Cover Page
Electronic Procurement System Request for Proposal Attachment 35: Cost and Software Data Reporting Plan Acquisition Category (ACAT) IAC Version: 1.2 17 November 2017
Distribution Notice A: Approved for public release; distribution is unlimited.
N00039-17-R-0002 Amendment 0006 ePS Investment Pg1 (CSDR Plan)
COST AND SOFTWARE DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
| 1. MAJOR PROGRAM | a. NAME: | Electronic Procurement System (ePS) | |||||||||||||
| b. PHASE/MILESTONE | c. PRIME MISSION PRODUCT | 2. WBS SYSTEM TYPE | 3. SUBMISSION TYPE | 4. CURRENT SUBMISSION DATE (YYYYMMDD) | 5. LAST APPROVED PLAN DATE (YYYYMMDD) | ||||||||||
| Pre-A | X | B | C-FRP | Electronic Procurement System | Automated Information System | X | INITIAL | ||||||||
| A | C-LRIP | O&S | CHANGE | 20160107 | |||||||||||
| 6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code) | 6b. TELEPHONE NUMBER (Include Area Code) | 6c. FAX NUMBER (Include Area Code) | 6d. E-MAIL ADDRESS | ||||||||||||
| George Stratman - East Cost Branch Head, Cost Analysis | (202) 433-0874 | george.stratman@navy.mil | |||||||||||||
| 7. PLAN TYPE | 8. PREPARING ORGANIZATION | 9a. CONTRACTOR NAME/ADDRESS | 9b. CONTRACT NUMBER | 9c. APPROPRIATION | 10. APPROVED PLAN NUMBER | ||||||||||
| PROGRAM | X | CONTRACT (PRIME) | i. PERFORMING ORGANIZATION | ii. DIVISION | TBD | X | RDT&E | N-16-B-C1 | |||||||
| CONTRACT (SUB) | SPAWAR 1.6 | TBD | X | PROCUREMENT | |||||||||||
| X | O&M |
| 11. WBS ELEMENT CODE | 12. | ||||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | ||||||
| (X if applicable) | DD 1921-3 (CBDR): | DD 1921-1 / 1921-5 EAC: | EVM Reporting: | ||||
| X | X |
| a. PROGRAM/ | ||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | |||
| SUBCONTRACT | a. CWBS | |||
| DICTIONARY | CCDR | g. SRDR | ||
| FORMATS | h. IPMR |
FORMAT 1
| b. DD 1921 | |||||||||||||||
| (CDSR) | c. DD 1921-1 | ||||||||||||||
| (FCHR) | d. DD 1921-2 | ||||||||||||||
| (PCR) | e. DD 1921-5 | ||||||||||||||
| (SFCHR) | f. EAC | ||||||||||||||
| 1.0 | Electronic Procurement System (ePS) | X | X | X | X | X | |||||||||
| 1.1 | Prime Mission Product | X | X | X | X | X | |||||||||
| 1.1.1 | Custom Application Software (Gap Closure) | X | X | X | X | X | |||||||||
| 1.1.1.1 | Limited Deployment | X | X | X | X | X | |||||||||
| 1.1.1.1.1 | Custom Application SoftwareModule 1...n (Specify) | X | X | X | X | X | |||||||||
| 1.1.1.1.1.1 | Business Process Design | X | X | X | X | ||||||||||
| 1.1.1.1.1.2 | Configurations | X | X | X | X | ||||||||||
| 1.1.1.1.1.3 | Customizations | X | X | X | X | ||||||||||
| 1.1.1.1.2 | Custom Application Software Integration, Assembly, Test and Checkout | X | X | X | X | X | |||||||||
| 1.1.1.2 | Release 1 | X | X | X | X | X | |||||||||
| 1.1.1.2.1 | Custom Application SoftwareModule 1...n (Specify) | X | X | X | X | X | |||||||||
| 1.1.1.2.1.1 | Business Process Design | X | X | X | X | ||||||||||
| 1.1.1.2.1.2 | Configurations | X | X | X | X | ||||||||||
| 1.1.1.2.1.3 | Customizations | X | X | X | X | ||||||||||
| 1.1.1.2.2 | Custom Application Software Integration, Assembly, Test and Checkout | X | X | X | X | X | |||||||||
| 1.1.1.3 | Release 2 | X | X | X | X | X | |||||||||
| 1.1.1.3.1 | Custom Application SoftwareModule 1...n (Specify) | X | X | X | X | X | |||||||||
| 1.1.1.3.1.1 | Business Process Design | X | X | X | X | ||||||||||
| 1.1.1.3.1.2 | Configurations | X | X | X | X | ||||||||||
| 1.1.1.3.1.3 | Customizations | X | X | X | X | ||||||||||
| 1.1.1.3.2 | Custom Application Software Integration, Assembly, Test and Checkout | X | X | X | X | X | |||||||||
| 1.1.2 | Enterprise Service Element (Contract Writing System) | X | X | X | X | X | |||||||||
| 1.1.2.1 | Limited Deployment | X | X | X | X | X | |||||||||
| 1.1.2.1.1 | Enterprise Service Element Software Module 1...n (Specify) | X | X | X | X | X | |||||||||
| 1.1.2.1.1.1 | Business Process Design | X | X | X | X | ||||||||||
| 1.1.2.1.1.2 | Configurations | X | X | X | X | ||||||||||
| 1.1.2.1.1.3 | Customizations | X | X | X | X | ||||||||||
| 1.1.2.1.2 | Enterprise Service Element Integration, Assembly, Test and Checkout | X | X | X | X | X | |||||||||
| 1.1.2.2 | Release 1 | X | X | X | X | X | |||||||||
| 1.1.2.2.1 | Enterprise Service Element Software Module 1...n (Specify) | X | X | X | X | X | |||||||||
| 1.1.2.2.1.1 | Business Process Design | X | X | X | X | ||||||||||
| 1.1.2.2.1.2 | Configurations | X | X | X | X | ||||||||||
| 1.1.2.2.1.3 | Customizations | X | X | X | X | ||||||||||
| 1.1.2.2.1.4 | Cybersecurity (Enterprise SW) | X | X | X | X | ||||||||||
| 1.1.2.2.2 | Enterprise Service Element Integration, Assembly, Test and Checkout | X | X | X | X | X | |||||||||
| 1.1.2.3 | Release 2 | X | X | X | X | X | |||||||||
| 1.1.2.3.1 | Enterprise Service Element Software Module 1...n (Specify) | X | X | X | X | X | |||||||||
