Performance Work Statement: SEA21I Inactive Ships Maintenance Office Philadelphia
This document is a comprehensive Performance Work Statement (PWS) for the SEA21I Inactive Ship On-Site Maintenance Office located at Philadelphia Navy Yard. The contract encompasses receipt, inspection, survey, maintenance, and disposal of decommissioned conventionally-powered U.S. Navy vessels, including potential structural, mechanical, and electrical modifications to support experimental programs, fleet part removals, equipment harvesting, and vessel conversions. The Government is transitioning to a hybrid pricing structure wherein core, recurring, and predictable facility operations (Section C.3) are performed on a Firm-Fixed-Price (FFP) basis, while unpredictable event-driven tasks and industrial operations (Section C.5) are performed on a Cost-Plus-Fixed-Fee (CPFF) basis. Work must comply with the highest professional standards and is governed by numerous Navy technical manuals, OSHA maritime standards, environmental regulations (OPNAVINST 5090.1, 40 CFR Parts 61 and 761), and applicable federal safety directives.
The PWS details extensive operational responsibilities organized into nine primary sections covering general scope; background and vessel information with three mobilization categories and disposal designations; core FFP responsibilities including general requirements, records management, safety/health/environmental protection, property management, security, Operations Security (OPSEC), and vessel inspections; ancillary CPFF responsibilities encompassing maintenance functions, vessel receipt/preparation, inactivation and activation cycles, emergency inspections, vessel disposal, cannibalization/equipment removals, commercial services (tugboat, diving), pontoon overhaul, and material reclamation; and comprehensive personnel requirements specifying 40+ labor categories with detailed minimum qualifications across nine departments (Site Administration, Maintenance, WHE/Rigging, Finance and Accounting, Inspections and Inactivation, Safety and Environmental, Supply and Property, and Operations). Key personnel positions (Site Manager, Production Manager, Work Control/Operations Manager, and Safety/Health/Environmental Manager) require Secret security clearances and must submit resumes with the initial proposal. Additional non-key personnel resumes are due within 10 calendar days of award. The contract includes quarterly program meetings covering safety, environmental compliance, inspections, operational management, and financial execution, with performance evaluated against a Quality Assurance Surveillance Plan detailed in Attachment J-4.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS Industry Feedback.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section C - Descriptions and Specifications
STATEMENT OF WORK
REQUIRED STANDARD OF WORKMANSHIP
Unless otherwise specifically provided in this contract, the quality of all services rendered hereunder shall conform to the highest standards in the relevant profession, trade, or field of endeavor. All services shall be rendered by or supervised directly by individuals fully qualified in the relevant profession, trade, or field, and holding any licenses or permits required by law.
Performance Work Statement (PWS) Table of Contents
• C.1.0 GENERAL SCOPE OF WORK
• C.2.0 BACKGROUND AND VESSEL INFORMATION
• C.2.1 Background
• C.2.2 Vessel Inventory
• C.2.3 Vessel Categories
• C.2.4 Vessel Maintenance Priorities
• C.2.5 Terminology
• C.3.0 SEA21I INACTIVE SHIPS MAINTENANCE OFFICE CORE RESPONSIBILITIES-FFP
• C.3.1 General Requirements
• C.3.1.1 Normal Working Hours
• C.3.1.1.1 Work Progress Report/Daily Work Plans
• C.3.1.1.2 Contractor Organizational Chart
• C.3.1.1.3 Ship Location and Listing
• C.3.1.1.4 Installation Access Control
• C.3.2 Records and Documentation
• C.3.2.1 Craft Boat Support System (CBSS)
• C.3.2.2 Inactive Ships Management System (ISMS)
• C.3.2.3 Ship's History File
• C.3.2.4 Operational Risk Management (ORM) Plan
• C.3.2.5 Standard Operating Procedures (SOP)
• C.3.2.6 Inspections and Inactivation Manual
• C.3.2.7 Safety and Health Program Plan
• C.3.2.8 Environmental Protection Plan
• C.3.2.9 Migratory Bird Protection and Deterrence Plan
• C.3.3 Safety, Health, and Environmental Protection
• C.3.3.1 "Buddy" System
• C.3.3.2 Hazardous Substance Leaks and Spills
• C.3.3.3 Facility/Grounds Cleanliness
• C.3.3.4 Shoreline and Floating Debris
• C.3.3.5 Adverse Weather Safety
• C.3.3.6 Heavy Weather Plan Requirements
• C.3.3.7 Gas Free Certification
• C.3.3.8 Polychlorinated Biphenyl (PCB) Handling
• C.3.3.9 Per- and Polyfluoroalkyl Substances (PFAS) and Aqueous Film-Forming Foam
(AFFF) Handling
• C.3.3.10 Firefighting and Rescue Equipment.
