cited in the solicitation (see 6.2).

AMERICAN SOCIETY FOR QUALITY CONTROL (ASQC)

ASQC Z1.4 Sampling Procedures and Tables for Inspection by Attributes

(Application for copies should be addressed to American Society for Quality Control, 611 East Wisconsin Avenue, Milwaukee, WI 53202.)

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

ASTM E1742 Standard Practice for Radiographic Examination (DoD Adopted)

(Application for copies of ASTMs should be sent to the American Society for Testing and Materials, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959)

2.4 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.

3. REQUIREMENTS

3.1 First article. When specified (see 6.2), the contractor shall furnish sample units for first article inspection and approval (see 4.3).

3.2 Conformance to documents. The CCU-44/B impulse cartridge shall be manufactured in accordance with the drawings and documents listed on DL 5184850. All materials used in the manufacture of the cartridges shall conform with the specifications referenced on the respective drawings.

3.3 Primary components. For the purpose of this specification, the header glass seal assembly (Drawing 5184834), the ignition element loaded assembly (Drawing 5184831), and the main propellant charge (Drawing 5184839) are defined as primary components.

3.3.1 Header glass seal assembly. The header glass seal assembly shall be manufactured in accordance with the drawings listed on DL 5184850 and undergo the tests listed in 4.6.1.

3.3.2 Ignition element. The ignition element shall be manufactured in accordance with the drawings listed on DL 5184850 and shall meet the following requirements when tested as specified in 4.6.2.

3.3.2.1 Ignition delay time. Ignition delay time shall not exceed 10 milliseconds (see 6.3.5).

3.3.2.2 Time to maximum pressure. The time to maximum pressure shall not exceed 25 milliseconds (see 6.3.6).

3.3.2.3 Maximum pressure. The minimum allowable value of maximum pressure shall be 2,000 psi.

3.3.3 Propellant charge.

3.3.3.1 Quantity. All propellant charges shall conform to Drawing 5184839. Charges shall be determined by weight rather than volume measurements.

3.3.3.2 Smokeless powder, handling and loading. Do not subject smokeless powder to unnecessary handling or exposure to the atmosphere. The handling and loading of smokeless powder exposed to the atmosphere shall be performed only under conditions that do not permit the relative humidity to exceed 75 percent.

3.3.3.3 Smokeless powder, condition. The smokeless powder utilized shall exhibit no evidence of decomposition.

3.4 Cartridge inspection.

3.4.1 Visual inspection. Cartridges shall be free of visual defects such as, but not limited to burrs, dents, deep scratches, split or cracked crimp, defective sealant application around crimp, chipped surfaces, or other defects which may prevent entry of the cartridge into the firing chamber, or affect the environmental stability of the cartridge.

3.4.2 Bridge circuit resistance. The resistance of the bridge circuit of each completely assembled cartridge, when measured electrically, shall be not less than .95 ohm nor more than 1.25 ohms (see 4.6.3.2).

3.4.3 Leakage. Cartridge leakage rate shall not exceed 10-4 cc of gas or air per second (see 4.6.3.3).

3.4.4 Radiographic examination. Cartridges shall be free of imperfections in components of assembly as verified by radiographic examination of all first article and production samples of 3.1, 3.3.2 and 3.5.

3.4.5 Electrode recess. The electrode recess shall be verified 100 percent during acceptance testing. If one or more samples fail to meet requirements, the contractor shall be required to screen the entire lot represented (see 4.6.3.6).

3.5 Ballistic requirements. Cartridges from each first article and production lot shall be capable of propelling a 475 pound mass horizontally when fired in the variable volume test fixture at an initial volume of 3.7 cubic inches and shall meet the requirements listed below (see 4.6).

3.5.1 Ignition delay time. Ignition delay time shall not exceed 10 milliseconds (see 6.3.5).

3.5.2 Time to maximum thrust. The time to maximum thrust shall not exceed 30 milliseconds (see 6.3.7).

3.5.3 Thrust. The upper limit of thrust shall be 12,200 lbf.

3.5.4 Velocity. The lower limit of velocity shall be 22 ft/sec, (see 6.3.8).

3.5.5 Misfire. There shall be no misfires.

3.6 Change in propellant lot. Whenever a change occurs in the propellant lot test firings shall be conducted in accordance with 4.7. No cartridge shall produce results outside the limits specified in 3.5.1 through 3.5.4 and no cartridge shall fail to meet the requirement of 3.5.5.

