CLIN 0001 - FY17 SSI INCREMENT 4 US PROGRAM SUPPORT (CPFF LOE)

From the effective date of contract award through twelve (12) months thereafter, the Contractor shall make available and employ its facilities, personnel at the level of effort set forth in Section F, services of others, and shall use its best efforts to provide technical and program management support services in support of FY17 US TRIDENT, SSI Increment 4 program as defined herein.

1.0 Program Support Integrated Master Schedule The Contractor shall develop and deliver a Full Program Integrated Master Schedule for long term future planning use in accordance with CDRL A020.

Earned Value Reports The Contractor shall deliver an Integrated Program Management Report (IPMR) in accordance with CDRL A003 and a Contract Financial Management Report (CFMR) in accordance with CDRL A001.

Technical Director Review (TDR) The Contractor’s Program Manager (PM) and Engineering Program Manager (EPM) – or designees shall support presentation preparations, attend Technical Director Reviews (TDRs) and assist in action item closure for TDRs.

Design and Deployment Team (DDT) Review The Contractor’s Engineering Program Manager (EPM) – or designee shall support presentation preparations, attend Design and Deployment Team Reviews and assist in action item closure for the DDT Reviews.

Technical Program Management The Contractor shall implement and execute a technical management program in accordance with T9001B Change 2, as modified by Requirements Applicable Matrix SD-13-17626 (NP) Rev F, Technical Program Management for Strategic Systems Program Acquisitions. In addition, the Contractor shall interface and coordinate activities across all Strategic Weapon System (SWS) programs to ensure schedule coordination, synchronization, and commonality across all SP development programs.

Working Group Meetings The Contractor shall support working group meetings, including but not limited to:

A. SSI

B. Safety C. Fleet Documentation The required support includes meeting preparations, attendance, and assistance or ownership of action item closure.

Installation Support The Contractor shall provide support for SSP Installation Working Group (IWG) Meetings/Focus Teams, which are held to ensure coordination with all affected SSP Branches, Branch Contractors, and site/shipyard personnel. The Contractor shall support working groups/focus teams which have been established including working groups specific to SSI Increment 4 program installation. The Contractor shall manage the Navigation SSI Increment 4 program installations and be responsible for the onsite implementation of SSI Increment 4 Navigation SPALT 40374.

The Contractor shall:

A. Assign Navigation Installation Team Leads to support the SSI Increment 4 Installation Working team;

B. Support pre-installation on-site briefings with TYCOM, SSP, NSSC, TRF, Ships Force, and Supporting Contractors;

C. Assist SSI Increment 4 IWG in meeting all Joint Fleet Maintenance Manual (JFMM) requirements for pre-installation, installation and post installation of SPALT 40374 to include specific MOA, service request, and HAZMAT, security and installation requirements;

D. Coordinate with EB Team Lead status of conjunctive SSI Increment 4 SHIPALT TRID 0569;

E. Coordinate with GDMS Team Lead status of conjunctive MFC SPALT 30332;

F. Coordinate with IEC Team Lead status of conjunctive DRS SPALT 30346;

G. Coordinate with NUWC Team Lead status of conjunctive CCS OCMOD 0336;

H. Provide daily FEIMS status reports;

I. Provide daily status reports during the installation period to the IWG.

In accordance with the SSI Increment 4 IWG and in accordance with the (Ref L, SD-13-17721 Rev- SSI INC 4 Navigation SPALTS 40374/14203 Implementation Manual for SSBN 730 through 743, UK 05 Class and US/UK Navigation Shore Facilities or latest revision), the Contractor shall support an Installation Readiness Review (IRR) meeting.

The Contractor shall support investigations of systems, software, hardware, and documentation problems identified by the Navigation SSI Increment 4 Tiger Team Field Engineers during installation. The contractor shall provide recommendations to resolve the problem and participate in the integration and deployment of approved recommendations.

Information Assurance (IA) / Cyber Security (CS) The Contractor shall provide the following personnel, described by IA workforce category, level, training and certification requirements, as follows (select the appropriate personnel group(s)):

A. IA Technical (IAT) environments B. Computer Network Defense Service Providers (CND-SPs) C. IA Systems Architects and Engineers (IASAEs) The Contractor shall ensure that personnel accessing information systems have the proper and current IA certification to perform IA functions in accordance with DoD 8570.01-M, Information Assurance Workforce (IAWF) Improvement Program. The Contractor shall meet the applicable IA certification requirements, including— (1) DoD-approved IAWF/CSWF certifications appropriate for each category and level as listed in the current version of DoD 8570.01-M; (2) Appropriate operating system (OS) certification or certificate of completion for IAT positions as required by DoD 8570.01-M; (3) Sustaining training for certification maintenance as required by the Certification Provider; and Continuing Learning (CL) requirements required by SECNAVINST 1543.2. The Contractor shall be responsible for yearly maintenance fees to maintain these certifications. This includes, but is not limited to 40 CL credits each year by 30 September.

The Contractor shall ensure that personnel assigned as CSWF within IA category and level shall hold and maintain the certification and certificates of completion and complete sustainment training, as per DoD 8770.01M.

The Contractor shall ensure all personnel assigned as CSWF have the appropriate security clearance and background investigation and meet U.S. citizenship requirements for their IA category and level and Information Technology (IT) position level in accordance with SECNAV M-5510.30.

The Contractor shall ensure all personnel assigned as an Information System Security Officer (ISSO) at the IAM Level I or IAM Level II hold a U.S. Government Secret security clearance and have a successfully adjudicated Single Scope Background Investigation (SSBI). In this capacity, they shall perform a critical-sensitive function and will be assigned an Information Technology (IT) Position Level IT-I.