• C.3.4 Property
• C.3.4.1 Inventory and Accountability of all Government Furnished Property, Material, and Facilities
• C.3.4.2 Government Furnished Vehicles
• C.3.4.3 GFE and GFP Maintenance Records
• C.3.4.3.1 Reporting Missing Property
• C.3.4.3.2 Property in the Custody of the Contractor
• C.3.4.4 Tow Rigs and Riding Equipment Maintenance
• C.3.5 Applicable Publications
• C.3.5.1 Technical Library
• C.3.6 Physical Security
• C.3.6.1 Escort and Access Control
• C.3.6.2 Facility Security
• C.3.6.3 Video Surveillance System
• C.3.6.4 Security Locking Gate and Access Doors
• C.3.6.5 Access to Vessels and Facilities by Non-U.S. Citizens
• C.3.7 OPSEC
• C.3.7.1 Controlled Unclassified Information (CUI)
• C.3.7.2 Level of Safeguard
• C.3.7.3 Accountability and Disposition of Classified Material
• C.3.7.4 Declassification Inspection and Survey of Vessels
• C.3.8 Scheduled Inspection of Vessels
• C.3.8.1 Inspection Schedules
• C.3.8.2 Perpetual Inspections
• C.3.8.3 Cathodic Protection (C/P) Inspection
• C.3.8.4 Dehumidification (D/H) Inspection
• C.3.8.5 F/F Alarm Inspection
• C.3.8.6 Integrity Inspection
• C.3.8.7 CO2 Fire Extinguisher Inspection
• C.3.8.8 Preservation Inspection
• C.3.9 General Maintenance
• C.3.9.1 Maintenance (GFE/GFP PMPS)
• C.3.9.2 Contractor- Furnished Tools and Equipment
• C.3.9.3Safety Equipment
• C.3.9.4 Vehicle Operators
• C.3.10 Workboats
• C.3.10.1 Workboat Operator
• C.3.10.2 Operational Documentation and Oversight
• C.3.11 Material and Weight Handling Equipment (M&WHE)
• C.3.11.1 Operating Personnel
• C.3.11.2 Material and Weight Handling Equipment (M&WHE) Safety Program
• C.3.11.3 M&WHE Inspection and Certification Program
• C.4.0 CONTRACT DATA REQUIREMENTS LIST (CDRL)
• C.5.0 SEA21I INACTIVE SHIPS MAINTENANCE OFFICE ANCILLIARY RESPONSIBILITIES-CPFF
• C.5.1 Maintenance Functions
• C.5.1.1 General Maintenance Tasks
• C.5.1.2 Preservation
• C.5.1.3 Dewatering
• C.5.1.4 Paint Chip Remediation
• C.5.2 Receipt/Preparation/Additions to Vessel Inventory
• C.5.2.1 Mooring and Unmooring Vessels
• C.5.2.2 Install Fire and Flood (F/F) Alarms and Flooding Markers
• C.5.3 Inactivation Cycle
• C.5.3.1 Design and Install Cathodic Protection (C/P)
• C.5.3.2 Preservation of Tanks, Voids, and Bilges
• C.5.3.3Dehumidification System (D/H System)
• C.5.3.4 Removal of Fire Hazards
• C.5.3.5 Correct Safety Hazards
• C.5.4 Activation Cycle
• C.5.4.1 Remove Inactive Ships Maintenance Office Equipment
• C.5.4.2 Install Tow Rigs and Riding Equipment
• C.5.5 Unscheduled and Event-Driven Vessel Inspections & Remediation
• C.5.5.1 Alarm Response and Initial Emergency Investigation
• C.5.5.2 Emergency Damage Control and Flooding Mitigation
• C.5.5.3 Inactivation Progress Inspections
• C.5.5.4 Asbestos Inspection/Survey
• C.5.5.5 PCB Inspection, Sampling
• C.5.6 Disposal of Vessels
• C.5.6.1 Vessel Disposal Industrial Tasks
• C.5.6.2 Preparation of Vessels for Dismantlement
• C.5.6.3 Experimental (Not-To-Sink)/Target Disposal Vessels (SINKEX)
• C.5.6.4 Artificial Reef (Reef-ex) / Donation Vessels
• C.5.7 Cannibalization (CASREP), Equipment Removals (ERS) and Stripping Operations
• C.5.7.1 Inactive Fleet Equipment Removal Database System (ERDS) Administration and
Cost Estimates
• C.5.7.2 Dedicated Support and Escort for Visiting Stripping Crews
• C.5.7.3 Shipboard Stock Items
• C.5.7.4 Cannibalization Replacement Parts Tracking
• C.5.7.5 Storage and Inventory of Cannibalization Replacement Items
• C.5.7.6 Cannibalization, Equipment Removal, and Stripping Folders
• C.5.8 Commercial Tugboat, Pilot, and Maritime Towing Services
• C.5.9 Commercial Diving Services
• C.5.10 Pontoon, Buoys, and Boat Overhaul
• C.5.10.1 Incidental Scope and Technical Direction
• C.5.11 Inactive Ship Material Reclamation and Fleet Support Operations
• C.5.11.1 Objective
• C.5.11.2 Identification and Safe Extraction
• C.5.11.3 Fleet Support and Disposal Acceleration
• C.5.11.4 Reclaimed Material Warehousing, Cataloging, and Inventory Management
• C.5.12 Financial Reporting
• C.5.12.1 Contractor Projection Report
• C.5.12.2 Status of Funds Report
• C.5.13 Contractor Timekeeping, Leave Accounting, and Compensatory Time Records
• C.5.13.1 Objective and Scope
• C.5.13.2 Required Labor & Time Tracking Elements
• C.5.13.3 Submission to the Contracting Officer's Representative (COR)
• C.5.14 Major repairs and purchase requirements
• C.5.14.1 Major Repairs
• C.5.14.2 COR Notification and Review
• C.5.14.3 Authorization to Incur Costs:
• 09210
• C.6.0 PERSONNEL REQUIREMENTS & LABOR CATEGORIES
• C.6.1 Personnel Responsibilities and Minimum Qualifications
• C.6.2 Site Administration
• C.6.2.1 Site Manager (KEY PERSONNEL) (FFP CORE)
• C.6.2.2 Administrative Assistant (FFP CORE)
• C.6.2.3 Data Entry Specialist (FFP CORE)
• C.6.3 Maintenance Department
• C.6.3.1 Production Manager (KEY PERSONNEL) (FFP CORE)
• C.6.3.2 Assistant Production Manager (FFP CORE)
• C.6.3.3 Ship Maintenance Supervisor (DUAL-ALLOCATED: FFP/CPFF)
• C.6.3.4 Laborer (DUAL-ALLOCATED: FFP/CPFF)
• C.6.3.5 Labor Crew Leader (DUAL-ALLOCATED: FFP/CPFF)
• C.6.3.6 Production Supervisor (FFP CORE)
• C.6.3.7 Electrical Foreman (DUAL-ALLOCATED: FFP/CPFF)
• C.6.3.8 Electrical Lead (DUAL-ALLOCATED: FFP/CPFF)
• C.6.3.9 Electrical Technician (DUAL-ALLOCATED: FFP/CPFF)
• C.6.3.10 Electrical Technician Helper (DUAL-ALLOCATED: FFP/CPFF)
• C.6.3.11 Mechanical Foreman (DUAL-ALLOCATED: FFP/CPFF)
• C.6.3.12 Mechanical Technician Lead (CPFF DEDICATED)
• C.6.3.13 Mechanical Technician (CPFF DEDICATED)
• C.6.3.14 Mechanical Technician Helper (CPFF DEDICATED)
• C.6.3.15 Ship Fitter/Welder/Mechanical Technician (DUAL-ALLOCATED: FFP/CPFF)
• C.6.3.16 Harvesting Mechanic Lead (CPFF DEDICATED)
• C.6.3.17 Harvesting Mechanic (CPFF DEDICATED)
• C.6.4 WHE/Rigging Department
• C.6.4.1 WHE/Rigging Manager (DUAL-ALLOCATED: FFP/CPFF)
• C.6.4.2 Rigging Foreman (DUAL-ALLOCATED: FFP/CPFF)
• C.6.4.3 Rigger (DUAL-ALLOCATED: FFP/CPFF)
• C.6.4.4 Rigger Helper (DUAL-ALLOCATED: FFP/CPFF)
