N0002420R2200 Flag Barge RFP.pdf

PDF 2 MB Posted

Attached to
USPACFLT Flag Barge Federal contract opportunity
Solicitation number
N00024-20-R-2200
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This request for proposal solicits the procurement of a flag barge to perform official tours of Pearl Harbor and support visits by government and military leaders. The Navy seeks a single, existing United States-built boat delivered to either Bremerton, WA or Norfolk, VA. The contractor must provide the flag barge fully outfitted with all ancillary components and deliver it within 90 days of award. The low price technically acceptable source will be selected for a firm fixed price contract valued at a single CLIN.

View the file

Other files for this federal contract opportunity

Other files attached to USPACFLT Flag Barge, newest first.
File Type Posted
N00024-20-R-2200 QA August 4 2020.xlsx XLSX spreadsheet
N00024-20-R-2200 Amendment 2.docx DOCX document
N00024-20-R-2200 July 28 2020.xlsx XLSX spreadsheet
DUNS CAGE GUIDANCE.pdf PDF
N00024-20-R-2200 Amendment 1.docx DOCX document
Att_2_FB Spec Response Matrix.xlsx XLSX spreadsheet
Att_3_-US Flag Vessel Affadavit.docx DOCX document
Att_1_Flag Barge Specification.docx DOCX document
Att_4_-Warranty.docx DOCX document
Att_5_- Technical Data Rights Assertion.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

N0002420R2200 08-Jul-2020

b. TELEPHONE NUMBER

202-781-2544

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 10 Aug 2020

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

N000249. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

HEATHER E GLOVINKSY

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

N0002420NR53114

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2020

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

1,000

NAICS:

336612

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF98

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

N0002420R2200

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

CLIN

Number

1 Each

Flag Barge

FFP

The Contractor shall provide the Flag Barge with all ancillary components and outfitting as defined in Section C and Attachment 1 and deliver the boat to the location specified in Section F of the contract with transportation charges prepaid by the Contractor as defined in Attachment 3.

FOB: Destination

PURCHASE REQUEST NUMBER: N0002420NR53114

PSC CD: 1940

NET AMT

Section C - Descriptions and Specifications

STATEMENT OF WORK

SECTION C

PART 1 – GENERAL STATEMENT OF WORK

PART 2 – CONTRACT LINE ITEM NUMBER (CLIN) DESCRIPTION

PART 3 –STATEMENT OF WORK, DETAIL DESIGN, AND CONVERSION

PART 4 – CLAUSES

PART 1 – GENERAL STATEMENT OF WORK

This statement of work defines the effort required for the procurement of a single, existing, United States-built boat, (hereafter referred to as the Flag Barge (FB)). The FB shall be delivered to the destination outlined in Section F of the contract. This SOW outlines the specific responsibilities and deliverables of this contract.

PART 2 – CONTRACT LINE ITEM NUMBER (CLIN) DESCRIPTION

ITEM 0001 – Flag Barge (FB)

The Contractor shall provide and deliver the Flag Barge with all ancillary components and outfitting as defined in Sections C, F and Attachment 1.

PART 3 –STATEMENT OF WORK, DETAIL DESIGN, AND CONVERSION

C-3.0 PROGRAM MANAGEMENT

Roles and Responsibilities

(a) A designated Project Manager (PM) shall be identified to serve as the principal representative of the Contractor throughout the duration of contract performance. The PM shall be responsible for the performance of the contract and on-time delivery of a technically compliant boat and associated equipment.

At all times, the PM shall have the responsibility for ensuring program integrity and overall contract performance. The contractor shall ensure that administration; logistics, financial and other task requirements pertinent to contract performance are addressed.

(b) The PM’s primary interface for contract performance and execution shall be with the Program Office, Support Ships, Boats and Craft (PMS 325) on all activities related to successful performance of the contract. An Assistant Program Manager (APM) will be the Government representative to the Contractor for day-to-day operations.

(c) The Government’s Contracting Officer (KO) from NAVSEA 02 is the contract owner and the only person authorized to make changes to this contract on behalf of the Government and must be contacted with any requests for change or deviation in the contract.

C-3.040 GENERAL

The Contractor shall:

- Deliver boat to either Bremerton, WA or Norfolk, VA, per Section F the contract.

