STATEMENT OF WORK
ITEM 0001- OHIO-CLASS Weapons and Weapons Support Systems Support – Cost-Plus-Fixed-Fee (CPFF) LOE (FY24 – O&M,N)
1. From May 1, 2024 through April 30, 2025, the Contractor shall make available and employ its facilities, personnel at the level of effort, services of others and materials and shall use its best efforts to provide technical services for the support of the OHIO-Class Strategic Weapon System (SWS)/Attack Weapon System (AWS) and Strategic Weapon Support System (SWSS)/Attack Weapon Support System (AWSS). The contractor shall establish, manage, and report on schedules, costs and events below.
OHIO Class Site Support and Technical Support Services & Strategic Weapon Support Systems (SWSS) and Selected Ship Systems (SSS) Technical Training
1. Provide technical services in support of Planning, Engineering, Design, Test and Program Management of the SWS/AWS and SWSS/AWSS associated with Fleet Support Sites including Extended Refit Periods (ERP). The contractor shall perform the following support services:
1.1. Deliver Monthly Status Report. (CDRL A001 Ship Cost Summary Report)
1.2. In support of the Fleet:
a. Perform investigations and resolution of problems associated with SWSS/AWSS and select ship services that affect the operation, performance, or reliability of the overall Strategic Weapon System.
b. Investigate and respond to SWS/AWS issues identified by the following: SWS/AWS portions of Work Plans (WPs), SWS/AWS Trouble Failure Reports, TCRs, test conduct deficiencies, Ship Maintenance Plans (SMP) and Preventative Maintenance Management Plan (PMMP) feedback reports, and patrol reports.
c. Provide test engineering services at Fleet Support Sites in support of the Extended Refit Periods (ERP) as defined in Submarine Maintenance Engineering, Planning and Procurement (SUBMEPP) ERP Work Package. These support services include staffing and managing the test administrative functions, test program planning, test documentation review comment and update, on-site meeting support, SWSPO and subsystem contractor interface, technical test conduct support, deficiencies repair and test problem resolution.
d. Support Modernization efforts and test problem resolution.
e. Conduct evaluations of planned Strategic Systems Programs Alteration (SPALT)s and ship alterations to assess impacts to the SWSS.
1.3. In support of the Ballast Program:
a. Support and perform all efforts associated with schedules, audits, inspections, handling, shipping and maintenance for the SWS Ballast Program.
b. Serve as the Government Agent for the management of the Ballast Assembly (BA) and Missile Tube Interface Equipment.
1.4. In support of Technical Training:
| a. | Support and maintain the curriculum for the Submarine Familiarization Course. |
| b. | Conduct on-site TRIDENT II D5 SWSS/SSS Overview training for SSP and Naval Sea Systems Command (NAVSEA) personnel. |
| c. | Deliver attendee training guides and/or CD-ROMs (CDRL A002 Navy Training Systems Plan). |
| d. | Support survey feedback for continuous improvement of course contents. |
ITEM 0002- OHIO Class Trainer Sustaining Support Services – CPFF LOE (FY24 – O&M,N)
1. From May 1, 2024 through April 30, 2025, the Contractor shall make available and employ its facilities, personnel at the level of effort, services of others, materials, and shall use its best efforts to perform the following technical support services:
a. Provide SWSS engineering services for the planning, design, manufacture, Integrated Logistic Support (ILS), installation and test of Strategic Systems Program (SSP) approved SPALTs and Conjunctive SWSS Alterations at the TRIDENT Training Facilities. Review and maintain SWS training hardware/software/material (EB Cognizant and Systems as directed by SP205) configuration to ensure system supportability.
b. Deliver Financial Status Report (CDRL A001 Ship Cost Summary Report).
c. Provide technical support for hardware, training materials and technical documentation for the upgrade of Trident Training Facilities.
d. Provide special study analysis for programmatic issues related to advanced training and trainer planning, including manning requirements, engineering rough order of magnitude, military ratings and rates.
e. Provide operational, maintenance, modernization and WISC planning support for SWS Training Facilities (i.e. facility services, security systems, structural, etc.). This effort will support continuing operations as well as maintenance activities for existing facilities, activities associated with SPALT installations, and activities associated with the new SWS Training Facilities.
f. Investigate and respond to SWS issues identified by the following: SWSS portions of WPs, SWS Trouble Failure Reports, Trouble Casualty Reports, test conduct deficiencies, SMP/PMMP feedback reports, fleet requested issues, or as directed by SP205.
g. Provide overall technical and administrative management support.
h. Conduct Trainer Tube Overhaul, consisting of removal/installation of hydraulic and pneumatic valves/components and conduct annual inspection/refurbishment of Air & Hydraulic Control Panel (AHCP)s, hydraulic power unit (HPU)s and Pneumatic PPUs and associated systems at TTF Bangor and TTF Kings Bay. Replenish repair materials in inventories.
i. Provide corrective maintenance support for Hydraulic Missile (HML) and Missile Gas (MG) systems at TTF Bangor and TTF Kings Bay in coordination with appropriate Training Hardware Contractor (THC)s.
j. Refurbish valves and equipment from TTF Bangor and TTF Kings Bay.
k. Replenish repair materials in inventories.
l. Provide operational, maintenance, and modernization support for SWS Valve Maintenance Facility Test Stands and associated infrastructures.
m. Conduct Equipment Condition Verification Inspections per OD 55218 Trainer Equipment Condition Verification Plan.
n. Support and attend meetings and conferences, as required by SP205. Complete and/or respond to action items provided by SP205.
