OMNIBUS_SSP_FY20_SOW.docx

DOCX document 75 KB Posted

Attached to
GDEB OMNIBUS Federal contract opportunity
Solicitation number
N00030-20-C-0028
Issued by
Department of the Navy Strategic Systems Programs

About this file

This document provides a statement of work for a cost plus fixed fee contract to support Navy Strategic Systems TRIDENT II Missile Engineered Refueling Overhaul and Demonstration and Shakedown Operations. Interested parties are requested to submit capability statements by September 12, 2019 in response to this Sources Sought notice, which is being used as a market research tool prior to a possible request for proposal. The contract would provide technical services including establishing schedules and costs, participating in planning meetings, reviewing work packages and test documentation, providing familiarization training and test support, and engineering services for the overhauls at Naval shipyards. The Strategic Systems Programs seeks these services to support TRIDENT II Missile operations.

SOW for SSP FY 20

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

May 9, 2019

Statement of Work (SOW) ITEM 0001 TRIDENT ERO Advance Planning, Execution and DASO – CPFF LOE (FY20 – O&MN)

1. This is a level of effort item. From the date of contract execution through 12 months, the contractor shall make available and employ its facilities, personnel at the level of effort set forth in section F, services of others and materials and shall use its best efforts to provide technical services for Advance Planning, Planning, Engineering, Design, Test Documentation Development and Program Management for Strategic Weapon System support for the Engineered Refueling Overhaul Maintenance Period and Demonstration and Shakedown Operations (DASO). The contractor shall establish, manage, and report on schedules, costs and events. The contractor shall perform the following support services:

1.1. Establish, manage, and report on schedules, costs and events.

1.2. In support of ERO:

a. Participate in ERO Execution Planning Meetings (EEPMs).

b. Review NAVSEA SUBMEPP Detachment generated ERO Work Package for accurate inclusion of SSP-approved SWSS/SSS work items and provide recommendations for changes to SSP.

c. Participate in Test Documentation (TDG) meetings and trade-off working group meetings.

d. Provide SWSS familiarization training and Shipyard Integrated Test Program (SITP) test equipment training to the Shipyard and Subsystem Support contractors, as requested by SP2012.

e. Review and update SITP test procedures to support advanced planning efforts and test program development for the ERO in accordance with OD 64497, SSBN Test Programs Test Requirements Document.

f. Provide test engineering services at Naval Shipyards in support of the D5 ERO test program as defined in OD 66790 ERO Procedural Program Plan (SEPPP) and OD 64497, Common Test Requirements Document. Services include staffing and managing the test administrative functions, test program planning, test documentation review comment and update, on-site meeting support, SWSPO and subsystem contractor interface, technical test conduct support, deficiencies repair and test problem resolution.

g. Support Modernization efforts and test problem resolution.

h. Provide Groton office design, engineering and management services to support resolution of SWSS issues noted during ERO.

i. The contractor shall process Test Analysis Reports (TARs) and Trouble Casualty Reports (TCRs) per SSP approved processes defined in OD 64497.

1.3. In support of DASO:

a. Provide planning, engineering, design, test, shipboard support and program management.

b. Provide technical input and recommendation for advance planning including identifying the requirements for the accomplishment of Submarine essential maintenance improvement repairs and instrumentation for data collection.

c. Provide technical support to SSP in conducting post engineering overhaul inspection of SWSS to ensure submarine is ready for sea.

d. Provide shipboard testing, checkout, inspection, operating adjustments, calibration, trouble-shooting, maintenance actions; essential repairs and at-sea support that are deemed by the Commanding Officer to be beyond the capability of Ship’s Force.

e. Provide program management including planning, budgeting, authorizing, and reporting all contracted work.

f. Attend Pre-DASO Planning Meetings (DPM) and Technical Directors Reviews (TDR), as required.

g. Provide any technical engineering assistance related to SWS/SWSS Fleet issues including attending meetings.

h. Provide support for DEPERM Operations.

ITEM 0002 OHIO Class Site and Technical Support Services & Strategic Weapons Support System (SWSS) and Selected Ship System (SSS) Technical Training – CPFF LOE (FY20 – O&MN)

1. From the date of contract execution through 12 months, the contractor shall make available and employ its facilities, personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services for Planning, Engineering, Design, Test and Program Management for Weapon System Support of the OHIO Class, SWS and SWSS Technical Support associated with Fleet Support Sites including Extended Refit Periods (ERP).