| 1.1.2.3.1.1 | Business Process Design | X | X | X | X | ||||||||||
| 1.1.2.3.1.2 | Configurations | X | X | X | X | ||||||||||
| 1.1.2.3.1.3 | Customizations | X | X | X | X | ||||||||||
| 1.1.2.3.1.4 | Cybersecurity (Enterprise SW) | X | X | X | X | ||||||||||
| 1.1.2.3.2 | Enterprise Service Element Integration, Assembly, Test and Checkout | X | X | X | X | X | |||||||||
| 1.1.3 | Enterprise Information System 1...n (Specify) (Enterprise Service Bus) | X | X | X | X | X | |||||||||
| 1.1.4 | External System Interface Development | X | X | X | X | X | |||||||||
| 1.1.4.1 | External System Interface Software Module 1...n (Specify) | X | X | X | X | X | |||||||||
| DD FORM 2794, AUGUST 2015 | PREVIOUS EDITION IS OBSOLETE | ||||||||||||||
| 11. WBS ELEMENT CODE | 12. | ||||||||||||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | ||||||||||||||
| (X if applicable) | DD 1921-3 (CBDR): | DD 1921-1 / 1921-5 EAC: | EVM Reporting: | ||||||||||||
| X | X |
| a. PROGRAM/ | ||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | |||
| SUBCONTRACT | a. CWBS | |||
| DICTIONARY | CCDR | g. SRDR | ||
| FORMATS | h. IPMR |
FORMAT 1
| b. DD 1921 | ||||||||||
| (CDSR) | c. DD 1921-1 | |||||||||
| (FCHR) | d. DD 1921-2 | |||||||||
| (PCR) | e. DD 1921-5 | |||||||||
| (SFCHR) | f. EAC | |||||||||
| 1.1.4.1.1 | Business Process Design | X | X | X | X | |||||
| 1.1.4.1.2 | Configurations | X | X | X | X | |||||
| 1.1.4.1.3 | Customizations | X | X | X | X | |||||
| 1.1.4.1.4 | Cybersecurity (Interface SW) | X | X | X | X | |||||
| 1.1.4.2 | External System Interface Integration, Assembly, Test and Checkout | X | X | X | X | X | ||||
| 1.1.5 | Development Suite Hosting | X | X | X | X | X | ||||
| 1.1.5.4 | Other Managed Services | X | X | X | ||||||
| 1.1.6 | System Level Integration | X | X | X | X | |||||
| 1.1.7 | Cybersecurity (Application) | X | X | X | X | |||||
| 1.2 | System Engineering | X | X | X | X | |||||
| 1.2.1 | Engineering Planning, Analysis & Tech Reviews | X | X | X | X | |||||
| 1.2.2 | Requirements Mgt | X | X | X | X | |||||
| 1.2.3 | Architecture | X | X | X | X | |||||
| 1.2.4 | Software Engineering | X | X | X | X | |||||
| 1.2.5 | Configuration, Change & Release Mgt processes | X | X | X | X | |||||
| 1.2.6 | Interface Mgt | X | X | X | X | |||||
| 1.2.7 | Cybersecurity Mgt | X | X | X | X | |||||
| 1.2.8 | Other Engineering Efforts | X | X | X | X | |||||
| 1.3 | Program Management | X | X | X | X | |||||
| 1.3.1 | Program Management | X | X | X | X | |||||
| 1.3.2 | Audit Readiness | X | X | X | X | |||||
| 1.4 | Change Management (Organizational) | X | X | X | X | |||||
| 1.5 | System Test and Evaluation | X | X | X | X | |||||
| 1.5.1 | Development Test and Evaluation | X | X | X | X | |||||
| 1.5.1.1 | Cyber Security | X | X | X | X | |||||
| 1.5.1.2 | Other DT&E | X | X | X | X | |||||
| 1.5.2 | Operational Test and Evaluation | X | X | X | X | |||||
| 1.5.2.1 | Cyber Security | X | X | X | X | |||||
| 1.5.2.2 | Other OT&E | X | X | X | X | |||||
| 1.5.3 | Mock-ups / System Integration Labs (SILs) | X | X | X | X | |||||
| 1.5.4 | Test and Evaluation Support | X | X | X | X | |||||
| 1.6 | Training | X | X | X | X | |||||
| 1.6.2 | Services | X | X | X | X | |||||
| 1.6.3 | Facilities | X | X | X | X | |||||
| 1.6.4 | Training Development | X | X | X | X | |||||
| 1.7 | Data | X | X | X | X | |||||
| 1.7.1 | Technical Publications | X | X | X | X | |||||
| 1.7.2 | Engineering Data | X | X | X | X | |||||
| 1.7.3 | Management Data | X | X | X | X | |||||
| 1.7.4 | Support Data | X | X | X | X | |||||
| 1.10 | Operational/Site Activation | X | X | X | X | |||||
| 1.10.1 | Deployment Hardware and Software | X | X | X | X | |||||
| 1.10.1.2 | Software-COTS Licenses | X | X | X | ||||||
| 1.10.1.2.1 | Software License | X | X | X | ||||||
| 1.10.1.2.2 | Custom Software (Cybersecurity) | X | X | X | ||||||
| 1.10.1.2.3 | Other License-Related Costs (e.g. Configuration Management) | X | X | X | ||||||
| 1.10.2 | User Documentation | X | X | X | X | |||||
| 1.10.3 | Site Activation | X | X | X | X | |||||
| 1.10.4 | User Training | X | X | X | X | |||||
| 1.10.5 | Data Migration | X | X | X | X | |||||
| 1.10.6 | HCA Specific Support | X | X | X | X | |||||
| 1.10.7 | Interim Logistics Support | X | X | X | X | |||||
| 1.10.7.1 | Interim Contractor Support (ICS) | X | X | X | ||||||
| 1.10.7.2 | Service Desk Operations, Escalation, and Metrics | X | X | X | ||||||
| 1.10.7.3 | Transition Management | X | X | X |
| DD FORM 2794, AUGUST 2015 | PREVIOUS EDITION IS OBSOLETE | |||||||
| 11. WBS ELEMENT CODE | 12. | |||||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | |||||||
| (X if applicable) | DD 1921-3 (CBDR): | DD 1921-1 / 1921-5 EAC: | EVM Reporting: | |||||
| X | X |
| a. PROGRAM/ | ||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | |||
| SUBCONTRACT | a. CWBS | |||