3.7 Packaging, packing and marking. The packaging and packing of cartridges and the container markings shall be in accordance with section 5 (see 4.5.3).

3.8 Workmanship. Cartridges shall be constructed and finished in a manner to assure compliance with all requirements of this specification. Particular attention should be directed to dimensions, finishes and assembly operations.

4. VERIFICATION

4.1 Classification of inspections. The inspection requirements specified herein are classified as follows:

a. First article inspection (see 4.3)

b. Quality conformance inspection (see 4.5)

4.2 Inspection conditions. Unless otherwise specified, all inspections shall be performed in accordance with the test conditions specified in 4.6 and 4.7.

4.3 First article inspection. First article inspection shall be performed after award of contract and prior to production at a location acceptable to the Government. First article inspection shall be performed on sample units which have been produced with equipment and procedures normally used in production.

First article approval is valid only on the contract under which it is granted, unless extended by the Government to other contracts.

4.3.1 Sample size. Unless otherwise specified (see 6.2), 25 header glass assemblies, 25 loaded ignition element assemblies and 94 cartridge assemblies shall be submitted for first article inspection.

4.3.2 Inspection routine.

4.3.2.1 Header glass seal assembly. The header glass seal assembly shall be tested as specified in 4.6.1.

4.3.2.2 Ignition element loaded assemblies. The ignition element loaded assemblies shall be loaded into modified cartridge cases conforming to Drawing 5184845 and tested as specified in 4.6.2.

4.3.2.3 Cartridge assembly. The cartridges shall undergo the tests of 4.6.3 following environmental exposure as described in MIL-D-81303. Tolerance on temperatures shall be ± 5° F. The environmental exposures shall be as follows: temperature and humidity (18), vibration (12), 20 "g" shock (12), 6-foot drop (6), 70°F (12), −65°F (12), and 200° F (12). The number in parentheses denotes number of cartridges. Temperature conditioning at the extremes shall be no less than 6 hours and no more than 24 hours. Firings shall be conducted in the variable volume test fixture. No cartridge shall produce results outside the limits of 3.5.1 through 3.5.4 and no cartridge shall fail to meet the limits of 3.5.5.

4.3.3 Failures. The failure of any cartridge to meet the requirements as stated above shall cause rejection of the first article sample. If more than 5 cartridges fail the leak test specified in 4.6.3.3 the first article sample shall be rejected.

4.4 Classification of characteristics. The characteristics verified by the tests and examinations herein are classified as Critical, Major or Minor in accordance with DOD-STD-2101. Tests and examinations that verify critical characteristics are identified by the symbol (C) and major characteristics by the symbol (M). The number following the classification symbol indicates the serial number of test or examination.

Tests and examinations which are not annotated with a classification code are classified minor.

4.5 Quality conformance inspection. Quality conformance inspection shall consist of verification of the characteristics classified on the drawings of DL 5184850 and the following:

Item Nature of requirement verification Applicable paragraphs

Classification

(DOD-STD-2101)

Primary components Single lot 3.3, 4.5.1 (M101) Header, glass seal Acceptance 3.3.1, 4.6.1 (M102) Ignition element Acceptance 3.3.2, 4.6.2 (M103) Propellant charge Type & weight 3.3.3 (M104) Smokeless powder Condition 3.3.3.3, 4.6.3.5 (M105) Cartridge Visual 3.4.1, 4.6.3.1 (M106) Cartridge Bridge circuit resistance 3.4.2, 4.6.3.2 (M107)

Cartridge Leakage 3.4.3, 4.6.2.2 (M108) Ignition element Power current 4.6.2.1 (M109) Cartridge Electrode recess 3.4.5, 4.6.3.6 (M110) Cartridge Ballistic 3.5, 4.6.2.2 (M111) Cartridge Ballistic (change in propellant lot) 3.6, 4.8 (M112)

Cartridge Packaging, packing & marking

3.7, 4.5.3 (M113)

4.5.1 Lot size. Unless otherwise specified in the contract the cartridge production lot size shall be 5,000 minimum to 20,000 maximum. Cartridges required for all test purposes shall be randomly selected from the production lot and will not be applied as a part of the quantity specified for delivery by the contract.