The contractor shall perform the following support services:

1.1. Establish, manage, and report on schedules, costs and events. (CDRL A0001)

1.2. In support of the Fleet:

a. Perform investigations and resolution of problems associated with Strategic and Attack Weapon Support Systems and select ship services that affect the operation, performance, or reliability of the overall Strategic Weapon System.

b. Investigate and respond to SWS/AWS issues identified by the following: SWS/AWS portions of Work Plans (WPs), SWS/AWS Trouble Failure Reports, Trouble Casualty Reports, test conduct deficiencies, Ship Maintenance Plans (SMP) and Preventative Maintenance Management Plan (PMMP) feedback reports, and patrol reports.

c. Provide test engineering services at Fleet Support Sites in support of the Extended Refit Periods (ERP) as defined in SUBMEPP ERP Work Package. These services include staffing and managing the test administrative functions, test program planning, test documentation review comment and update, on-site meeting support, Strategic Weapons Systems Program Officer (SWSPO) and subsystem contractor interface, technical test conduct support, deficiencies repair and test problem resolution.

d. Support Modernization efforts and test problem resolution.

e. Conduct evaluations of planned SSP SPALTs and ship alterations to assess impacts to the Strategic Weapon Support System.

1.3 In support of the Ballast Program:

a. Perform all efforts associated with schedules, audits, inspections, handling, shipping and maintenance for the SWS Ballast Program.

b. Serve as the Government Agent for the management of the Ballast Assembly (BA) and Missile Tube Interface Equipment.

1.4 In support of SWS Ashore:

a. Perform trade-off analysis, special shipboard or laboratory tests, and preparation of mock-ups and breadboard models required to support investigations and evaluations.

b. Support Trident Equipment Group meetings and actions.

c. Provide SWS Ashore Facility onsite supervisory and safety services.

d. Provide SWS Ashore Facility onsite engineering and program management services for the operation, maintenance and modernization of SWSS equipment.

e. Provide technical support for NAVSEA delivered hardware, training materials and technical documentation for the SWS Ashore facility.

f. Investigate and respond to SWS issues identified by the following: SWSS portions of WPs, SWS Trouble Failure Reports, Trouble Casualty Reports, test conduct deficiencies, SMP/PMMP feedback reports, fleet requested issues, or as directed.

g. Conduct Tube Overhaul, consisting of removal/installation of hydraulic and pneumatic valves/components and conduct annual inspection/refurbishment of AHCPs, HPUs and PPUs and associated systems. Procure repair materials required to replenish inventories.

h. Provide corrective maintenance support for HML and MG systems in coordination with appropriate THCs.

i. Attend and participate in quarterly program reviews.

1.5 In support of Technical Training:

a. Maintain the curriculum in support of the Submarine Familiarization Course.

b. Conduct on-site TRIDENT II D5 SWSS/SSS Overview training for SSP and Naval Sea.

c. Systems Command (NAVSEA) personnel.

d. Develop a course summary for promoting the training in the SSP Newsletter.

e. Coordinate with helpdesk@ssp.navy.mil as required to advertise the course.

f. Provide instructor(s), Conduct training, duration 4 days.

g. Provide attendee training guides and/or CD-ROMs (CDRL A0002).

h. Support survey feedback for continuous improvement of course contents.

ITEM 0003 OHIO Class Trainer Sustaining Support Services - LOE (FY20 – O&MN)

1. From the date of contract execution through 12 months, the contractor shall make available and employ its facilities, personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services and Program Management for Strategic Weapon Support Systems (SWSS) Trainer/Training Support Services. The contractor shall perform the following support services through 12 months, the contractor shall:

a. Provide SWSS engineering services for the planning, design, manufacture, ILS, installation and test of Strategic Systems Program (SSP) approved SPALTs and Conjunctive SWSS Alterations at the TRIDENT Training Facilities. Review and maintain SWS training hardware/software/material (EB Cognizant and Systems as directed by SP-205) configuration to ensure system supportability.

b. Provide Monthly Reports (CDRL A0001).

c. Provide technical support to deliver hardware, training materials and technical documentation for the upgrade of Trident Training Facilities.

d. Provide special study analysis for programmatic issues related to advanced training and trainer planning, including manning requirements, military ratings and rates.

e. Provide operational, maintenance, modernization and WISC support for SWS Training Facilities (i.e. facility services, security systems, structural, etc.). This effort will support continuing operations as well as maintenance activities for existing facilities, activities associated with SPALT installations, and activities associated with the new SWS Training Facilities.

f. Investigate and respond to SWS issues identified by the following: SWSS portions of WPs, SWS Trouble Failure Reports, Trouble Casualty Reports, test conduct deficiencies, SMP/PMMP feedback reports, fleet requested issues, or as directed by SP205.