- Provide a one-day “boat familiarization” to the accepting Government crew to cover general systems operation, safety equipment location and operation, startup and shutdown procedures for major equipment and similar information.

- Provide care of the boat until delivery and acceptance.

- Support Post Delivery inspection and correct findings

- Upon acceptance, surrender boat title, keys and all technical documentation as outlined in Section C-3.085b to the Government.

C-3.045a CARE OF THE BOAT The Contractor shall maintain the boat in good condition during the entire period the boat is in the Contractor's possession. The Contractor shall provide protection of equipment from the time of contract award until boat delivery.

The Contractor shall ensure that all equipment is properly maintained during periods of inactivity. Appropriate measures shall be taken to minimize wear and damage during storage, and to prevent corrosion or other deterioration.

The Contractor shall protect piping, machinery, and equipment from damage such as freezing or other adverse environmental conditions. The Contractor shall protect the boat from adverse weather, including hauling and blocking if necessary.

The Contractor shall inspect and clean the hull and propellers of marine growth no more than fourteen (14) days prior to Delivery at final destination. Following delivery to the final destination and prior to acceptance by the Government, the interior and exterior of the boat shall be swept, washed down, and cleaned.

C-3.045b PREPARATION FOR DELIVERY OF THE BOAT The boat shall be delivered with all items such as, but not limited to, equipment, accessories, appliances, plumbing fixtures, walls (interior and exterior), floors and decks, ceilings and overheads, windows, machinery spaces, etc., displaying an obvious appearance of being clean and well maintained. The boat shall be free of dirt and debris and adequately prepared for transportation to destination. The boat shall, in addition to the above, display the highest level of cleanliness such that all areas of the boat can be immediately put to its intended use of performing official tours of Pearl Harbor and supporting official visits by Heads of State, foreign government and military leaders, U.S.

Presidents, Vice Presidents, U.S. Cabinet members, members of Senate and Congress, as well as influential people of industry, education and civil leaders.

All boat systems shall be in operating condition at delivery of the vessel. Equipment having periodic certification and/or calibration requirements shall have a minimum of eight (8) months remaining of the certification and/or calibration period at delivery of the vessel (e.g. life raft, fire extinguisher, EPIRB etc.).

The Contractor shall deliver the boat fully outfitted per the contract and specifications, ready to receive the crew and no less than 200 gallons of fuel on board.

C-3.045d FIRE AND FLOODING PREVENTION The Contractor shall ensure all fire prevention, fire detection, and firefighting equipment is present, operable and up to date to protect the boat prior to delivery. The Contractor shall ensure all bilge pumps, batteries and chargers are operable and working to prevent flooding and to protect the boat while it is waterborne and prior to delivery.

C-3.085a BOAT OWNERSHIP DOCUMENTATION The contractor shall provide clear evidence (title) of ownership of the boat within 5 business days of contract award.

If contractor fails to present proof of ownership to the Government within the allotted time the Government reserves the right to cancel the award for cause and award to the next Lowest Price Technically Acceptable (LPTA) Offeror.

In the event of termination for cause, the Government shall not be liable to any contractor for any amount for supplies or services not delivered and accepted in accordance with FAR 52.212-4(m).

The contractor warrants and guarantees that a good and clear title to the boat, provided pursuant to the contract requirements, shall pass to the Government free and clear of all claims, liens, security interest and other rights and encumbrances.

C-3.085b DATA PACKAGE The Contractor shall provide all data as required in Attachment 1.

C-3.094 POST-DELIVERY INSPECTION

A Post-Delivery Inspection with sea trial will be conducted by the Government and performed by the Contractor at or near the final destination, prior to acceptance of the boat by the Navy to ensure: proper operation and material conditions of the boat and all systems; no damage has occurred during delivery; and that all loose items (Manuals, OEM warranty books, unsecured parts etc.) and data are present.

