N00024-23-R-6201 GFI for SWFTS CIS_CCE (2022-12-01).pdf
PDF 2 MB Posted
- Solicitation number
- N00024-23-R-6201
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Draft RFP CIS Responses for Posting 2023-02-03.pdf | ||
| N00024-23-R-6201 CIS CDRLS (posted 2022-12-19).pdf | ||
| Bidders Questions.xlsx | XLSX spreadsheet | |
| N00024-23-R-6201 Draft Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVSEA 4340/2 (Rev. Aug. 2021) Page 1 of 6
GOVERNMENT FURNISHED INFORMATION
ATTACHMENT # PR#
PROGRAM TITLE: CONTRACT NUMBER: DATE:
CODE:
(1) NUMBER (5) GFI DUE DATE(4) DOCUMENT DATE(3) DOCUMENT NUMBER(2) DOCUMENT TITLE
NAVSEA 4340/2 (Rev. Aug. 2021) Page 2 of 6
GOVERNMENT FURNISHED INFORMATION (CON'T)
NAVSEA 4340/2 (Rev. Aug. 2021) Page 3 of 6
NAVSEA 4340/2 (Rev. Aug. 2021) Page 4 of 6
NAVSEA 4340/2 (Rev. Aug. 2021) Page 5 of 6
NAVSEA 4340/2 (Rev. Jul 2020) Page 6 of 6
NAVSEA Form 4340/2 - Government Furnished Information Instructions
ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.
PR #: Enter Purchase Request (PR) number.
PROGRAM TITLE: Enter the title of the program.
CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.
DATE: Enter the calendar date that this form was prepared.
CODE: Enter the Program Office / Requiring Activity's office code.
NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.
DOCUMENT TITLE, Column (2): Enter Document Title for each item.
DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.
DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).
GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:
DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test
PAGE __ OF __: Assign page numbers sequentially.
| StyleSheet[0]: |
| #subform[0]: |
| TextField1[0]: TBD - |
| TextField2[0]: |
| TextField7[0]: SWFTS CIS & CCE |
| TextField8[0]: TBD (RFP N00024-23-R-6201) |
| DateField1[0]: 01 December, 2022 |
| TextField3[0]: PMS425 |
| DateField3[0]: RFP |
| DateField2[0]: Feb 1, 2022 |
| TextField6[0]: |
| TextField5[0]: System Performance Specification for Common Infrastructure Services (CIS) Subsystem |
| TextField4[0]: 1 |
| DateField3[1]: RFP |
| DateField2[1]: Sep 23, 2022 |
| TextField6[1]: |
| TextField5[1]: Ready Reference Manual for Combat Control System AN/BYG-1(v)1 (for TI20 - APB19 Platforms) (TI20-19.9) |
| TextField4[1]: 11 |
| DateField3[2]: 45 DAC |
| DateField2[2]: Sep 23, 2022 |
| TextField6[2]: |
| TextField5[2]: Combat Control System AN/BYG-1(v)1 Technical Insertion (TI) 20 Advanced Processor Build 19 (APB19) (TI20-19.9) IETM |
| TextField4[2]: 10 |
| DateField3[3]: 45 DAC |
| DateField2[3]: Aug 23, 2022 |
| TextField6[3]: |
| TextField5[3]: TI-20 APB19 SWFTS CCE Functional Description Data |
| TextField4[3]: 9 |
| DateField3[4]: 45 DAC |
| DateField2[4]: Aug 9, 2022 |
| TextField6[4]: |
| TextField5[4]: TI-20 APB19 SWFTS CIS & SoS Interactive Electronic Technical Manual (IETM) |
| TextField4[4]: 8 |
| DateField3[5]: RFP |
| DateField2[5]: Oct 19, 2022 |
| TextField6[5]: |
| TextField5[5]: TI-24 AN/BYG-1 SSBN OHIO (V)5 Initial Design Review (IDR) |
| TextField4[5]: 7 |
| DateField3[6]: 45 DAC |
| DateField2[6]: Mar 14, 2019 |
| TextField6[6]: |
| TextField5[6]: CIS Training Plans and Curriculum |
| TextField4[6]: 6 |
| DateField3[7]: 45 DAC |
| DateField2[7]: Aug 4, 2022 |