| DICTIONARY | CCDR | g. SRDR | ||
| FORMATS | h. IPMR |
FORMAT 1
| b. DD 1921 | |||||
| (CDSR) | c. DD 1921-1 | ||||
| (FCHR) | d. DD 1921-2 | ||||
| (PCR) | e. DD 1921-5 | ||||
| (SFCHR) | f. EAC | ||||
| Subtotal Cost | X |
| Reporting Contractor G&A | X |
| Reporting Contractor Undistributed Budget | X |
| Reporting Contractor Management Reserve | X |
| Reporting Contractor FCCM | X |
| Total Cost | X |
Reporting Contractor Profit/Loss or Fee X
Total Price X
DD FORM 2794, AUGUST 2015 PREVIOUS EDITION IS OBSOLETE
Cost and Software Data Reporting Plan (CSDR) Page &P of &N
&A N00039-17-R-0002 ePS WBS
| Solicitation Number: N00039-17-R-0002; Attachment Number: 9 |
| ePS Work Breakdown Structure (WBS) |
| CLIN | PWS | WBS # | MIL-STD-881C with CAPE's O&S Recommendations | BASE | Option | |
| 1 | Option | |||||
| 2 | Option | |||||
| 3 | Option | |||||
| 4 | Option | |||||
| 5 | Option | |||||
| 6 | Option | |||||
| 7 | Option | |||||
| 8 | Option |
| Rollup | Rollup | 1.0 | Electronic Procurement System (ePS) | X | X | X | |||||||
| Rollup | Rollup | 1.1 | Prime Mission Product | X | X | X | |||||||
| Rollup | Rollup | 1.1.1 | Custom Application Software (Gap Closure) | X | X | X | |||||||
| 0003 | 4.3.5 | 1.1.1.1 | Limited Deployment | X | |||||||||
| 0003 | 4.3.5 | 1.1.1.1.1 | Custom Application SoftwareModule 1...n (Specify) | X | |||||||||
| 0003 | 4.3.5 | 1.1.1.1.1.1 | Business Process Design | X | |||||||||
| 0003 | 4.3.5 | 1.1.1.1.1.2 | Configurations | X | |||||||||
| 0003 | 4.3.5 | 1.1.1.1.1.3 | Customizations | X | |||||||||
| 0003 | 4.3.5 | 1.1.1.1.2 | Custom Application Software Integration, Assembly, Test and Checkout | X | |||||||||
| 1003 | 4.3.5 | 1.1.1.2 | Release 1 | X | |||||||||
| 1003 | 4.3.5 | 1.1.1.2.1 | Custom Application SoftwareModule 1...n (Specify) | X | |||||||||
| 1003 | 4.3.5 | 1.1.1.2.1.1 | Business Process Design | X | |||||||||
| 1003 | 4.3.5 | 1.1.1.2.1.2 | Configurations | X | |||||||||
| 1003 | 4.3.5 | 1.1.1.2.1.3 | Customizations | X | |||||||||
| 1003 | 4.3.5 | 1.1.1.2.2 | Custom Application Software Integration, Assembly, Test and Checkout | X | |||||||||
| 2003 | 4.3.5 | 1.1.1.3 | Release 2 | X | |||||||||
| 2003 | 4.3.5 | 1.1.1.3.1 | Custom Application SoftwareModule 1...n (Specify) | X | |||||||||
| 2003 | 4.3.5 | 1.1.1.3.1.1 | Business Process Design | X | |||||||||
| 2003 | 4.3.5 | 1.1.1.3.1.2 | Configurations | X | |||||||||
| 2003 | 4.3.5 | 1.1.1.3.1.3 | Customizations | X | |||||||||
| 2003 | 4.3.5 | 1.1.1.3.2 | Custom Application Software Integration, Assembly, Test and Checkout | X | |||||||||
| Rollup | Rollup | 1.1.2 | Enterprise Service Element (Contract Writing System) | X | X | X | |||||||
| 0003 | 4.1.2/4.1.5 | 1.1.2.1 | Limited Deployment | X | |||||||||
| 0003 | 4.1.2/4.1.5 | 1.1.2.1.1 | Enterprise Service Element Software Module 1...n (Specify) | X | |||||||||
| 0003 | 4.1.2/4.1.5 | 1.1.2.1.1.1 | Business Process Design | X | |||||||||
| 0003 | 4.1.2/4.1.5 | 1.1.2.1.1.2 | Configurations | X | |||||||||
| 0003 | 4.1.2/4.1.5 | 1.1.2.1.1.3 | Customizations | X | |||||||||
| 0003 | 4.1.2/4.1.5 | 1.1.2.1.2 | Enterprise Service Element Integration, Assembly, Test and Checkout | X | |||||||||
| 1003 | 4.1.2/4.1.5 | 1.1.2.2 | Release 1 | X | |||||||||
| 1003 | 4.1.2/4.1.5 | 1.1.2.2.1 | Enterprise Service Element Software Module 1...n (Specify) | X | |||||||||
| 1003 | 4.1.2/4.1.5 | 1.1.2.2.1.1 | Business Process Design | X | |||||||||
| 1003 | 4.1.2/4.1.5 | 1.1.2.2.1.2 | Configurations | X | |||||||||
| 1003 | 4.1.2/4.1.5 | 1.1.2.2.1.3 | Customizations | X | |||||||||
| 1003 | 4.1.2/4.1.5 | 1.1.2.2.1.4 | Cybersecurity (Enterprise SW) | X | |||||||||
| 1003 | 4.1.2/4.1.5 | 1.1.2.2.2 | Enterprise Service Element Integration, Assembly, Test and Checkout | X | |||||||||
| 2003 | 4.1.2/4.1.5 | 1.1.2.3 | Release 2 | X | |||||||||
| 2003 | 4.1.2/4.1.5 | 1.1.2.3.1 | Enterprise Service Element Software Module 1...n (Specify) | X | |||||||||
| 2003 | 4.1.2/4.1.5 | 1.1.2.3.1.1 | Business Process Design | X | |||||||||
| 2003 | 4.1.2/4.1.5 | 1.1.2.3.1.2 | Configurations | X | |||||||||
| 2003 | 4.1.2/4.1.5 | 1.1.2.3.1.3 | Customizations | X | |||||||||
| 2003 | 4.1.2/4.1.5 | 1.1.2.3.1.4 | Cybersecurity (Enterprise SW) | X | |||||||||
| 2003 | 4.1.2/4.1.5 | 1.1.2.3.2 | Enterprise Service Element Integration, Assembly, Test and Checkout | X | |||||||||
| 0003/1003/2003 | 4.1.2/4.1.5 | 1.1.3 | Enterprise Information System 1...n (Specify) (Enterprise Service Bus) | X | X | X | |||||||
| Rollup | Rollup | 1.1.4 | External System Interface Development | X | X | X | |||||||
| 0003/0048/0049/0051/0052/1003/1048/1049/2003/2048/2050 | 4.3.7 | 1.1.4.1 | External System Interface Software Module 1...n (Specify) | X | X | X | |||||||
| 0003/0048/0049/0051/0052/1003/1048/1049/2003/2048/2050 | 4.3.7 | 1.1.4.1.1 | Business Process Design | X | X | X | |||||||