• C.6.5 Finance and Accounting Department
• C.6.5.1 Finance and Accounting Manager (FFP CORE)
• C.6.5.2 Budget Analyst (FFP CORE)
• C.6.5.3 Accounting Technician (FFP CORE)
• C.6.6 Inspections and Inactivation Department
• C.6.6.1 Inspections and Inactivation Manager (DUAL-ALLOCATED: FFP/CPFF)
• C.6.6.2 Inspections and Inactivations Supervisor (DUAL-ALLOCATED: FFP/CPFF)
• C.6.6.3 Marine Inspector (DUAL-ALLOCATED: FFP/CPFF)
• C.6.6.4 Marine Inspections Monitor (DUAL-ALLOCATED: FFP/CPFF)
• C.6.7 Safety and Environmental Department
• C.6.7.1 Safety Health and Environmental Manager (KEY PERSONNEL) (FFP CORE)
• C.6.7.2 Ship Maintenance Safety Supervisor (FFP CORE)
• C.6.7.3 Safety and Environmental/Hazardous Material Technician (DUAL-
ALLOCATED: FFP/CPFF)
• C.6.7.4 Safety Technician (DUAL-ALLOCATED: FFP/CPFF)
• C.6.8 Supply and Property Department
• C.6.8.1 Supply and Property Manager (FFP CORE)
• C.6.8.2 Facilities Supervisor (FFP CORE)
• C.6.8.3 Equipment Maintenance Mechanic (DUAL-ALLOCATED: FFP/CPFF)
• C.6.8.4 Custodian (FFP CORE)
• C.6.8.5 Purchasing Agent (FFP CORE)
• C.6.8.6 Warehouse/Inventory Supervisor (DUAL-ALLOCATED: FFP/CPFF)
• C.6.8.7 Inventory Control Specialist (DUAL-ALLOCATED: FFP/CPFF)
• C.6.8.8 Warehouse Operator (DUAL-ALLOCATED: FFP/CPFF)
• C.6.9 Operations Department
• C.6.9.1 Work Control/Operations Manager (KEY PERSONNEL) (FFP CORE)
• C.6.9.2 Project Coordinator (FFP CORE)
• C.6.9.3 Assistant Project Coordinator (Planner/Estimator) (FFP CORE)
• C.6.9.4 Escort Coordinator (FFP Core)
• C.7.0 RESUME REQUIREMENTS
• C.7.1 Key Personnel Resumes
• C.7.2 Non-Key Personnel Resumes
• C.8.0 SECURITY CLEARANCE REQUIREMENTS
• C.9.0 PROGRAM MEETINGS
• C.9.1 Contractor Performance Presentation
• C.9.2 Inactive Ships Maintenance Office Evaluation & Scheduling
• C.10.0 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
• C.11.0 REQUESTS FOR NAVY DONATION OF MATERIAL
C.1.0 GENERAL SCOPE OF WORK
This contract encompasses all vessels assigned to the SEA21I INACTIVE Ship On-Site Maintenance Office in
Philadelphia, PA. The Contractor shall furnish all necessary direct labor, materials, and supplies to support SEA21I operations, specifically the receipt, inspection, survey, maintenance, and disposal of Naval vessels.
Additionally, the Contractor may be required to perform structural, mechanical, and electrical modifications. These tasks support experimental use programs, fleet part removals, equipment harvesting, berthing vessel programs, and conversions, as directed by the program sponsor.
C.2.0 BACKGROUND AND VESSEL INFORMATION
C.2.1 Background. The SEA21I Inactive Ship Maintenance Office (INACTSHIPMAINTO) Philadelphia, located at the historic Philadelphia Navy Yard, is a critical field activity under the Navy Inactive Ships Directorate (SEA21I) responsible for the secure custody, maintenance, and disposal of decommissioned, conventionally powered U.S.
Navy vessels. The facility's support contract provides the essential industrial, administrative, and logistical backbone required to execute three primary lifecycle objectives: preserving designated ships in a reserve status for potential reactivation during national emergencies; harvesting critical components to supply the active fleet and save procurement costs; and safely preparing vessels for final disposal, which may include foreign military sales, museum donation, artificial reefing, SINKEX, or dismantling. To fulfill these missions in accordance with overarching Inactive Ships Management Office (ISMO) instructions, the Contractor is tasked with a broad scope of operational duties, including maintaining vessel dehumidification and cathodic protection systems, coordinating complex "dead ship" towing operations, assisting with vessel disposal awardees, managing hazardous materials to ensure environmental compliance, and providing comprehensive security, fire response readiness, and escort services for visiting maintenance and inspection crews.+
Historically, this requirement was performed under a Cost-Plus-Fixed-Fee (CPFF) contract. Under this contract, the
Government is transitioning to a hybrid pricing structure to align with Department of Defense acquisition efficiency initiatives. Core, recurring, and predictable facility operations, routine surveillance, security, and steady-state maintenance (as specified in Section C.3) shall be performed on a Firm-Fixed-Price (FFP) basis. Unpredictable, event-driven, and variable industrial tasks, ship lifecycle evolutions, and emergent remediations (as specified in
Section C.5) shall be performed on a Cost-Plus-Fixed-Fee (CPFF) basis.
C.2.2 Vessel Inventory. ATTACHMENT J-1 is the list of vessels expected to be assigned to the SEA21I
INACTIVE Ships Maintenance Office Philadelphia, PA, as of the award date of this contract. The Procuring
Contracting Officer (PCO) will notify the Contractor of changes to the vessel inventory and of the category to which an added vessel has been assigned.
C.2.3 Vessel Categories. Vessels are assigned to categories by the Chief of Naval Operations (CNO). The categories to which an inactive vessel may be assigned are:
1. Retention: Mobilization Category (MOB) "B" (Out of Commission in Reserve (OCIR) and Out of Service in Reserve (OSIR)) and "C".
2. Disposal: Stricken.
3. Other: In Service or Temporary Berth.
These categories are defined in OPNAVINST 4770.5J (Series). Retention vessels identified in ATTACHMENT J-1 include vessels designated as mobilization assets for the CNO. Disposal vessels identified in ATTACHMENT J-1 include vessels designated for Foreign Military Sales (FMS), fleet SINKEX vessels, donation vessels, and vessels scheduled for scrap.
C.2.4 Vessel Maintenance Priorities. Category "B" (OCIR and OSIR) vessels shall receive the highest priority of maintenance for inactive vessels. Category "C" vessels shall be retained in an "as is" status and preserved to minimize the amount of deterioration.
