This is a questions and answers document containing contractor questions and government responses regarding technical specifications for the USS SOMERSET (LPD 25) Docking Selected Restricted Availability (DSRA) contract (N00024-25-R-4415). The document covers questions 23-32 and addresses specific work items including Ship Self Defense System modifications, radar cross section reduction sheathing, insulation work, foundation plates, temporary announcing systems, and cable testing responsibilities. The responses provide technical clarifications, reference corrections, and guidance on work specifications.
The Q&A includes important clarifications about contractor versus AIT (Alteration Installation Team) responsibilities, references to upcoming errata documents that will modify or delete certain work items, and directions for contractors to review complete specifications and conduct shipboard measurements for various installations and repairs. The questions primarily seek additional detail about technical specifications, drawings, measurements, and work locations, with government responses generally directing contractors to review existing documentation or providing specific technical clarifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N00024-25-R-4415 Amendment 0003.pdf | ||
| N00024-25-R-4415 Amendment 0003 CONFORMED.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
# 23 - 32 USS SOMERSET (LPD 25) Docking Selected Restricted Availability N00024-25-R-4415
NAVSEA POC:
Courtney Schlusser, courtney.j.schlusser.civ@us.navy.mil Chika Chikezie, chikachasi.a.chikezie.civ@us.navy.mil
| BQ # | Work Item | Question | |||
| Area | Section / Para # | Contractor Question | Government Response | ||
| 23 | 411-90-001 | Section M | 3.1 | Work Item 411-90-001, “ShipAlt LPD17-98552K, Ship Self Defense System (SSDS) Mk 2 Modification; accomplish (OPTION ITEM)” |
Contractor notes paragraph 3.1 states “AIT will accomplish2.11 through 2.20 in their entirety using 2.21 as reference.” Paragraphs 3.1.11 and 3.1.12 call out testing of fiber and copper cables that were installed by the AIT.
Bidder’s Question:
Was it the customers intention to have the KTR test cables that were installed by the AIT?
| Who will be repairing cables that do not pass the testing? | Reference para 3.1 of work item 411-90-001. No, the Contractor is responsible for the work tasked to the Contractor (including testing of cables) and the AIT is responsible for the work tasked to the AIT. If the work identified in 411-90-001 is identified as for the Contractor then the Contractor will repair cables that did not pass testing. If the work identified in 411-90-001 is identified as for the AIT then the AIT will repair cables that did not pass testing. | |||||
| 24 | 631-21-010 | Section M | 3.1 | Remove each existing radar cross section reduction (RCSR) sheathing and closure plate from the underside of each AN/SLQ-32 platform located in 1.2, using 2.2 and 2.3 for guidance. Can the government advise page Number, plan view, section, detail info for each reference? | Work item 631-21-010 is deleted in Errata 6. | |
| 25 | 631-21-009 | Attachment J-1 | N/A | 1.3.1 Quantity (60 EA), Stud, CRES, 3/8-16UNC-2A by 1-1/2 Inch, 316, Stainless Steel. |
Can the government advise Ref #, plan, section, detail info?
1.3.2 Quantity (12 EA), Foundation Plate, Stainless Steel, 316L, Item Number 5 of 2.4 Can the government advise page #, plan view, section, detail info?
1.3.3 Quantity (50 SF), DIAB HP 130 Core, Piece 5 of 2.2
| Can the government advise page #, plan view, section, detail info? | The work item 631-21-009 is written and referenced correctly. The contractor should review and follow the reference in its entirety. | |||||
| 26 | 123-11-001 | Attachment J-1 | 3.3.1 | paragraph 3.3.1 invokes reference 2.3, but notes this to be a possible typo and should instead reflect invoking reference 2.2? | Work Item 123-11-001is corrected in Errata 6. | |
| 27 | 631-21-006 | Attachment J-1 | N/A | can the government provide drawings to reference to support 3.1? | Work Item 631-21-006 the drawing referenced in paragraph 3.1 will be added in Errata 7. | |
| 28 | 512-11-002 | Attachment J-1 | N/A | para 5.1 GFM providing 1 each Impeller, however KTR notes the spec does not direct KTR to replace Impeller. Please advise? | Recommend KTR ship check work item. 009-17 Para 3.1.1. The Impeller will be provided to the contractor through GFP (see Attachment J-8). | |
| 29 | 508-11-005 | Attachment J-1 | 3.1 | para 3.1 direct KTR to remove deteriorated insulation and lagging per attachment A. | ||
| No width or diameter, no length, and no Area other than compartment provided. Please advise plan view, section, details for location of work? | For work item 508-11-005, the contractor should review para. 3.3 Template exact size, configuration, and location from each existing shipboard condition. Attachment A provides color photos with arrows. Read specification in its entirety. | |||||
| 30 | 508-11-003 | Attachment J-1 | 3.1 | para 3.1 direct KTR to replace 4 linear feet damage insulation. No width or diameter, no length, and no Area other than compartment provided. Please advise plan view, section, details for location of work? | For work item 508-11-003, the Space Location: para. 1.2.1 Uptake Space (5-80-1-Q); Equipment: para. 1.3.1 Quantity (One EA), Number 3 Ship Service Diesel Generator Silencer; and para. 3.1 Remove 4 linear feet of existing damaged and deteriorated insulation for equipment listed in 1.3 and as designated by the SUPERVISOR. | |
| 31 | 508-11-002 | Attachment J-1 | 3.1 | 002 para 3.1 direct KTR to replace 8 linear feet damage insulation and lagging. No width or diameter, no length, and no Area other than compartment provided. Please advise plan view, section, details for location of work? | For work item 508-11-002, para. 3.1 Remove 8 linear feet of existing damaged and deteriorated insulation |
and lagging on low point drain for equipment listed in 1.3 and located in paragraph 1.2, as designated by the SUPERVISOR. 3.3 Template exact size, configuration, and location from each existingshipboard condition. Review the work item.
32 992-11-025 Attachment J-1 3.1 can the government provide a list of space required to support 3.1? The contractor must read specification and references in its entirity. References are correct. Based on the specifications the contractor shall determine THROUGHOUT THE SHIP the temporary 1MC (announcing system) to meet the requirements.