g. Provide overall technical and administrative management.

h. Conduct Trainer Tube Overhaul, consisting of removal/installation of hydraulic and pneumatic valves/components and conduct annual inspection/refurbishment of AHCPs, HPUs and PPUs and associated systems at TTF Bangor and TTF Kings Bay. Procure repair materials required to replenish inventories.

i. Provide corrective maintenance support for HML and MG systems at TTF Bangor and TTF Kings Bay in coordination with appropriate THCs.

j. Refurbish valves and equipment from TTF Bangor, TTF Kings Bay, and TTF UK. Procure materials required to replenish inventories. Provide operational, maintenance, and modernization support for SWS Valve Maintenance Facility Test Stands and associated infrastructures.

k. Conduct Equipment Condition Verification Inspections per OD 55218 Trainer Equipment Condition Verification Plan.

l. Attend meetings and conferences, as required by SP205. Complete and/or respond to action items provided by SP205.

ITEM 0004 OHIO Class Training Support Services – CPFF LOE (FY20 OM&N)

1. From the date of contract execution through 12 months, the contractor shall make available and employ its facilities, personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services and Program Management for the maintenance and review of Missile Technician (MT) Continuum program Instructor Led Training and Learner Directed Content (ILT and LDC) for the Strategic Weapon Support Systems (SWSS) Trainer /Training Systems. The contractor shall perform the following support services through 12 months, the contractor shall:

a. Participate in SP205 MT Continuum storyboard and content reviews.

b. Deliver available graphics, reusable content and technical data for content.

c. Deliver Monthly Reports. (CDRL A0001)

d. Perform overall technical and administrative management of the Training System Program.

e. Provide monthly reviews of curriculum to identify needed improvements and updates and report results of such reviews to SP205.

f. Review SP205 curricula training material’s technical changes.

g. Review tactical system design changes and documentation for training impacts and report to SP205.

h. Deliver special study analysis for programmatic issues related to advanced training and trainer planning, including manning requirements, military ratings and rates.

i. Investigate and respond to SWS issues identified by the following: CACL(Curriculum Action Check List), TFRs, fleet requested issues, or as directed by SP205.

j. Attend SP205 meetings and conferences.

k. Complete and/or respond to action items provided by SP205.

l. Provide SP205 SSBN/SWS/AWS graphic support.

m. Provide Training Effectiveness Systems (TES) support in accordance with SSPINST 1500.6.

n. Investigate and respond to SWS issues identified by SP205 or the following: SWS portions of WPs, SWS Trouble Failure Reports, Trouble Casualty Reports, test conduct deficiencies, SMP/PMMP feedback reports, CACL, TES, or fleet requested issues.

o. Monitoring and Analyzing Operational Tactical Program Data and Identifying Potential Training Issues. Log potential issues into the TES Database.

p. Conducting Initial and Detailed Analysis of Training Issues as directed by Training Effectiveness Systems Missile Technician (TESMT).

q. Provide and implement recommended corrective actions and monitoring results. .

r. Review and update the TES program database.

s. Review TES input data and identify potential SWS program training-related issues and make recommendations to SP205.

t. Coordinate with SP205 and other Contractors as necessary to resolve TES program issues.

u. Review and update cognizant published TRIDENT Information Bulletin (TIB) articles and lecture guides.

v. Provide Instructor Advisory Services for noted training deficiencies as directed by TESMT.

ITEM 0005 SSP Waterfront Support Facilities – CPFF LOE (FY20 – O&MN)

1. From the date of contract execution through 12 months, the contractor shall make available and employ its facilities, personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services and Program Management for the operation, maintenance, repair and procurement efforts for SSP Waterfront Support Facilities located at Kings Bay Naval Submarine Base , Bangor Naval Submarine Base, Norfolk Naval Shipyard (NNSY) and Puget Sound Naval Shipyard (PSNS) and the SWS Ashore Facility located at Cape Canaveral. The contractor shall perform the services through 12 months, the contractor shall:

a. Establish, manage, and report on schedules, costs and events.

b. Provide operation, maintenance, cleaning, repair and refurbishment services in accordance with Barge Operation/Maintenance Manual associated with Barge YNFB39 at PSNS and Barge YR90 at NNSY for the following systems:

1.b.1. Heating /Ventilation System 1.b.2. Air Conditioning System 1.b.3. Sanitary System 1.b.4. Water System 1.b.5. Electrical System 1.b.6. Refrigeration Equipment

c. Provide maintenance, cleaning and repair services for the SSP Waterfront Operations Facilities located at Kings Bay Naval Submarine Base (Building 5193) and at Bangor Naval Submarine Base (Buildings T059A and T059B) and the SWS Ashore Facility located at Cape Canaveral.