Unless otherwise stated, all service craft assigned to the inactive fleet will be maintained as Category "C" vessels.
Category "C" vessels require, as a minimum, the installation of fire and flood alarms, and when feasible, cathodic protection and dehumidification.
C.2.5 Terminology. References made herein to "service craft" include those SEA21I INACTIVE Ships
Maintenance Office Philadelphia, PA, units identified in ATTACHMENT J-1 as service craft. All other assets are referred to as "ships." References made to "vessels" will include both service craft and ships collectively.
C.3.0 SEA21I INACTIVE SHIPS MAINTENANCE OFFICE CORE RESPONSIBILITIES-FFP
C.3.0.1 Firm-Fixed-Price (FFP) Contract Line Item Number (CLIN) Mapping and Cost Architecture:
All work, deliverables, and continuous operations specified under Section C.3 (inclusive of subsections C.3.1 through C.3.11) represent the steady-state baseline requirements of this contract and shall be performed on a Firm-
Fixed-Price (FFP) basis. These requirements are directly mapped to the FFP Core Operations CLINs (0X01, 1X01, 2X01, 3X01, 4X01) as designated in the Section B Contract Schedule.
• All-Inclusive Monthly FFP Pricing: The Contractor's proposed monthly price for these CLINs must represent the complete, fully burdened cost of executing all Section C.3 requirements. This includes, but is not limited to: direct labor, fringe benefits, indirect overhead, General and Administrative (G&A) expenses, subcontractor loaded rates, materials, consumables, and profit.
• Indirect Cost Allocation: Day-to-day business operational costs, including but not limited to Workers'
Compensation insurance, general corporate overhead, administrative office supplies, routine waste management/dumpster services, and site-office communications, are deemed indirect costs and shall be integrated into the FFP CLIN pricing baseline. The Contractor is strictly prohibited from direct-billing these costs to the Cost-Plus-Fixed-Fee (CPFF) or Cost-Reimbursable Material CLINs.
• Baseline Maintenance Threshold: The Contractor shall absorb the costs of all routine preventative maintenance, servicing, and minor parts/material replacements up to the contractually established threshold of $2,500 per incident within the FFP CLINs, as detailed in Sections C.3.4.1.1 (Vehicles), C.3.9.2 (GFE), C.3.10.2 (Workboats), and C.3.11.2 (M&WHE).
• No Duplicative Billing: Any labor hours, materials, or indirect costs priced under the Section C.3 FFP baseline shall not be allocated, charged, or double-billed against any CPFF Work Order or Cost-
Reimbursable ODC CLIN.
C.3.1 General Requirements. The general requirements in this section apply as identified for SEA21I INACTIVE
Ships Maintenance Office Philadelphia.
C.3.1.1 Core Operational Hours and Facility Access. Normal Government facility operating hours are Monday through Friday, excluding Federal holidays as set by the Office of Personnel Management (OPM), between the hours of 0700 and 1530. The Contractor shall provide required support coverage and interface with Government personnel during these core hours, unless an alternative schedule is coordinated in advance with the Contracting
Officer’s Representative (COR) to support mission requirements. The Contractor is solely responsible for managing employee work schedules, rest periods, and leave to ensure uninterrupted performance of the requirements defined in this PWS.
C.3.1.1.1 Work Progress Report/Daily Work Plans. The Contractor shall develop and maintain a comprehensive
Work Progress Report and Daily Work Plan in accordance with CDRL A038 and CDRL A002. This deliverable shall provide a detailed schedule of all planned and ongoing tasks, enabling the Government to accurately monitor performance and track milestone completion. To ensure total operational visibility, the Work Progress Report must explicitly incorporate all discrepancy reports, the active Equipment Removal Database System (ERDS) tracker, current Casualty Reports (CASREPs), and a comprehensive weekly summary report detailing completed actions and upcoming evolutions.
C.3.1.1.2 Contractor Organizational Chart. The Contractor shall prepare and submit an organizational chart depicting management structure, Key Personnel, and primary operational points of contact at the beginning of each fiscal year, quarterly, and as changes to Key Personnel or management structure occur, in accordance with CDRL
A016.
C.3.1.1.3 Ship Location and Listing. The Contractor shall prepare and submit a ship listing report each month on the 1st working day of the month or within two (2) days after a change is made in accordance with CDRL A018.
C3.1.1.4 Installation Access Control. All contractor personnel requiring physical access to the installation must successfully undergo security vetting and obtain official access credentials in strict accordance with the installation
Commanding Officer’s directives. Contractor personnel who currently possess an active Common Access Card
(CAC) or Defense Biometric Identification System (DBIDS) card must proactively maintain their credential status, monitor expiration dates, and coordinate renewals through their sponsor to ensure continuous, uninterrupted access.
The Contractor is responsible for ensuring timely submission of all security vetting documentation. The Contractor shall immediately notify the COR if an employee's access is denied or revoked and recover and return all issued credentials to the issuing security office immediately upon an employee’s termination, reassignment, or contract completion, in accordance with CDRL A044.
Additionally, the Contractor shall provide an initial Installation Access Control Status Report within 30 days of contract award, and annually thereafter by the 15th of October, in accordance with CDRL A045.
C.3.2 Records and Documentation
C.3.2.1 Craft Boat Support System (CBSS). The CBSS shall be maintained by the Contractor in accordance with
OPNAVINST 4780.6G (Series). Annually, validation will be requested by Program Executive Officer Ships (PEO
SHIPS), PMS 325, Washington Navy Yard, DC, to review and update service craft and boat data, and be submitted by 30 November each year in accordance with CDRL A012.
C.3.2.2 Inactive Ships Management System (ISMS). The ISMS Database shall be maintained on a daily basis by the Contractor in accordance with Inactive Ships Management Office Portsmouth, VA (hereafter referred to as
INACTSHIPOFF Portsmouth, VA) INACTSHIPOFFINST 5401.1 (Series). All applicable user guides for the ISMS
Database will be made available to the Contractor as Government Furnished Information (GFI) and are readily available on the Database homepage. The Contractor shall ensure all personnel performing site management, inspections, project coordination, estimating, work control, and financial tracking maintain active, authorized access to ISMS in accordance with CDRL A030.