PART 4 – CLAUSES

CLAUSES INCORPORATED BY REFERENCE

C-222-H002 DEPARTMENT OF LABOR SAFETY AND HEALTH

STANDARDS FOR SHIPBUILDING (NAVSEA) (OCT

2018)

OCT 2018

C-227-H002 PLANS AND OTHER DATA (NAVSEA) (OCT 2018) OCT 2018

CLAUSES INCORPORATED BY FULL TEXT

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)

(OCT 2018)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

(End of text)

C-211-H001 ACCESS TO THE VESSEL(S) (NAVSEA) (OCT 2018)

Officers, employees and associates of other prime Contractors with the Government and their subcontractors, shall, as authorized by the Supervisor, have, at all reasonable times, admission to the plant, access to the vessel(s) where and as required, and be permitted, within the plant and on the vessel(s) required, to perform and fulfill their respective obligations to the Government. The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Supervisor to be given admission to the plant and access to the vessel(s) for office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of the respective responsibilities involved, and reasonable to their performance.

C-211-H007 PROTECTION OF THE SHIP DURING ADVERSE ENVIRONMENTAL CONDITIONS (NAVSEA)

(MAR 2019)

The Contractor shall ensure that the ship(s), all related material and Government property at the Contractor's facilities are protected during conditions of heavy weather such as, high winds, heavy snow and ice, gales, storms, hurricanes and high water or similar adverse environmental conditions. The Contractor shall develop, maintain, and implement as necessary a Heavy Weather Plan in accordance with the NAVSEA Standard Item (SI) 009-69 dated 30 April 2018, which prescribes the actions and procedures and assigns responsibilities for action to be taken in preparation for and during the period of adverse environmental conditions. The Contractor shall furnish the plan to the cognizant Supervisor of Shipbuilding (Supervisor) and shall make such changes in the plan as the Supervisor considers necessary to provide for adequate protection of the ship(s), Government property and the materials and equipment to be installed therein.

C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)

The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

C-211-H020 PROTECTION OF THE VESSEL (NAVSEA) (MAR 2019)

(a) The Contractor shall exercise reasonable care, as agreed upon with the Supervisor, to protect the vessel from fire, and shall maintain a system of inspection over the activities of its welders, burners, riveters, painters, pipe fitters, and similar workers, and of its subcontractors, particularly where such activities are undertaken in the vicinity of the vessel's magazines, fuel oil tanks, or store rooms containing inflammable materials. All ammunition, fuel oil, motor fuels, and cleaning fluids shall have been off-loaded and the tanks cleaned, except as may be mutually agreed upon between the Contractor and the Supervisor prior to work on the vessel by the Contractor. Fire hose lines shall be maintained by the Contractor ready for immediate use on the vessel at all times while the vessel is berthed alongside the Contractor's pier or in dry dock. All tanks under alteration or repair shall be cleaned, washed, and steamed out or otherwise made safe to the extent necessary, and the Contractor shall furnish the vessel's Gas Free Officer and the Supervisor with a "Gas Chemists' Certificate" before any hot work is done. The Contractor shall maintain a fire watch aboard the vessel in areas where the Contractor is working. All other fire watches aboard the vessel shall be the responsibility of the Government.

(b) Except as otherwise provided in contractually invoked technical specifications or NAVSEA furnished directives, while the vessel is at the Contractor's plant and when the temperature becomes as low as thirty-five degrees Fahrenheit, the Contractor shall assist the Government when requested in keeping all pipe-lines, fixtures, traps, tanks, and other receptacles on the vessel drained to avoid damage from freezing, or if this is not practicable, the vessel shall be kept heated to prevent such damage. The vessel's stern tube and propeller hubs shall be protected by the Contractor from frost damage by applied heat through the use of a salamander or other proper means.

(c) The work shall, whenever practicable, be performed in such manner as not to interfere with the work performed by military personnel attached to the vessel, and provisions shall be made so that personnel assigned shall have access to the vessel at all times, it being understood that such personnel will not unduly interfere with the work of the Contractor's workmen.

(d) The Contractor shall at all times keep the site of the work on the vessel free from accumulation of waste material or rubbish caused by its employees, or the work performed by the Contractor in accordance with this contract, and at the completion of such work shall remove all rubbish from and about the site of the work, and shall leave the work in its immediate vicinity "broom clean", unless more exactly specified by the Supervisor.

(End of Text)

C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)

(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal TBD dated TBD in response to Solicitation No.

N00024-20-R-2200.

(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.

