Exhibit_A_-_CDRL.pdf

PDF 3 MB Posted

Attached to
JCREW I1B1 Full Rate Production RFP
Solicitation number
N00024-16-R-6327
Issued by

About this file

Exhibit A Contract Data Requirements List (CDRL) DD Form 1423-1 dated 5 July 2016 40 pages

View the file

Other files

File Type Posted
Amendment_0005_Conformed.docx DOCX document
Amendment_0005.docx DOCX document
Amendment_0004.docx DOCX document
Amendment_0004_Conformed.docx DOCX document
Attachment_9.pdf PDF
Amendment_3_Conformed.docx DOCX document
Amendment_3.docx DOCX document
RFP_Amendment_0002.docx DOCX document
RFP_Amendment_0002_Conformed.docx DOCX document
N00024-16-R-6327-0001_Mod.docx DOCX document
N00024-16-R-6327-0001_Conformed.docx DOCX document
N00024-16-R-6327_2016_Post.docx DOCX document
N00024-16-R-6327_2016_Post.docx DOCX document
Attachment_1_-_DD254.pdf PDF
Attachment_9_-_WBS _Level_3.pdf PDF
Attachment_2_-_Cost_and_Price_Summary_Workbook.xlsx XLSX spreadsheet
Attachment_3_-_CDRL_Media_Delivery.docx DOCX document
Attachment_13_-_Support_Equipment_Pricing.xlsx XLSX spreadsheet
Attachment_5_-_GFI_List.xlsx XLSX spreadsheet
Attachment_4_-_JCREW_Bidders_Library.pdf PDF
Attachment_16_-_Contractor_Announcement_Info.docx DOCX document
Attachment_10_-_Bidder's_Question_Submittal_Form.xlsx XLSX spreadsheet
Attachment_12_-_Contractor_Compliance_Checklist.docx DOCX document
Attachment_15_-_D-Level_Parts_Pricing.xlsx XLSX spreadsheet
Attachment_14_-_O-Level_Parts_Pricing.xlsx XLSX spreadsheet
Attachment_4_-_JCREW_Bidders_Library_.pdf PDF
Attachment_14_-_O-Level_Parts_Pricing.xlsx XLSX spreadsheet
Attachment_15_-_D-Level_Parts_Pricing.xlsx XLSX spreadsheet
Attachment_16_-_Contractor_Announcement_Info.docx DOCX document
Attachment_9_-_WBS _Level_3.pdf PDF
Attachment_3_-_CDRL_Media_Delivery.docx DOCX document
Attachment_13_-_Support_Equipment_Pricing.xlsx XLSX spreadsheet
Exhibit_A_CDRL.pdf PDF
Attachment_10_-_Bidder's_Question_Submittal_Form.xlsx XLSX spreadsheet
Attachment_1_-_DD_Form_254.pdf PDF
Attachment_5_-_GFI_List.xlsx XLSX spreadsheet
N00024-16-R-6327_Draft_RFP.docx DOCX document
Attachment_12_-_Contractor_Compliance_Checklist.docx DOCX document
Attachment_2_-_Cost_and_Price_Summary_Workbook.xlsx XLSX spreadsheet
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JCREW I1B1 FRP CDRL LIST

CDRL# TITLE SUBTITLE

FRP SOW

REFERENCE

A001 Manufacturing Plan 3.1.1

A002 As Built Configuration List (ABCL) Indentured Bill of Materials 3.1, 3.1.5

A003 Configuration Status Accounting (CSA) Information 3.1.4

A004 Contractor’s Progress, Status, and Management Report 3.1.4, 3.2.2, 3.6

A005 First Article Qualification Test Plan and Procedures First Article Qualification Test (FAQT) Plan 3.1, 3.1.6.1

A006 First Article Qualification Test Report First Article Qualification Test (FAQT) Report 3.1, 3.1.6.1

A007 Acceptance Test Plan Functional Evaluation/Acceptance Test (FE/AT) Plan 3.1

A008 Acceptance Test Report Functional Evaluation/Acceptance Test Report(FE/ATR) 3.1, 3.1.6.2

A009 Failure Summary and Analysis Report Failure Analysis and Corrective Action System (FRACAS) 3.2

A010 Failure Summary and Analysis Report Failure Analysis and Corrective Action Report (FACAR) 3.2.2.4

A011 Parts List Initial O-Level and Initial Depot Spares and Consumables

Lists 3.4.2.1, 3.4.2.2

A012 Depot Maintenance Work Request (DMWR) Manuals 3.4.3

A013 Unique Identification (IUID) Activity and Verification Report 3.4.4

A014 Configuration Management Plan Contractor's Configuration Management Plan 3.5