ITEM 0006 SSGN AWSS Training Equipment and Curricula Support Services - CPFF LOE (FY20 – O&MN)

1. From the date of contract execution through 12 moths, the contractor shall make available and employ its facilities, personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services and Program Management for Attack Weapon Support Systems (AWSS) Trainer/Training Support Services. The contractor shall perform the following support services through 12 months, the contractor shall:

a. Update and document equipment alterations (SHIPALT/SPALTs) software and firmware SHIPALT/SPALTs and fault insertions requirements.

b. Deliver interactive courseware materials and courseware installations for operations and/or maintenance of tactical and non-tactical training equipment.

c. Deliver special study analysis of programmatic issues related to advanced training and trainer planning, including manning requirements, military ratings and rates.

d. Provide operational, maintenance and modernization support for AWS Training Facilities infrastructure.

ITEM 0007 SWS Ashore (SWSA) COLUMBIA Bay Strategic Weapon Support System (SWSS) Support – CPFF - LOE (FY20 - RDTE)

1. From the date of contract execution through 12 months, the Contractor shall make available and employ its facilities, personnel at the level of effort set forth in Section F, services of others, and materials, and shall use its best efforts to provide project management, ship design, and installation support activities for the Strategic Weapon System (SWS) Ashore facility located at Launch Complex 25 at Cape Canaveral Air Force Station (CCAFS). The contractor shall:

a. Provide installation support for COLUMBIA SWS / SWSS equipment and testing components in SWS Ashore facility.

b. Scope installation and production effort and provide POAM (Plan Of Action and Milestones), Rough Order of Magnitude(s) and schedule(s).

c. Develop detailed plan(s) that are shared with SWS Ashore Program Manager and other site contractors. Develop work package(s) for installing mechanical and electrical/signal equipment.

d. The Contractor shall provide Quality Control Evidence of installation completion in accordance with SWSAP 4730.2 Construction Outfitting Closeout Procedures.

e. Installation includes resolving Deficiency Report(s), Change Request(s), and / or Engineering Change Request(s) assigned to GDEB. All work shall be performed in accordance with the MOA between DIRSSP and PEO SUBS dtd 07 Dec 2016. Installation and production activities include:

1.e.1. Providing and installation of spare cards, electrical system components, pumps, valves and other SWSS equipment specified via the change request process to correct SWS Ashore deficiencies during Verification & Validation testing as well as proofing of the Shipyard Installation Test Program.

1.e.2. Provide technical support for the COLUMBIA Bay Ship’s Power system, interior communications system, and systems under SSP’s cognizance in the MOA.

ITEM 0008 SSI Program Support Services – CPFF LOE (FY20 OPN)

1. From the date of contract execution through 12 months, the Contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform technical services for SSI Programs. The contractor shall perform the following support services through 12 months, the contractor shall:

1.1. Provide engineering and program support for SSI program development efforts for SSP through participation in development and installation planning discussions. This support includes

a. Evaluation of concept and preliminary design information related to each SSI increment to identify potential US and UK ship impacts,

b. Development and delivery of preliminary requirements document identifying ship design impacts for conjunctive US and UK ShipAlts as requested to support each SSI increment

c. Support for the coordination drawing process for review of Proposed Notifications of Change as required to support development of all SSI increments in the absence of Ship Alteration conceptual design development

d. Evaluation of development and installation schedules related to the SSI program to ensure efficient integration of SSI SPALT and conjunctive ShipAlt schedules for US and UK ships

e. Support system level safety and risk management efforts related to development of SSI increment development

f. Transition to Ship Alteration conceptual development as requested to support SSI Increment

ITEM 0009 TRID 0586 SHIPALT Installation for SSP Shipboard Integration, Increment 11 Launcher Initiation System (CPFF) – Completion (FY20 - OPN)

1. The contractor shall Plan, Install, and Test Ship Alteration (SHIPALT) TRID 0586 for SSP Shipboard Integration (SSI) Increment 11. The contractor shall establish, manage, and report on schedules, costs and events (CDRL A0004). The contractor shall provide installation and test services for Ship Alteration (SHIPALT) TRID 0586 for SSP Shipboard Integration (SSI) Increment 11, LIS. Specifically, The contractor shall deliver the following:

a. TRID 0586 SHIPALT on-site installation planning, installation execution and test services for one (1) SHIPALT installations, in accordance with Exhibit B

b. Support and participate in Program Reviews, Installation Readiness Reviews (IRR), Production and Installation Reviews, Technical Exchanges and Coordination and Status Meetings.