| TextField6[7]: |
| TextField5[7]: TI-20 APB19 CIS Software Version Description |
| TextField4[7]: 5 |
| DateField3[8]: RFP |
| DateField2[8]: Sep 8, 2022 |
| TextField6[8]: |
| TextField5[8]: TI-20 APB19 CIS Program Software Product Specification |
| TextField4[8]: 4 |
| DateField3[9]: 45 DAC |
| DateField2[9]: Jun 2, 2022 |
| TextField6[9]: |
| TextField5[9]: TI-20 APB19 CIS System/Subsystem Design Description |
| TextField4[9]: 3 |
| DateField3[10]: RFP |
| DateField2[10]: May 9, 2022 |
| TextField6[10]: |
| TextField5[10]: TI-20 APB19 CIS Specification Requirement Verification Matrix |
| TextField4[10]: 2 |
| TextField4[11]: 12 |
| TextField4[12]: 13 |
| TextField4[13]: 14 |
| TextField5[11]: TI-20 APB19 Submarine Warfare Federated Tactical System (SWFTS) Group Requirements List (GRL) |
| TextField5[12]: TI-20 APB19 Interface Implementation Database (IIDB) – Group Data Dictionary (GDD) |
| TextField5[13]: TI-20 APB19 Google Protocol Buffers (GPB) |
| TextField6[11]: |
| TextField6[12]: |
| TextField6[13]: |
| DateField2[11]: Oct 27, 2022 |
| DateField2[12]: Nov 3, 2022 |
| DateField2[13]: Oct 27, 2022 |
| DateField3[11]: RFP |
| DateField3[12]: RFP |
| DateField3[13]: 45 DAC |
| #subform[1]: |
| DateField3[14]: RFP |
| DateField2[14]: May 26, 2022 |
| TextField6[14]: |
| TextField5[14]: TI-20 APB19 SWFTS System Initialization & Fault Tolerance (SIFT) |
| TextField4[14]: 18 |
| DateField3[15]: 45 DAC |
| DateField2[15]: Jul 12, 2021 |
| TextField6[15]: |
| TextField5[15]: Submarine Combat and Weapon Control Program Office, Configuration Management Plan |
| TextField4[15]: 28 |
| DateField3[16]: 45 DAC |
| DateField2[16]: Jun 20, 2017 |
| TextField6[16]: |
| TextField5[16]: PMS425 System Safety Management Plan (SSMP), 425-SAFETY-SSMP-03 |
| TextField4[16]: 31 |
| DateField3[17]: RFP |
| DateField2[17]: Jan 14, 2021 |
| TextField6[17]: |
| TextField5[17]: PMS425 Submarine Combat and Weapons Control System Systems Engineering Plan (SEP) – DEVSECOPS Addendum |
| TextField4[17]: 30 |
| DateField3[18]: 45 DAC |
| DateField2[18]: Aug 25, 2020 |
| TextField6[18]: |
| TextField5[18]: Cybersecurity Vulnerability Management Program for the SWFTS TSUB Cyber Ltr Ser TSUB/006 |
| TextField4[18]: 29 |
| DateField3[19]: 45 DAC |
| DateField2[19]: Aug 1, 2012 |
| TextField6[19]: |
| TextField5[19]: Naval Warfare Systems Certification Policy NAVSEAINST 9410.2A |
| TextField4[19]: 27 |
| DateField3[20]: 45 DAC |
| DateField2[20]: Apr 30, 2020 |
| TextField6[20]: |
| TextField5[20]: TI-20 APB19 Submarine Warfare Federated Tactical System (SWFTS) Contact Data Matrix |
| TextField4[20]: 26 |
| DateField3[21]: 45 DAC |
| DateField2[21]: Aug 18, 2022 |
| TextField6[21]: |
| TextField5[21]: TI-20 APB19 Submarine Warfare Federated Tactical System (SWFTS) Alerts Matrix |
| TextField4[21]: 25 |
| DateField3[22]: 45 DAC |
| DateField2[22]: May 26, 2022 |
| TextField6[22]: |
| TextField5[22]: TI-20 APB19 Submarine Warfare Federated Tactical System (SWFTS) Overlay Matrix |
| TextField4[22]: 24 |
| DateField3[23]: 45 DAC |
| DateField2[23]: May 26, 2022 |
| TextField6[23]: |
| TextField5[23]: TI-20 APB19 Submarine Warfare Federated Tactical System (SWFTS) Display Standards and Conventions |
| TextField4[23]: 23 |
| DateField3[24]: RFP |