ITEM 0003- OHIO Class Training Support Services – CPFF LOE (FY24 – O&M,N)
1. From May 1, 2024 through April 30, 2025, the Contractor shall make available and employ its facilities, personnel at the level of effort, services of others, materials, and shall use its best efforts to perform the technical services and provide Program Management support for the maintenance and review of Instructor Led Training and Interactive Multi-media Instruction (ILT and IMI) for the SWSS Trainer /Training Systems. The contractor shall perform the following support services:
a. Support and participate in SP205 Strategic Weapons Support Systems (SWSS) storyboard and content reviews.
b. Maintain and support training graphics, reusable content and technical data for content.
c. Deliver Monthly Status Report (CDRL A001 Ship Cost Summary Report).
d. Review and maintain curriculum in accordance with OD45240 and OD60803.
e. Provide special study analysis for programmatic issues related to advanced training and trainer planning, including manning requirements, military ratings and rates.
f. Support and attend SP205 meetings and conferences.
g. Complete and/or respond to action items provided by SP205.
h. Provide Training Effectiveness Systems (TES) support in accordance with SSPINST 1500.6.
i. Review and update cognizant published TRIDENT Information Bulletin (TIB) articles and lecture guides.
ITEM 0004- SSP Waterfront Support Facilities – CPFF LOE (FY24 – O&M,N)
1. From May 1, 2024 through April 30, 2025, the Contractor shall make available and employ its facilities, personnel at the level of effort, services of others, materials, and shall use its best efforts to perform the technical services and provide Program Management support for the operation, maintenance, repair and procurement efforts for SSP Waterfront Support Facilities located at Kings Bay Naval Submarine Base , Bangor Naval Submarine Base, Puget Sound Naval Shipyard (PSNS) and the SWS Ashore Facility located at Cape Canaveral. The contractor shall perform the following support services:
a. Deliver Finical Status Report (CDRL A001 Ship Cost Summary Report).
b. Establish, manage, and report on schedules, costs and events.
c. Provide operation, maintenance, cleaning, repair and refurbishment services in accordance with Barge Operation/Maintenance Manual associated with Barge YNFB39 at PSNS:
1.c.1. Heating /Ventilation System 1.c.2. Air Conditioning System 1.c.3. Sanitary System 1.c.4. Water System 1.c.5. Electrical System 1.c.6. Refrigeration Equipment
d. Provide maintenance, cleaning and repair services for the SSP Waterfront Operations Facilities located at Kings Bay Naval Submarine Base (Building 5193) and at Bangor Naval Submarine Base (Buildings T059A and T059B) and the SWS Ashore Facility located at Cape Canaveral.
e. Provide support services to enable monitoring weather and news alerts at the fleet support site.
ITEM 0005- SSGN AWSS Training Equipment and Curricula Support Services - CPFF LOE (FY24 – O&M,N)
1. From May 1, 2024 through April 30, 2025, the Contractor shall make available and employ its facilities, personnel at the level of effort, services of others, materials, and shall use its best efforts to perform the technical services and provide Program Management support for Attack Weapon Support Systems (AWSS) Trainer/Training Support Services. The contractor shall perform the following support services:
a. Provide special study analysis of programmatic issues related to advanced training and trainer planning, including manning requirements, military ratings and rates.
b. Provide operational, maintenance and modernization support for AWS Training Facilities infrastructure.
c. Support and participate in SP205 content reviews.
d. Maintain training graphics, reusable content and technical data for content.
e. Deliver Monthly Status Report (CDRL A001 Ship Cost Summary Report).
f. Perform overall technical and administrative management support of the Training System Program.
g. Provide monthly reviews of curriculum to identify needed improvements and updates and inform SP205 of such reviews and information.
h. Support SP205 curricula training material’s technical changes.
i. Review tactical system design changes and documentation for training impacts and report to SP205.
j. Support special study analysis for programmatic issues related to advanced training and trainer planning, including manning requirements, military ratings and rates.
k. Support and attend SP205 meetings and conferences.
l. Complete and/or respond to Trainer/Training action items provided by SP205.
m. Provide Training Effectiveness Systems (TES) support in accordance with SSPINST 1500.6.
n. Review and update cognizant published TRIDENT Information Bulletin (TIB) articles and lecture guides.