C-222-H001 ACCESS TO THE VESSELS BY NON-U.S. CITIZENS (NAVSEA) (APR 2019)

(a) No person not known to be a U.S. citizen shall be eligible for access to naval vessels, work sites and adjacent areas when said vessels are under construction, conversion, overhaul, or repair, except upon a finding by COMNAVSEA or his designated representative that such access should be permitted in the best interest of the United States. The Contractor shall establish procedures to comply with this requirement and NAVSEAINST 5510.2D.

(b) If the Contractor desires to employ non-U.S. citizens in the performance of work under this contract or agreement that requires access as specified in paragraph (a) of this requirement, approval must be obtained prior to access for each contract or agreement where such access is required. To request such approval for non-U.S. citizens of friendly countries, the Contractor shall submit to the cognizant Contract Administration Office (CAO), an Access Control Plan (ACP) which shall contain as a minimum, the following information:

(1) Badge or Pass oriented identification, access, and movement control system for non-U.S. citizen employees with the badge or pass to be worn or displayed on outer garments at all times while on the Contractor's facilities and when performing work aboard ship.

(i) Badges must be of such design and appearance that permits easy recognition to facilitate quick and positive identification.

(ii) Access authorization and limitations for the bearer must be clearly established and in accordance with applicable security regulations and instructions.

(iii) A control system, which provides rigid accountability procedures for handling lost, damaged, forgotten or no longer required badges, must be established.

(iv) A badge or pass check must be performed at all points of entry to the Contractor's facilities or by a site supervisor for work performed on vessels outside the Contractor's plant.

(2) Contractor's plan for ascertaining citizenship and for screening employees for security risk.

(3) Data reflecting the number, nationality, and positions held by non-U.S. citizen employees, including procedures to update data as non-U.S. citizen employee data changes, and pass to cognizant CAO.

(4) Contractor's plan for ensuring subcontractor compliance with the provisions of the Contractor's ACP.

(5) These conditions and controls are intended to serve as guidelines representing the minimum requirements of an acceptable ACP. They are not meant to restrict the Contractor in any way from imposing additional controls necessary to tailor these requirements to a specific facility.

(c) To request approval for non-U.S. citizens of hostile and/or communist-controlled countries (listed in Department of Defense Industrial Security Manual, DOD 5220.22-M or available from cognizant CAO), Contractor shall include in the ACP the following employee data: name, place of birth, citizenship (if different from place of birth), date of entry to U.S., extenuating circumstances (if any) concerning immigration to U.S., number of years employed by Contractor, position, and stated intent concerning U.S. citizenship. COMNAVSEA or his designated representative will make individual determinations for desirability of access for the above group. Approval of ACP's for access of non-U.S. citizens of friendly countries will not be delayed for approval of non-U.S. citizens of hostile communist-controlled countries. Until approval is received, Contractor must deny access to vessels for employees who are non- U.S. citizens of hostile and/or communist-controlled countries.

(d) The Contractor shall fully comply with approved ACPs. Noncompliance by the Contractor or subcontractor serves to cancel any authorization previously granted, in which case the Contractor shall be precluded from the continued use of non-U.S. citizens on this contract or agreement until such time as the compliance with an approved ACP is demonstrated and upon a determination by the CAO that the Government's interests are protected. Further, the Government reserves the right to cancel previously granted authority when such cancellation is determined to be in the Government's best interest. Use of non-U.S. citizens, without an approved ACP or when a previous authorization has been canceled, will be considered a violation of security regulations. Upon confirmation by the CAO of such violation, this contract, agreement or any job order issued under this agreement may be terminated or default in accordance with the clause entitled "Default (Fixed-Price Supply and Service)" (FAR 52.249-8), "Default (Fixed-Price Research and Development)" (FAR 52.249-9) or "Termination (Cost Reimbursement)" (FAR 52.249- 6), as applicable.

(e) Prime Contractors have full responsibility for the proper administration of the approved ACP for all work performed under this contract or agreement, regardless of the location of the vessel, and must ensure compliance by all subcontractors, technical representatives and other persons granted access to U.S. Navy vessels, adjacent areas, and work sites.

(f) In the event the Contractor does not intend to employ non-U.S. citizens in the performance of the work under this contract, but has non-U.S. citizen employees, such employees must be precluded from access to the vessel and its work site and those shops where work on the vessel's equipment is being performed. The ACP must spell out how non-U.S. citizens are excluded from access to contract work areas.