The Contractor shall ensure all personnel assigned as Privileged User at the IAT Level III hold a U.S. Government Top Secret security clearance and have a successfully adjudicated Single Scope Background Investigation (SSBI). In this capacity, they shall perform a critical-sensitive function and will be assigned an Information Technology (IT) Position Level IT-I.

The Contractor shall ensure all personnel assigned as Privileged User at the IAT Level II hold a U.S. Government Secret security clearance and have a successfully adjudicated Single Scope Background Investigation (SSBI). In this capacity, they shall perform a critical-sensitive function and are assigned an Information Technology (IT) Position Level IT-I.

The Contractor shall ensure all personnel assigned as Limited Privileged User at the IAT Level I hold a U.S. Government Secret security clearance and a NACI. In this capacity, they shall perform a noncritical-sensitive function and are assigned an Information Technology (IT) Position Level IT-II.

The Contractor shall provide a list of personnel in IA/CS positions to SSP for appointment in writing by the SSP Command Information Officer (SPCIO). The list should contain the person’s name, IA category and level, and IT position level.

The Contractor must provide IA certifications for all IAWF; OS certifications and/or certificates of completion for IAT workforce applicable to their operating environments or security tools; and hours completed for sustaining training for certification maintenance and CL upon request.

The Contractor must report IA certification status and compliance to the COR and/or designee during the Program Management Review (PMR).

CLIN 0002 - FY17 SSI INCREMENT 4/8/13 UK PROGRAM SUPPORT (CPFF LOE) (UK)

From the effective date of contract award through twelve (12) months thereafter, the Contractor shall make available and employ its facilities, personnel at the level of effort set forth in Section F, services of others, and materials, and shall use its best efforts to provide technical and management support services in support of SSI Increment 4, SSI Increment 8, and SSI Increment 13 program as defined herein. The required support services shall be in accordance with US/UK Technical Arrangements to achieve the objectives defined in subparagraphs below. The required technical support services shall be based on SSBN schedules contained in the latest issue of the SPOSE/Joint Program Requirements (JPR).

1. Technical Program Management The Contractor shall implement and execute a technical management program in accordance with T9001B Change 2, as modified by Requirements Applicability Matrix SD-13-17626 (NP) Rev F, Technical Program Management Requirements for Strategic Systems Programs Acquisitions. The Contractor shall update and deliver a detailed Integrated Master Plan in accordance with CDRL A038 and Full Program Integrated Master Schedule in accordance with CDRL A020 for all active SSI Increment Programs from contract award through final delivery, installation, and check-out of systems on-board the SSBNs.

The Contractor shall also interface and coordinate activities across all Strategic Weapon System (SWS) programs to ensure schedule coordination, synchronization, and commonality across all SP development programs.

The Contractor shall also interface and coordinate activities across all Strategic Weapon System (SWS) programs to ensure schedule coordination, synchronization, and commonality across all SP development programs.

The Contractor shall:

A. Provide program support in preparation for transition of SSI Increment 4, SSI Increment 8, and SSI Increment 13 from development to deployed system. This effort shall include monitoring of UK installation activities, coordination with the development team and logistics to assure transition provides sufficient equipment and forward planning.

B. Provide focal point for customer contact by maintaining full time liaison with SSP, UK Strategic Weapons Program Team (SWPT) representatives, and UK Contractor representatives.

C. Plan, coordinate, direct, and participate in US/UK Meetings in the US and UK covering SSI technical reviews, presentations, planning and follow-up.

D. Generate Conference Reports.

E. Provide UK SSI Increment 4, SSI Increment 8, and SSI Increment 13 implementation planning support.

Systems Engineering The Contractor shall:

A. Develop UK Contingency Reserve H/W (e.g. Patch Panel and Cables).

B. Develop UK Installation H/W and consumables (UK Ready Service Kit).

C. Provide on-site Installation and training for RMDT.

D. Provide build, test, and deliver one Navigation Patrol Database System (NPDS).

E. Provide on-site installation and training for two NPDS.

Field Engineering The Contractor shall:

A. Prepare SSI4 Fiber Optic Cables and Copper Build for UK Field Engineering Training Use.

B. Update the Implementation Manual for SSI Increment 4 UK unique information for the following:

a. Second Level shop,

b. Contingency Reserve (CR),

c. Strategic Weapons Support Building.

C. Each location above is required to be a separate appendix to the Implementation Manual (Ref L)

a. Conduct Test Proofing of UK NAV Ship to DRS SMP

b. Prepare for and attend SSI Increment 4, SSI Increment 8, and SSI Increment 13 Installation Planning Meetings

c. Provide on-site liaison at SSP.

d. Provide UK SSI Increment 4, SSI Increment 8, and SSI Increment 13 implementation planning support.

e. Develop a UK Implementation Manual CDRL A045.

D. Provide on-site support at HMNB CLYDE (Faslane) assisting UK during Installation and test for UK 2nd level shop (SWSB), to include post installation CAPE.

a. Provide on-site support at HMNB CLYDE (Faslane) assisting UK during their build of UK TTF fiber optic cables.

E. Update the Implementation Manual for SSI Increment 4, SSI Increment 8, and SSI Increment 13 UK unique information for UK SSBN.

F. Develop UK SSI 4 Shipyard Installation Test Procedures (SITP) CDRL XXXX.

Trainer Unique ESGN / EEC Modifications The Contractor shall:

A. Develop ESGN simulator kits for UK TTF Maintenance Lab.

B. Replace D5BF / SSI 4 Dual Modification Kits - (TTC) with ESGN simulator at UK TTF Maintenance Lab.

C. Update Trainer SPALT 14203 for UK.

Configuration Management The Contractor shall:

A. Support preparation and review of UK portions of SPALT proposals.

B. Ensure all documents supplied to the UK have been authenticated.

C. Review UK unique document changes.

D. Maintain UK configuration management database.

E. Vault/Archive UK Docware.

F. Provide UK SSI4 implementation planning support.

Quality Assurance The Contractor shall:

A. Support operations from a quality perspective to ensure compliance with T9001B as modified by their associated RAMs. Support process issues.