ITEM 0006- SWS Ashore (SWSA) Operations and Maintenance Support – CPFF LOE (FY24 – O&M,N)
1. From May 1, 2024 through April 30, 2025, the Contractor shall make available and employ its facilities, personnel at the level of effort, services of others, and materials, and shall use its best efforts to provide project management, ship design, and installation support activities for the Strategic Weapon System (SWS) Ashore facility located at Launch Complex 25 at Cape Canaveral Space Force Station (CCSFS). The contractor shall:
a. Provide operations, maintenance, and planning yard support for TB#1, HM&E, and facility equipment at SWS Ashore.
b. Provide term software licenses for the applicable commercial CAD software for SP2012 to support Change Request(s), and / or Engineering Change Request(s).
c. Provide SWS Ashore Facility onsite supervisory and safety services and test director services.
d. Scope installation and production efforts and provide POAM (Plan of Action and Milestones), Rough Order of Magnitude(s) and schedule(s) for such efforts. Develop detailed plan(s) that are shared with SWS Ashore Program Manager and other site contractors. Develop work package(s) for installing mechanical and electrical/signal equipment.
e. Coordinate with SP2012 to maintain SWS Ashore drawings, operational, maintenance procedures, cybersecurity documentation, and training for EB provided systems.
f. Perform trade studies and Analysis of Alternatives (AoA) for SWS Ashore test bay optimizations for current and future programs.
g. Provide ad hoc A&E services for TB#1, ship, and facility modifications as requested by SP2012.
h. The Contractor shall provide Quality Control Evidence of installation completion in accordance with SWSAP 4730.2 Construction Outfitting Closeout Procedures.
i. Installation support, including resolving Deficiency Report(s), Change Request(s), and / or Engineering Change Request(s) assigned to GDEB. All work shall be performed in accordance with all MOAs between DIRSSP and PEO SUBS Installation and production activities include:
| 1.i.1. | Providing and installing spare cards, electrical system components, pumps, valves and other SWSS equipment specified via the change request process to correct SWS Ashore deficiencies during testing and lifecycle operations. |
| 1.i.1. | Provide and install empty tube Teflon Thermal Pads as necessary based on empty tube preventative maintenance results |
| 1.i.1. | Provide technical support for the TB#2 Ship’s Power system, interior communications system, and systems under SSP’s cognizance based on the MOAs. |
| 1.i.1. | Provide corrective maintenance support for HML, MHC, MDD, MG, ICS, HCI, corrosion control, and Power system. |
| j. | Deliver Monthly Status Reports. (CRDL A001 Ship Cost Summary Report) |
ITEM 0007- SSI Program Support – CPFF Completion (FY24 – OP,N)
1. The Contractor shall provide SSP Shipboard Integration (SSI) technical support, including the evaluation of concepts and preliminary designs, review of Proposed Notification of Change, and evaluation of development schedules, and deliver the Contract Summary Report. The Contractor’s development and delivery of the Contract Summary Report shall include the following necessary engineering, technical, and program support:
a. Deliver Monthly Status Reports (CDRL A001 Ship Cost Summary Report)
b. Provide engineering and program support for SSI program development efforts for SSP through participation in development and installation planning discussions. This support includes:
| 1.b.1 | Evaluation of concept and preliminary design information related to each SSI increment to identify potential US and UK ship impacts. |
| 1.b.2 | Development and delivery of completion report identifying ship design impacts for conjunctive US and UK ShipAlts, as requested to support each SSI increment. (CDRL A003 Contract Summary Report) |
| 1.b.3 | Support for the coordination drawing process for review of Proposed Notifications of Change as required to support development of all SSI increments in the absence of Ship Alteration conceptual design development. |
| 1.b.4 | Provide evaluation of development and installation schedules related to the SSI program to ensure efficient integration of SSI SPALT and conjunctive ShipAlt schedules for US and UK ships. |
| 1.b.5 | Support system level safety and risk management efforts related to development of SSI increment development |
| 1.b.6 | Support installation working group efforts in support of SSI increments. |
ITEM 0008- TRID 0586 SHIPALT Installation for SSP Shipboard Integration, Increment 11 Launcher Initiation System – CPFF Completion (FY24 – OP,N)
1. The contractor shall plan, install, and test ship alteration (SHIPALT) TRID 0586 for SSP Shipboard Integration (SSI) Increment 11. The contractor shall provide installation and test services for Ship Alteration (SHIPALT) TRID 0586 for SSP Shipboard Integration (SSI) Increment 11, LIS and deliver corresponding reports (CDRL A004 Installation Test Reports) after completion of the installation. The contractor shall provide the following:
a. TRID 0586 SHIPALT on-site installation planning, installation execution and test services for one (1) SHIPALT installations.
b. Support and participate in Program Reviews, Installation Readiness Reviews (IRR), Production and Installation Reviews, Technical Exchanges and Coordination and Status Meetings.
c. Deliver Monthly Status Report. (CDRL A001 Ship Cost Summary Report)
ITEM 0009- TRID 0597 SHIPALT US Installation – CPFF Completion (FY24 – OP,N)
1. The contractor shall Plan, Install, and Test Ship Alteration (SHIPALT) TRID 0597. The Contractor shall establish, manage, and report on schedules, costs and events. In support of the delivery of Ship Alteration (SHIPALT) TRID 0597, the Contractor shall:
a. Prepare boat for completion of TRID 0597 SHIPALT installation. Complete five (5) SHIPALT installations in accordance with TRID 0597. Provide TRID 0597 SHIPALT on-site installation planning, material kit installation and test. Support and deliver SHIPALT completion reports to SSP. (CDRL A005 Installation Test Reports)
b. Support and participate in Program Reviews, Installation Readiness Reviews (IRR), Design Reviews, Production and Installation Reviews, Technical Exchanges and Coordination and Status Meetings.