A015 Environmental Stress Screening Procedures and

Implementation Plan 3.1.6.2.1

A016 Environmental Stress Screening (ESS) Report 3.1.6.2.1

A017 Notice of Revision (NOR) 3.5.2

A018 Request for Variance (RFV) 3.5.3

A019 Diminishing Manufacturing Sources and Material Shortages

(DMSMS) Health Analysis Report

DMSMS Health Analysis and Forecasting Bill of Materials

Report 3.5.4

A020 Engineering Change Proposal (ECP) 3.1, 3.5.1

A021 Integrated Program Management Report (IPMR) 3.7

A022 Status of Government Furnished Equipment (GFE Report) 3.7.1

A023 Presentation Material 3.7.3.1, 3.7.3.2, 3.7.3.3

A024 Reliability Test Plan Production Reliability Acceptance Test (PRAT) Plan 3.1, 3.1.6.2.2.2

A025 Reliability Test Report Production Reliability Acceptance Test (PRAT) Report 3.1, 3.1.6.2.2.2

A026 Repair Parts Report (RPR) 3.4.1, 3.4.1.1, 3.4.1.2, 3.4.1.3

A027 Finish Specification 3.1.1.3

A028 Failure Reporting, Analysis and Corrective Action System

(FRACAS)

Failure Reporting, Analysis and Corrective Action System

(FRACAS) Plan

3.2.2, 3.2.2.1, 3.2.2.5

A029 Manhour Estimate, Technical Cost Proposals Depot Repair Estimate 3.4.1.3

JCREW I1B1 FRP CDRL LIST CONTINUED

CDRL# TITLE SUBTITLE

FRP SOW

REFERENCE

A030 Reliability and Maintainability (R&M) Program Plan 3.4.1

A031 Failure Modes, Effects and Criticality Analysis (FEMECA) Report 3.2.1

A032 Technical Report - Studies/Services Program Protection Implementation Plan (PPIP) 3.8

A033 Calibration and Measurement Requirements Summary

(CMRS) 3.4.1

A034 Quality Assurance Program Plan 3.1

A035 Corrosive Prevention and Control Plan 3.1.1.3

A036 Configuration Audit Plan Physical Configuration Audit (PCA) Plan 3.1.2.1

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X MGMT

D. SYSTEM/ITEM

JCREW FRP

E. CONTRACT/PR NO.

N00024-16-R-6327

F. CONTRACTOR

1. DATA ITEM NO

A001

2. TITLE OF DATA ITEM

Manufactoring Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Doc. No)

DI-MGMT-81889

5. CONTRACT REFERENCE

3.1.1

6. REQUIRING OFFICE

PMS 408

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

1TIME

12. DATE OF 1st SUBMISSION

60 DAC

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A Draft

Final

Reg Repro

16. REMARKS

BLK 9: STATEMENT “D” REASON: DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY;

CONTAINS CRITICAL CREW PROGRAM INFORMATION (7 OCT 15). OTHER

U.S. REQUESTS SHALL BE REFERRED TO THE PROGRAM MANAGER,

EXPEDITIONARY MISSIONS (PMS408).

BLK 14: IDE, IAW CONTRACT

SEE

ADDRESSEE

LIST

15. TOTAL

G. PREPARED BY

Barbara Hime

H. DATE

7/1/2016

I. APPROVED BY J. DATE

7/5/2016

17. PRICE

GROUP

18.

ESTIMATED

TOTAL

PRICE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 2 of 36 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X CMAN

D. SYSTEM/ITEM

JCREW FRP

E. CONTRACT/PR NO.

N00024-16-R-6327

F. CONTRACTOR

1. DATA ITEM NO

A002

2. TITLE OF DATA ITEM

As Built Configuration List (ABCL)

3. SUBTITLE

Indentured Bill of Materials

4. AUTHORITY (Data Acquisition Doc. No)

DI-CMAN-81516

5. CONTRACT REFERENCE

3.1, 3.1.5

6. REQUIRING OFFICE

PMS 408

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See BLK 16

12. DATE OF 1st SUBMISSION

See BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See BLK 16 Draft

Final

Reg Repro

16. REMARKS

BLK 9: STATEMENT “D” REASON: DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY;

CONTAINS CRITICAL CREW PROGRAM INFORMATION (7 OCT 15). OTHER

U.S. REQUESTS SHALL BE REFERRED TO THE PROGRAM MANAGER,

EXPEDITIONARY MISSIONS (PMS408).

BLK 10, 12, 13: A BILL OF MATERIALS (BOM) SHALL BE SUBMITTED WITH

EACH LRIP REFURBISHED OR PRODUCTION UNIT.