| 0003/0048/0049/0051/0052/1003/1048/1049/2003/2048/2050 | 4.3.7 | 1.1.4.1.2 | Configurations | X | X | X | |||||||
| 0003/0048/0049/0051/0052/1003/1048/1049/2003/2048/2050 | 4.3.7 | 1.1.4.1.3 | Customizations | X | X | X | |||||||
| 0003/0048/0049/0051/0052/1003/1048/1049/2003/2048/2050 | 4.3.7 | 1.1.4.1.4 | Cybersecurity (Interface SW) | X | X | X | |||||||
| 0003/0048/0049/0051/0052/1003/1048/1049/2003/2048/2050 | 4.3.7 | 1.1.4.2 | External System Interface Integration, Assembly, Test and Checkout | X | X | X | |||||||
| Rollup | Rollup | 1.1.5 | Development Suite Hosting | X | X | X | |||||||
| 0009/1009/2009/0010/1010/2010 | 4.2 | 1.1.5.1 | Compute/Instance Services | X | X | X | |||||||
| 0009/1009/2009/0010/1010/2010 | 4.2 | 1.1.5.2 | Storage Services | X | X | X | |||||||
| 0009/1009/2009/0010/1010/2010 | 4.2 | 1.1.5.3 | Networking Services | X | X | X | |||||||
| 0009/1009/2009/0010/1010/2010/0044-0047/1044-1047/2044-2047 | 4.2 | 1.1.5.4 | Other Managed Services | X | X | X | |||||||
| 0003/1003/2003 | 4.3a.,b.,c.,d.,e.,f., | 1.1.6 | System Level Integration | X | X | X | |||||||
| 0003/1003/2003 | 4.1.11 | 1.1.7 | Cybersecurity (Application) | X | X | X | |||||||
| Rollup | Rollup | 1.2 | System Engineering | X | X | X | |||||||
| 0003/1003/2003 | 4.3.1/4.3.2 | 1.2.1 | Engineering Planning, Analysis & Tech Reviews | X | X | X | |||||||
| 0003/1003/2003 | 4.3.4 | 1.2.2 | Requirements Mgt | X | X | X | |||||||
| 0003/1003/2003 | 4.3.6 | 1.2.3 | Architecture | X | X | X | |||||||
| 0003/1003/2003 | 4.3.3 | 1.2.4 | Software Engineering | X | X | X | |||||||
| 0003/1003/2003 | 4.3.8/4.3.9/4.3.10 | 1.2.5 | Configuration, Change & Release Mgt processes | X | X | X | |||||||
| 0003/0048/0049/0051/0052/1003/1048/1049/2003/2048/2050 | 4.3.7 | 1.2.6 | Interface Mgt | X | X | X | |||||||
| 0003/1003/2003 | 4.3.13 | 1.2.7 | Cybersecurity Mgt | X | X | X | |||||||
| 0006/1006/2006 | 4.3.14 | 1.2.8 | Other Engineering Efforts | X | X | X | |||||||
| Rollup | Rollup | 1.3 | Program Management | X | X | X | |||||||
| 0003/1003/2003/0008/1008/2008 | 4.7 | 1.3.1 | Program Management | X | X | X | |||||||
| 0003/1003/2003 | 4.1.10/4.3.12 | 1.3.2 | Audit Readiness | X | X | X | |||||||
| 0003/1003/2003 | 4.4.4 | 1.4 | Change Management (Organizational) | X | X | X | |||||||
| Rollup | Rollup | 1.5 | System Test and Evaluation | X | X | X | |||||||
| 0003/1003/2003 | 4.3.11 | 1.5.1 | Development Test and Evaluation | X | X | X | |||||||
| 0003/1003/2003 | 4.3.11 | 1.5.1.1 | Cyber Security | X | X | X | |||||||
| 0003/1003/2003 | 4.3.11 | 1.5.1.2 | Other DT&E | X | X | X | |||||||
| 0003/1003/2003 | 4.3.11 | 1.5.2 | Operational Test and Evaluation | X | X | X | |||||||
| 0003/1003/2003 | 4.3.11 | 1.5.2.1 | Cyber Security | X | X | X | |||||||
| 0003/1003/2003 | 4.3.11 | 1.5.2.2 | Other OT&E | X | X | X | |||||||
| 0008/1008/2008 | 4.3.11 | 1.5.3 | Mock-ups / System Integration Labs (SILs) | X | X | X | |||||||
| 0003/1003/2003 | 4.3.11 | 1.5.4 | Test and Evaluation Support | X | X | X | |||||||
| Rollup | Rollup | 1.6 | Training | X | X | X | |||||||
| 0007/1007/2007 | 4.4.3 | 1.6.2 | Services | X | X | X | |||||||
| 0008/1008/2008 | 4.4.3 | 1.6.3 | Facilities | X | X | X | |||||||
| 0003/1003/2003 | 4.1.7 | 1.6.4 | Training Development | X | X | X | |||||||
| Rollup | Rollup | 1.7 | Data | X | X | X | |||||||
| 0003/1003/2003 | 4.1.8 | 1.7.1 | Technical Publications | X | X | X | |||||||
| 0003/1003/2003 | 4.1.8 | 1.7.2 | Engineering Data | X | X | X | |||||||
| 0003/1003/2003 | 4.1.8 | 1.7.3 | Management Data | X | X | X | |||||||
| 0003/1003/2003 | 4.1.8 | 1.7.4 | Support Data | X | X | X | |||||||
| Rollup | Rollup | 1.10 | Operational/Site Activation | X | X | X | |||||||
| Rollup | Rollup | 1.10.1 | Deployment Hardware and Software | X | X | X | |||||||
| Rollup | Rollup | 1.10.1.2 | Software-COTS Licenses | X | X | X | |||||||
| 0001/1001/2001/0002/1002/2002/0011/1011/2011 | 4.1.1/4.1.3 | 1.10.1.2.1 | Software License | X | X | X | |||||||
| 0001/1001/2001/0002/1002/2002/0011/1011/2011 | 4.1.11 | 1.10.1.2.2 | Custom Software (Cybersecurity) | X | X | X | |||||||
| 0001/1001/2001/0002/1002/2002/0011/1011/2011 | 4.1.4/4.1.9/4.1.12 | 1.10.1.2.3 | Other License-Related Costs (e.g. Configuration Management) | X | X | X | |||||||
| 0003/1003/2003 | 4.1.6/4.4.1/4.4.2 | 1.10.2 | User Documentation | X | X | X | |||||||
| 0003/1003/2003 | 4.4.5 | 1.10.3 | Site Activation | X | X | X | |||||||
| 0007/1007/2007 | 4.4.3 | 1.10.4 | User Training | X | X | X | |||||||
| 0003/1003/2003 | 4.4.6/4.4.7 | 1.10.5 | Data Migration | X | X | X | |||||||
| 0012-0041/1012-1041/2012-2041 | 4.5.4 | 1.10.6 | HCA Specific Support | X | X | X | |||||||
| Rollup | Rollup | 1.10.7 | Interim Logistics Support | X | X | X | |||||||
| 0004/1004/2004 | 4.5.1 | 1.10.7.1 | Interim Contractor Support (ICS) | X | X | X | |||||||