C.3.2.3 Ship’s History File. The Contractor shall maintain a hardcopy and electronic file for each vessel in inventory (Attachment J-7). All documentation involving each vessel shall be incorporated into the file in accordance with Naval Ships Technical Manual (NSTM) Chapter 050. The Contractor shall initiate and verify the
Ship’s History File within seven (7) working days of vessel arrival at the facility and submit verification to the COR in accordance with CDRL A007. The Contractor shall maintain the file throughout the vessel's inactive custody period. Environmental Files shall be prepared and transferred to the Government for long-term storage for fifty (50) years after vessel departure. All other operational and maintenance files shall be retained for seven (7) years after vessel departure before final archiving or disposition.
C.3.2.4 Operational Risk Management (ORM) Plan. The Contractor shall prepare an ORM Plan that describes how the Contractor will ensure contract requirements are met in a manner that mitigates injury to personnel and damage to property in accordance with OPNAVINST 3500.39 (Series). At a minimum, the ORM Plan shall describe how the Contractor implements the ORM Program and the Contractor's ORM management structure. The ORM
Plan shall be submitted to the COR for review and acceptance within 30 days of contract award. The Contractor shall review the ORM Plan annually and submit an updated version to the COR by 15 October in accordance with
CDRL A029.
C.3.2.5 Standard Operating Procedures (SOP). The Contractor shall develop, implement, and maintain standard operating procedures (SOPs) governing operational tasks under this contract. Within ninety (90) calendar days following receipt of Government-Furnished Information (GFI) baseline documentation, the Contractor shall submit initial SOPs to the Contracting Officer’s Representative (COR) for review and Government acceptance in accordance with CDRL A035. At a minimum, SOPs shall be developed for the following technical requirements:
• C.3.3.1 “Buddy” System
• C.3.3.7 Gas Free Certification
• C.3.3.8 PCB Handling
• C.3.4.1 Inventory of GFE/GFP
• C.3.6 Physical Security
• C.3.6.1 Inactive Ships Maintenance Office Access Control
• C.3.6.2 Facility Security/Security Violation Report
• C.3.6.4 Security Locking Gate and Access Door
• C.3.10 Workboat Operations
• C.3.11 M&WHE
• C.5.1.2 Preservation
• C.5.1.3 Dewatering
• C.5.2.1 Mooring and Unmooring vessels
• C.5.2.2 Install Fire and Flood Alarms and Flood Markers
• C.5.4.1 Install Cathodic Protection
• C.5.4.5 Disposition of Classified Material
• C.5.5.1 Emergency Inspection
• C.5.7 Cannibalization/Stripping of Vessels
• C.5.7.1 Supporting Visiting Crews
The Government will provide baseline historical SOPs as GFI within fifteen (15) calendar days of contract award.
The Contractor shall maintain SOPs to reflect current operational, environmental, and safety standards, and shall submit an updated master index of all active operational SOPs annually in accordance with CDRL A035.
C.3.2.6 Inspections and Inactivation Manual. The Contractor shall develop and maintain a comprehensive
Inspections and Inactivation Manual detailing how the Contractor will execute overarching program quality requirements. The manual must outline the Contractor’s inspection management organization, specific inspection procedures used to evaluate completed tasks, established protocols for handling non-conforming items, and the process for issuing Inspection Deficiency Reports (IDRs). The initial manual shall be submitted to the COR for review and acceptance within 90 days of contract award. Thereafter, the Contractor shall conduct an annual review of the manual and submit any updates to the COR no later than 15 October of each year, in accordance with CDRL
A019.
C.3.2.7 Safety and Health Program Plan. The Contractor shall prepare and implement a comprehensive Safety and Health Program Plan within 30 days of contract award, submitted to the COR for review and acceptance in accordance with CDRL A020, with annual reviews submitted by 15 October. The plan shall address mitigation of hazardous physical and chemical agents present in ship maintenance environments, including fumes, dust, noise, heat stress, radiation, and hazardous materials (e.g., PCBs, Lead, Mercury, Asbestos).
The Contractor is solely responsible for establishing, executing, and funding an occupational health and medical surveillance program for its employees (including pre- and post-employment evaluations and exposure monitoring) in accordance with NAVMED P5055 (Series), OPNAVINST 5090.1 (Series), OSHA, and applicable federal, state, and local standards. The Contractor shall verbally notify the COR of all work-related accidents, mishaps, and injuries immediately, and submit a written mishap report within 24 hours of occurrence. The report shall detail the nature of the incident, personnel status, root cause, and immediate corrective actions taken.
C.3.2.8 Environmental Protection Plan. The Contractor shall prepare an Environmental Protection Plan within 30 days of contract award and submit it to the COR for review and acceptance in accordance with CDRL A021. The plan shall cover, at a minimum: Radiation Safety; Polychlorinated Biphenyls (PCBs) handling; Mercury Handling;
Asbestos Control; Lead Control; Battery Handling; Refrigerant Recovery; Oily Waste Management; Per- and
Polyfluoroalkyl Substances (PFAS) / Aqueous Film-Forming Foam (AFFF) containment and disposal; and the facility Pollution Prevention Program. The Contractor shall review and update the Environmental Plan annually.
C.3.2.9 Migratory Bird Protection and Deterrence Plan. The Contractor shall prepare a Migratory Bird
Protection and Deterrence Plan within 30 days of contract award and submit it to the COR for review and acceptance. The plan shall establish procedures for reporting protected migratory bird activity (specifically Bald
Eagles and Ospreys), lawful removal of unoccupied nests, and active deterrent strategies to prevent nesting on inactive vessels and structures. Removal of unoccupied nests and deployment of deterrents shall occur within three
(3) business days of detection when feasible and legally permissible. The Contractor shall submit a weekly surveillance log in accordance with CDRL A039.
C.3.3 Safety, Health, and Environmental Protection. The Contractor shall ensure all work is conducted in a safe manner and in compliance with all applicable statutes and regulations, such as OSHA, NIOSH, EPA, and other federal, state, and local laws and regulations. The Contractor shall be responsible for implementing safety, health, and environmental protection programs and providing all required training. Any requirements for upgrading the facility to standards required by safety, health, or environmental regulations shall be submitted to the Contracting
Officer (KO) and COR in writing.