| DateField2[24]: Nov 3, 2022 |
| TextField6[24]: |
| TextField5[24]: TI-20 APB19 Submarine Warfare Federated Tactical System (SWFTS) Any Display Anywhere (ADAW) Matrix |
| TextField4[24]: 22 |
| DateField3[25]: 45 DAC |
| DateField2[25]: Nov 3, 2022 |
| TextField6[25]: |
| TextField5[25]: TI-20 APB19 Submarine Warfare Federated Tactical System (SWFTS) Access Control List (ACL) |
| TextField4[25]: 21 |
| DateField3[26]: RFP |
| DateField2[26]: Sep 16, 2021 |
| TextField6[26]: |
| TextField5[26]: TI-20 APB19 SWFTS & Submarine Tactical Systems Cybersecurity Baseline Requirements Document |
| TextField4[26]: 20 |
| DateField3[27]: RFP |
| DateField2[27]: Sep 16, 2021 |
| TextField6[27]: |
| TextField5[27]: TI-20 APB19 Submarine Warfare Federated Tactical System (SWFTS) Network Design Document (NDD) |
| TextField4[27]: 19 |
| TextField4[28]: 15 |
| TextField4[29]: 17 |
| TextField5[28]: TI-20 APB19 Interface Design Language (IDL) |
| TextField5[29]: TI20 APB19 Submarine Warfare Federated Tactical System (SWFTS) Subsystem Name List |
| TextField6[28]: |
| TextField6[29]: |
| DateField2[28]: Dec 8, 2021 |
| DateField2[29]: Oct 27, 2022 |
| DateField3[28]: 45 DAC |
| DateField3[29]: 45 DAC |
| TextField4[30]: 16 |
| TextField5[30]: TI-20 APB19 Submarine Warfare Federated Tactical System (SWFTS) Software Standards |
| TextField6[30]: |
| DateField2[30]: Aug 18, 2022 |
| DateField3[30]: 45 DAC |
| #subform[2]: |
| DateField3[31]: RFP |
| DateField2[31]: Latest |
| TextField6[31]: |
| TextField5[31]: SWFTS Execution Schedule |
| TextField4[31]: 35 |
| DateField3[32]: 45 DAC |
| DateField2[32]: Mar 21, 2022 |
| TextField6[32]: |
| TextField5[32]: TI20 APB19 SWFTS CIS Interactive Electronics Technical Manual PVT |
| TextField4[32]: 45 |
| DateField3[33]: 45 DAC |
| DateField2[33]: Mar 15, 2022 |
| TextField6[33]: |
| TextField5[33]: TI20 APB19 LMS Hosting PVT |
| TextField4[33]: 48 |
| DateField3[34]: 45 DAC |
| DateField2[34]: Sep 26, 2022 |
| TextField6[34]: |
| TextField5[34]: TI20 APB19 OBTT-MC Hosting PVT |
| TextField4[34]: 47 |
| DateField3[35]: 45 DAC |
| DateField2[35]: Sep 26, 2022 |
| TextField6[35]: |
| TextField5[35]: TI20 APB19 Print Services PVT |
| TextField4[35]: 46 |
| DateField3[36]: 45 DAC |
| DateField2[36]: Sep 16, 2022 |
| TextField6[36]: |
| TextField5[36]: TI24 Submarine Warfare Federated Tactical System (SWFTS) Network Description Document (NDD) |
| TextField4[36]: 44 |
| DateField3[37]: 45 DAC |
| DateField2[37]: May 3, 2022 |
| TextField6[37]: |
| TextField5[37]: TI24 Submarine Warfare Federated Tactical System (SWFTS) Architecture Description Document (ADD) |
| TextField4[37]: 43 |
| DateField3[38]: 45 DAC |
| DateField2[38]: Latest |
| TextField6[38]: |
| TextField5[38]: SWFTS Integrated Master Schedule |
| TextField4[38]: 42 |
| DateField3[39]: 45 DAC |
| DateField2[39]: Oct 26, 2022 |
| TextField6[39]: |
| TextField5[39]: TI-20 Platform Diagrams |
| TextField4[39]: 41 |
| DateField3[40]: RFP |
| DateField2[40]: Feb 11, 2022 |
| TextField6[40]: |
| TextField5[40]: System of Systems Baseline Roadmap Process |
| TextField4[40]: 40 |
| DateField3[41]: 45 DAC |
| DateField2[41]: Jun 1, 2020 |
| TextField6[41]: |
| TextField5[41]: PEO SUB-S Submarine Warfare Federated Tactical Systems (SWFTS) Overview ("SWFTS 101") |