B. Support verification of operational documentation.

C. Support system and Docware disk checkout.

D. Resolve technical problems in getting new sources qualified as parts suppliers.

E. Provide source inspection and acceptance for hardware.

F. Provide UK SSI Increment 4, SSI Increment 8, and SSI Increment 13 implementation planning support.

CLIN 0003 - FY17 SSI INCREMENT 4 PROCUREMENT OF US ON-BOARD REPAIR PARTS, SPARES, TOOLS, EQUIPMENT & materials (FFP COMPLETION) In support of the required effort associated with the SSI Increment 4 program, the Contractor shall manufacture or procure, test and deliver required onboard repair parts, spares, tools, equipment, and materials. In accordance with T9001B, and as modified by the production column of Ref (G), the Contractors shall deliver hardware and CDRL documentation as specified in subparagraph below and Section F. In the event when a part number listed is superseded by another part number as a result of approved equipment SPALT or Engineering Change Request (ECR), the superseding part number shall be delivered in place of the superseded part number in accordance with the break-in instructions provided in the approved equipment SPALT or ECR.

1. Delivery of CDRLs The contractor shall deliver the following CDRLs in accordance with Section F:

A. Production and Procurement Report CDRL A004.

B. Repair Lay-in Range and Depth Report CDRL A005.

C. Residual Material and Test Station Readiness Report CDRL A006.

Delivery of OBRPs, Spares, Tools, Equipment, and Materials The contractor shall:

A. Procure or manufacture, test, inspect, accept and deliver OBRPs, spares and materials in accordance with Section F and Table A;

B. Procure or manufacture, test, inspect, accept and deliver installation tools and materials in accordance with Section F and Table B.

The contractor shall ship equipment and residual materials to SERF and NSWC Crane or as directed by SP24.

CLIN 0004 - FY17 SSI INCREMENT 4 PROCUREMENT OF UK ON-BOARD REPAIR PARTS, SPARES, TOOLS, EQUIPMENT, & materials (FFP COMPLETION) (UK) In support of the required effort associated with the SSI Increment 4 program, the Contractor shall manufacture or procure, test and deliver required onboard repair parts, spares, tools, equipment, and materials. In accordance with T9001B, and as modified by the production column of Ref (G), the Contractors shall deliver hardware and CDRL documentation as specified in subparagraph below and Section F. In the event when a part number listed is superseded by another part number as a result of approved equipment SPALT or Engineering Change Request (ECR), the superseding part number shall be delivered in place of the superseded part number in accordance with the break-in instructions provided in the approved equipment SPALT or ECR.

1. Delivery of CDRLs The contractor shall deliver the following CDRLs in accordance with Section F:

A. Production and Procurement Report CDRL A004.

B. Repair Lay-in Range and Depth Report CDRL A005.

C. Residual Material and Test Station Readiness Report CDRL A006.

Delivery of OBRPs, Spares, Tools, Equipment, and Materials The contractor shall:

A. Procure or manufacture, test, inspect, accept, and deliver OBRPs, spares and materials in accordance with Section F and Table C;

B. Procure or manufacture, test, inspect, accept, and deliver installation tools and materials in accordance with Section F and Table C.

C. Procure or manufacture, test, inspect, accept, and deliver SSI Increment 4 Trainer Hardware in accordance with Section F and Table C.

D. Procure or manufacture, test, inspect, accept, and deliver ESGN Simulator hardware for the VME Cabinet and GFE D5BF EEC Simulators and material to modify UK MLAB site wiring in accordance with Section F and Table C.

E. Procure or manufacture, test, inspect, accept, and deliver Contingency Reserve Hardware for Patch Panel and Cables in accordance with Section F and Table C.

F. Procure or manufacture, test, inspect, accept, and deliver Contingency Reserve Hardware for Patch Panel and Cables in accordance with Section F and Table C.

G. Procure or manufacture, test, inspect, accept, and deliver UK Installation hardware and consumables for UK Ready Service Kits in accordance with Section F and Table C.

H. Procure or manufacture, test, inspect, accept, and deliver hardware for a modified NPDS system incorporating Unified Analysis Framework (UAF) in accordance with Section F and Table C.

The contractor shall ship equipment and residual materials to SERF and NSWC Crane or as directed by SP24.

CLIN 0005 - FY17 TRANSDUCER US PRODUCTION (CPIF COMPLETION) (OPTION)

Item 0005 applies only if the Government exercises the option for Item 0005. In support of the US TRIDENT Program, the Contractor shall deliver a replacement to the TR-143 Transducer to address obsolescence and maintenance concerns while ensuring continued Navigation Subsystem performance within the existing performance envelope. T9001B Technical Program Management Requirements as modified by SD-13-17626 Rev F (“Development” and “Production” columns) shall apply.

The Contractor shall also deliver various technical reports, evaluations, documentation and components as identified in subparagraphs below:

A. Produce a lot of four (4) production transducers TR143-A in accordance with the TSSS Transducer Design Disclosure Package (DDP).

B. Ensure the transducer meets the performance requirements as outlined in the Hardware Requirements Specification (HRS) for the Next Generation Navigation Sonar (NSS) Transducer (SSP OD 66285 Rev -).

C. Deliver the lot of four (4) transducers in accordance with Section F.

D. Plan and monitor schedule progress, technical performance, contract status, financial status, performance. Provide TSSS Transducer Monthly Progress Report (CDRL A046) which includes cost and schedule status.