Only primary components from a single lot shall be used in a production lot of cartridges; however, one primary component production lot may be used in more than one cartridge production lot. Cartridges selected for the ballistic tests shall be delivered to the activity designated by the contracting agency.

4.5.2 Sampling. Unless otherwise specified, and when applicable, the sampling plans and procedures used in the determination of the acceptability of products submitted by a supplier shall be in accordance with the provisions of ANSI/ASQC Z1.4, inspection level I with all functional testing conducted with the criteria accept 0 reject 1. In addition, 10 cartridges shall be randomly selected from each lot and retained for investigative purposes.

4.5.3 Packaging, packing and marking. Quality conformance inspection shall be conducted in accordance with the inspection criteria on the applicable drawings referenced in Section 5.

4.6 First article tests.

4.6.1 Header glass seal assembly. The header glass seal assembly shall be inspected for conformance to the requirements of Drawing 5184834. The header glass seal assembly shall undergo the tests listed below and meet the requirements specified on Drawing 5184834.

4.6.1.1 Dead load. The header glass seal assembly shall be capable of supporting a 300 pound dead load as detailed on Drawing 5184834.

4.6.1.2 Header integrity test. The header glass seal assembly shall be capable of withstanding 30,000 ± 500 psi hydrostatic pressure as detailed on Drawing 5184834.

4.6.1.3 Dielectric withstanding voltage. The header glass seal assembly shall meet the requirements of the dielectric withstanding voltage test as detailed on Drawing 5184834.

4.6.2 Ignition element assembly. After visual, radiographic and leakage inspections, the ignition element assemblies shall undergo the tests listed below in the sequence given. The ignition elements, installed in modified cartridge cases, shall be conditioned at 70° ± 5° F for a minimum of 4 hours prior to testing.

4.6.2.1 Power-current test. Each ignition element in the first article test sample shall have a direct current of not less than one ampere supplying a minimum of one watt applied to the bridge circuit for a period of at least 5 minutes. The test current shall be regulated throughout the period of application to within 2 percent. If a rectified current is used, the ripple content shall not exceed 5 percent rms of the test current. Test temperature is ambient and the sample or lot is rejected if a cartridge fires during the 5 minute period.

4.6.2.2 Ballistic test. After conditioning, the sample shall be installed into the ignition element test chamber (DL 838AS123). The sample shall be fired by application of 4.0 ± 0.1 amp and shall meet the requirements of 3.3.2.

4.6.3 Cartridge assembly.

4.6.3.1 Visual inspection. Examine all cartridges visually and reject those having any of the defects of 3.4.1.

4.6.3.2 Bridge circuit resistance. Conformance with the bridge circuit resistance of 3.4.2 shall be ascertained on all completely assembled cartridges by means of a test circuit which limits the bridge circuit current to 25 milliamperes, maximum. A safety chamber shall be used to protect the operator during the application of current. A suitable instrument which is known to be accurate within one percent in the range of resistance specified shall be used to determine whether or not the requirement is being met. Units which fail to meet the requirements of 3.4.2 shall be rejected. The results of bridge circuit resistance measurements shall not be affected by the resistance of the test circuit and connector.

4.6.3.3 Leakage. Each assembled cartridge in the sample represented shall be leak tested in a dry gas or dry air leak tester. Cartridges which exhibit a leak rate in excess of 10-4 cc/sec of air or gas at a pressure differential of 0.5 ± 0.05 atmosphere shall be considered defective. The sample shall be accepted if the requirement of 3.4.3 has been met at ANSI/ASQC Z1.4 inspection Level I.

4.6.3.4 Radiographic examination. All cartridges in the first article or production test samples shall be radiographically examined in accordance with ASTM E1742; any observable imperfections in the assembly shall be cause for cartridge rejection. The cartridges shall be positioned on their sides for the most revealing exposure. All cartridges shall be identified with serial numbers prior to examination. The cartridge serial numbers shall be in consecutive order beginning with the number 001 in each production lot. The cartridges shall be arranged on trays or boards in consecutive numerical order, and each radiograph shall carry a permanent identification of the cartridges displayed thereon. The radiograph identification shall include the complete lot number, as stamped on the cartridges, and the span of serial numbers displayed. If any assembly or loading defects are noted then the contractor must 100 percent X-ray the represented lot and submit X-rays to the cartridge design activity for review (see 6.2.2).