| 0042/0043/1042/1043/2042/2043 | 4.5.2 | 1.10.7.2 | Service Desk Operations, Escalation, and Metrics | X | X | X | |||||||
| 0004/1004/2004 | 4.5.3 | 1.10.7.3 | Transition Management | X | X | X | |||||||
| Rollup | Rollup | 2.0 | Sustainment Effort | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.4 | Sustaining Support (System Level Cost Only) | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.4.3 | Sustaining/Systems Engineering | X | X | X | X | X | X | X | |||
| 3004-9004 | 4.6.2/4.6.3 | 2.4.3.2 | Logistics Engineering (Lsa Updates, Logistics Analysis) | X | X | X | X | X | X | X | |||
| 3004-9004 | 4.6.2/4.6.3 | 2.4.3.8 | Product Engineering Support | X | X | X | X | X | X | X | |||
| 3004-9004 | 4.6.2/4.6.3 | 2.4.3.9 | Information Assurance | X | X | X | X | X | X | X | |||
| 3004-9004 | 4.6.2/4.6.3 | 2.4.3.10 | Configuration Management | X | X | X | X | X | X | X | |||
| 3004-9004 | 4.6.2/4.6.3 | 2.4.3.13 | Data Analysis | X | X | X | X | X | X | X | |||
| 3004-9004 | 4.6.2/4.6.3 | 2.4.3.15 | Cyber Security | X | X | X | X | X | X | X | |||
| 3006-9006 | 4.6.5 | 2.4.3.16 | Other Engineering Efforts | X | X | X | X | X | X | X | |||
| 3004-9004 | 4.7 | 2.4.4 | Program Management | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.4.5 | Information Systems | X | X | X | X | X | X | X | |||
| 3001-9001/3002-9002/3011-9011 | 4.1.1/4.1.3/4.1.9/4.1.11 | 2.4.5.2 | License Fees | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.4.5.3 | System Support/Maintenance | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.4.5.3.1 | Help Desk | X | X | X | X | X | X | X | |||
| 3042-9042/3043-9043 | 4.6.1.2 | 2.4.5.3.1.1 | Tier 0 | X | X | X | X | X | X | X | |||
| 3042-9042/3043-9043 | 4.6.1.2 | 2.4.5.3.1.2 | Tier 1 | X | X | X | X | X | X | X | |||
| 3042-9042/3043-9043 | 4.6.1.2 | 2.4.5.3.1.3 | Tier 2 | X | X | X | X | X | X | X | |||
| 3042-9042/3043-9043 | 4.6.1.2 | 2.4.5.3.1.4 | Tier 3 | X | X | X | X | X | X | X | |||
| 3009-9009/3010-9010/3044-3045/9044-9045 | 4.2 | 2.4.5.3.2 | System Database Administration | X | X | X | X | X | X | X | |||
| 3007-9007 | 4.6.1.1 | 2.4.5.3.3 | Follow On User Training | X | X | X | X | X | X | X | |||
| 3004-9004 | 4.6.2.10 | 2.4.5.3.4 | Independent Verification And Validation (IV&V) | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.4.5.4 | Hosting Services | X | X | X | X | X | X | X | |||
| 3044-3047/9044-9047 | 4.2 | 2.4.5.4.1 | Compute/Instance Services | X | X | X | X | X | X | X | |||
| 3044-3047/9044-9047 | 4.2 | 2.4.5.4.2 | Storage Services | X | X | X | X | X | X | X | |||
| 3044-3047/9044-9047 | 4.2 | 2.4.5.4.3 | Networking Services | X | X | X | X | X | X | X | |||
| 3009-9009/3010-9010/3044-3047/9044-9047 | 4.2 | 2.4.5.4.4 | Other Managed Services | X | X | X | X | X | X | X | |||
| 3004-9004 | 4.6.1 | 2.4.6 | Data And Technical Publications | X | X | X | X | X | X | X | |||
| 3004-9004 | 4.6 | 2.4.8 | Other Sustaining Support (Specify In Remarks) | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.5 | Continuing System Improvements | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.5.2 | Software Support | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.5.2.1 | Software Changes | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.5.2.1.1 | Release 1...N (Specify) | X | X | X | X | X | X | X | |||
| Rollup | Rollup | 2.5.2.1.1.1 | WBS Name 1...N (Specify) | X | X | X | X | X | X | X | |||
| 3002-9002 | 4.1.9/4.6.2.3 | 2.5.2.1.1.1.1 | Correction Of Deficiencies | X | X | X | X | X | X | X | |||
| 3002-9002 | 4.1.9/4.6.2.3 | 2.5.2.1.1.1.2 | Enhancements | X | X | X | X | X | X | X | |||
| 3002-9002 | 4.1.4 | 2.5.2.2 | Software License Management | X | X | X | X | X | X | X | |||
| 3012-3041/9012-9041 | 4.6.4 | 2.5.2.5 | HCA Operational Management | X | X | X | X | X | X | X | |||
| Note: Rollup indicates that the specific WBS is for summary purposes only. It is not expected that any BOE would be bid at the rollup level. |
File Name: ePS_RFP_Attach_09_ePS_Work_Breakdown_Structure_WBS_Amendment_0003 work breakdown Structure (WBS) Page &P of &N
&10&K01+047UNCLASSIFIED//FOROFFICIAL USE ONLY (FOUO) &10&K01+047N00039-17-R-0002
Amendment 0003 ePS Investment Pg2 (CSDR Plan)
| 14. CSDR SUBMISSION DATES | |||||
| a. | |||||
| SUBMISSION | b. | ||||
| FORM(S) | c. | ||||
| EVENT | d. | ||||
| REPORT TYPE | e. AS OF DATE | f. DUE DATE | |||
| (YYYYMMDD) | (YYYYMMDD) | ||||
| 1 | CWBS Dictionary | CWBS Dictionary - 60 Days after Contract Award | 20190118 | 20190318 | |
| 2 | 1921, 1921-1, SRDR Development | Initial SRDR Release 1 - 60 Days after Contract Award | 20190118 | 20190318 | |
| 3 | 1921, 1921-1, SRDR Development | Initial SRDR Limited Fielding- 60 Days after Contract Award | 20190118 | 20190318 | |
| 4 | 1921, 1921-1 | Interim Report #1 - Base Year | 20191018 | 20191218 | |
| 5 | 1921, 1921-1 | Interim Report #2 - Base Year | 20200418 | 20200618 | |