E. Marking of the TSSS Transducer shall be per the Identification Marking Specification, Trident Equipment (Document Number 53711-7134170). Unless otherwise specified, the latest revision of the document cited at the date of procurement shall apply.

CLIN 0006 - FY17 TRANSDUCER UK PRODUCTION (CPIF COMPLETION) (UK) (OPTION)

Item 0006 applies only if the Government exercises the option for Item 0006. In t support of the UK TRIDENT Program, the Contractor shall deliver a replacement to the TR-143 Transducer to address obsolescence and maintenance concerns while ensuring continued Navigation Subsystem performance within the existing performance envelope. T9001B Technical Program Management Requirements as modified by SD-13-17626 Rev F (“Development” and “Production” columns) shall apply.

The Contractor shall also deliver various technical reports, evaluations, documentation and components as identified in subparagraphs below:

A. Produce a lot of four (4) production transducers TR143-A in accordance with the TSSS Transducer Design Disclosure Package (DDP).

B. Ensure the transducer meets the performance requirements as outlined in the Hardware Requirements Specification (HRS) for the Next Generation Navigation Sonar (NSS) Transducer (SSP OD 66285 Rev -).

C. Deliver the lot of four (4) transducers in accordance with Section F.

D. Plan and monitor schedule progress, technical performance, contract status, financial status, performance. Provide TSSS Transducer Monthly Progress Report (CDRL A046) which includes cost and schedule status.

E. Marking of the TSSS Transducer shall be per the Identification Marking Specification, Trident Equipment (Document Number 53711-7134170). Unless otherwise specified, the latest revision of the document cited at the date of procurement shall apply.

CLIN 0007 – FY17 SSI INCREMENT 4 BOAT INSTALLATION 4 (CPIF COMPLETION)

The Contractor shall conduct and complete the SPALT 40374 Installation requirements with assistance of Navy personnel in accordance with Installation Working Group (IWG) schedule revision 2.1. The Contractor shall alter equipment as specified in SPALT 40374. The Contractor shall provide the SHIPALT rip out/installing activity Installation team. The Contractor shall complete NAV SPALT 40374 Navigation Subsystem equipment removal, packing and shipping, installation logistics, alterations at refit site in preparation for successful installation of SSI4 Navigation Subsystem components onboard SSBN.

The Contractor shall deliver an Installation/ Summary Report for SSBN Installation 4 including lessons learned to SP24 in accordance with CDRL A019.

CLIN 0008 – FY17 SSI INCREMENT 4 BOAT INSTALLATION 5 (CPIF COMPLETION)

The Contractor shall conduct and complete the SPALT 40374 Installation requirements with assistance of Navy personnel in accordance with Installation Working Group (IWG) schedule revision 2.1. The Contractor shall alter equipment as specified in SPALT 40374. The Contractor shall provide the SHIPALT rip out/installing activity Installation team. The Contractor shall complete NAV SPALT 40374 Navigation Subsystem equipment removal, packing and shipping, installation logistics, alterations at refit site in preparation for successful installation of SSI4 Navigation Subsystem components onboard SSBN.

The Contractor shall deliver an Installation/Completion Summary Report for SSBN Installation 5 including lessons learned to SP24 in accordance with CDRL A019.

CLIN 0009 – FY17 SSI INCREMENT 4 BOAT INSTALLATION 6 (CPIF COMPLETION)

The Contractor shall conduct and complete the SPALT 40374 Installation requirements with assistance of Navy personnel in accordance with Installation Working Group (IWG) schedule revision 2.1. The Contractor shall alter equipment as specified in SPALT 40374. The Contractor shall provide the SHIPALT rip out/installing activity Installation team. The Contractor shall complete NAV SPALT 40374 Navigation Subsystem equipment removal, packing and shipping, installation logistics, alterations at refit site in preparation for successful installation of SSI4 Navigation Subsystem components onboard SSBN.

The Contractor shall deliver an Installation/ Summary Report for SSBN Installation 6 including lessons learned to SP24 in accordance with CDRL A019.

CLIN 0010 – FY17 SSI INCREMENT 4 BOAT INSTALLATION 7 (CPIF COMPLETION)

The Contractor shall conduct and complete the SPALT 40374 Installation requirements with assistance of Navy personnel in accordance with Installation Working Group (IWG) schedule revision 2.1. The Contractor shall alter equipment as specified in SPALT 40374. The Contractor shall provide the SHIPALT rip out/installing activity Installation team. The Contractor shall complete NAV SPALT 40374 Navigation Subsystem equipment removal, packing and shipping, installation logistics, alterations at refit site in preparation for successful installation of SSI4 Navigation Subsystem components onboard SSBN.

The Contractor shall deliver an Installation/Summary Report for SSBN Installation 7 including lessons learned to SP24 in accordance with CDRL A019.

CLIN 0011 – FY17 SSI INCREMENT 4 BOAT INSTALLATION 8 (CPIF COMPLETION)

The Contractor shall conduct and complete the SPALT 40374 Installation requirements with assistance of Navy personnel in accordance with Installation Working Group (IWG) schedule revision 2.1. The Contractor shall alter equipment as specified in SPALT 40374. The Contractor shall provide the SHIPALT rip out/installing activity Installation team. The Contractor shall complete NAV SPALT 40374 Navigation Subsystem equipment removal, packing and shipping, installation logistics, alterations at refit site in preparation for successful installation of SSI4 Navigation Subsystem components onboard SSBN.

The Contractor shall deliver an Installation/Summary Report for SSBN Installation 8 including lessons learned to SP24 in accordance with CDRL A019.