(g) The same restriction as in paragraph (f) above applies to other non-U.S. citizens who have access to the Contractor's facilities (e.g., for accomplishing facility improvements, from foreign crewed vessels within its facility, etc.) except that, with respect to access to the vessel and worksite, the restrictions shall not apply to uniformed U.S.

Navy personnel who are non-U.S. citizens and who are either assigned to the ship or require access to the ship to perform their duties.

C-233-H002 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--ALTERNATE I (NAVSEA)

(JUL 2019)

(a) For the purposes of this requirement, the term “change” includes not only a change that is made pursuant to a written order designated as a “change order” but also (i) an engineering change proposed by the Government or the Contractor pursuant to other requirements of this contract and (ii) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment under the “Changes” clause or any other article or requirement of this contract.

(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect of a change made pursuant to a written order designated as a “change order” or in respect of a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect of any other act or omission to act on the part of the Government, the proposal supporting such request shall include the following information for each individual item or element of the request:

(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of identifiable components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work. Items of identifiable raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;

(2) Description of work necessary to undo work already completed which has been deleted by the change;

(3) Description of work which is substituted or added by the change. A list of identifiable components and equipment (not bulk materials or items) involved, should be included. Separate descriptions are to be furnished for design work and production work;

(4) Description of interference and inefficiencies in performing the change;

(5) Description of disruption attributable solely to the change; which description shall include the following information:

(i) Description of each identifiable element of disruption and how work has been, or may be, disrupted;

(ii) The calendar period of time during which disruption occurred, or may occur;

(iii) Area(s) of the Contractor’s operations where disruption occurred, or may occur;

(iv) Trade(s) or functions disrupted, with a breakdown of manhours and material for each trade or function;

(v) Scheduling of trades before, during, and after period of disruption insofar as such scheduling may relate to or be affected by the estimated disruption;

(vi) Description of any measures taken to lessen the disruptive effect of the change;

(6) Delay in delivery attributable solely to the change;

(7) Other work or increased costs attributable to the change;

(8) Supplementing the foregoing, a narrative statement of the nature of the alleged Government act or omission, when the alleged Government act or omission occurred, and the “causal” relationship between the alleged Government act or omission and the claimed consequences thereof, cross-referenced to the detailed information provided as required above.

(c) Each proposal submitted in accordance with this requirement shall include a copy of the Contractor's ship's labor budget at the cost level in effect as of the date the event began, the cost incurred at the cost level as of the same date, and the proposed effect of the change at the cost class level.

(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in subparagraphs (b)(1) through (b)(8) above, or that the Contractor may not reasonably be able to furnish complete information on all of the factors listed in subparagraph (b)(1) through (b)(8) above. Accordingly, the Contractor is only required to set forth in its request for equitable adjustment information with respect to those factors which are relevant to the individual request for equitable adjustment, or in the level of detail which is reasonably available to the Contractor.

(e) In addition to any information required under paragraph (b) above, each proposal submitted in support of a claim for equitable adjustment, under any requirement of this contract, in an amount which requires certified cost or pricing data, shall contain such cost or pricing data as the Contracting Officer shall require with respect to each individual claim item, and shall be in sufficient detail to permit the Contracting Officer to cross-reference the claimed increased costs, or delay in delivery, or both, as appropriate, with the information submitted pursuant to subparagraphs (b)(1) through (b)(8) hereof.

C-233-H003 EQUITABLE ADJUSTMENTS: WAIVER AND RELEASE OF CLAIMS (OCT 2018)

(a) Whenever the Contractor, after receipt of a change made pursuant to the clause of this contract entitled "Changes" or after affirmation of a constructive change under the clause entitled "Notification Of Changes", submits any claim for equitable adjustment under the foregoing, such claim shall include all types of adjustments in the total amounts to which the foregoing entitle the Contractor, including but not limited to adjustments arising out of delays or disruptions or both caused by such change.

(b) Further, the Contractor agrees (except as the parties may otherwise agree) that, if required by the Contracting Officer, it will execute a release, in form and substance satisfactory to the Contracting Officer, as part of the supplemental agreement setting forth the aforesaid equitable adjustment, and that such release shall discharge the Government, its officers, agents and employees, from any further claims including but not limited to further claims arising out of delays or disruptions or both, caused by the aforesaid change.