The following specific policies and procedures apply to this contract:
1. OPNAVINST 5090.1 (Series): Environmental and National Resources Manual
2. Title 10, Code of Federal Regulations (CFR), Parts 0 to 199: Energy (Nuclear Regulatory Commission)
3. Title 29, CFR, Parts 1910 and 1915: General Industry and Marine Standards
4. Title 40, CFR, Part 61: National Emission Standards for Hazardous Air Pollutants (NESHAP)
5. Title 40, CFR, Part 761: Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in
Commerce, and Use Prohibition
6. 15 USC Sections 2601-2698: Toxic Substances Control Act
7. 29 USC Sections 651-655: Occupational Safety and Health Act
8. 33 USC Sections 1251-1387: Federal Water Pollution Control Act (Clean Water Act)
9. 42 USC Sections 6901-6992ki: Resource Conservation and Recovery Act
10. 42 USC Sections 7401-7671: Clean Air Act and Amendments of 1990
11. 42 USC Sections 9601-9675: Comprehensive Environmental Response Compensation and Liability Act of
12. 16 USC Sections 1531-1544: Endangered Species Act
All training and certification of personnel qualified to perform such work shall be commensurate with the above-listed regulations and in accordance with all other federal, state, local, and respective host/tenant policies, procedures, and regulations. All permits, licenses, etc., shall be acquired by the Contractor prior to the commencement of work commensurate with federal, state, local, and respective host/tenant policies, procedures, and requirements.
All subsequent regulatory revisions shall become effective upon issuance. If any such revision increases or decreases the cost of, or the time required for, performance of any part of the work under this contract, it shall be treated as a change under the "Changes" clause of this contract. The Contractor shall promptly notify the
Contracting Officer in writing of any potential cost or schedule impact prior to implementing the revised standard.
C.3.3.1 "Buddy" System. A minimum of two persons shall be required for all tasks performed onboard vessels moored at the site. Sign in/out logs and identification tags hung from the vessel’s lighting disconnect switch while onboard are required. This includes after-hours alarm investigations.
C.3.3.2 Hazardous Substance Leaks and Spills. The Contractor shall investigate all leaks and spills immediately and initiate corrective action. The COR shall be notified immediately (as soon as practicable after discovery) and advised of any required Government-furnished assistance. The Contractor shall ensure its personnel are thoroughly familiar with current federal, state, and local instructions (such as OPNAVINST 5090.1 Series) governing leaks and spills. The Contractor shall prepare a Spill Prevention Control and Countermeasures (SPCC) Plan defining measures to prevent spills and actions to be taken in the event a spill is discovered. The SPCC Plan shall be submitted to the
COR for review and acceptance within 20 days of contract award. The Contractor shall review the SPCC Plan annually and submit updates to the COR by 15 October in accordance with CDRL A022. The Contractor shall maintain Spill Fast Response Kits with appropriate materials required to contain a small spill (less than 5 gallons).
C.3.3.3 Facility/Grounds Cleanliness.
• Trash & Debris: No later than 1500 each workday, the Contractor shall collect and deposit all trash, garbage, crating, and debris from the facility into designated, Government-provided containers. This facility coverage includes Building 545, Wharf N, Pier 4, Pier F, Wharf F, Constitution Avenue, and
Intrepid Avenue. The Government is responsible for emptying the containers and final disposal of all refuse.
• Janitorial & Grounds: The Contractor shall provide janitorial services for the facility and surrounding areas in accordance with Attachment J-8. Grounds maintenance (including clearing vegetation and weed abatement) is out-of-scope. Any future requirement for grounds maintenance must be formally authorized via bilateral contract modification executed by the Contracting Officer.
C.3.3.4 Shoreline and Floating Debris. The Contractor shall clean up facility shoreline areas between high and low water marks. Debris on shore shall be collected and disposed of. Floating debris shall be removed from the basin monthly by the Contractor.
C.3.3.5 Adverse Weather Safety. The Contractor shall monitor weather conditions continuously to protect
Government property and personnel from hazards such as high winds, rising tides, and heavy rain. Upon issuance of a "High Wind Watch," the Contractor shall prepare to secure all potentially hazardous objects at shore facilities and onboard ships. Upon issuance of a "High Wind Advisory," the Contractor shall immediately secure these objects and suspend outside work in accordance with established safety standards.
During active storms, the Contractor shall monitor flood and fire alarms and, weather and safety permitting, conduct emergency inspections. The Contractor shall remain visually alert for shipboard flooding and damage to
Government-owned buildings, property, piers, camels, and mooring lines. During winter months with freezing potential, the Contractor shall install de-icer bubblers on thin-hull or leak-prone vessels. A baseline quantity of de-icers is currently available as Government-Furnished Property (GFP) / Government inventory; however, any additional de-icers, replacement units, or ancillary equipment required to ensure complete vessel protection shall be furnished and installed by the Contractor at no additional cost to the Government. Beginning November 1st, the
Contractor shall provide the Contracting Officer’s Representative (COR) with weekly status updates on adverse weather preparations.
C.3.3.6 Heavy Weather Plan Requirements. The Contractor shall develop and submit a Heavy Weather Plan for review and acceptance within 20 days of the contract effective date. The Contractor shall review this plan annually and submit updates to the COR by 15 October, in accordance with the Contract Data Requirements List (CDRL
A029). At a minimum, the plan must address required actions for each Condition of Readiness, high winds
(exceeding 25 MPH), snow and ice conditions, local intense thunderstorms and tornadoes, and small craft advisories/gale warnings.
Requirement Trigger / Timeline Mandatory Contractor Actions
High Wind Watch Issuance of Watch Prepare to secure all loose/hazardous objects (shore and shipboard).
High Wind
Advisory Issuance of Advisory Secure objects immediately; suspend outdoor work as safety dictates.
Storm Monitoring Active Storm Event Monitor alarms; conduct emergency inspections; check for flooding/damage.
Winter Preparations Nov – End of Season Install de-icer bubblers on vulnerable vessels; report status to COR weekly.
Initial Plan Within 20 days of award Submit initial comprehensive plan for review and acceptance.
Annual Plan Update Annually by 15
October Review plan and submit to COR per CDRL requirements.
C.3.3.7 Gas Free Certification. Prior to entering any unventilated space or initiating hot work (including, but not limited to, welding or burning), the Contractor shall ensure a gas-free certification is performed. All inspections and certifications must be conducted by Contractor-provided personnel certified in accordance with 29 CFR 1915.7.
These personnel must maintain annual recertification to remain eligible to perform these duties. The Contractor shall execute all gas-free certifications in strict compliance with 29 CFR 1915, NFPA 306, and all applicable Federal and state safety regulations. The Contractor is responsible for maintaining comprehensive records of all gas-free certifications issued throughout the performance of the contract.
C.3.3.8 Polychlorinated Biphenyl (PCB) Handling. The Contractor shall contain, remove, clean, and prepare for the disposal of Polychlorinated Biphenyl (PCB) materials spilled or found leaking onboard assigned vessels in accordance with Title 40 CFR 761, Navy, Federal, state, local, and host shipyard regulations. Additionally, the
Contractor shall remove, contain, package, and prepare for the disposal of other non-leaking PCB-containing materials in accordance with 40 CFR 761, Navy, Federal, state, local, and host/tenant regulations.