| 6 | 1921, 1921-1 | Interim Report #1 - Option Year 1 | 20200818 | 20201018 | |
| 7 | 1921, 1921-1, SRDR Development | Final SRDR Limited Fielding- 60 Days After Limited Fielding | 20200618 | 20200818 | |
| 8 | 1921, 1921-1 | Interim Report #2 - Option Year 1 | 20210418 | 20210618 | |
| 9 | 1921, 1921-1, SRDR Development | Final SRDR Release 1 - 60 Days after Software Delivery | 20210618 | 20210818 | |
| 10 | 1921, 1921-1, SRDR Development | Initial SRDR Release 2 - 60 Days after Development Initiation | 20210518 | 20210718 | |
| 11 | 1921, 1921-1 | Interim Report #1 - Option Year 2 | 20210818 | 20211018 | |
| 12 | 1921, 1921-1 | Interim Report #2 - Option Year 2 | 20220418 | 20220618 | |
| 15 | 1921, 1921-1, SRDR Development | Final SRDR Release 2 - 60 Days after Software Delivery | 20220618 | 20220818 | |
| 16 | 1921, 1921-1 | Final Report - Due 60 days after Full Deployment | 20220618 | 20220818 | |
| 0 | 1921, 1921-1 | "Just in Time" CCDR | |||
| 0 | SRDR Development | "Just in Time" SRDR |
| DD FORM 2794 (PAGE 2), AUGUST 2015 | PREVIOUS EDITION IS OBSOLETE |
| 15. REMARKS |
| Special Remarks and Instructions |
| NON-RECURRING/RECURRING DEFINITIONS |
| The contractor will utilize the specific definitions and requirements in the CSDR Manual (DoD 5000.04-M-1) and the definitions in the DIDs for the forms 1921 and 1921-1 to segregate Recurring and Nonrecurring costs discretely and not as an aggregate. Refinements or expansions to these definitions are TBD pending the pre-contract or post contract award conference |
| COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT DIFFERENCES |
| Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable. |
| 1921-3 CONTRACTOR BUSINESS DATA REPORT |
| a. The Contractor Business Data Report is prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government. |
b. Reports are submitted annually at the end of the contractor's fiscal year.
c. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.
| Software Reporting and Cost Reporting |
| For Submission Events with SRDRs (i.e. Limited Deployment, Release 1, and Release 2), the contractor shall provide a 1921 and 1921-1 that is discrete to that effort. For Example, for submission event Final SRDR Limited Deployment, the contractor shall report all costs that are only associated to Limited Deployment, and shall exclude all costs related to Release 1, and Release 2. |
| CSDR Submission Dates |
| The dates currently in block 14c and 14d of CSDR plan, N-16-B-C1, are notional and subject to change. The dates for the submissions will reflect the contract award and shall be updated after the post award meeting. For the most up-to-date submission due dates, please see the dates in the CSDR-SR. |
| Just in Time Cost Report and SRDRs |
| JIT reports are intended to be collected when a need for current cost and software data arises. When the need arises from the CWIPT to receive a new cost and software report, the contractor will be notified by the CWIPT to generate a set of costs and software data reports (one for the MC and one for the Navy efforts), and deliver reports NLT 75 days after notification to the DCARC |
| Software Reporting Requirements |
| CSDR Reporting by COTS Module |
| During the Post Award Meeting, the contractor shall specify all software modules and shall setup their accounting and EV systems to report all costs by software module, which a plan revision will take place to incorporate software module reporting. The contractor shall also provide individual Dev SRDRs bysoftware module. |
| Additional Software Metrics |
| The contractor shall identify any additional software metrics during Post Award Meeting that are not already identified in the Development SRDR DID, but are internally tracked. |
| Cybersecurity |
| The goal of specifying cybersecurity costs in the WBS is to address the cybersecurity cost premium. During the Post Award Meeting, the contractor will be able to submit suggestions for collecting cybersecurity costs over and above normal commercial protection requirements. |
DD FORM 2794 (PAGE 2), AUGUST 2015 PREVIOUS EDITION IS OBSOLETE
Cost and Software Data Reporting Plan (CSDR) Page &P of &N
&A N00039-17-R-0002 ePS Sustainment Pg1 (CSDR Plan)
COST AND SOFTWARE DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
| 1. MAJOR PROGRAM | a. NAME: | Electronic Procurement System (ePS) | |||||||||||||
| b. PHASE/MILESTONE | c. PRIME MISSION PRODUCT | 2. WBS SYSTEM TYPE | 3. SUBMISSION TYPE | 4. CURRENT SUBMISSION DATE (YYYYMMDD) | 5. LAST APPROVED PLAN DATE (YYYYMMDD) | ||||||||||
| Pre-A | X | B | C-FRP | Electronic Procurement System | Automated Information System | X | INITIAL | ||||||||
| A | C-LRIP | O&S | CHANGE | 20170313 | |||||||||||
| 6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code) | 6b. TELEPHONE NUMBER (Include Area Code) | 6c. FAX NUMBER (Include Area Code) | 6d. E-MAIL ADDRESS | ||||||||||||
