This sources sought announcement and enclosure outline the work required for the USS RUSSELL (DDG 59) FY25 Docking Selected Restricted Availability (DSRA). The Navy seeks maintenance, repair, and modernization services between March 2025 and June 2026 for the USS RUSSELL. The enclosure describes the ship characteristics and outlines the anticipated work across multiple trades and systems, including structural repairs, preservation, propulsion repairs, auxiliary system overhauls, and combat system upgrades. Interested parties must submit responses by March 22, 2024 identifying their capabilities to perform the work. The solicitation is expected to be released in June 2024.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Enclosure (1) | Page i
Enclosure (1): Outline of some of the work anticipated to be completed under the expected USS
RUSSELL (DDG 59) FY25 DSRA
A. General
a. Competition Area: Coast Wide – West Coast
b. Rough Estimate Man-Days:
i. Maintenance Ship Yard ~ 320,000
ii. Modernization Ship Yard ~ 5,000
c. Ship Particulars:
i. Length: 510 ft, 10.6 inches
ii. Beam: 66 ft 5 inches (breadth, Molded Maximum)
iii. Draft: 21 ft 9 inches (Full Load Condition)
iv. Displacement: 9191 tons
v. Mean Navigable Water depth draft: >30 ft 8 inches
vi. Air Draft: 150.5 ft.
d. Facility Particulars:
i. Pier Length: > 509 feet 6 inches
ii. Electrical: 4800 amps, 450 volts, 60 hz, 3 ph (UFC 4-150-02 table C-7)
iii. Potable Water: 9500 GPD (UFC 4-150-02 Table C-4)
iv. Sea Water: 1250 GPM (UFC 4-150-02 Table C-3), 150 PSI measured at the most remote outlet (UFC 4-150-02, Para 3-3.2.1)
v. Sewage: Ability to accommodate and dispose of 10,000 GPD of effluent and
10,000 GPD of waste water
vi. Mean Pier Water depth draft: >33 ft
vii. Dry Dock to support DDG51 Class Ship
B. The Availability’s modernization scope will include a significant amount of work across multiple trades and spaces. The work will largely consist of CANES HW 2.0, BMD 4.0, TTWCS V5.4.0.2, SLQ-32(V)6, AWS:CKT 3TV COTS Upgrade, VLS Magazine Ventilation Upgrades, AN/SQQ- 89A(V)15 WITH TI-18 HW various NAVSEA Program Alts as well as Berthing modifications, Removal of Unused MCS Cables and Main Drainage System Piping ShipAlts. The successful contractor must be able to provide an integrated production schedule that incorporates AIT, 3rd Party contractors, and Government workload. Key trades & efforts include: structural welding, cabling pulling, piping, electrical, and ventilation work if needed. Both the prime contractor and AIT contractors will execute the structural/industrial work. Further direction will be provided in the work specification package to define the work split.
C. The Availability’s maintenance requirements are expected to include the following types of work:
Hull Structure
• MER 1/2 Bilge Preservation and repairs
• Aux 1/2 Bilge Preservation and repairs
• 05 Level Weather Decks corrosion
• Intake/Uptake repairs/preservation
• structural from the last avail (DFS)
• Below water line assessment repairs
• FWD VCHT deck replace
• Tank and void open/gas free/inspect, structural repair and preservation
• Condition-based repair and replacement of structural decks
• Condition-based repair and replacement of superstructure and deckhouse level decks
Enclosure (1) | Page ii
• Condition-based repair and replacement of watertight doors, hatches, and scuttles
Propulsion Plant
• Condition-based repair and preservation of the propulsion combustion air intakes
• Condition-based repair and preservation of the propulsion exhaust air uptakes
Electric Plant and Distribution Equipment
• GTG repairs
• Cableway inspection and condition-based repair
• Generator support system repairs
Command and Surveillance
• Tank level indicator system repairs
• IFF antennae repair
• Array resurfacing
• Sonar transducer and stave cable replacement
• SLQ-32 and PCMS repair
• 1 MK 82 Director replacement
Auxiliary Systems
• Condition-based repair and replacement of insulation and lagging in machinery spaces
• Clean, condition-based repair to ventilation ducting as identified by the maintenance team and repair 2 ventilation fans as condition warrants and as identified by the maintenance team
• Overhaul 1 A/C plant compressor as condition warrants and as identified by the maintenance team and clean all 5 A/C plant condensers
• Replace FM piping and chemically clean FM piping system
• Overhaul 1 HPAC as condition warrants and as identified by the maintenance team
• Repair hydraulic anchor windlass and repair and preserve anchors, and anchor chain assemblies
• Repair RAST system as condition warrants and as identified by the maintenance team
• Repair HHDs as condition warrants and as identified by the maintenance team
• Condition-based repair to VCHT piping and VCHT valve repair as condition warrants and as identified by the maintenance team
Outfit and Furnishings
• Condition-based interior preservation
• Condition-based exterior preservation
• Condition-based repair and preservation of the stacks
• Preservation of the underwater body hull.
• Preservation of the freeboard.
• Replacement of the ICCP system and sacrificial anodes.
• Condition-based replacement of deck covering and exterior deck non-skid
• Condition-based replacement of flight and hangar deck non-skid
• Condition-based replacement of hull insulation
Armament
• Removal, shipping and replacement of MT 51 gun.
• Condition-based repair and preservation of RSLs
• Replacement of approximately one-half of the VLS deluge system critical flex hoses.
Ship Assembly and Support Services
• Services are directly related to availability, location, duration, and man-day determination.
Enclosure (1) | Page iii
Man-days can differ by region and whether the availability is performed in a public or private ship repair facility. Services are predominately driven by availability duration with the exception of cleaning and pumping (tanks and bilges), crane, rigging, and temporary refrigeration services which are more ship-specific.
• Temporary Air Conditioning/Lodging
• Hazardous waste control
Key Maintenance Work Items (not all inclusive)
• Compensated Fuel Tank; repair
• Air Intake and Exhaust; structural repairs
• Forecastle Nonskid; replace
• Underwater Hull; preserve
• Flight Deck Nonskid; replace
Key Modernization Work Items (not all inclusive)
• CANES HW 2
• TTWCS V5.4.0.2
• SLQ-32(V)6
• AN/SQQ-89A(V)15 WITH TI-18 HW
• Removal of Unused MCS Cables
• Main Drainage System Piping