c. Prepare, maintain and issue monthly financial cost reports for TRID 0586 SHIPALT installations.(CDRL A0001)

ITEM 0010 TRID 0597 SHIPALT Kit Procurement – (CPFF) Completion (FY20)

1. The Contractor shall provide procurement, production, and manufacturing services supporting SSP Shipboard Integration (SSI) Increment 8, Electrostatically Supported Gyroscope Navigator Replacement (ESGNR) TRID 0597 as follows:

a. Procure, fabricate, inspect, test, inventory, kit and deliver twelve (12) Shipsets IAW government approved TRID 0597.

b. Support and participate in Program Reviews, Design Reviews, Production and Installation Reviews, Installation Readiness Reviews (IRR) and status meetings.

ITEM 0011- RESERVED

ITEM 0012 SSI INC 13/15 Support FY20 – (CPFF) OPN (LOE)

1. From the date of contract execution through 12 months , the Contractor shall make available and employ its facilities and personnel at the level-of-effort set forth in Section F, services of others, and materials and shall use its best efforts to perform the services specified below. The Contractor shall provide support for the SP23 Fire Control Shipboard Systems Integration development efforts in accordance with the SSP SSI Program. The Contractor shall perform support services through 12 months, the contractor shall:

a. Provide support as directed to SSI Increments 13, 15, and others as identified by SP23. Support to any Increment shall include the following:

b. Participation in SSI development reviews and meetings including meeting attendance, preparation of information, review of documentation, etc., in support of increment development. The reviews and meetings may include: (a) Design Development Teams (DDT); (b) Systems Requirements Review (SRR); (c) Preliminary Design Review (PDR); (d) Critical Design Review (CDR); (e) Systems Requirements Allocation Review (SRAR); (f) Systems Preliminary Design Review (SPDR); (g) Systems Critical Design Review (SCDR); (h) Test Baseline Readiness Review (TBRR); (i) Load Baseline Readiness Review (LBRR); (j) Information Assurance Working Group (IAWG); (k) Installation Working Group (IWG); (l) Data Function Dictionary Reviews with Analysis, and (m) Review and support of coordinated interface and data changes as a result of SSI changes.

a. Provide impacts to ship and related equipment on future increments including budgetary information, technical analysis of the changes required, schedule generation and initial planning efforts.

b. Respond to SSI program drills including funding, schedules, statements of work, etc.

c. Submittal of Final Activity Summary Report summarizing the support provided (CDRL A0003) ITEM 0013 OHIO Replacement Common Trainer Support Services – (CPFF) LOE (FY20 – R&D)

1. From the date of contract execution through 12 months , the Contractor shall make available and employ its facilities, personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the following technical services for the OHIO Replacement Common Trainer Program. The Contractor shall provide the following support services through 12 months, the contractor shall:

a. Design and develop a common Ship’s Systems trainer design for the SSBN-R SWTS Program in accordance with; plans published in OD 68710 - Program Plan for the SSBN Replacement Strategic Weapon Training and the policies and procedures established in OD 36763 Revision 5, and the T9001B checklist.

b. Perform the following tasks:

1.b.1. Develop a SWTS Missile Compartment 2 Tube common US/UK trainer design IAW the requirements defined in OD 68875 SSBN-R SWTS Capabilities Requirements Specification, Version 1.2, dated 26-Feb-2015 and document the design IAW SP205 requirements outline on OD36763 1.b.2. Perform the following Missile Compartment 2 Tube Design Reviews as identified in the SSBN-R Facility Design Schedule;

1.b.2.1. Preliminary Design Review 1.b.2.2. Critical Design Review 1.b.2.3. Production Readiness Review 1.b.3. Develop a SWTS UK Superstructure Missile Tube closure handling trainer design IAW the requirements defined in OD 68875 SSBN-R SWTS Capabilities Requirements Specification, Version 1.2, dated 26-Feb-2015 and document the design IAW SP205 requirements outline on OD36763 1.b.3.1. Perform the following Superstructure Design Reviews (reviews may be combined with those corresponding reviews identified in Task #1);

1.b.3.1.1. Sub-System Requirements Review 1.b.4. Develop a SWTS US/UK Common Ship’s System Bench and/or Part-Task Trainer requirements defined in OD 68875 SSBN-R SWTS Capabilities Requirements Specification, Version 1.2, dated 26-Feb-2015 and document the design IAW SP205 requirements outline on OD36763 1.b.4.1. Perform the following Design Reviews (reviews may be combined with those corresponding reviews identified in Task #1);