| TextField4[41]: 39 |
| DateField3[42]: 45 DAC |
| DateField2[42]: Feb 5, 2020 |
| TextField6[42]: |
| TextField5[42]: SWFTS AMQP Reference Implementation Version Description Document |
| TextField4[42]: 38 |
| DateField3[43]: 45 DAC |
| DateField2[43]: Jun 1, 2022 |
| TextField6[43]: |
| TextField5[43]: Posture Transition Operations Manual (PTOM) Process Requirements |
| TextField4[43]: 37 |
| DateField3[44]: 45 DAC |
| DateField2[44]: Latest |
| TextField6[44]: |
| TextField5[44]: Baseline Roadmap |
| TextField4[44]: 36 |
| TextField4[45]: 32 |
| TextField4[46]: 34 |
| TextField5[45]: SWFTS System Engineering Baseline Management Process |
| TextField5[46]: TI-XX Installation Schedule |
| TextField6[45]: |
| TextField6[46]: |
| DateField2[45]: Mar 6, 2019 |
| DateField2[46]: Oct 1, 2021 |
| DateField3[45]: 45 DAC |
| DateField3[46]: 45 DAC |
| TextField4[47]: 33 |
| TextField5[47]: SWFTS CCE v2.x Service Level Agreement |
| TextField6[47]: |
| DateField2[47]: Nov 7, 2022 |
| DateField3[47]: 45 DAC |
| #subform[3]: |
| DateField3[48]: 45 DAC |
| DateField2[48]: Mar 15, 2022 |
| TextField6[48]: |
| TextField5[48]: TI20 APB19 Landing Pad PVT |
| TextField4[48]: 52 |
| DateField3[49]: 45 DAC |
| DateField2[49]: Sep 2, 2022 |
| TextField6[49]: |
| TextField5[49]: TI20 APB19 Cybersecurity PVT |
| TextField4[49]: 62 |
| DateField3[50]: 45 DAC |
| DateField2[50]: Sep 2, 2022 |
| TextField6[50]: |
| TextField5[50]: TI20 APB19 Annex (Post Install) PVT |
| TextField4[50]: 65 |
| DateField3[51]: RFP |
| DateField2[51]: Mar 8, 2022 |
| TextField6[51]: |
| TextField5[51]: TI20 APB19 Infrastructure PVT |
| TextField4[51]: 64 |
| DateField3[52]: RFP |
| DateField2[52]: Sep 26, 2022 |
| TextField6[52]: |
| TextField5[52]: TI20 APB19 CCE PVT |
| TextField4[52]: 63 |
| DateField3[53]: 45 DAC |
| DateField2[53]: Mar 21, 2022 |
| TextField6[53]: |
| TextField5[53]: TI20 APB19 Time Distribution PVT |
| TextField4[53]: 61 |
| DateField3[54]: 45 DAC |
| DateField2[54]: Mar 15, 2022 |
| TextField6[54]: |
| TextField5[54]: TI20 APB19 Platform Parameters PVT |
| TextField4[54]: 60 |
| DateField3[55]: 45 DAC |
| DateField2[55]: Mar 15, 2022 |
| TextField6[55]: |
| TextField5[55]: TI20 APB19 Overlay Service PVT |
| TextField4[55]: 59 |
| DateField3[56]: 45 DAC |
| DateField2[56]: Mar 8, 2022 |
| TextField6[56]: |
| TextField5[56]: TI20 APB19 Discovery Service PVT |
| TextField4[56]: 58 |
| DateField3[57]: 45 DAC |
| DateField2[57]: Mar 8, 2022 |
| TextField6[57]: |
| TextField5[57]: TI20 APB19 Display Sharing PVT |
| TextField4[57]: 57 |
| DateField3[58]: 45 DAC |
| DateField2[58]: Mar 21, 2022 |
| TextField6[58]: |
| TextField5[58]: TI20 APB19 Video Data Distribution PVT |
| TextField4[58]: 56 |
| DateField3[59]: 45 DAC |
| DateField2[59]: Mar 8, 2022 |
| TextField6[59]: |
| TextField5[59]: TI20 APB19 Globe Service PVT |
| TextField4[59]: 55 |
| DateField3[60]: 45 DAC |
| DateField2[60]: Mar 21, 2022 |
| TextField6[60]: |
| TextField5[60]: TI20 APB19 SecureNet PVT |
| TextField4[60]: 54 |
| DateField3[61]: 45 DAC |
| DateField2[61]: Sep 2, 2022 |
| TextField6[61]: |
| TextField5[61]: TI20 APB19 iNet PVT |
| TextField4[61]: 53 |
| TextField4[62]: 49 |
| TextField4[63]: 51 |
| TextField5[62]: TI20 APB19 SRMS Hosting PVT |