CLIN 0012 – FY17 SSI INCREMENT 4 BOAT INSTALLATION 9 (CPIF COMPLETION)

The Contractor shall conduct and complete the SPALT 40374 Installation requirements with assistance of Navy personnel in accordance with Installation Working Group (IWG) schedule revision 2.1. The Contractor shall alter equipment as specified in SPALT 40374. The Contractor shall provide the SHIPALT rip out/installing activity Installation team. The Contractor shall complete NAV SPALT 40374 Navigation Subsystem equipment removal, packing and shipping, installation logistics, alterations at refit site in preparation for successful installation of SSI4 Navigation Subsystem components onboard SSBN.

The Contractor shall deliver an Installation/Summary Report for SSBN Installation 9 including lessons learned to SP24 in accordance with CDRL A019.

CLIN 0013 – FY17 SSI INCREMENT 4 SUPPORT FOR MODERNIZATION OF OHIO CLASS COMMAND AND CONTROL SYSTEM (CPIF COMPLETION) (OPTION) Item 0013 applies only if the Government exercises the option for Item 0013. The Contractor shall complete software development, NAV-Ship Interface Integration Testing, Software Acceptance Testing and applicable Cyber Security Updates to maintain Certification and Accreditation for system and auxiliary support system (NEIS) in support of SSI Increment 4 program.

1. Documentation Updates The Contractor shall update documentation required for the NAV system, driven by the SSBN modernization effort and deliver a Technical Data Report in accordance with CDRL A042.

Simulator Fabrication and Test The Contractor shall fabricate, test and deliver two (2) NEIS Simulators in accordance with Section F.

Design, Engineering, Fabrication, and Test Software The Contractor shall update the TR-D0 software to incorporate the ability to operate in accordance with Ref [E], regardless of platform SSBN modernization status and shall deliver an SSBN Modernization Software Summary Report in accordance with CDRL A041.

Test Plans A. NAV-Ship External Interface Integration Test: The Contractor shall develop and deliver a NAV-Ship External Interface Test Plan in accordance with CDRL A021 and NAV-Ship External Interface Test Procedure(s) in accordance with CDRL A022.

B. Ship Sensor Changes SSBN Test: The Contractor shall develop and deliver a Changes SSBN Test Executive Overview in accordance with CDRL A023 and Ship Sensor Changes SSBN Special Test Plan (STP) in accordance with CDRL A024.

Test Execution The Contractor shall conduct SWS NAV-Ship Interface Integration testing and deliver Test Reports as follows:

A. NAV-Ship Interface Integration Test: The Contractor shall conduct a Preliminary and Final Test to confirm NAV-Ship Interface changes as a result of the SSBN modernization effort and shall deliver a NAV-Ship Interface Integration Test Report in accordance with CDRL A025.

B. Ship Sensor Changes SSBN Test: The Contractor shall conduct the Special Test in accordance with the Special Test Plan (STP) to confirm that the ship sensor changes and the data latency changes do not adversely impact NAV system performance and shall deliver a Ship Sensor Changes SSBN Test Report in accordance with CDRL A026.

Trainer / USNS WATERS Updates The Contractor shall update Navigation equipment at the Kings Bay and Bangor Trainers and the USNS WATERS to account for impacts driven by the SSBN modernization changes. Trainer updates include, but are not limited to, tactical software updates and EM Log simulator changes. USNS WATERS updates include, but are not limited to, NEIS simulator.

Cyber Security (CS) / Information Assurance (IA) Workforce The Contractor shall provide the following personnel, described by IA workforce category, level, training and certification requirements, as follows (select the appropriate personnel group(s)):

A. IA Technical (IAT) environments B. Computer Network Defense Service Providers (CND-SPs) C. IA Systems Architects and Engineers (IASAEs) The Contractor shall ensure that personnel accessing information systems have the proper and current IA certification to perform IA functions in accordance with DoD 8570.01-M, Information Assurance Workforce (IAWF) Improvement Program. The Contractor shall meet the applicable IA certification requirements, including— (1) DoD-approved IAWF/CSWF certifications appropriate for each category and level as listed in the current version of DoD 8570.01-M; (2) Appropriate operating system (OS) certification or certificate of completion for IAT positions as required by DoD 8570.01-M; (3) Sustaining training for certification maintenance as required by the Certification Provider; and Continuing Learning (CL) requirements required by SECNAVINST 1543.2. The Contractor shall be responsible for yearly maintenance fees to maintain these certifications. This includes, but is not limited to 40 CL credits each year by 30 September.

The Contractor shall ensure that personnel assigned as CSWF within IA category and level shall hold and maintain the certification and certificates of completion and complete sustainment training, as per DoD 8770.01M.

The Contractor shall ensure all personnel assigned as CSWF have the appropriate security clearance and background investigation and meet U.S. citizenship requirements for their IA category and level and Information Technology (IT) position level in accordance with SECNAV M-5510.30.

The Contractor shall ensure all personnel assigned as an Information System Security Officer (ISSO) at the IAM Level I or IAM Level II hold a U.S. Government Secret security clearance and have a successfully adjudicated Single Scope Background Investigation (SSBI). In this capacity, they shall perform a critical-sensitive function and will be assigned an Information Technology (IT) Position Level IT-I.

The Contractor shall ensure all personnel assigned as Privileged User at the IAT Level III hold a U.S. Government Top Secret security clearance and have a successfully adjudicated Single Scope Background Investigation (SSBI). In this capacity, they shall perform a critical-sensitive function and will be assigned an Information Technology (IT) Position Level IT-I.

The Contractor shall ensure all personnel assigned as Privileged User at the IAT Level II hold a U.S. Government Secret security clearance and have a successfully adjudicated Single Scope Background Investigation (SSBI). In this capacity, they shall perform a critical-sensitive function and are assigned an Information Technology (IT) Position Level IT-I.