1.b.4.1.1. Sub-System Requirements Review

ITEM 0014 UKALT 2234 SHIPALT Installation for UK SSP Shipboard Integration, Increment 4 Navigation Equipment Refresh – (CPFF) LOE (FY20 - UK)

1. This is a Level of Effort item. From the date of contract execution through 12 months, the contractor shall make available and employ its facilities, personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services for Planning, Installing, Testing and Program Management associated with Ship Alteration (SHIPALT) UKALT 2234 for SSP Shipboard Integration (SSI) Increment 4 Navigation Equipment Refresh. The contractor shall:

c. Establish, manage, and report on schedules, costs and events. (CDRL A0006)

d. Provide UKALT 2234 SHIPALT on-site installation planning and technical support for two (2) SHIPALT installations.

e. Attend and participate in Program Reviews, Installation Readiness Reviews (IRR), Production and Installation Reviews, Technical Exchanges and Coordination and Status Meetings.

f. Prepare, maintain and issue monthly financial cost reports for UKALT 2234 SHIPALT installations (CDRL A0001)

ITEM 0015 UK SITP, TCR and UKALT Installation Support Services – CPFF LOE (FMS)

1. From the date of contract execution, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform technical services for the maintenance and development of Shipyard Integrated Test Program (SITP) Test Documentation, processing of Trouble Casualty Reports (TCRs), SSP Installation Working Group support and Program Management for Strategic Weapon System (SWS) and the Strategic Weapon Support System (SWSS) to the UK MoD via SSP. The contractor shall:

a. Establish, manage, and report on schedules, costs and events.

b. Participate in Test Documentation (TDG) meetings and trade-off working group meetings.

c. Provide SWSS familiarization training and Shipyard Integrated Test Program (SITP) test equipment training to the Shipyard and Subsystem Support contractors, when requested by SP2012.

d. Review and update SITP test procedures to support advanced planning efforts and test program development for the ERO in accordance with OD 64497, SSBN Test Programs Test Requirements Document.

e. Process Trouble Casualty Reports (TCRs) per SSP approved processes defined in OD 64497.

f. Evaluation of development and installation schedules related to the SSI program to ensure efficient integration of SSI SPALT and conjunctive ShipAlt schedules for UK ships.

g. Prepare for and attending SSP Installation Working Group for UK Ships.

ITEM 0016 UKALT 2281 SHIPALT Installation for UK SSP Shipboard Integration, Increment 11 LAUNCHER INITIATION SYSTEM - LOE (FY22 UK)

1. From the date of contract execution, the contractor shall make available and employ its facilities, personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services for Planning, Installing, Testing and Program Management associated with Ship Alteration (SHIPALT) UKALT 2281 for SSP Shipboard Integration (SSI) Increment 11 Launcher Initiation System. The contractor shall establish, manage, and report on schedules, costs and events (CDRL A0008). The contractor shall perform the following:

a. Provide UKALT 2281 SHIPALT on-site installation planning and technical support for one (1) SHIPALT installation.

b. Attend and participate in Program Reviews, Installation Readiness Reviews (IRR), Production and Installation Reviews, Technical Exchanges and Coordination and Status Meetings.

c. Prepare, maintain and issue monthly financial cost reports for UKALT 2281 SHIPALT installations (CDRL A0001)

ITEM 0017 SCN Curricula Development– CPFF (LOE) (FY20) (UK )

1. From the date of contract execution through 12 months , the Contractor shall make available and employ its facilities, personnel at the level of effort set forth in Section F, services of others, and materials, and shall use its best efforts to make available and employ its facilities and personnel to provide services that include

a. Program Planning / Coordination, Draft Training Program Plan, Develop

b. schedules and milestones,

c. Assess training needs & define training requirements, Develop outline for

d. the Training Baseline Document,

e. Monitor and assess Tactical development efforts for impacts to Training '

f. Implement US/UK common curricula and deliver to the UK.

g. Initiate Curricula updates based on UK training lesson learned.

ITEM 0018- RESERVED

ITEM 0019- RESERVED

ITEM 0020- RESERVED

ITEM 0021- TRIDENT ERO Advance Planning, Execution and DASO – (CPFF) LOE (FY21 Option)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0001.

ITEM 0022- OHIO Class Site and Technical Support Services & Strategic Weapons Support System (SWSS) and Selected Ship System (SSS) Technical Training – CPFF LOE (FY21 – O&MN) (Option)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0002.

ITEM 0023- OHIO Class Trainer Sustaining Support Services – (CPFF) LOE (FY21 – O&MN)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0003.

