Attachment_2_-_GFI_16_August_18.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- Tactical Control System Development
- Solicitation number
- N0002418R6407
About this file
Updated Attachment 2.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GFI A - Info Only
GOVERNMENT FURNISHED INFORMATION (GFI)
ATTACHMENT #2 PR# N000024-18-R-6407
| PROGRAM TITLE: Tactical Control System (TCS) | CONTRACT NO.: | ||||||||
| TBD | DATE: 16 August 2018 | ||||||||
| CODE: PEO SUB - PMS425 | |||||||||
| LINE ITEM NUMBERS | DOCUMENT TITLE | VOL | PRT | REV | CHG | SUP | DOC DATE | GFI |
DUE DATE
| TDA Notes 11 2017: Update 28 Nov | LK Email and TDA Response: 11- 28-2017 | |||||||||
| SCHEDULE | A/C | MOD | ||||||||
| <1> | <2> | <3> | <5> | <6> | <7> | |||||
| 1 | X | PMS425 Configuration Management Plan | 11-Feb-14 | RFP | GFI Item 01 | |||||
| 2 | X | PMS425 Risk Management Plan | 1 | 1-May-13 | RFP | GFI Item 02 | ||||
| 3 | X | PMS425 System Safety Management Plan (SSMP), 425-SAFETY-SSMP-02 | 20-Jun-17 | RFP | GFI Item 03 | |||||
| 4 | X | System Performance Specification for the AN/BYG-1 Tactical Control System TI-16/APB-17 Final | 12-Dec-16 | RFP | GFI Item 04 | |||||
| 5 | X | TI16/APB17 CIS P-SPEC | 2 | 3-Feb-17 | RFP | GFI Item 05 | ||||
| 6 | X | SWFTS FY18-FY19 SoS Schedule | 1-Sep-16 | RFP | GFI Item 06 | |||||
| 7 | X | TI-16 APB-15 Submarine Warfare Federated Tactical System (SWFTS) Group Requirements List (GRL) | 16-5.2 | 27-May-16 | RFP | GFI Item 07 | ||||
| 8 | X | TI16/APB17 SWFTS IIDB-GDD | 16.15.2 | 27-May-16 | RFP | GFI Item 08 | ||||
| 9 | X | TI16/APB 17 SWFTS IDL | RFP | GFI Item 09 | ||||||
| 10 | X | TI-16 APB-15 Submarine Warfare Federated Tactical System (SWFTS) Software Standards | 2 | 27-May-16 | RFP | GFI Item 10 | ||||
| 11 | X | TI-16 APB-15 Submarine Warfare Federated Tactical System (SWFTS) Subsystem Name List | 2 | 27-May-16 | RFP | GFI Item 11 | ||||
| 12 | X | TI-16 APB-15 Submarine Warfare Federated Tactical System (SWFTS) IP Spreadsheet (IPSS) | 16-5.2 | 27-May-16 | RFP | GFI Item 12 | ||||
| 13 | X | TI-16 APB-15 Submarine Warfare Federated Tactical System (SWFTS) IP Software Ports | 2 | 27-May-16 | RFP | GFI Item 13 | ||||
| 14 | X | TI-16 APB-15 Submarine Warfare Federated Tactical System (SWFTS) Network Design Document (NDD) | 1 | 4-Mar-16 | RFP | GFI Item 14 | ||||
| 15 | X | TI-16 APB-15 SWFTS & Submarine Tactical Systems Information Assurance Baseline Requirement | 1 | 4-Mar-16 | RFP | GFI Item 15 | ||||
| 16 | X | PEO SUB-S Submarine Warfare Federated Tactical Systems (SWFTS) Overview ("SWFTS 101") | 27-Jul-15 | RFP | GFI Item 16 | |||||
| 17 | X | Information Assurance Vulnerability Management Policy for SWFTS, PMS425 ltr Ser 425/0092 | 23-Mar-15 | RFP | GFI Item 17 | |||||
| 18 | X | AN/BYG-1 Submarine Combat and Weapon Control System - Systems Engineering Plan (SEP) | 1.1.3 | 15-Dec-15 | RFP | GFI Item 18 | ||||
| 19 | X | S1000D Interactive Electronic Technical Manual (IETM) Authorizing Guide for Submarine Warfare Federated Tactical System (SWFTS) / Non-Propulsion Electronics Systems (NPES) | Initial | |||||||