The Contractor shall ensure all personnel assigned as Limited Privileged User at the IAT Level I hold a U.S. Government Secret security clearance and a NACI. In this capacity, they shall perform a noncritical-sensitive function and are assigned an Information Technology (IT) Position Level IT-II.

The Contractor shall provide a list of personnel in IA/CS positions to SSP for appointment in writing by the SSP Command Information Officer (SPCIO). The list should contain the person’s name, IA category and level, and IT position level.

The Contractor must provide IA certifications for all IAWF; OS certifications and/or certificates of completion for IAT workforce applicable to their operating environments or security tools; and hours completed for sustaining training for certification maintenance and CL upon request.

The Contractor must report IA certification status and compliance to the COR and/or designee during the Program Management Review (PMR).

CLIN 0014 – FY17 SSI INCREMENT 8/13 DEVELOPMENT (CPIF COMPLETION)

1. General Requirements The Contractor shall:

A. Deliver a Navigation Subsystem CDR Entrance Criteria Report (CDRL A031). This report shall provide an assessment against all NAV CDR entrance criteria.

B. Deliver an NAV CDR Summary Report which includes all documentation submitted for entrance into NAV CDR, all NAV CDR presentation material, and all documentation documenting the results of the NAV CDR event (CDRL A047).

C. Update and deliver the Master Test and Evaluation Plan (CDRL XXXX).

D. Deliver CSS performance test reports (CDRL XXXX).

E. Develop and deliver SAT procedure and test reports (CDRL XXXX).

F. Conduct an Increment 13 System CDR in accordance with OD 65406 and deliver an Increment 13 CDR Summary Report in accordance with CDRL A007.

Preamplifier/Control Console DDP The Contractor shall develop and deliver an update to the P/CC DDP in accordance with CDRL A008.

Hardware The Contractor shall:

A. Mature the hardware design and conduct a Hardware Critical Design Review. The Contractor shall develop and deliver an Increment 13 Hardware Design Document in accordance with CDRL A009 based on the Increment 13 Hardware Requirements Specification.

B. Deliver an Increment 13 Hardware CDR Plan in accordance with CDRL A010, Hardware CDR Entry Criteria Report in accordance with CDRL A011 and Hardware CDR Summary Report in accordance with CDRL A012.

Software The Contractor shall:

A. Code, test, and deliver software Build 1B to support STP/TEMPALT testing on board SSBN.

B. Code, test and deliver software Build 2 to support dual INS subsystem configuration.

C. Develop and deliver an Increment 13 Critical Software Design Document CDRL A013 based on the Increment 13 Software Requirements Specification. The Contractor shall mature the software design and conduct an Increment 13 Software Critical Design Review (SW CDR). The Contractor shall deliver an Increment 13 Software CDR Plan in accordance with CDRL A014, and an Increment 13 SW CDR Entry Criteria Report CDRL A015. This report shall provide an assessment against all SW CDR entrance criteria.

D. Deliver an Increment 13 SW CDR Summary Report which includes all documentation submitted for entrance into SW CDR, all SW CDR presentation material, and all documentation documenting the results of the Increment 13 SW CDR event (CDRL A016).

E. Develop and deliver Software Qualification Procedures (CDRL A018).

F. Provide a software metrics report in accordance with CDRL A040.

EDM Testing The Contractor shall deliver an EDM Test Report in accordance with CDRL A017.

INS

The Contractor shall:

A. Deliver an INS CDR Entry Criteria Report (CDRL A032). This report shall provide an assessment against all INS CDR entrance criteria.

B. Deliver an INS CDR Summary Report which includes all documentation submitted for entrance into INS CDR, all INS CDR presentation material, and all documentation documenting the results of the INS CDR event (CDRL A027).

C. Deliver an INS PRR Summary Report which includes all documentation submitted for entrance into INS PRR, all INS PRR presentation material, and all documentation documenting the results of the INS PRR event (CDRL A028).

D. Update and deliver the INS DDP (CDRL A036).

E. Deliver an INS Model Based System Development Report (CDRL XXXX).

F. Conduct INS qualification testing and deliver an INS Qualification Test Report (CDRL A048).

Gyroscope The Contractor shall:

A. Deliver a Gyro TRR Entry Criteria Report (CDRL A033). This report shall provide an assessment against all Gyro TRR entrance criteria.

B. Deliver a Gyro TRR Summary Report which includes all documentation submitted for entrance into Gyro TRR, all Gyro TRR presentation material, and all documentation documenting the results of the Gyro TRR event (CDRL A029).

C. Conduct Functional and Environmental Qualification testing and deliver a Gyro Functional and Environmental Qualification Report (CDRL XXXX).

D. Deliver a Gyro Model Based System Development Report (CDRL XXXX) which covers build code test of the gyro model.

Trainers The Contractor shall:

A. Update and deliver the Training Implementation Plan (CDRL XXXX).

B. Design and deliver the Trainer Unique Hardware DDP (CDRL A037).

C. Deliver the Trainer Unique Logistics Data (CDRL XXXX).

D. Deliver a Trainer CDR Entry Criteria Report (CDRL A034). This report shall provide an assessment against all Trainer CDR entrance criteria.

Logistics The contractor shall deliver the Integrated Logistics Support Plan (CDRL A035), Maintenance Plan (CDRL A049) and Product Support Plan (CDRL XXXX).

Fleet Documentation The contractor shall update and deliver Operational Documentation and IETMs in support of ANC and SNC Validation testing (CDRL XXXX).