| George Stratman - East Cost Branch Head, Cost Analysis | (703) 604-5362 | george.stratman@navy.mil | |||||||||||||
| 7. PLAN TYPE | 8. PREPARING ORGANIZATION | 9a. CONTRACTOR NAME/ADDRESS | 9b. CONTRACT NUMBER | 9c. APPROPRIATION | 10. APPROVED PLAN NUMBER | ||||||||||
| PROGRAM | X | CONTRACT (PRIME) | i. PERFORMING ORGANIZATION | ii. DIVISION | TBD | RDT&E | N-16-B-C2 | ||||||||
| CONTRACT (SUB) | SPAWAR 1.6 | TBD | PROCUREMENT | ||||||||||||
| X | O&M |
| 11. WBS ELEMENT CODE | 12. | ||||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | ||||||
| (X if applicable) | DD 1921-3 (CBDR): | DD 1921-1 / 1921-5 EAC: | EVM Reporting: | ||||
| X | X |
| a. PROGRAM/ | ||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | |||
| SUBCONTRACT | a. CWBS | |||
| DICTIONARY | CCDR | g. SRDR | ||
| FORMATS | h. IPMR |
FORMAT 1
| b. DD 1921 | |||||||||||||||
| (CDSR) | c. DD 1921-1 | ||||||||||||||
| (FCHR) | d. DD 1921-2 | ||||||||||||||
| (PCR) | e. DD 1921-5 | ||||||||||||||
| (SFCHR) | f. EAC | ||||||||||||||
| 1.0 | SUSTAINMENT EFFORT | X | X | X | X | ||||||||||
| 1.1 | UNIT-LEVEL MANPOWER (SYSTEM LEVEL COST ONLY) | X | N/A | ||||||||||||
| 1.2 | UNIT OPERATIONS (SYSTEM LEVEL COST ONLY) | X | N/A | ||||||||||||
| 1.3 | MAINTENANCE | X | N/A | ||||||||||||
| 1.4 | SUSTAINING SUPPORT (SYSTEM LEVEL COST ONLY) | X | X | X | X | ||||||||||
| 1.4.1 | SYSTEM SPECIFIC TRAINING | X | N/A | ||||||||||||
| 1.4.2 | SUPPORT EQUIPMENT REPLACEMENT AND REPAIR | X | N/A | ||||||||||||
| 1.4.3 | SUSTAINING/SYSTEMS ENGINEERING | X | X | X | X | ||||||||||
| 1.4.3.1 | RELIABILITY AND MAINTAINABILITY ENGINEERING | X | X | X | X | ||||||||||
| 1.4.3.2 | LOGISTICS ENGINEERING (LSA updates, logistics analysis) | X | X | X | X | ||||||||||
| 1.4.3.3 | SUPPLY ANALYSIS EFFORTS | X | N/A | ||||||||||||
| 1.4.3.4 | SAFETY/HUMAN SYSTEMS INTEGRATION ENGINEERING | X | N/A | ||||||||||||
| 1.4.3.5 | AFFORDABILITY ENGINEERING | X | N/A | ||||||||||||
| 1.4.3.6 | OBSOLESCENCE ENGINEERING | X | N/A | ||||||||||||
| 1.4.3.7 | AVAILABILITY MANAGEMENT | X | N/A | ||||||||||||
| 1.4.3.8 | PRODUCT ENGINEERING SUPPORT | X | X | X | X | ||||||||||
| 1.4.3.9 | INFORMATION ASSURANCE | X | X | X | X | ||||||||||
| 1.4.3.10 | CONFIGURATION MANAGEMENT | X | X | X | X | ||||||||||
| 1.4.3.11 | SYSTEM PERFORMANCE ANALYSIS | X | N/A | ||||||||||||
| 1.4.3.12 | SUPPLY | X | N/A | ||||||||||||
| 1.4.3.13 | DATA ANALYSIS | X | X | X | X | ||||||||||
| 1.4.3.14 | PHYSICAL SECURITY | X | N/A | ||||||||||||
| 1.4.3.15 | Cyber Security | X | X | X | X | ||||||||||
| 1.4.4 | PROGRAM MANAGEMENT | X | X | X | X | ||||||||||
| 1.4.5 | INFORMATION SYSTEMS | X | X | X | X | X | |||||||||
| 1.4.5.1 | TECH REFRESH | X | N/A | ||||||||||||
| 1.4.5.2 | IS RELATED LICENSE FEES (Software) | X | X | X | X | ||||||||||
| 1.4.5.3 | SYSTEM SUPPORT/MAINTENANCE | X | X | X | X | X | |||||||||
| 1.4.5.3.1 | HELP DESK | X | X | X | X | ||||||||||
| 1.4.5.3.1.1 | TIER 0 | X | X | X | X | ||||||||||
| 1.4.5.3.1.4 | TIER 3 | X | X | X | X | ||||||||||
| 1.4.5.3.2 | SYSTEM DATABASE ADMINISTRATION | X | X | X | X | ||||||||||
| 1.4.5.3.3 | FOLLOW ON USER TRAINING | X | X | X | X | ||||||||||
| 1.4.5.3.4 | INDEPENDENT VERIFICATION AND VALIDATION (IV&V) | X | X | X | X | ||||||||||
| 1.4.5.4 | Hosting Services | X | X | X | X | ||||||||||
| 1.4.5.4.4 | Other Managed Services | X | X | X | X | ||||||||||
| 1.4.6 | DATA AND TECHNICAL PUBLICATIONS | X | X | X | X | ||||||||||
| 1.4.7 | SIMULATOR/TRAINING DEVICE OPERATIONS AND REPAIR | X | N/A | ||||||||||||
| 1.4.8 | OTHER SUSTAINING SUPPORT (SPECIFY IN REMARKS) | X | X | ||||||||||||
| 1.5 | CONTINUING SYSTEM IMPROVEMENTS | X | X | X | X | ||||||||||
| DD FORM 2794, AUGUST 2015 | PREVIOUS EDITION IS OBSOLETE | ||||||||||||||
| 11. WBS ELEMENT CODE | 12. | ||||||||||||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | ||||||||||||||
| (X if applicable) | DD 1921-3 (CBDR): | DD 1921-1 / 1921-5 EAC: | EVM Reporting: | ||||||||||||
| X | X |
| a. PROGRAM/ | ||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | |||
| SUBCONTRACT | a. CWBS | |||
| DICTIONARY | CCDR | g. SRDR | ||
| FORMATS | h. IPMR |
FORMAT 1
| b. DD 1921 | ||||||||||
| (CDSR) | c. DD 1921-1 | |||||||||
| (FCHR) | d. DD 1921-2 | |||||||||
| (PCR) | e. DD 1921-5 | |||||||||
| (SFCHR) | f. EAC | |||||||||
| 1.5.1 | HARDWARE MODIFICATIONS | X | N/A | |||||||
| 1.5.2 | SOFTWARE SUPPORT | X | X | X | X | X | ||||
| 1.5.2.1 | SOFTWARE CHANGES | X | X | X | X | |||||
| 1.5.2.1.1 | RELEASE 1...n (Specify) | X | X | X | X | X | ||||
| 1.5.2.1.1.1 | WBS NAME 1...n (Specify) | X | X | X | X | X | ||||
| 1.5.2.1.1.1.1 | CORRECTION OF DEFICIENCIES | X | X | X | X | X | ||||
| 1.5.2.1.1.1.2 | ENHANCEMENTS | X | X | X | X | X | ||||
| 1.5.2.2 | SOFTWARE LICENSE MANAGEMENT | X | X | X | X | |||||
| 1.5.2.3 | SYSTEM FACILITIES | X | N/A | |||||||