| Release | 1-Jul-12 | RFP | GFI Item 19 | |||||||
| 20 | X | Long Term AMQP Transition Plan | 4-Oct-16 | RFP | GFI Item 20 | |||||
| 21 | X | AMQP_GPB_TEM | 1 | 19-Jun-13 | RFP | GFI Item 21 | ||||
| 22 | X | SWFTS System Engineering Baseline Management Process | 10 | 14-Jan-15 | RFP | GFI Item 22 | ||||
| 23 | X | Installation Planning Matrix | 10-Nov-17 | RFP | GFI Item 23: | Uploaded new doc | ||||
| 24 | X | PSE-IPT Charter | 16-Sep-16 | RFP | GFI Item 24 | |||||
| 25 | X | TI18 Posture Transition Operations Manual (PTOM) Policy & Process Document | 1 | TBD | Contract Award | GFI Item 25 | ||||
| 26 | X | SAWG Charter | Final | 16-Oct-15 | RFP | GFI Item 26 | ||||
| 27 | X | TI-16 APB-15 Platform Diagrams VA, SEAWOLF & SSBN | 7 | 12-Oct-16 | RFP | GFI Item 27 | ||||
| 28 | X | SWFTS Reference Implementation Version Description Document (VDD) | - | 9-Mar-15 | RFP | GFI Item 28 | ||||
| 29 | X | TI-18 Technology Insertion (TI) Requirements Letter | 28-Jul-16 | RFP | GFI Item 29 | |||||
| 30 | X | SWFTS Technology Insertion (TI) IPT | 28-Nov-11 | RFP | GFI Item 30 | |||||
| 31 | X | Virtualization in Submarine Warfare Federated Tactical System (SWFTS) | 17-Mar-16 | RFP | GFI Item 31 | |||||
| 32 | X | TI-18 Planning Early Trade Studies (ETS1) | 1-Jul-16 | RFP | GFI Item 32 | Updated Title | ||||
| 33 | X | PMS425 Work Breakdown Structure (WBS) | 11-Mar-14 | RFP | GFI Item 33 | |||||
| 34 | X | Submarine Warfare Federated Tactical System (SWFTS) Architecture Description Document (ADD) | 1.1 | 31-Dec-14 | RFP | GFI Item 34 | ||||
| 35 | X | PMS425 Integrated Master Plan (IMP) | Q.1 | 17-May-18 | RFP | GFI Item 35 | Uploaded new doc | |||
| 36 | X | OPNAVINST 5100.28, Hazardous Materials User's Guide (HMUG) | 21-Jan-05 | RFP | GFI Item 36 | |||||
| 37 | X | System Performance Specification for the AN/BYG-1 Tactical Control System TI18/APB19 Final | 2 | TBD | Contract Award | GFI Item 37 | No Action Taken | |||
| 38 | X | System Performance Specification for the AN/BYG-1 Tactical Control System TI16/APB15 Final | 18-Sep-15 | RFP | GFI Item 38 | Uploaded | ||||
| 39 | X | System Performance Specification for the AN/BYG-1 Tactical Control System TI18/APB17 Final | 27-Nov-17 | RFP | GFI Item 39 | Uploaded | ||||
| 40 | X | TI16/APB15 SSS | 17-Nov-16 | RFP | GFI Item 40 | Uploaded | ||||
| 41 | X | TI16/APB15 SSDD | 17-Nov-16 | RFP | GFI Item 41 | Uploaded | ||||
| 42 | X | TI16APB15 SRVM | 11-May-17 | RFP | GFI Item 42 | Uploaded | ||||
| 43 | X | TI16/APB15 SRS | 17-Nov-16 | RFP | GFI Item 43 | Uploaded | ||||
| 44 | X | TI16/APB15 Test Procedures | Various | RFP | GFI Item 44 | Uploaded | ||||
| 45 | X | TI16/APB15 TRD Matrix | 21-Nov-17 | RFP | GFI Item 45 | Uploaded | ||||
| 46 | X | TI14/APB15 Unclassified Source Code | RFP | |||||||
| 47 | X | TI-XX Installation Schedule 20180216_FOUO.xlsm | 16-Feb-18 | RFP | ||||||
| 48 | X | TMCR NO. SNIPP-160115-000 | 9-Aug-18 | RFP |
&P
File details come from the government source that posted it.