C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018)

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

C-243-H001 CONTRACTOR PROBLEM IDENTIFICATION REPORTS (NAVSEA) (OCT 2018)

(a) Contract Problem Identification Reports (CPIRs) shall be used by the Contractor for the purpose of alerting the Government to actual or potential contract problems and of establishing an early dialogue between the Contractor and the Government with regard thereto.

(b) A "contract problem" is a fact or circumstance of which the Contractor is aware that does, will or reasonably is anticipated to (1) have a significant or substantial impact on the delivery schedule or completion of contract performance or the cost of performance of the contract (increase or decrease) or (2) requires modification to the contract or specification(s). The terms "significant" and "substantial" shall be interpreted in the same manner as they would be interpreted by a reasonably prudent business person under the relevant circumstances.

(c) The Contractor shall report each contract problem promptly and in no event later than ten (10) calendar days, after the Contractor identifies such contract problem. A written CPIR shall be transmitted via the Administrative Contracting Officer (ACO) to the Procuring Contracting Officer and to the cognizant NAVSEA Program Office. Each CPIR shall be entitled "Contract Problem Identification Report", shall be dated, numbered sequentially and shall set forth the following based on the best and most complete information then known or available to the Contractor:

(1) The nature of the contract problem;

(2) The date on which the contract problem arose and the date on which the contract problem was identified as such;

(3) The anticipated direct and consequential effects of the contract problem upon the delivery schedule or completion of contract performance or the cost of performance of the contract;

(4) Identification of the supplies and/or services which are or may be affected; and

(5) The Contractor's recommended solution to the reported contract problem.

(d) Follow-up status reports of each contract problem, identified by the original CPIR number, shall be furnished monthly or more frequently as required by the Contracting Officer. A final follow-up report shall be furnished immediately following resolution of each contract problem.

(e) CPIRs shall not be submitted when notice of the same contract problem is required to be furnished to the Government pursuant to any other requirement of this contract. The submission of a CPIR, however, does not relieve the Contractor of its obligations to provide notice required under any other requirement of this contract.

C-243-H002 NOTIFICATION OF CHANGES (NAVSEA) (MAY 2019)

(a) Definitions. As used in this requirement, the term "Contracting Officer" does not include any representative of the Contracting Officer whether or not such representative is acting within the scope of his authority nor does it include any other individuals or activities that in any way communicate with the Contractor. As used in this requirement, the term "conduct" includes both actions and failures to act, and includes the furnishing of, or the failure to furnish, any item under any provision of this contract.

(b) Notice. The primary purpose of this requirement is to obtain prompt reporting of any conduct which the Contractor considers would constitute or would require a change to this contract. The parties acknowledge that proper administration of this contract requires that potential changes be identified and resolved as they arise. Therefore, except for changes identified as such in writing and signed by the Contracting Officer, the Contractor shall notify the Contracting Officer of any conduct which the Contractor considers would constitute or would require a change to this contract. Such notice shall be provided promptly, and in any event within thirty (30) calendar days from the date the Contractor identifies any such conduct. The Notice shall be written and shall state, on the basis of the most accurate information available to the Contractor:

(1) The date, nature, and circumstances of the conduct regarded as a change;

(2) The name, function, and activity of the individuals directly involved in or knowledgeable about such conduct;

(3) The identification of any documents and the substance of any oral communication involved in such conduct;

(4) The particular elements of contract performance for which the Contractor might seek an equitable adjustment under this requirement, including:

(i) What ship(s) have been or might be affected by the alleged change;

(ii) To the extent practicable, labor or materials or both which have been or might be added, deleted, or wasted by the alleged change;

(iii) To the extent practicable, the Contractor's preliminary order of magnitude estimate of cost and schedule impact, including what delay and disruption in the manner and sequence of performance and effect on continued performance have been or may be caused by the alleged change; and

(iv) What and in what manner are the particular technical requirements or contract requirements regarded as changed; and

(v) The Contractor’s estimate of the time by which the Government must respond to the Contractor’s notice to minimize cost, delay or disruption of performance.