| TextField5[63]: TI20 APB19 ISMT Hosting PVT |
| TextField6[62]: |
| TextField6[63]: |
| DateField2[62]: Mar 21, 2022 |
| DateField2[63]: Mar 21, 2022 |
| DateField3[62]: 45 DAC |
| DateField3[63]: 45 DAC |
| TextField4[64]: 50 |
| TextField5[64]: TI20 APB19 RTSBA Hosting PVT |
| TextField6[64]: |
| DateField2[64]: Mar 15, 2022 |
| DateField3[64]: 45 DAC |
| #subform[4]: |
| DateField3[65]: 45 DAC |
| DateField2[65]: Jul 1, 2019 |
| TextField6[65]: |
| TextField5[65]: MOU between the DoD of the USA and the DoD of Australia for the Cooperative Development, Production, and Support of the Combat System AN/BYG-1 Tactical and Weapons Control System |
| TextField4[65]: 69 |
| DateField3[66]: |
| DateField2[66]: |
| TextField6[66]: |
| TextField5[66]: |
| TextField4[66]: |
| DateField3[67]: |
| DateField2[67]: |
| TextField6[67]: |
| TextField5[67]: |
| TextField4[67]: |
| DateField3[68]: |
| DateField2[68]: |
| TextField6[68]: |
| TextField5[68]: |
| TextField4[68]: |
| DateField3[69]: |
| DateField2[69]: |
| TextField6[69]: |
| TextField5[69]: |
| TextField4[69]: |
| DateField3[70]: |
| DateField2[70]: |
| TextField6[70]: |
| TextField5[70]: |
| TextField4[70]: |
| DateField3[71]: |
| DateField2[71]: |
| TextField6[71]: |
| TextField5[71]: |
| TextField4[71]: |
| DateField3[72]: 45 DAC |
| DateField2[72]: May 1, 2013 |
| TextField6[72]: |
| TextField5[72]: Submarine Combat and Weapon Control System Program Office Risk Management Plan |
| TextField4[72]: 76 |
| DateField3[73]: 45 DAC |
| DateField2[73]: Mar 21, 2022 |
| TextField6[73]: |
| TextField5[73]: TI20 APB19 System Overview Implicit Inspection & Analysis Test Verification (IIATV) |
| TextField4[73]: 75 |
| DateField3[74]: 45 DAC |
| DateField2[74]: Sep 26, 2022 |
| TextField6[74]: |
| TextField5[74]: TI20 APB19 Cyber System Overview Implcit Inspection & Analysis Test Verification (IIATV) |
| TextField4[74]: 74 |
| DateField3[75]: 45 DAC |
| DateField2[75]: Feb 22, 2018 |
| TextField6[75]: |
| TextField5[75]: CIS Program Transition Plan |
| TextField4[75]: 73 |
| DateField3[76]: 45 DAC |
| DateField2[76]: Sep 20, 2016 |
| TextField6[76]: |
| TextField5[76]: NAVSEA 9400.2A - NAVSEA Platform Information Technology-Control Systems Cybersecurity Governance and Guidance |
| TextField4[76]: 72 |
| DateField3[77]: RFP |
| DateField2[77]: Sep 15, 2022 |
| TextField6[77]: |
| TextField5[77]: PMS425 Integrated Master Plan (IMP) |
| TextField4[77]: 71 |
| DateField3[78]: 45 DAC |
| DateField2[78]: Jun 20, 2017 |
| TextField6[78]: |
| TextField5[78]: PMS425 System Safety Management Plan (SSMP) |
| TextField4[78]: 70 |
| TextField4[79]: 66 |
| TextField4[80]: 68 |
| TextField5[79]: TI20 APB19 System Management PVT |
| TextField5[80]: SWFTS Transformation to Improve Cyber Resiliency and the Speed of Capability Delivery Ser TSUB/0110 |
| TextField6[79]: |
| TextField6[80]: |
| DateField2[79]: Sep 26, 2022 |
| DateField2[80]: Jul 19, 2012 |
| DateField3[79]: 45 DAC |
| DateField3[80]: 45 DAC |
| TextField4[81]: 67 |
| TextField5[81]: Virginia (SSN 774) Class Non-Propulsion Electronic Systems (NPES) Block IV Functional Requirements Documents (FRD) |
| TextField6[81]: |
| DateField2[81]: Nov 5, 2019 |
| DateField3[81]: 45 DAC |
File details come from the government source that posted it. Updated .