Discontinuities in serial numbers shall be identified on the X-ray. Defective cartridges found by the vendor shall be clearly identified on the X-ray and those defectives removed from the production lot. The serial numbers shall be pen or ink stamped on the cartridges with approximately 1/8 inch-high characters.

The serial numbers shall be located apart from the other cartridge markings. When screening of the production lot by X-ray review is required, it shall be at the expense of the contractor.

4.6.3.5 Smokeless powder, condition. Smokeless powder shall be inspected in accordance with the applicable paragraphs of OP 5. Evidence of decomposition shall be cause for rejection.

4.6.3.6 Electrode recess. The electrode shall be below the cartridge surface 0.005 inches to 0.011 inches, as detailed on Drawing 5184850.

4.6.3.7 Ballistic testing. After successfully completing the above tests the cartridges shall be conditioned as specified in 4.3.2.3. Cartridges shall be removed from the conditioning chamber and installed into the variable volume test fixture . The cartridges shall be fired, at an initial free volume of 3.7 cubic inches, by application of 4.0 ± 0.1 amps within 5 minutes after removal from the conditioning cabinet. If this time is exceeded, the cartridges shall be removed from the test fixture and reconditioned for 1 hour minimum at the specified temperature.

4.7 Quality conformance tests.

4.7.1 Cartridge inspection. Before undergoing any functional testing the sample shall be tested in accordance with 4.6.3.1 through 4.6.3.6.

4.7.2 Ballistic testing. The cartridges shall be grouped into two equal sections with one group conditioned a t −65 ± 5° F and the other group conditioned a t +200 ± 5° F for 4 hours minimum and 24 hours maximum. If the sample size is an odd number, the odd cartridge shall be conditioned a t −65° F.

The cartridges shall then be functionally tested in accordance with 4.6.3.7. The lot shall be accepted if the requirements of 3.4 and 3.5 have been met with an accept 0 reject 1 criteria .

4.8 Change in propellant lot. Whenever a change in propellant lot occurs, the charge weight shall be verified by firing 36 cartridges which have been temperature conditioned for a minimum of 4 hours and a maximum of 24 hours (12 at −65° F, 12 at 70° F, and 12 at 200° F). Results of these firings shall meet the requirements of 3.6.

4.9 Retest. There shall be no retests.

4.9.1 Test failure. If test failure is attributable to an assignable cause, excluding the test cartridge, the original test results should be discarded and that portion of the test reconducted.

5. PACKAGING

5.1 Packaging. For acquisition purposes, the packaging requirements shall be as specified in the contract or order (see 6.2). When actual packaging of materiel is to be performed by DOD personnel, these personnel need to contact the responsible packaging activity to ascertain requisite packaging requirements. Packaging requirements are maintained by the Inventory Control Point’s packaging activity within the Military Department or Defense Agency, or within the Military Department’s System Command. Packaging data retrieval is available from the managing Military Department or Defense Agency automated packaging files, CD-ROM products, or by contacting the responsible packaging activity

6. NOTES

(This section contains information of a general or explanatory nature that may be helpful but is not mandatory.)

6.1 Intended use. The CCU-44/B impulse cartridge is intended to eject stores from military aircraft.

These impulse cartridges are military unique and there is no equivalent commercial application for this design.

6.2 Acquisition requirements. Acquisition documents must specify the following:

a. Title , number, and date of this specification.

b. Whether first article inspection is required and, if so, specify the test activity (see 4.3).

c. Special sample size, if other than as specified in 4.3.1.

d. Production lot size and test activity (see 4.5.1).

e. That the safety precaution requirements o f the "Contractors' Safety Manual for Ammunition, Explosives, and Related Dangerous Material,” DOD 4145.26M are applicable. NOTE: When this specification is used as part of the description of work to be accomplished by a Government activity, the safety precaution requirements of "Ammunition and Explosives Ashore," OP 5, are applicable.

6.3 Data requirements. The following data requirements should be considered when this specification is applied on a contract. To ensure correct contractual application of the data requirements, a Contract Data Requirements List (DD Form 1423) must be prepared to obtain the data, except where DOD FAR Supplement 27.475-1 exempts the requirement for a DD Form 1423.