| 1.5.2.4 | FIELD SOFTWARE ENGINEERING (FSE) | X | N/A | |||||||
| 1.5.2.5 | OPERATIONAL MANAGEMENT | X | X | |||||||
| 1.6 | INSTALLATION AND PERSONNEL SUPPORT (System Level Only) | X | N/A |
Subtotal Cost X X
| Reporting Contractor G&A | X | X |
| Reporting Contractor Undistributed Budget | X | X |
| Reporting Contractor Management Reserve | X | X |
| Reporting Contractor FCCM | X | X |
| Total Cost | X | X |
Reporting Contractor Profit/Loss or Fee X X
Total Price X X
DD FORM 2794, AUGUST 2015 PREVIOUS EDITION IS OBSOLETE
Cost and Software Data Reporting Plan (CSDR) Page &P of &N
&A N00039-17-R-0002 ePS Sustainment Pg2 (CSDR Plan)
| 14. CSDR SUBMISSION DATES | |||||||
| a. | |||||||
| SUBMISSION | b. | ||||||
| FORM(S) | c. | ||||||
| EVENT | d. | ||||||
| REPORT TYPE | e. AS OF DATE | f. DUE DATE | |||||
| (YYYYMMDD) | (YYYYMMDD) | ||||||
| 1 | CWBS Dictionary | CWBS Dictionary - 60 Days after Full Deployment | Initial | 20220618 | 20220818 | ||
| 2 | 1921, 1921-5 | Initial Report - 60 Days after Full Deployment | Initial | 20220618 | 20220818 | ||
| 3 | SRDR Maintenance | Initial Report - 60 Days after Full Deployment | Initial | 20220618 | 20220818 | ||
| 4 | 1921, 1921-5 | Interim Report #1 - Option Year 3 | Interim | 20230419 | 20230619 | ||
| 5 | SRDR Maintenance | Interim Report #1 - Option Year 3 | Interim | 20230419 | 20230619 | ||
| 6 | 1921, 1921-5 | Interim Report #1 - Option Year 4 | Interim | 20240420 | 20240620 | ||
| 7 | SRDR Maintenance | Interim Report #1 - Option Year 4 | Interim | 20240420 | 20240620 | ||
| 8 | 1921, 1921-5 | Interim Report #1 - Option Year 5 | Interim | 20250421 | 20250621 | ||
| 9 | SRDR Maintenance | Interim Report #1 - Option Year 5 | Interim | 20250421 | 20250621 | ||
| 10 | 1921, 1921-5 | Interim Report #1 - Option Year 6 | Interim | 20260422 | 20260622 | ||
| 11 | SRDR Maintenance | Interim Report #1 - Option Year 6 | Interim | 20260422 | 20260622 | ||
| 12 | 1921, 1921-5 | Interim Report #1 - Option Year 7 | Interim | 20270423 | 20270623 | ||
| 13 | SRDR Maintenance | Interim Report #1 - Option Year 7 | Interim | 20270423 | 20270623 | ||
| 14 | 1921, 1921-5 | Interim Report #1 - Option Year 8 | Interim | 20280424 | 20280624 | ||
| 15 | SRDR Maintenance | Interim Report #1 - Option Year 8 | Interim | 20280424 | 20280624 | ||
| 16 | 1921, 1921-5 | Final Report - Due 60 days after Contract Completion | Final | 20290125 | 20290325 | ||
| 17 | SRDR Maintenance | Final Report - Due 60 days after Contract Completion | Final | 20290125 | 20290325 | ||
| 0 | 1921, 1921-5 | "Just in Time" CCDR | |||||
| 0 | SRDR Maintenance | "Just in Time" SRDR |
| DD FORM 2794 (PAGE 2), AUGUST 2015 | PREVIOUS EDITION IS OBSOLETE |
| 15. REMARKS |
1. NON-RECURRING/RECURRING DEFINITIONS:
The contractor will utilize the specific definitions and requirements in the CSDR Manual (DoD 5000.04-M-1) and the definitions in the DIDs for the forms 1921 and 1921-5 to segregate Recurring and Nonrecurring costs discretely and not as an aggregate.
2. COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT:
Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable.
| 3. DD Form 1921-3 Contractor Business Data Report: |
| a. The Contractor Business Data Report is prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government. |
| b. Reports are submitted annually at the end of the contractor's fiscal year. |
| c. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years. |
| 4. Sustainment: |
| a. Contractor shall provide the following Quantity information in the Remarks section of the 1921 and 1921-5: number of systems supported by this contract, and number of repairs performed. The Contractor must state the nominal capacity planned for each Delivery Order (e.g., the # of repairs, # of overhauls, # of flight hours, etc.) identified in the plan. This requirement is intended to capture what services are being bought with each effort. |
| b. In each cost element, contractor will provide the number of items associated with that cost element in Column C of the 1921 Cost Report. For example, for 1.1 Manpower the quantity would be # of person years; for 1.3.1 # of overhauls, for 1.3.2 # of DLRs, for 1.3.3 # of parts, 1.4.1 # of students etc. |
| c. For Element 1.6 Installation Support, the quantity listed in Column C of the 1921 Cost Report should reflect the number of sites/bases/installations |
| 5. Final Cost Report to be submitted when final end item has been delivered and accepted by the government (e.g., as evidenced by a completed DD 250) and 95% or more of total contract costs have been incurred. |
| 6. Contractor will report software changes under 1.5.2.1.1.1.1 and 1.5.2.1.1.1.2 by complexity, using McCabe cyclomatic complexity or similar technique. |
DD FORM 2794 (PAGE 2), AUGUST 2015 PREVIOUS EDITION IS OBSOLETE
Cost and Software Data Reporting Plan (CSDR) Page &P of &N
&A N00039-17-R-0002 image1.png