Information Assurance/Cyber Security – Increment 13 The Contractor shall develop and deliver an Information Assurance/Cyber Security Phase 2 Package in order to obtain Certification in accordance with CDRL A043.

Delivery of End Items – Increment 13 The Contractor shall build and deliver EDM Increment 13 kit in accordance with Section F.

CLIN 0015 - FY17 SSI INCREMENT 8/13 PROGRAM SUPPORT (CPIF LOE)

From the effective date of contract award through twelve (12) months thereafter, the Contractor shall make available and employ its facilities, personnel at the level of effort set forth in Section F, services of others, and shall use its best efforts to provide technical and management support services for SSI Increment 8 and SSI Increment 13 program as defined herein.

1. Integrated Baseline Reviews The Contractor shall conduct Integrated Baseline Reviews (IBR) with SP24 to evaluate risks inherent in the Contractor’s planned performance measurement baselines that are in effect during the execution of the contract. The Contractor shall deliver a monthly Integrated Program Management Report (IMPR) in accordance with CDRL A003, a Contract Work Breakdown Structure (CWBS) in accordance with CDRL A002 and a monthly Contract Financial Management Report (CFMR) in accordance with CDRL A001.

Technical Program Management The Contractor shall implement and execute a technical management program in accordance with T9001B Change 2, as modified by Requirements Applicability Matrix SD-13-17626 (NP) Rev F, Technical Program Management Requirements for Strategic Systems Programs Acquisitions. The Contractor shall update and deliver a detailed Integrated Master Plan in accordance with CDRL A038 and Full Program Integrated Master Schedule in accordance with CDRL A020 for all active SSI Increment Programs from contract award through final delivery, installation, and check-out of systems on-board the SSBNs.

The Contractor shall also interface and coordinate activities across all Strategic Weapon System (SWS) programs to ensure schedule coordination, synchronization, and commonality across all SSP development programs.

Shipboard Integration Program Support The Contractor shall support SSP and SP24 designated meetings and coordinate with other SSP Branches to assist in system development, identify and address issues, and to ensure coordination with SP24 Navigation Subsystem Development efforts.

In support of SSP and SP24 Shipboard Integration effort, the contractor shall manage and update the Increment 8 GFE/GFI list. The contractor shall request GFE/GFI to support the Increment 8 program through SSBN Installation.

SSI Documentation The Contractor shall review changes and recommend updates to SSP and SSI ODs and documentation to reflect changes to methodologies, selection, test and development of common hardware and software elements; and review changes and recommend updates to reflect changes to standards, methodologies, test and development of graphically oriented application software.

Requirement Tracking and Design Disclosure Package Management The Contractor shall utilize DOORS (excluding Trainer’s effort) as a requirements management tool for all software and hardware items in accordance with Navigation System: Implementation and User’s Guide, OD 66139. DOORS Database with CM control of all requirements and design shall be updated, maintained.

The Contractor shall manage the overall Design Disclosure Package for Increment 8. The Contractor shall maintain the DDP for SSP in a database. The Contractor shall provide electronic access to the documentation.

SSI and Emerging Fleet Problem Tracking The Contractor shall maintain a corrective action system in accordance with T9001B Change 2, as modified by Requirements Applicability Matrix SD-13-17626 (NP) Rev F section 3.1.10 Corrective Action System. The Contractor shall evaluate and assess the impact of any Program Problem Report (PPR) on SSI requirements, design, training, and data logging/encryption. The Contractor shall deliver a Problem and Trouble Impact Report which defines problems, identifies the impact, and provides recommended corrective solutions in accordance with CDRL A039.

SSI Increment 8 SPALT/PNOC/SHIPALT Support The Contractor shall provide inputs related to the SSI 8 Navigation Subsystem Coordination Drawing, and SHIPALT process. The Contractor shall develop cabling diagrams, electrical interfaces, run sheets, and mechanical foundations which are necessary to install the SSI 8 Navigation Subsystem on the SSBN. The Contractor shall develop and provide Contractor furnished information to support the development of SPALT documentation, Coordination Drawing Updates, issuance of PNOCs, SHIPALT documentation, and Data Function Dictionaries. The Contractor shall document and deliver the above information in an SSI 8 Contractor Furnished Information Data Package in accordance with CDRL A050.

SSI Increment 8 Rework of Prototype INS, PDM INS, and EDM Gyroscopes The Contractor shall rework the prototype INS, PDM INS, and EDM gyroscopes that have failed or degraded to out of performance specification. The Contractor shall rework the hardware items to full operating and performance condition for use in supporting the SSI Increment 8 program. The contractor shall update associated design documentation.

Information Assurance (IA) / Cyber Security (CS) The Contractor shall provide the following personnel, described by IA workforce category, level, training and certification requirements, as follows (select the appropriate personnel group(s)):

A. IA Technical (IAT) environments B. Computer Network Defense Service Providers (CND-SPs) C. IA Systems Architects and Engineers (IASAEs) The Contractor shall ensure that personnel accessing information systems have the proper and current IA certification to perform IA functions in accordance with DoD 8570.01-M, Information Assurance Workforce (IAWF) Improvement Program. The Contractor shall meet the applicable IA certification requirements, including— (1) DoD-approved IAWF/CSWF certifications appropriate for each category and level as listed in the current version of DoD 8570.01-M; (2) Appropriate operating system (OS) certification or certificate of completion for IAT positions as required by DoD 8570.01-M; (3) Sustaining training for certification maintenance as required by the Certification Provider; and Continuing Learning (CL) requirements required by SECNAVINST 1543.2. The Contractor shall be responsible for yearly maintenance fees to maintain these certifications. This includes, but is not limited to 40 CL credits each year by 30 September.

The Contractor shall ensure that personnel assigned as CSWF within IA category and level shall hold and maintain the certification and certificates of completion and complete sustainment training, as per DoD 8770.01M.

The Contractor shall ensure all personnel assigned as CSWF have the appropriate security clearance and background investigation and meet U.S. citizenship requirements for their IA category and level and Information Technology (IT) position level in accordance with SECNAV M-5510.30.

The Contractor shall ensure all personnel assigned as an Information System Security Officer (ISSO) at the IAM Level I or IAM Level II hold a U.S. Government Secret security clearance and have a successfully adjudicated Single Scope Background Investigation (SSBI). In this capacity, they shall perform a critical-sensitive function and will be assigned an Information Technology (IT) Position Level IT-I.

The Contractor shall ensure all personnel assigned as Privileged User at the IAT Level III hold a U.S. Government Top Secret security clearance and have a successfully adjudicated Single Scope Background Investigation (SSBI). In this capacity, they shall perform a critical-sensitive function and will be assigned an Information Technology (IT) Position Level IT-I.

The Contractor shall ensure all personnel assigned as Privileged User at the IAT Level II hold a U.S. Government Secret security clearance and have a successfully adjudicated Single Scope Background Investigation (SSBI). In this capacity, they shall perform a critical-sensitive function and are assigned an Information Technology (IT) Position Level IT-I.

The Contractor shall ensure all personnel assigned as Limited Privileged User at the IAT Level I hold a U.S. Government Secret security clearance and a NACI. In this capacity, they shall perform a noncritical-sensitive function and are assigned an Information Technology (IT) Position Level IT-II.

The Contractor shall provide a list of personnel in IA/CS positions to SSP for appointment in writing by the SSP Command Information Officer (SPCIO). The list should contain the person’s name, IA category and level, and IT position level.

The Contractor must provide IA certifications for all IAWF; OS certifications and/or certificates of completion for IAT workforce applicable to their operating environments or security tools; and hours completed for sustaining training for certification maintenance and CL upon request.

The Contractor must report IA certification status and compliance to the COR and/or designee during the Program Management Review (PMR).

Special Test Plan with Associated TEMPALT The Contractor shall:

A. Coordinate and support Special Test Plan and TEMPALT installation activities.

B. Deliver a TEMPALT TRR Summary Report which includes all documentation submitted for entrance into TEMPALT TRR, all TEMPALT TRR presentation material, and all documentation documenting the results of the TEMPALT TRR event (CDRL A030).

C. Support two SSBN installations and deliver summary report of each event (CDRL XXXX).

CLIN 0016 – RESERVED

CLIN 0017 - FY17 SSI INCREMENT 8/13 US PRODUCTION (CPIF COMPLETION)

The Contractor shall deliver SSI Increment 8 Inertial Navigation Subsystem (INS) Long Lead material in accordance with Section F in support of SSI Increment 8 and SSI Increment 13 program.

CLIN 0018 - FY17 SSI INCREMENT 8/13 UK PRODUCTION (CPIF COMPLETION) (UK)

The Contractor shall deliver SSI Increment 8 INS Long Lead material in accordance with Section F in support of SSI Increment 8 and SSI Increment 13 program.

CLIN 0019 – FY17 SSI INCREMENT 8/13 US GYRO PRODUCTION (CPIF COMPLETION)

The Contractor shall deliver gyroscope production material in accordance with Section F in support of SSI Increment 8 and SSI Increment 13 program.

CLIN 0020 – FY17 SSI INCREMENT 8/13 UK GYRO PRODUCTION (CPIF COMPLETION) (UK)

The Contractor shall deliver gyroscope production material in accordance with Section F in support of SSI Increment 8 and SSI Increment 13 program.

CLIN 0021 – FY17 MULTI-STAR ENHANCED PRELAUNCH TASKS (CPFF LOE) (RDT&E) (OPTION)

Item 0021 applies only if the Government exercises the option for Item 0021. From the effective date of Option Item 0021 through twelve (12) months thereafter, the Contractor shall make available and employ its facilities, personnel at the level of effort set forth in Section F, services of others, and shall use its best efforts to provide technical and program management support services in support of MULTI-STAR ENHANCED PRELAUNCH as defined below.

The Contractor shall support the Multi-Star Enhanced Prelaunch (MEP) Working Group (WG). Support for the MEPWG will include, but not limited to:

A. Attending meetings;

B. Perform data analysis;

C. Perform software modifications in support of testing;

D. Support testing on the USNS WATERS;

The Contractor shall perform the following navigation subsystem development tasks in support of the development and demonstration of MEP via the planned end-to-end system test to occur onboard DASO 30:

A. NSS error model for SWS Missile and Guidance Hardware In The Loop (HWIL) simulation and validation activity.

B. Updated filter architecture to support utilization of NSS data as part of Enhanced Prelaunch functionality. This should be aligned to TR-D2 software or the latest navigation system software available.

C. Navigation Error Matrix necessary to support end-to-end test onboard DASO 30.

D. Testable method of inducing position errors to support DASO-30.

CLIN 0022 - FY17 SSI INCREMENT 15 DEVELOPMENT (CPIF LOE)

From the effective date of contract award through twelve (12) months thereafter, the Contractor shall make available and employ its facilities, personnel at the level of effort set forth in Section F, services of others, and shall use its best efforts to provide the following services in support of the SSI Increment 15 program as defined below.

1. Engineering & Program Management Support The Contractor shall provide engineering and program management support to the SSI Increment 15 program with early evaluation of SSI Increment 15 scope (tactical, trainer, and auxiliary systems) applicable to OHIO/VANGUARD and shall include the following:

A. Obsolescence;

B. Information assurance re-certification;

C. Requirement / initiatives definition;

D. Generate planning and presentation documents;

E. Examine critical…