(c) Continued Performance. Except as provided in paragraph (f) below, following submission of notice, the Contractor shall take no action to implement an alleged change until advised by the Contracting Officer in writing as provided in (d) below, unless the alleged change was previously directed by the Contracting Officer, in which case the Contractor shall conform therewith. Nothing in this paragraph (c) shall excuse the Contractor from proceeding with contract work other than implementation of the alleged change or from proceeding in accordance with directions issued by the Contracting Officer.

(d) Government Response. The Contracting Officer shall promptly, and in any event within twenty-one (21) calendar days after receipt of Notice, respond thereto in writing. In such response, the Contracting Officer shall either:

(1) Confirm that the conduct of which the Contractor gave notice would constitute a change, and when necessary, direct the mode of further performance, or;

(2) Countermand any conduct regarded by the Contractor as a change, or;

(3) Deny that the conduct of which the Contractor gave notice would constitute a change and, when necessary, direct the mode of further performance, or;

(4 In the event the Contractor's notice information is inadequate to make a decision under (i), (ii) or (iii) above, advise the Contractor what additional information is required. Failure of the Government to respond within the time required above shall be deemed a countermand under (d)(ii).

(e) Equitable Adjustments. Equitable adjustments for changes confirmed or countermanded by the Contracting Officer shall be made in accordance with the clause of this contract entitled "CHANGES", or any other requirement of this contract which provides for an equitable adjustment.

(f) Special Procedures. Paragraph (c) provides that the Contractor is to take no action to implement an alleged change pending the Contracting Officer's response to the Contractor's notice of the change, except where specifically directed by the Contracting Officer. In special situations, however, such as where:

(1) The circumstances do not allow sufficient time to notify the Contracting Officer of the facts prior to the need to proceed with the work, and;

(2) The work must proceed to avoid hazards to personnel or property or to avoid additional cost to the Government, the Contractor may proceed with work in accordance with the alleged change. In such special situations, the Contractor shall advise the Contracting Officer in writing within ten (10) days of the conduct giving rise to the alleged change that the Contractor has proceeded with work and shall describe the nature of the special situation which required proceeding prior to notification. Within thirty (30) calendar days of the conduct giving rise to the alleged change, the Contractor shall provide notice as required in (b) above. The Contracting Officer shall respond as set forth in (d) above. If the Contracting Officer determines that the conduct constitutes a change and countermands it, the Contractor shall be entitled to an equitable adjustment for performance of work in accordance with that change prior to the countermand including any additional performance resulting from the countermand.

(g) When the Contractor identifies any conduct which may result in delay to delivery of the ship(s), the Contractor shall promptly so inform the Contracting Officer thereof prior to providing the notice required by paragraph (b) above.

(h) Despite good faith best efforts, occasions may arise in which the Contractor does not provide notice within the time periods specified in paragraphs (b) and (f) above. Accordingly, prior to the end of the first and third quarters of each calendar year through the period of performance of this contract, beginning with the TBD quarter of TBD, the Contractor shall deliver to the Government an executed release, in the format set forth in Exhibit "A" to this requirement, covering the six-month period of time ending with the second and fourth quarters, respectively, of the preceding year, with such specific exceptions, if any, as are identified by the Contractor. If the Contractor cites specific exceptions to the release, the Contractor shall concurrently provide the Contracting Officer with notice, containing the information set forth in paragraph (b) of this requirement, for each item excepted from the release. However, the release required by this requirement shall not make unallowable any costs which are otherwise allowable under any other requirement of this contract. Within sixty (60) days of receipt of the release, the Contracting Officer shall sign and return a copy of the release to the Contractor. If the Contracting Officer fails to execute and return the release within the required time, then the release shall be deemed to be void and of no effect for the period involved.

EXHIBIT A TO C-243-H002, NOTIFICATION OF CHANGES

This modification reflects the agreement of the parties to the mutual full and final releases for the consequences of that conduct (as conduct is defined in the requirement entitled "NOTIFICATION OF CHANGES"), described below, except the conduct identified in Attachment A hereto is excluded and not covered by the terms of this release.

1. Except for the conduct listed in Attachment A by either party, neither the Contractor nor the Government shall be entitled to any equitable adjustment or to money damages and/or other relief for any conduct, as specified below.