In accordance with the Environmental Protection Plan (CDRL A021), and prior to any handling of PCBs, a standard procedure shall be implemented on handling requirements to eliminate possible dermal exposure to personnel from
PCB sources. A Medical Surveillance and Training Program shall be maintained by the Contractor in accordance with the Safety and Health Program plan (CDRL A020) for affected personnel in accordance with Title 29 CFR
1910 and 1915. These procedures and program plans shall be submitted to the COR for review and acceptance within 90 days after contract award.
The Contractor shall take samples for PCB Sampling and Analysis as necessary. The Contractor shall ensure all employees taking samples and performing analysis are properly trained to ensure standardized sampling techniques.
C.3.3.9 Per- and Polyfluoroalkyl Substances (PFAS) and Aqueous Film-Forming Foam (AFFF) Handling. The
Contractor shall identify, contain, extract, and prepare for lawful disposal PFAS-containing materials, specifically legacy AFFF fire-suppression systems and concentrated reservoirs found onboard assigned vessels. Due to environmental and regulatory requirements, the Contractor must implement containment protocols prior to dismantling or flushing any pipework, tanks, or bilges suspected of containing AFFF.
The Contractor shall ensure all extracted AFFF and PFAS-contaminated effluent is systematically drained, securely containerized in approved secondary-containment systems, and prepared for processing strictly through EPA-certified and DoD-approved hazardous waste destruction facilities. At no time shall AFFF be discharged into the facility basin, shore drains, or local waterways. The Contractor shall maintain compliance with the latest DoD, Navy
(OPNAVINST 5090.1 Series), federal, and state regulations governing PFAS remediation. Any accidental discharge, spill, or leakage of AFFF must be contained immediately and reported to the COR and the Installation
Environmental Office within one (1) hour of discovery.
C.3.3.10 Firefighting and Rescue Equipment. The Contractor shall maintain a comprehensive inventory of all firefighting and rescue equipment, ensuring it is commensurate with the facility layout and any applicable host tenant agreements. This inventory shall be prepared and submitted to the COR annually by 15 October in accordance with CDRL A033. The Contractor shall also maintain site-specific Standard Operating Procedures
(SOPs) for the inspection, maintenance, and emergency response utilization of firefighting and rescue equipment in accordance with COMNAVREGMIDLANTINST 11320.11 (Series). All equipment shall undergo functional testing at least annually to ensure operational readiness.
The Government remains responsible for providing equipment re-certification services. In the event the Government cannot provide timely re-certification, the Contractor shall immediately notify the Contracting Officer and COR to coordinate an equitable adjustment, if necessary, via formal contract modification prior to the Contractor obtaining third-party certification services.
C.3.4 Property. A Preventative Maintenance Program and Schedule (PMPS) must be developed by the Contractor and submitted to the Contracting Officer's Representative (COR) for review and acceptance in accordance with
CDRL A040. Implementation shall begin immediately upon Government acceptance.
Requirement Deadline Recipient / Reference
Initial PMPS Submission Within 90 days of contract effective date Contracting Officer's Representative (COR)
Annual Review & Update Every 15 October COR (IAW CDRL A040)
Implementation Upon Government Acceptance N/A
The PMPS shall provide comprehensive procedures and schedules for both operational checks and preventative maintenance. The program applies to the following Government-owned equipment:
• Marine Assets: Workboats
• Material Handling: Forklifts and Tractors
• Access Equipment: Lifts
• Transportation: Personnel Operated Vehicles (POVs)
C.3.4.1 Inventory and Accountability of Government Furnished Property, Material, and Facilities. The
Government will furnish property, material, and facilities strictly as identified in Attachments J-8 and J-13. The
Contractor shall maintain full inventory and accountability of all assigned Government Furnished Equipment (GFE) and Government Furnished Property (GFP) in accordance with FAR Part 45 and FAR Clause 52.245-1. The
Contractor shall submit a 10% physical inventory report monthly and an annual 100% reconciliation report by 15
October in accordance with CDRL A001.
Except for the specific Government-furnished items identified in Attachments J-8 and J-13, the Contractor shall furnish all tools, personal protective equipment (PPE - e.g., hard hats, safety shoes, respirators), consumables, and administrative equipment necessary to perform the requirements of this contract.
C.3.4.2 Government Furnished Vehicles. The Government will provide only the vehicles specifically listed in
Attachment J-10. All vehicles operated in support of this contract must be maintained in a safe, operational condition and comply with all Federal, State, and installation directives, including registration, licensing, and safety inspections. Any vehicle identified by the COR as being in unsafe or poor operating condition shall be immediately removed from service by the Contractor for repair or replacement.
The Contractor shall perform all routine preventative maintenance and minor servicing (e.g., oil changes, tune-ups, tire rotations, and replacement of expendables such as wiper blades, batteries, and bulbs). Major mechanical repairs
(engine/transmission overhaul or collision damage not caused by contractor negligence) shall be reported to the
Contracting Officer and COR for disposition or authorization under an established equitable adjustment mechanism
NOTE: Contractors are prohibited from using Government-furnished vehicles for personal use or home-to-work transportation consistent with Pub. L. 99-550 amending 31 U.S.C. 1344. Violation of this prohibition may be grounds for termination for default.
NOTE: The Contractor is responsible for obtaining, at its own expense, any additional vehicles deemed necessary for performance that are not listed in Attachment J-10.
C.3.4.3 GFE and GFP Maintenance Records. The Contractor shall establish, update, and maintain comprehensive, auditable maintenance records for all assigned GFE and GFP utilized during the performance of this contract. These records must accurately document the complete lifecycle history of each item, including all scheduled preventative maintenance (PM), corrective repairs, calibrations, safety inspections, and replaced parts.
Each record shall identify the item by nomenclature, manufacturer, serial number, and assigned Government property tag. All maintenance data shall be kept current and accessible for Government review, inventory audits, or safety investigations, and submitted in accordance with CDRL A008.