BLK 14: IDE, IAW CONTRACT

SEE

ADDRESSEE

LIST

15. TOTAL

G. PREPARED BY

Barbara Hime

H. DATE

7/1/2016

I. APPROVED BY J. DATE

7/5/2016

17. PRICE

GROUP

18.

ESTIMATED

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 3 of 36 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X SESS

D. SYSTEM/ITEM

JCREW FRP

E. CONTRACT/PR NO.

N00024-16-R-6327

F. CONTRACTOR

1. DATA ITEM NO

A003

2. TITLE OF DATA ITEM

Configuration Status Accounting (CSA) Information

3. SUBTITLE

4. AUTHORITY (Data Acquisition Doc. No)

DI-SESS-81253B

5. CONTRACT REFERENCE

3.1.4

6. REQUIRING OFFICE

PMS 408

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

MTHLY

12. DATE OF 1st SUBMISSION

30 DAC

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See BLK 16 Draft

Final

Reg Repro

16. REMARKS

BLK 9: STATEMENT “D” REASON: DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY;

CONTAINS CRITICAL CREW PROGRAM INFORMATION (7 OCT 15). OTHER

U.S. REQUESTS SHALL BE REFERRED TO THE PROGRAM MANAGER,

EXPEDITIONARY MISSIONS (PMS408).

BLK 10 and 12: INCLUDED AS PART OF THE MONTHLY CONTRACTOR'S

PROGRESS, STATUS AND MANAGEMENT REPORT. CSA DATA FOR EACH

NEWLY IDENTIFIED CONFIGURATION ITEM SHALL BE DELIVERED NLT 30

CALENDAR DAYS AFTER THE NEWLY IDENTIFIED CONFIGURATION ITEM’S

APPROVAL.

BLK 13: CSA DATA SHALL BE UPDATED NLT 30 CALENDAR DAYS AFTER

THE CONTRACTOR CHANGES THE CONFIGURATION ITEM OR THE

CONTRACTOR IS PROVIDED CSA DATA FOR A GOVERNMENT EXECUTED

CHANGE TO THE CONFIGURATION.

BLK 14: IDE, IAW CONTRACT

SEE

ADDRESSEE

LIST

15. TOTAL

G. PREPARED BY

Barbara Hime

H. DATE

7/1/2016

I. APPROVED BY J. DATE

7/5/2016

17. PRICE

GROUP

18.

ESTIMATED

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 4 of 36 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X MGMT

D. SYSTEM/ITEM

JCREW FRP

E. CONTRACT/PR NO.

N00024-16-R-6327

F. CONTRACTOR

1. DATA ITEM NO

A004

2. TITLE OF DATA ITEM

Contractor's Progress, Status, and Management Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Doc. No)

DI-MGMT-80227 (SEE BLK 16)

5. CONTRACT REFERENCE

3.1.4, 3.2.2, 3.6

6. REQUIRING OFFICE

PMS 408

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

MTHLY

12. DATE OF 1st SUBMISSION

30 DAC

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A Draft

Final

Reg Repro

16. REMARKS

BLK 4: DI-MGMT-80227: PARAGRAPH 10.2, FIRST SENTENCE DOES NOT

APPLY. USE CONTRACTOR FORMAT.

BLK 8: APPROVAL IS FOR TECHNICAL CONTENT. GOVERNMENT

RESPONSE TIME IS 15 WORKING DAYS. ANY REJECTED SUBMISSION

SHALL BE CORRECTED AND RESUBMITTED WITHIN 7 WORKING DAYS OF

THE DATE OF REJECTION.

BLK 9: STATEMENT “D” REASON: DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY;

CONTAINS CRITICAL CREW PROGRAM INFORMATION (7 OCT 15). OTHER

U.S. REQUESTS SHALL BE REFERRED TO THE PROGRAM MANAGER,

EXPEDITIONARY MISSIONS (PMS408).

BLK 14: IDE, IAW CONTRACT

SEE

ADDRESSEE

LIST

15. TOTAL

G. PREPARED BY

Barbara Hime

H. DATE

7/1/2016

I. APPROVED BY J. DATE

7/5/2016

17. PRICE

GROUP

18.

ESTIMATED

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 5 of 36 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X NDTI

D. SYSTEM/ITEM

JCREW FRP

E. CONTRACT/PR NO.

N00024-16-R-6327

F. CONTRACTOR

1. DATA ITEM NO

A005

2. TITLE OF DATA ITEM

First Article Qualification Test Plan and Procedures

3. SUBTITLE

First Article Qualification Test (FAQT) Plan

4. AUTHORITY (Data Acquisition Doc. No)

DI-NDTI-81307A

5. CONTRACT REFERENCE

3.1, 3.1.6.1

6. REQUIRING OFFICE

PMS 408

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See BLK 16

12. DATE OF 1st SUBMISSION

See BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See BLK 16 Draft

Final

Reg Repro

16. REMARKS

BLK 8: APPROVAL IS FOR TECHNICAL CONTENT AND ACCURACY.

