About this file

Industry Day Q A Session Comments and Attendees.

View the file

Other files

File Type Posted
Draft_SOW_2016_03_28.pdf PDF
Industry_Day_Registration_Form.docx DOCX document
MITRE_Visit_Request_Form.pdf PDF
Industry_Question_Form.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

# Question/ Comment/ Concern Response

Would you provide a brief summary of I1B1 to date:

- When did it start?

- Who designed?

- Who performed LRIP?

- How many of each variant have been built ( #

EDM, # LRIP)?

The Program started in 2008. NGC designed the systems and built 25 EDMs. The LRIP contract was awarded to NGC in Sep 2015. No LRIP systems have been delivered to date.

How many orders -ballpark- do you anticipate (# of units)?

More information will be provided if the RFP is released. Please see future updates to FBO announcement.

Will a draft RFP be released? If so, what is the target date?

The Government reserves the right to release a draft RFP. Anticipate releasing RFP in 3QFY16.

Please see future updates to FBO announcement.

What is the estimated quantity range for the base year, and for each of the option years?

More information will be provided if the RFP is released. Please see future updates to FBO announcement.

What is the LRIP quantity and what is the anticipated production quantities for base and follow-on years?

More information will be provided if the RFP is released. Please see future updates to FBO announcement.

Who manufactured EDM units? What was the quantity?

NGC designed the systems and built 25 EDMs.

Who manufactured LRIP units? What was the quantity?

The LRIP contract was awarded to NGC in Sep 2015. No LRIP systems have been delivered to date.

Will the charts presented today be made available to attendees? Either sent or posted?

The Government will provide a mechanism for distribution. See FBO for further information.

Can you clarify if a production lot is equal to the base production build or each option? I.e.

One production lot in each 22 month production phase?

Requirements will be documented in the RFP.

Anticipate releasing RFP in 3QFY16. Please see future updates to FBO announcement.

What are the current requirements for the program? Mounted, Discount, Fixed Site?

Requirements will be documented in the RFP.

Anticipate releasing RFP in 3QFY16. Please see future updates to FBO announcement.

Who are the users currently signed up for this? For LRIP, the users are the US Navy and US Air Force.

Are these currently funded requirements? If so, how much $?

Anticipate releasing RFP in 3QFY16. Please see future updates to FBO announcement.

Will there be sources sought for a possible small business set aside?

Government is in the process of Market Research.

JCREW I1B1 Full Rate Production Industry Day - Question/Answer Session

Have the LRIP units been through and passed the environmental tests?

No.

With this build to print, are we responsible for performance to the P-Spec?

Requirements will be documented in the RFP.

Anticipate releasing RFP in 3QFY16. Please see future updates to FBO announcement.

Will we have access to the latest test and performance/ environmental test data?

If you have specific suggestions about test and performance / environmental test data, please provide to PCO.

Will we have a GFM "Golden Unit" for / as a performance reference unit?

If you have specific suggestions about GFM, please provide to PCO.

Can a TDP still be obtained? Yes. A draft TDP can be obtained via the PCO if requested by 22 April 2016. See Industry Day synopsis.

What Support Equipment is anticipated at IOC and FOC?

The Support Equipment requirements will be provided in the RFP.

Will all Support Equipment requirements be defined in the SOW, or is the offeror expected to include recommended items?

The Support Equipment requirements will be provided in the RFP.

Under Engineering Support Services, what is the qualitative expection for inventory control?

Requirements will be provided in the RFP.

What are the expected production unit quantities during the base delivery period?

More information will be provided if the RFP is released. Please see future updates to FBO announcement.

What special purpose test equipment is needed for testing?

More information will be provided if the RFP is released. Please see future updates to FBO announcement.

What programs are needed to read the drawings?

CATIA

Did not hear of Cyber or Information Assurance mentioned today. Are there any known compliance matters / requirements for the awarded firm with which to comply?

More information will be provided if the RFP is released. Please see future updates to FBO announcement.

Received question on spoofing. The Government did not understand the question. Please clarify and resubmit your unclassfied question to PCO.

How many (systems) for LRIP 1, LRIP 2, 4-year

IDIQ?

The FRP contract is anticipated as a base plus four year option years.

Is there a MILGPS (SASSM/ M-Code) requirement? Are you aware of "real" M-Code status? Are you aware of M-Code waiver via

OSD?

Requirements will be provided in the RFP.

Will the PRAT and FE/AT Test plans be provided as GFI?

Yes, GFI will be identified in the RFP.

Are the detailed manufacturing and process instructions part of the TDP?

Please see the released draft TDP. Please provide comments or suggestions to the PCO.

More information will be provided if the RFP is released. Please see future updates to FBO announcement.

Would you provide more detail about the responsibilities of the SSA? For example, will the contractor be responsible for updating the tactical firmware and software implementing techniques to defeat advanced threats. OR, will the contractor develop techniques to defeat advanced threats and SSA implements the techniques in firmware / software?

Please provide comments or suggestions to the PCO. More information will be provided if the RFP is released. Please see future upadates to FBO announcement.

Recommend changing requirement to allow submission of IUID via WAWF.

List of Attendees:

Chesapeake Technology Int'l Corp DRS Technologies, Inc Impact Science & Technology (Harris Corp) Lockheed Martin Management Services Group NextGen Communications (Harris Corp) Northrop Grumman Rockwell Collins Sechan Electronics, Inc.

Sierra Nevada Corp SRC, Inc Telephonics Corp Ultra Electronics-Herley

File details come from the government source that posted it. Updated .