2. In consideration of the foregoing the parties hereby agree to the following release:

a. The Government, for itself, its assigns, vendors, suppliers, and contractors, hereby remises, releases, and forever discharges the Contractor, its officers, agents and employees from any and all entitlement of the Government to equitable adjustment of the contract price and delivery schedule due to conduct under this contract, which occurred on or before

TBD.

b. The Contractor, for itself, its successors, assigns, vendors, suppliers, and subcontractors, hereby remises, releases and forever discharges the Government, its officers, agents and employees from (i) any and all entitlement of the Contractor to equitable adjustment of the contract cost and profit/fee and/or delivery schedule of this contract or of any other Government contract (with this or any other Contractor) or any contract between the Contractor and any third party by reason of any conduct which increases the Contractor's cost or time of performance of work under this contract and meets the following conditions (1) known to the Contractor, (2) occurred on or before TBD and (3) the Contractor failed to give notice prior to date of this release, and (ii) any and all liabilities to the Contractor for money damages and/or other relief for the impact of any such conduct, upon this contract or any other Government contract (with this or any other Contractor) or any contract between the Contractor and any third party.

(End of Exhibit A)

C-243-H003 CONFIGURATION MANAGEMENT (NAVSEA) (JAN 2019)

(a) Baseline Definition - All contractual documentation in effect at the time of contract award shall constitute the Contract Baseline, which shall be considered incorporated in the baseline documentation.

(b) General Requirement - (1) The Contractor shall maintain a Configuration Control Program to assure that all detail level work being performed under this contract is in compliance with appropriate baseline documentation.

The Contractor shall prepare a Configuration Management Plan in accordance with the requirements of the contract.

If required, the Contractor’s Configuration Management Plan shall be submitted through the appropriate Contract Data Requirements List (CDRL) for approval by the Government.

(2) Whenever a situation arises wherein the Contractor cannot comply with a baseline document, or whenever intent of such documentation is significantly changed by detail level documentation, the Contractor shall submit change documents to modify the baseline to resolve the conflict or to allow non-compliance. Whenever the cost of implementing a proposed change is less than the threshold requiring certified cost or pricing data, the Contractor shall provide such detail of related costs as to allow the Government to determine an equitable adjustment for the change document submission. Whenever the contract cost changes by an amount greater than the threshold requiring certified cost or pricing data, the Contractor shall complete such cost and pricing data as the Contracting Officer shall require detailing all related costs, and attach it to the change document. Requirements for cost and pricing data shall be determined by the gross amount of the change unless otherwise directed by the Contracting Officer. Change documentation shall be submitted to the Contracting Officer in accordance with the appropriate CDRL, and as described in paragraphs (c) through (f) below.

(c) Engineering Change Proposals (ECPs) - ECPs shall be prepared in accordance with the approved configuration management plan and the requirements of the contract. DI-SESS-80639D approved 7 April 2015, EIA-649-1 of Nov 2014 and MIL-HDBK-61A of 7 Feb 2001 apply. An ECP shall be submitted whenever the detail level physical configuration, material quality, operational or functional performance of equipment or installed systems will not be in compliance with baseline design-related documents (Specifications, Contract Drawings, etc.), and a change to the baseline document is considered an appropriate means of resolving a design-related issue. The contractor shall develop documentation in sufficient detail to enable Government review and evaluation of the merits of the proposed change, including cost and scheduling impact, ship class impact if applicable, and consequences if disapproved. List all existing drawings and technical manuals impacted by the change, including a brief narrative explanation of needed changes to incorporate the ECP if approved. Provide weight and moment data incidental to the change, if applicable. The Contractor shall also prepare applicable baseline document insert sheets, with specific word changes or proposed re-write, to facilitate baseline documentation changes.

(d) Non-Engineering Change Proposals (NECPs) – An NECP shall be submitted whenever necessary to document administrative, procedural, scheduling, or documentation changes that do not directly impact the physical configuration of the equipment. The NECP shall explain the nature of the problem, identify the applicable baseline document (i.e., Contract Data Requirement List (CDRL), Contract Clause, etc.) and provide a detailed explanation justifying the proposed course of action desired to resolve the problem. Insert sheets for applicable documents shall also be attached to facilitate change action in the event the NECP is approved.

(e) Deviations/Waivers - In the event that a baseline design-related document requirement cannot be met, and a change to the baseline…

This is the start of the file's text. The full file is on GovTribe.