C.3.4.3.1 Reporting Missing Property. The Contractor shall maintain strict accountability for all Government property and file a formal Report of Missing, Lost, or Stolen Property (MLSR) in the event of any loss, theft, damage, or destruction of GFE, GFP, or Government-owned material. Initial notification shall be provided to the
Contracting Officer and COR within 24 hours of discovery, followed by the submission of a formal MLSR within two (2) working days in accordance with CDRL A023. This report must include nomenclature, serial numbers, acquisition costs, incident circumstances, and a statement regarding whether the asset contained Controlled
Unclassified Information (CUI). If theft or vandalism is suspected, the Contractor shall immediately notify installation security and law enforcement. Submission of this report does not relieve the Contractor of liability under
FAR 52.245-1.
C.3.4.3.2 Annual Property Custody Report. The Contractor shall submit an Annual Report of DoD Property in its custody to the COR no later than 15 October of each year, covering the preceding Fiscal Year (1 October through 30
September) in accordance with CDRL A001. The report must provide a complete audit trail and financial reconciliation of all GFP, detailing the beginning balance, itemized additions (receipts, transfers), itemized deletions
(disposals, transfers, authorized abandonments), and ending balance, including NSN, part number, serial number, unit acquisition cost, and location to support DoD Financial Improvement and Audit Readiness (FIAR) standards.
C.3.4.4 Tow Rigs and Riding Equipment Maintenance. The Contractor shall manage the end-to-end warehousing, inspection, certification tracking, storage, and maintenance of all Government-owned towing rigs and riding equipment—including wire rope, pendants, and shackles—utilized for vessels transiting to or from SEA21I
Philadelphia.
The Contractor's responsibilities include the physical assembly, staging, de-rigging, and technical preparation of towing gear, as well as the storage and regulatory disposition of rigging assets in accordance with SL740-AA-MAN-
010 (US Navy Towing Manual). The Contractor shall support external fleet towing requirements and coordinate the timely return (payback) of SEA21I-owned towing property to the local inventory.
All towing assets must be accompanied by digital serviceability and non-destructive pull-test certifications, which the Contractor shall maintain in a centralized, shared repository accessible to the Government. The Contractor shall compile and submit a comprehensive inventory of all on-hand towing and riding equipment to the COR annually by
15 October in accordance with CDRL A028.
C.3.4.5 Reclaimed Material Warehousing, Cataloging, and Inventory Management. The Contractor shall operate and maintain the facility's centralized, climate-controlled parts warehouse to store and protect all reclaimed and harvested shipboard assets in a Ready-for-Issue (RFI) status.
The Contractor shall receive harvested items, clean and perform routine preservation maintenance in accordance with applicable MIL-SPEC or Original Equipment Manufacturer (OEM) standards to prevent degradation, package/tag items with Unique Identification (UID) or Radio Frequency Identification (RFID) labels, and log all assets into the Government-designated inventory management database. The Contractor shall maintain 100% inventory accuracy and conduct routine physical inventory audits of the warehouse as part of standard facility operations within the established firm-fixed-price.
C.3.5 Applicable Publications
In addition to directives and publications stated elsewhere in this contract, the Contractor shall adhere to applicable portions of the following Government directives and publications. These publications are available for review at
SEA21I Inactive Ships Maintenance Office Philadelphia, PA; under no circumstances shall original publications be removed from the facility.
Document Reference Title
DOD 4160.21-M Defense Utilization and Disposal Manual
DODM 4160.28-M V1 Defense Demilitarization: Program Administration
DODM 4160.28-M V2 Defense Demilitarization: Demilitarization Coding
DODM 4160.28-M V3 Defense Demilitarization: Procedural Guidance
DOD 5220.22-M Industrial Security Manual for Safeguarding Classified Information
NAVSEAINST 4440.5 Stripping of Material from Ships Programmed for Disposal
NAVSEAINST 4570.1 Demilitarization and Disposal of Excess Ammunition and Ordnance
NAVSEAINST 4570.3 Precious Metals Recovery Program
NAVSEAINST 5500.3A Control of Access to Vessels by Non-US Citizens
NAVINACTSHIPSPORTSVAINST
4700.1 Facility Maintenance Guidance
NAVINACTSHIPSPORTSVAINST
4770.1 Inactivation Planning
NAVINACTSHIPSPORTSVAINST
4770.3 Instructions for Disposal of Inactive Fleet Ships and Crafts
NAVINACTSHIPSPORTSVAINST
4770.5J Instructions for Cannibalization of Inactive Fleet Vessels
NAVINACTSHIPSPORTSVAINST
5400.1 Operation of the Inactive Ship Maintenance Facility
NAVINACTSHIPSPORTSVAINST
5401.1 Navy Inactive Fleet Policy
OPNAVINST 4614.1 Uniform Materiel Movement and Issue Priority System (UMMIPS)
OPNAVINST 4770.5J General Instructions for Inactive Ships and Craft
OPNAVINST 4780.6G Procedures for Administering Service Craft and Boats
SECNAVINST 4900.48 Transfer of U.S. Navy Ships to Foreign Governments
SECNAVINST 5510.30 Department of Navy Personnel Security
SECNAVINST 5510.36 Department of Navy Information Security
SL740-AA-MAN-010 Towing Manual
NAVFAC P-300 Management of Transportation Equipment
NAVFAC P-306
Testing and Licensing of Weight Handling and Construction
Equipment Operators
NAVFAC P-307 Management of Weight Handling Equipment
NAVMED P-5055 Radiation Health Protection Manual
NAVSO P-3006 Financial Management of Resources
NAVSUPPUB 437 MILSTRIP/MILSTRAP
NSTM CHAPTER 050 Inactivation and Maintenance of Ships and Craft
NSTM CHAPTER 582 Mooring and Towing
NSTM CHAPTER 613 Wire and Fiber Rope
OPNAVINST 3500.39 Operational Risk Management
C.3.5.1 Technical Library. The Contractor shall maintain and update technical publications on site that are delineated in this contract and any additional publications necessary for the maintenance of vessels. The current computer listing of Technical Library publications shall be submitted to the COR on an annual basis or after any notified changes occur in accordance with CDRL A042.
C.3.6 Physical Security. The Contractor shall provide physical security for all vessels, facilities, and property located within the SEA21I Inactive Ships Maintenance Office in Philadelphia, PA, within the standard Force
Protection Conditions (FPCON) baseline defined at contract award. During the first shift (normal workdays), the
Contractor is responsible for maintaining active oversight and protection of the installation. During second and third shifts (non-working hours), as well as weekends and holidays, the Contractor shall ensure all administrative and support buildings are secured, perimeter gates are locked, and piers and brows are secured to prevent unauthorized access. Throughout these non-working periods, security personnel shall conduct routine patrol inspections multiple times per shift to maintain site integrity and situational awareness.
Specific technical duties include regular monitoring of flood markers to identify…