ITEM 0010- UK Trainer Support Services – CPFF LOE (FY24 – UK) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to provide project management, installation support, and testing support activities for the UK DREADNOUGHT Trident Training Facility- Future (TTF(F)). In support of these efforts, the Contractor shall:
| a. | Deliver Monthly Status Report. (CDRL A001 Ship Cost Summary Report) |
| b. | Provide Subject Matter Expert (SME) engineering assessments and testing support for UK TTF(F) |
| c. | Provide technical support of SWSS hardware and documentation validation for UK TTF(F). |
| d. | Provide replacement/repair parts, spares, and consumables as required to support the installation and testing period in support of Initial Ready-For-Training (RFT) for UK TTF(F). |
| e. | Support, attend and participate in Program Reviews, Technical Reviews, Technical Exchanges, and Coordination and Status Meetings as required. |
ITEM 0012- Columbia Curricula Development– CPFF LOE (FY24 – SCN)
1. From May 1, 2024 through April 30, 2025, the Contractor shall make available and employ its facilities, personnel at the level of effort, services of others, and materials, and shall use its best efforts to make available and employ its facilities and personnel to provide services that include:
a. Deliver Monthly Status Report. (CDRL A001 Ship Cost Summary Report)
b. Support the development of schedules and milestones.
c. Provide inputs/updates to support the Job Duty Task Analysis.
d. Monitor and assess Tactical development efforts for impacts to Training.
e. Developing SWSS COLUMBIA formal training materials in support of Instructor Led Training (ILT), Interactive Multimedia Instruction (IMI) and PC Simulations.
f. Providing inputs/updates to SWSS COLUMBIA formal training materials in support of Instructor Led Training (ILT), Interactive Multimedia Instruction (IMI) and PC Simulations.
g. Support Curricula Development Team meetings and focus teams by:
| 1.g.1. | Providing inputs/updates to the Training Project Plan. |
| 1.g.2. | Providing inputs/updates to the Course Training Task List. |
| 1.g.3. | Providing inputs/updates to the Course Outline of Instruction. |
| 1.g.4. | Providing inputs/updates to the Training Course Control Document. |
ITEM 0013- UKALT 2281 SHIPALT Installation for UK SSP Shipboard Integration, Increment 11 Launcher Initiation System – CPFF LOE (FY25 - UK)
1. From May 1, 2024 through April 30, 2025, the Contractor shall Plan, Install, Test and provide Program Management support associated with Ship Alteration (SHIPALT) UKALT 2281 for SSP Shipboard Integration (SSI) Increment 11 Launcher Initiation System. . The Contractor shall establish, manage, and report on schedules, costs and events. The contractor shall perform the following:
a. Deliver Monthly Status Report. (CDRL A001 Ship Cost Summary Report)
b. Support UKALT 2281 SHIPALT on-site installation planning and technical support for one (1) SHIPALT installation.
c. Support, attend and participate in Program Reviews, Installation Readiness Reviews (IRR), Production and Installation Reviews, Technical Exchanges and Coordination and Status Meetings.
ITEM 0014- UK SITP, TCR and UKALT Installation Support Services – CPFF LOE (FY24 -UK)
1. From May 1, 2024 through April 30, 2025, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to perform technical support services for the maintenance and development of Shipyard Integrated Test Program (SITP) Test Documentation, processing of Trouble Casualty Reports (TCRs), SSP Installation Working Group support and Program Management for Strategic Weapon System (SWS) and the Strategic Weapon Support System (SWSS) to the UK MOD via SSP. The contractor shall:
a. Deliver Monthly Status Report. (CDRL A001 Ship Cost Summary Report)
b. Support and participate in Test Documentation (TDG) meetings and trade-off working group meetings.
c. Support and provide SWSS familiarization training and Shipyard Integrated Test Program (SITP) test equipment training to the Shipyard and Subsystem Support contractors, when requested by SP2012.
d. Support, review and update SITP test procedures for advanced planning efforts and test program development for the ERO in accordance with OD 64497, SSBN Test Programs Test Requirements Document.
e. Support and process Trouble Casualty Reports (TCRs) per SSP approved processes defined in OD 64497.
f. Support evaluation of development and installation schedules related to the SSI program to ensure efficient integration of SSI SPALT/UK Alteration (UKALT) and conjunctive UKALT/ShipAlt schedules for UK ships.
ITEM 0015- UKALT 2653 Installation for UK SSP Shipboard Integration, Increment 8 Navigation Equipment Refresh - CPFF LOE (FY24 - UK)
1. From May 1, 2024 through April 30, 2025, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to perform technical services for Planning, Installing, Testing and Program Management associated with UKALT 2653 for SSP Shipboard Integration (SSI) Increment 8. In support of these efforts, the Contractor shall:
a. Establish, manage, and report on schedules, costs and events.
b. Provide UKALT 2653 on-site installation planning and technical support for one (1) UKALT installation
c. Attend and participate in Program Reviews, Installation Readiness Reviews (IRR), Production and Installation Reviews, Technical Exchanges and Coordination and Status Meetings.
d. Deliver Monthly Status Report. (CDRL A001 Ship Cost Summary Report).
e. Support Coordination Drawing reviews, Government Furnished Information (GFI), and SP24 Program documentation.
f. Provide ILS and fleet documentation revisions as impacted by SSI Increment 8.
g. Support ILS Certification efforts for the development of SSI Increment 8
ITEM 0016- Contract Data Requirements List (CDRLs – Not Separately Price (NSP))
1. The contractor shall deliver the data requirements, including technical data and computer software, per the Contract Data Requirements List (CDRL), DD Form 1423, Exhibit A, as attached under Section J of this contract. Non-CDRL deliverables required under the efforts described within this Statement of Work shall be delivered pursuant to the requirements of the contract. Electronic delivery of technical data and software required by the Contract Data Requirements Lists, DD Forms 1423, Section J, Exhibit A, or any other requirement of this contract, shall constitute delivery for purposes of the technical data and software clauses incorporated into Section I of this contract.
ITEM 0017- Contractor Acquired Property (CAP)
1. Delivery of Contractor Acquired Property (CAP) under this line item shall be completed as soon as the CAP item is identified if the value of the item meets or exceeds the capitalization threshold as identified in the memorandum issued jointly by the Under Secretary of Defense (USD) Comptroller and the USD (Acquisition, Technology, and Logistics) on 20 September 2013, entitled, “Elimination of Military Equipment Definition and Increase to Capitalization Thresholds for General Property, Plant and Equipment” or if the item is categorized as special tooling, special test equipment, or equipment designated for preservation and storage under a major defense acquisition program (see Section 815 of the National Defense Authorization Act for Fiscal Year 2009 (Pub. L. 110- 417).
1.1 "Residual CAP" means property acquired, fabricated, or otherwise provided by the Contractor for performing this contract, and to which the Government has title pursuant to FAR 52.245-1 (e)(3), and that is not incorporated in, or consumed in the production of, a deliverable under this contract. This includes any CAP items identified through plant clearance in accordance with the clause at DFARS 252.245-7004, Reporting, reutilization, and Disposal; inventory reports provided by the Contractor in accordance with FAR clause 52.245-1; or other reporting requirements, as specified in this contract. All Residual CAP shall be delivered upon completion of performance under each Contract Line Items, unless earlier delivery is required
1.2 During contract performance, oversight and visibility of CAP shall be accomplished through reviews and audits of Contractor business systems, including the Contractors accounting systems, property management systems, and material management and accounting in accordance with FAR 52.245-1, Government Property.
1.3 The contractual transfer of accountability for CAP from one contract to another is prohibited. Only upon delivery and acceptance by the Government under this line item can this property be transferred to other contracts and/or other locations not currently specified under a line item or exhibit of this contract as Government-furnished property (GFP), with written authorization by the Contracting Officer. Written authorization may only be accomplished by contract modification(s) issued on a Standard Form (SF) 30 by the Contracting Officer, or as delegated to the Administrative Contracting Officer (ACO), to execute transfers of Government property accountability between existing contracts. No other forms or documents, such as the DD Form 1149, Requisition and Invoice/Shipping Document, are authorized for the transfer of Government property (CAP or GFP) accountability from one contract to another. Upon delivery and acceptance by the Government, and when retained by the Contractor for use under this contract, the delivered CAP items become GFP and shall be added to the contract and referenced under the GFP list attached to the contract in Section J. A list in the format outlined in CDRL A008 shall accompany all deliveries of CAP under this contract.
1.4 When delivering CAP and updating this list (CDRL A008):
a. The value of any delivered CAP item shall be at the Contractor provided fully burdened cost, i.e., normal or provisional burdens to the direct costs in accordance with the applicable disclosed accounting practices, including an appropriate amount for fee or profit (as reflected in the contract under which the estimate is prepared) in addition to the direct and indirect costs.
b. Unless otherwise noted by the Contractor at the time of delivery to the Government, the placed-in-service date shall be the date of acquisition or, if fabricated, the date of completed manufacture.
ITEM 0101- OHIO-CLASS Weapons and Weapons Support Systems Support – CPFF LOE (FY25 –
O&M,N) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to continue to perform the technical support services described under CLIN 0001.
ITEM 0102- OHIO Class Trainer Sustaining Support Services – CPFF LOE (FY25 – O&M,N) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to continue to perform the technical support services described under CLIN 0002.
ITEM 0103- OHIO Class Training Support Services – CPFF LOE (FY25 – O&M,N) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to continue to perform the technical support services described under CLIN 0003.
ITEM 0104- SSP Waterfront Support Facilities – CPFF LOE (FY25 – O&M,N) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to continue to perform the technical support services described under CLIN 0004. In addition to services described under CLIN 0004, the Contractor shall:
| a. | Provide project management and subcontracting services for the dry docking and hull preservation of the YNFB39. |
| 1.a.1. | Develop and maintain a detailed project plan. |
| 1.a.2. | Identify suitable shipyards and obtain quotations for approval by SSP. |
| 1.a.3. | Coordinate with the selected shipyard to schedule the work. |
| 1.a.4. | Coordinate and supervise the transportation of the barge to the shipyard. |
| 1.a.5. | Supervise the work to be performed during the dry docking, including hull preservation, painting, and any necessary repairs. |
| 1.a.6. | Prepare a final report on the preservation project, including a summary of the work performed, costs, and recommendations for future maintenance. |
ITEM 0105- SSGN AWSS Training Equipment and Curricula Support Services - CPFF LOE (FY25 –
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to perform the technical support services described under CLIN 0005.
ITEM 0106- SWS Ashore (SWSA) SWS Ashore (SWSA) Operations and Maintenance Support – CPFF LOE (FY25 – O&M,N) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to continue to perform the technical support services described under CLIN 0006.
ITEM 0107- SSI Program Support – CPFF Completion (FY25 – OP,N) OPTION
1. If the option is exercise, the Contractor shall provide SSP Shipboard Integration (SSI) technical support, including the evaluation of concepts and preliminary designs, review of Proposed Notification of Change, and evaluation of development schedules, and deliver the Contract Summary Report. The Contractor’s development and delivery of the Contract Summary Report shall include the following necessary engineering, technical, and program support:
a. Deliver Monthly Status Report. (CDRL A001 Ship Cost Summary Report)
b. Provide engineering and program support for SSI program development efforts for SSP through participation in development and installation planning discussions. This support includes:
| 1.b.1 | Evaluation of concept and preliminary design information related to each SSI increment to identify potential US and UK ship impacts. |
| 1.b.2 | Development and delivery of completion report identifying ship design impacts for conjunctive US and UK ShipAlts, as requested to support each SSI increment. (CDRL A003 Contract Summary Report) |
| 1.b.3 | Support for the coordination drawing process for review of Proposed Notifications of Change as required to support development of all SSI increments in the absence of Ship Alteration conceptual design development. |
| 1.b.4 | Provide evaluation of development and installation schedules related to the SSI program to ensure efficient integration of SSI SPALT and conjunctive ShipAlt schedules for US and UK ships. |
| 1.b.5 | Support system level safety and risk management efforts related to development of SSI increment development |
| 1.b.6 | Support installation working group efforts in support of SSI increments. |
ITEM 0109- SSI 8 TRID 0597 SHIPALT US Installation – CPFF Completion (FY25 – OP,N) OPTION
1. If exercised, the contractor shall Plan, Install, and Test Ship Alteration (SHIPALT) TRID 0597. The Contractor shall establish, manage, and report on schedules, costs and events. In support of the delivery of Ship Alteration (SHIPALT) TRID 0597, the Contractor shall:
a. Prepare boat for completion of TRID 0597 SHIPALT installation. Complete five (5) SHIPALT installations in accordance with TRID 0597. Provide TRID 0597 SHIPALT on-site installation planning, material kit installation and test. Support and deliver SHIPALT completion reports to SSP. (CDRL A005 Installation Test Reports)
b. Support and participate in Program Reviews, Installation Readiness Reviews (IRR), Design Reviews, Production and Installation Reviews, Technical Exchanges and Coordination and Status Meetings.
ITEM 0110- UK Trainer Support Services – CPFF LOE (FY25 – UK) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to perform the technical support services described under CLIN 0010.
ITEM 0112- Training Curricula Development– CPFF LOE (FY25 - SCN) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to continue to perform the technical support services described under CLIN 0012.
ITEM 0113- UKALT 2281 SHIPALT Installation for UK SSP Shipboard Integration, Increment 11 Launcher Initiation System – CPFF LOE (FY25 - UK) OPTION
1. For a period of twelve months after option exercise, the Contractor shall Plan, Install, Test and provide Program Management support associated with Ship Alteration (SHIPALT) UKALT 2281 for SSP Shipboard Integration (SSI) Increment 11 Launcher Initiation System. The Contractor shall establish, manage, and report on schedules, costs and events. The contractor shall perform the following:
| a. | Deliver Monthly Status Report. (CDRL A001 Ship Cost Summary Report) |
| b. | Support UKALT 2281 SHIPALT on-site installation planning and technical support for one (1) SHIPALT installation. |
| c. | Support, attend and participate in Program Reviews, Installation Readiness Reviews (IRR), Production and Installation Reviews, Technical Exchanges and Coordination and Status Meetings. |
ITEM 0114- UK SITP, TCR and UKALT Installation Support Services – CPFF LOE (FY25 -UK) OPTION
For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to continue to perform the technical support services described under CLIN 0014.
ITEM 0115- UKALT 2653 Installation for UK SSP Shipboard Integration, Increment 8 Navigation Equipment Refresh - CPFF LOE (FY25 - UK)
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to perform technical services for Planning, Installing, Testing and Program Management associated with UKALT 2653 for SSP Shipboard Integration (SSI) Increment 8. In support of these efforts, the Contractor shall:
a. Establish, manage, and report on schedules, costs and events.
b. Provide UKALT 2653 on-site installation planning and technical support for one (1) UKALT installation
c. Attend and participate in Program Reviews, Installation Readiness Reviews (IRR), Production and Installation Reviews, Technical Exchanges and Coordination and Status Meetings.
d. Deliver Monthly Status Report. (CDRL A001 Ship Cost Summary Report).
e. Support Coordination Drawing reviews, Government Furnished Information (GFI), and SP24 Program documentation.
ITEM 0201- OHIO-CLASS Weapons and Weapons Support Systems Support – CPFF LOE (FY26 –
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to continue to perform the technical support services described under CLIN 0001.
ITEM 0202- OHIO Class Trainer Sustaining Support Services - CPFF LOE (FY26 – O&M,N) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to perform the technical support services described herein as CLIN 0002.
ITEM 0203- OHIO Class Training Support Services – CPFF LOE (FY26 – O&M,N) OPTION
1. If exercised, for a period of twelve months, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to continue to perform the technical support services described under CLIN 0003.
ITEM 0204- SSP Waterfront Support Facilities – CPFF LOE (FY26 - O&M,N) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to continue to perform the technical support services described under CLIN 0004.
ITEM 0205- SSGN AWSS Training Equipment and Curricula Support Services – CPFF LOE (FY26 –
O&MN) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to continue to perform the technical support services described under CLIN 0005.
ITEM 0206- SWS Ashore (SWSA) SWS Ashore (SWSA) Operations and Maintenance Support – CPFF LOE (FY26 – O&M,N) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to perform the technical support services described under CLIN 0006. In addition to the tasks under CLIN 0006, the Contractor shall:
a. Provide ECS and TDAR Cyber security and engineering support and SWSA TDARS and ECS Life Cycle Extension support. In providing this support, the Contractor shall ensure that:
1.a.1. Contractor support personnel will be available during all Environmental Conditioning System (ECS) and Test Data Acquisition & Reduction System (TDARS) operations. This includes Four (4) test durations per year (one month duration each) and Five (5) year refreshes.
1.a.2. Required spares are provided.
1.a.3. One permanent Full Time Equivalent will be available at SWSA.
ITEM 0207- SSI Program Support – CPFF Completion (FY26 – OP,N) OPTION
1. The Contractor shall provide SSP Shipboard Integration (SSI) technical support, including the evaluation of concepts and preliminary designs, review of Proposed Notification of Change, and evaluation of development schedules, and deliver the Contract Summary Report. The Contractor’s development and delivery of the Contract Summary Report shall include the following necessary engineering, technical, and program support:
| a. | Deliver Monthly Status Report. (CDRL A001 Ship Cost Summary Report) |
| b. | Provide engineering and program support for SSI program development efforts for SSP through participation in development and installation planning discussions within 12 months. This support includes: |
| 1.b.1 | Evaluation of concept and preliminary design information related to each SSI increment to identify potential US and UK ship impacts. |
| 1.b.2 | Development and delivery of completion report identifying ship design impacts for conjunctive US and UK ShipAlts, as requested to support each SSI increment. (CDRL A003 Contract Summary Report) |
| 1.b.3 | Support for the coordination drawing process for review of Proposed Notifications of Change as required to support development of all SSI increments in the absence of Ship Alteration conceptual design development. |
| 1.b.4 | Provide evaluation of development and installation schedules related to the SSI program to ensure efficient integration of SSI SPALT and conjunctive ShipAlt schedules for US and UK ships. |
| 1.b.5 | Support system level safety and risk management efforts related to development of SSI increment development |
| 1.b.6 | Support installation working group efforts in support of SSI increments. |
ITEM 0210- UK Trainer Support Services – CPFF LOE (FY26 – UK) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to perform the technical support services described under CLIN 0010.
ITEM 0212- Training Curricula Development – CPFF LOE (FY26 - SCN) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to continue to perform the technical support services described under CLIN 0012.
ITEM 0214- UK SITP, TCR and UKALT Installation Support Services – CPFF LOE (FY26 - UK) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to continue to perform the technical support services described under CLIN 0014.
ITEM 0215- UKALT 2653 Installation for UK SSP Shipboard Integration, Increment 8 Navigation Equipment Refresh - CPFF LOE (FY26 - UK) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to perform technical services for Planning, Installing, Testing and Program Management associated with UKALT 2653 for SSP Shipboard Integration (SSI) Increment 8. In support of these efforts, the Contractor shall:
| a. | Establish, manage, and report on schedules, costs and events. |
| b. | Provide UKALT 2653 on-site installation planning and technical support for one (1) UKALT installation |
| c. | Attend and participate in Program Reviews, Installation Readiness Reviews (IRR), Production and Installation Reviews, Technical Exchanges and Coordination and Status Meetings. |
| d. | Deliver Monthly Status Report. (CDRL A001 Ship Cost Summary Report). |
| e. | Support Coordination Drawing reviews, Government Furnished Information (GFI), and SP24 Program documentation. |
| f. | Provide ILS and fleet documentation revisions as impacted by SSI Increment 8. |
| g. | Support ILS Certification efforts for the development of SSI Increment 8 |
ITEM 0301- OHIO-CLASS Weapons and Weapons Support Systems Support – CPFF LOE (FY27 –
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to perform the technical support services described herein as CLIN 0001.
ITEM 0302- OHIO Class Trainer Sustaining Support Services – CPFF LOE (FY27 – O&M,N) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to continue to perform the technical support services described under CLIN 0002.
ITEM 0303- OHIO Class Training Support Services – CPFF LOE (FY27 - O&M,N) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to continue to perform the technical support services described under CLIN 0003.
ITEM 0304- SSP Waterfront Support Facilities – CPFF LOE (FY27 - O&M,N) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to continue to perform the technical support services described under CLIN 0004.
ITEM 0305- SSGN AWSS Training Equipment and Curricula Support Services – CPFF LOE (FY27 –
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to continue to perform the technical support services described under CLIN 0005.
ITEM 0306- SWS Ashore (SWSA) SWS Ashore (SWSA) Operations and Maintenance Support – CPFF LOE (FY27 – O&M,N) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to continue to perform the technical support services described under CLIN 0206. In addition to the tasks outlined in CLIN 0206, the Contractor shall:
a. Provide installation support for SWSA SWS / SWSS equipment and testing components in SWS Ashore facility.
b. Scope installation and production effort and provide POAM (Plan of Action and Milestones), Rough Order of Magnitude(s) and schedule(s) for installing mechanical and electrical/signal equipment. Prepare for Operations Control Board Activities. Review tactical system design changes and documentation for test facility impacts and report to SP2012.
c. Provide Quality Control Evidence of installation completion in accordance with SWSAP 4730.2 Construction Outfitting Closeout Procedures.
d. Provide and install spare cards, electrical system components, pumps, valves and other SWSS equipment specified via the change request process to correct SWS Ashore deficiencies during Lifecycle testing as well as proofing of the Shipyard Installation Test Program.
e. Provide corrective maintenance support for the SWSS at SWSA in coordination with SWS Ashore Operations Crew. Support Includes systems such as SWSA TDARS and ECS Life Cycle Extension HML, MHC, MDD, MG, ICS, Power system, and Corrosion Control.
f. Provide SWS Ashore Facility onsite supervisory and safety services and test director services.
ITEM 0307- SSI Program Support – CPFF Completion (FY27 – OP,N) OPTION
1. The Contractor shall provide SSP Shipboard Integration (SSI) technical support, including the evaluation of concepts and preliminary designs, review of Proposed Notification of Change, and evaluation of development schedules, and deliver the Contract Summary Report. The Contractor’s development and delivery of the Contract Summary Report shall include the following necessary engineering, technical, and program support:
a. Deliver Monthly Status Report. (CDRL A001 Ship Cost Summary Report)
b. Provide engineering and program support for SSI program development efforts for SSP through participation in development and installation planning discussions. This support includes:
| 1.b.1 | Evaluation of concept and preliminary design information related to each SSI increment to identify potential US and UK ship impacts. |
| 1.b.2 | Development and delivery of completion report identifying ship design impacts for conjunctive US and UK ShipAlts, as requested to support each SSI increment. (CDRL A003 Contract Summary Report) |
| 1.b.3 | Support for the coordination drawing process for review of Proposed Notifications of Change as required to support development of all SSI increments in the absence of Ship Alteration conceptual design development. |
| 1.b.4 | Provide evaluation of development and installation schedules related to the SSI program to ensure efficient integration of SSI SPALT and conjunctive ShipAlt schedules for US and UK ships. |
| 1.b.5 | Support system level safety and risk management efforts related to development of SSI increment development |
| 1.b.6 | Support installation working group efforts in support of SSI increments. |
ITEM 0312- Training Curricula Development – CPFF LOE (FY27 - SCN) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to continue to perform the technical support services described under CLIN 0012
ITEM 0314-UK SITP, TCR and UKALT Installation Support Services – CPFF LOE (FY27 - UK) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to continue to perform the technical support services described under CLIN 0014.
ITEM 0315- UKALT 2653 Installation for UK SSP Shipboard Integration, Increment 8 Navigation Equipment Refresh - CPFF LOE (FY27 - UK) OPTION
1. For a period of twelve months after option exercise, the Contractor shall make available and employ its facilities and personnel at the level of effort, services of others, materials, and shall use its best efforts to perform technical services for Planning, Installing, Testing and Program Management associated with UKALT 2653 for SSP Shipboard Integration (SSI) Increment 8. In support of these efforts, the Contractor shall:
| a. | Establish, manage, and report on schedules, costs and events. |