ITEM 0024- OHIO Class Training Support Services – (CPFF) LOE (FY21 Option)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0004.

ITEM 0025- SSP Waterfront Support Facilities – (CPFF) LOE (FY21 Option)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0005.

ITEM 0026- SSGN AWSS Training Equipment and Curricula Support Services - LOE (FY21 – O&MN) (OPTION)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0006.

ITEM 0027- SWS Ashore (SWSA) COLUMBIA Bay Strategic Weapon Support System (SWSS) Support – CPFF - LOE (FY21 - RDTE) (OPTION)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0007.

ITEM 0028- SSI Program Support Services - LOE (FY21) (option)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0008.

ITEM 0029 TRID 0586 SHIPALT Installation for SSP Shipboard Integration, Increment 11 Launcher Initiation System (LIS) – Completion (FY21 - OPN) (OPTION)

1. This Item shall apply only if the government exercises the option for this item. The contractor shall Plan, Install, and Test Ship Alteration (SHIPALT) TRID 0586 for SSP Shipboard Integration (SSI) Increment 11. The contractor shall establish, manage, and report on schedules, costs and events. The contractor shall provide installation and test services for Ship Alteration (SHIPALT) TRID 0586 for SSP Shipboard Integration (SSI) Increment 11, LIS. Specifically, the contractor shall DELIVER the following:

a. Provide TRID 0586 SHIPALT on-site installation planning, installation execution and test services for one (1) SHIPALT installations, in accordance with Exhibit B

b. Attend and participate in Program Reviews, Installation Readiness Reviews (IRR), Production and Installation Reviews, Technical Exchanges and Coordination and Status Meetings.

c. Prepare, maintain and issue monthly financial cost reports for TRID 0586 SHIPALT installations. (CDRL A0001)

ITEM 0030 SSI 8 TRID 0597 SHIPALT Proofing Installation – (CPFF) Completion (FY21-OPN ) (Option)

1. This Item shall apply only if the government exercises the option for this item. The Contractor shall provide the following support services: The contractor shall plan, install, and test Ship Alteration (SHIPALT) TRID 0597. The contractor shall establish, manage, and report on schedules, costs and events in support of the delivery of Ship Alteration (SHIPALT) TRID 0597, the contractor shall deliver the following:

a. Complete one (1) TRID 0597 SHIPALT installation (proofing boat), in accordance with Exhibit D, ELIN D001 through D005. Provide TRID 0597 SHIPALT on-site installation planning, material kit installation and test. Support and deliver SHIPALT completion reports to SSP. (CDRL A0005)

b. Attend and participate in Program Reviews, Installation Readiness Reviews (IRR), Design Reviews, Production and Installation Reviews, Technical Exchanges and Coordination and Status Meetings.

c. Prepare, maintain and issue monthly financial cost reports for TRID 0597 SHIPALT installations. (CDRL A0001)

ITEM 0031- RESERVED

ITEM 0032- SSI INC 13/15 Support FY21 - OPN

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0012.

ITEM 0033- RESERVED

ITEM 0034- RESERVED

ITEM 0035- UK SITP, TCR and UKALT Installation Support Services – CPFF LOE (FMS)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0015.

ITEM 0037- SCN Curricula Development– CPFF (FY21 SCN)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0017.

ITEM 0040- SSBN-R Trainer Procurement, Installation, and Test – Completion - (FY21 -OPN) (Option)

1. The contractor shall provide project management, hardware procurement, deliver, and installation support activities for the King Bay Trident Training Facility (TTF).

2. The contractor shall in accordance with, (1) Common Missile Compartment (CMC) Strategic Weapons Trainer System (SWTS) Strategic Weapons Support System (SWSS) Trainer Requirements Specification OD 71322 Rev A, dated 6 April 2018, and (2) Policies and Procedures established in OD 36763 Revision 5, and the (3) T9001B checklist, shall fabricate, deliver, and provide installation support of the Strategic Weapons Support System (SWSS) components of the Training system at Kings Bay TTF. The Contractor shall provide to the TTF:

a. Long lead time material (>100 days) (to build the 7 Bench Trainer/Part task Trainer)

b. Identified in the SSP GFE database.

c. On tube components (valves, piping, access doors, cabling, limit switches)

d. Off tube components (Missile Gas (MG) Reducing Station, Hydraulic Security Enclosure, Coordinators Watch Station Tube Air and Hydraulics Control Panel

e. Bench Trainers (Hydraulic Components, Missile Gas (MG) Components, Missile Heating and Cooling (MHC) Water Heater, Miscellaneous Components, MG-71 Supply Valve, MG-72 Vent Valve, Locking Ring Actuator) Missile Tube

ITEM 0041- TRIDENT ERO Advance Planning, Execution and DASO – CPFF LOE (FY22 Option O&MN)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0001.