Ref. Paragraph Title

4.6.3.4 X-ray

6.3 Definitions. For the purpose of this specification, the following definitions apply.

6.3.1 Level A packaging. The degree of preservation anti packaging which will afford adequate protection against corrosion, deterioration and physical damage during handling, shipment, indeterminate storage and world-wide redistribution.

6.3.2 Level C packaging. The degree of preservation and packaging which will afford adequate protection against corrosion, deterioration and physical damage during shipment from supply source to the first receiving activity for immediate use. This level may conform to supplier's commercial practice when such meets the requirements of this level.

6.3.3 Level A packing. The degree of packing which will afford adequate protection during shipment, handling, indeterminate storage and world-wide redistribution.

6.3.4 Level C packing. The degree of packing which will afford protection against damage during direct domestic shipment from the supply source to the first receiving activity for immediate use. This level in general will conform to applicable carrier rules and regulations and may be the supplier's commercial practice when such meets the requirement of this level.

6.3.5 Ignition delay. Ignition delay is the time from application of current to first indication of continuous thrust or pressure on the thrust or pressure vs time trace from application of current to the point of maximum pressure on the pressure time trace.

6.3.6 Time to maximum pressure. Time to maximum pressure is the time from application of current to the point of maximum pressure on the pressure time trace.

6.3.7 Time to maximum thrust. Time to maximum thrust is the time from application of current to the point of maximum thrust on the thrust vs time trace.

6.3.8 Velocity. Velocity is defined as velocity at end of stroke.

6.4 Packaging.

6.4.1 Preservation and packaging. For definitions of packaging levels, see 6.3.

6.4.1.1 Level A. Level A packaging shall be used for packaging of all production lots for service use.

Specific packaging shall be as specified by the procuring activity as follows ten cartridges packaged per TPO 01-063-3165; eighty packaged per TPO 01-063-3164; sixty packaged per Drawing 5184852; or 480 packaged per Drawing 5184851.

6.4.1.2 Level B. Not applicable.

6.4.1.3 Level C. When directed by the procuring activity, those cartridges which are intended for expenditure in first article sample testing and for production lot acceptance tests shall be packaged in accordance with MIL-STD-2073-1D and with 49 CFR 171-178.

6.4.2 Packing. For definitions of packing levels, see 6.3.

6.4.2.1 Level A. Level A packing shall be used for packing of all production lots for service use (see 6.4.1.1).

6.4.2.2 Level B. Not applicable.

6.4.2.3 Level C. When directed by the first article procuring activity, cartridges intended for expenditure in sample testing and packaged in accordance with 6.4.1.3 shall be packed to afford protection against damage during direct shipment from the supply source to the first receiving activity for immediate use.

Shipping- containers shall be in accordance with 49 CFR 171 -178.

6.4.3 Markings.

6.4.3.1 Special markings. Marking of exterior containers shall be in accordance with 49 CFR 171-178.

6.4.3.2 Normal markings. Unless otherwise specified in the contract or order, the marking information on unit packages and shipping containers shall be as specified on TPO's 01-063-3165 and 01-063-3164 or Drawings 5184852 and 5184851. The specified marking information shall be applied to the containers in accordance with the applicable provisions of MIL-STD-129.

6.5 First article. When first article inspection is required the item(s) should be a first article sample, selected from the first five production items, or it may be a standard production item from the contractor's current inventory as specified 4.3.2 and 4.3.3. The first articles should consist of five or more, unit(s). The contracting officer should include specific instructions in acquisition documents regarding inspection, approval of first article test results and disposition of first articles. Invitations for bids should provide, that the Government reserves the right to waive the requirement for samples for first article inspection to those bidders offering a product which has been previously acquired or tested by the Government, and that bidders offering such products, who wish to rely on such production or test, must furnish evidence with the bid that prior Government approval is currently appropriate for the pending contract.

6.6 Subject term (keyword) listing.

Military aircraft Stores ejection

6.7 Changes from previous issue. Marginal notations are not used to identify changes with respect to the previous issue because of the extensiveness of the changes.

Custodians : Preparing Activity:

Navy – OS Navy - OS Air Force – 99 (Project No. 1377-0206)

Review Activities:

Navy - AS Air Force - 70

STANDARDIZATION DOCUMENT IMPROVEMENT PROPOSAL

INSTRUCTIONS

1. The preparing activity must complete blocks…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .