This sources sought announcement from the Naval Sea Systems Command seeks information from potential offerors for the FY23 Depot Modernization Period availability on the USS LASSEN (DDG 82). Work is anticipated to include dry dock and pier-side maintenance, repair, and alterations from December 2022 through August 2024. The announcement provides an outline of anticipated work on hull structure, propulsion plant, electric plant and distribution equipment, command and surveillance systems, auxiliary systems, outfit and furnishings, and armament. Interested parties are requested to submit a notice of interest and responses to questions about organizational capabilities and experience by January 2022. The anticipated contract type is firm-fixed price, with award planned for on or around January 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Enclosure (1) - USS LASSEN.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Enclosure (1): Outline of some of the work anticipated to be completed under the expected USS LASSEN (DDG 82) FY23 DMP
A. General
a. Competition Area: Coast Wide – East and Gulf Coasts
b. Rough Estimate Man-Days:
| i. Maintenance Ship Yard | ~ 70,000 | |
| ii. Modernization Ship Yard | ~ 15,000 |
c. Ship Particulars:
3. Length: 510 ft, 10.6 inches
3. Beam: 66 ft 5 inches (breadth, Molded Maximum
3. Draft: 21 ft 9 inchs (Full Load Condition)
3. Displacement: 9191 tons
3. Mean Navigable Water depth draft: >30 ft 8 inches
3. Air Draft: 150.5 ft.
d. Facility Particulars:
4. Pier Length: > 509 feet 6 inches
4. Electrical: 4800 amps, 450 volts, 60 hz, 3 ph (UFC 4-150-02 table C-7)
4. Potable Water: 9500 GPD (UFC 4-150-02 Table C-4)
4. Sea Water: 1250 GPM (UFC 4-150-02 Table C-3), 150 PSI measured at the most remote outlet (UFC 4-150-02, Para 3-3.2.1)
4. Sewage: Ability to accommodate and dispose of 10,000 GPD of effluent and 10,000 GPD of waste water
4. Mean Pier Water depth draft: >33 ft
4. Dry Dock to support DDG51 Class Ship
B. The Availability’s modernization scope will include a significant amount of work across multiple trades and spaces. The successful contractor must be able to provide an integrated production schedule that incorporates AIT, 3rd Party contractors, and Government workload. Key trades & efforts include: structural welding, cabling pulling, piping, electrical, and ventilation work if needed. Both the prime contractor and AIT contractors will execute the structural/industrial work. With the taking down of FODMS, the installation of a temporary fire alarm system and temporary flooding system will be necessary based on requirements of S0570-AC-CCM-010/8010; Industrial Ship Safety Manual for Fire Prevention and Response. Further direction will be provided in the work specification package to define the work split.
C. The Availability’s maintenance requirements are expected to include the following types of work:
Hull Structure
· Assessments.
· Condition-based repair and replacement of structural decks.
· Condition-based repair and replacement of superstructure and deckhouse level decks. This will include thicker deck plating.
· Condition-based repair and replacement of watertight doors, hatches, and scuttles.
· Preservation and condition-based repairs of U/W Hull, Freeboard, FWD/AFT Stacks, Mast and Superstructure
· Complete rip out and replace 02 level plating and replace with thicker plate
· Condition based repairs of 03 Level plating.
· Anode replacement
· ICCP refurbishment
Propulsion Plant
· Condition-based repairs to the MRG and associated components (main thrust bearing assembly).
· Condition-based repair and preservation of the propulsion combustion air intakes and louvers.
· Condition-based repair and preservation of the propulsion exhaust air uptakes.
· Full Shafting Package to include OD Box, MX-9 Seal, Hub replacement, Waterborne Shafting replacement/refurbish, Rudder Structural refurbishment, Control Rod/Prairie Air Tube and Blade repairs Bearing Land Shim Straps for Stern Tube and Struts
· GTM/GTG Louver preservation.
Electric Plant and Distribution Equipment
· Cableway inspection and condition-based repair. Additionally, circuit breaker replacement.
· Generator support system repairs.
· Shore Power Breaker Bunker repairs
· Degaussing cable refurbishment
Command and Surveillance
· Sonar transducer and stave cable replacement.
· SDRW; inspect and repair
· SDRW RT; accomplish
· Communication Antenna HF/UHF/VHF refurbishment
Auxiliary Systems
· Condition-based repair and replacement of insulation and lagging in machinery spaces.
· Repair ventilation fans as condition warrants and as identified by the maintenance team. Also, condition-based repair to ventilation ducting as identified by the maintenance team.
· Clean A/C plant, SPY and Sonar Cooling Skid, LO coolers and condensers.
· Condition-based repair to FM/Sea Water piping as identified by the maintenance team.
· Condition-based repair to VCHT piping, and VCHT valve replacement.
· Sea Valve repair/replacement to include waster sleeve replacement
Outfit and Furnishings
· Condition-based interior preservation.
· Condition-based exterior preservation.
· Condition-based repair and preservation of the stacks.
· Condition-based replacement of deck covering and exterior deck non-skid.
· Condition-based replacement of foc’sle, flight and hangar deck non-skid.
· Condition-based replacement of hull insulation.
Armament
· Condition-based repair of Ammo Elevator
· MK-41 VLS Launcher; resurface and hatch repairs
Ship Assembly and Support Services
· Services are directly related to availability, location, duration, and man-day determination. Man days can differ by region and whether the availability is performed in a public or private ship repair facility. Services are predominately driven by availability duration with the exception of cleaning and pumping (tanks and bilges), crane, rigging, and temporary refrigeration services which are more ship-specific.