ITEM 0042- OHIO Class Site and Technical Support Services & Strategic Weapons Support System (SWSS) and Selected Ship System (SSS) Technical Training – CPFF LOE (FY22 – O&MN)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0002.

ITEM 0043- OHIO Class Trainer Sustaining Support Services - CPFF LOE (FY22 – O&MN)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0003.

ITEM 0044- OHIO Class Training Support Services – CPFF LOE (FY22 Option)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0004.

ITEM 0045- SSP Waterfront Support Facilities – CPFF LOE (FY22 Option O&MN)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0005.

ITEM 0046- SSGN AWSS Training Equipment and Curricula Support Services – CPFF LOE (FY22 – O&MN)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0006.

ITEM 0047- SWS Ashore (SWSA) COLUMBIA Bay Strategic Weapon Support System (SWSS) Support – CPFF - LOE (FY22 - RDTE)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0007.

ITEM 0048- SSI Program Support Services – CPFF LOE (FY22)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0008.

ITEM 0049- RESERVED

ITEM 0050- RESERVED

ITEM 0051- SSI 8 TRID 0597 SHIPALT US Installation – CPFF Completion (FY22 Option)

1. The contractor shall plan, install, and test Ship Alteration (SHIPALT) TRID 0597. The contractor shall establish, manage, and report on schedules, costs and events. In support of the delivery of Ship Alteration (SHIPALT) TRID 0597, the contractor shall deliver the following:

1.1. Complete five (5) TRID 0597 SHIPALT installations in accordance with Exhibit D, ELIN D001 through D005. Provide TRID 0597 SHIPALT on-site installation planning, material kit installation and test. Support and deliver SHIPALT completion reports to SSP. (CDRL A0005)

1.2. Support and participate in Program Reviews, Installation Readiness Reviews (IRR), Design Reviews, Production and Installation Reviews, Technical Exchanges and Coordination and Status Meetings.

1.3. Prepare, maintain and issue monthly financial cost reports for TRID 0597 SHIPALT installations. (CDRL A0001) ITEM 0052- SSI INC 13/15 Support (FY22 Option) – CPFF LOE (FY22-OPN)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0012.

ITEM 0053- RESERVED

ITEM 0054- RESERVED

ITEM 0055- UK SITP, TCR and UKALT Installation Support Services – CPFF LOE (FMS)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0015.

ITEM 0056- UKALT 2281 SHIPALT Installation for UK SSP Shipboard Integration, Increment 11 LAUNCHER INITIATION SYSTEM – CPFF LOE (FY22 - UK)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities, personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services for Planning, Installing, Testing and Program Management associated with Ship Alteration (SHIPALT) UKALT 2281 for SSP Shipboard Integration (SSI) Increment 11 Launcher Initiation System. The contractor shall establish, manage, and report on schedules, costs and events. The contractor shall perform the following:

1.1. Provide UKALT 2281 SHIPALT on-site installation planning and technical support for one (1) SHIPALT installation.

1.2. Attend and participate in Program Reviews, Installation Readiness Reviews (IRR), Production and Installation Reviews, Technical Exchanges and Coordination and Status Meetings.

ITEM 0057- SCN Curricula Development– CPFF LOE (FY22 SCN)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0017.

ITEM 0058- RESERVED

ITEM 0059- RESERVED

ITEM 0060- SSBN-R Trainer Procurement, Installation, and Test – CPFF LOE (FY22-OPN)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0040

ITEM 0061- RESERVED

ITEM 0062- OHIO Class Site and Technical Support Services & Strategic Weapons Support System (SWSS) and Selected Ship System (SSS) Technical Training – CPFF LOE (FY23 – O&MN)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0002.

ITEM 0063- OHIO Class Trainer Sustaining Support Services - LOE (FY23 – O&MN)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0003.

ITEM 0064- OHIO Class Training Support Services – CPFF LOE (FY23 Option)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0004.

ITEM 0065- SSP Waterfront Support Facilities – CPFF LOE (FY23 Option)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others, materials, and shall use its best efforts to perform the technical services described herein as CLIN 0005.

ITEM 0066- SSGN AWSS Training Equipment and Curricula Support Services – CPFF LOE (FY23 – O&MN)

1. This Item shall apply only if the government exercises the option for this item. This is a level of effort item. From the date the option is exercised through 12 months, the contractor shall make available and employ its facilities and personnel at the level of effort specified in Section F, services of others,…