GOVERNMENT RESPONSE TIME IS 30 CALENDAR DAYS. ANY REJECTED

SUBMISSION SHALL BE CORRECTED AND RESUBMITTED WITHIN 30

CALENDAR DAYS OF THE DATE OF REJECTION.

BLK 9: STATEMENT “D” REASON: DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY;

CONTAINS CRITICAL CREW PROGRAM INFORMATION (7 OCT 15). OTHER

U.S. REQUESTS SHALL BE REFERRED TO THE PROGRAM MANAGER,

EXPEDITIONARY MISSIONS (PMS408).

BLK 10, 12, 13: NLT 60 CALENDAR DAYS PRIOR TO FAQT FOR EACH

SYSTEM. REVISIONS NLT 14 CALENDAR DAYS AFTER CHANGES THAT

AFFECT THIS DATA ITEM.

BLK 14: IDE, IAW CONTRACT

SEE

ADDRESSEE

LIST

15. TOTAL

G. PREPARED BY

Barbara Hime

H. DATE

7/1/2016

I. APPROVED BY J. DATE

7/5/2016

17. PRICE

GROUP

18.

ESTIMATED

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 6 of 36 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X NDTI

D. SYSTEM/ITEM

JCREW FRP

E. CONTRACT/PR NO.

N00024-16-R-6327

F. CONTRACTOR

1. DATA ITEM NO

A006

2. TITLE OF DATA ITEM

Test/Inspection Report

3. SUBTITLE

First Article Qualification Test (FAQT) Report

4. AUTHORITY (Data Acquisition Doc. No)

DI-NDTI-80809B

5. CONTRACT REFERENCE

3.1, 3.1.6.1

6. REQUIRING OFFICE

PMS 408

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See BLK 16

12. DATE OF 1st SUBMISSION

See BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A Draft

Final

Reg Repro

16. REMARKS

BLK 8: APPROVAL IS FOR TECHNICAL CONTENT AND ACCURACY.

GOVERNMENT RESPONSE TIME IS 30 CALENDAR DAYS. ANY REJECTED

SUBMISSION SHALL BE CORRECTED AND RESUBMITTED WITHIN 30

CALENDAR DAYS OF THE DATE OF REJECTION.

BLK 9: STATEMENT “D” REASON: DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY;

CONTAINS CRITICAL CREW PROGRAM INFORMATION (7 OCT 15). OTHER

U.S. REQUESTS SHALL BE REFERRED TO THE PROGRAM MANAGER,

EXPEDITIONARY MISSIONS (PMS408).

BLK 10, 12, 13: SUBMIT TEST REPORT NLT 30 CALENDAR DAYS AFTER A

FAQT TEST EVENT IS CONDUCTED.

BLK 14: IDE, IAW CONTRACT

SEE

ADDRESSEE

LIST

15. TOTAL

G. PREPARED BY

Barbara Hime

H. DATE

7/1/2016

I. APPROVED BY J. DATE

7/5/2016

17. PRICE

GROUP

18.

ESTIMATED

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 7 of 36 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X QCIC

D. SYSTEM/ITEM

JCREW FRP

E. CONTRACT/PR NO.

N00024-16-R-6327

F. CONTRACTOR

1. DATA ITEM NO

A007

2. TITLE OF DATA ITEM

Acceptance Test Plan

3. SUBTITLE

Functional Evaluation/Acceptance Test (FE/AT) Plan

4. AUTHORITY (Data Acquisition Doc. No)

DI-QCIC-80553A

5. CONTRACT REFERENCE

3.1

6. REQUIRING OFFICE

PMS 408

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See BLK 16

12. DATE OF 1st SUBMISSION

See BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See BLK 16 Draft

Final

Reg Repro

16. REMARKS

BLK 8: APPROVAL IS FOR TECHNICAL CONTENT. GOVERNMENT

RESPONSE TIME IS 30 CALENDAR DAYS. ANY REJECTED SUBMISSION

SHALL BE CORRECTED AND RESUBMITTED WITHIN 15 CALENDAR DAYS

OF THE DATE OF REJECTION.

BLK 9: STATEMENT “D” REASON: DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY;

CONTAINS CRITICAL CREW PROGRAM INFORMATION (7 OCT 15). OTHER

U.S. REQUESTS SHALL BE REFERRED TO THE PROGRAM MANAGER,

EXPEDITIONARY MISSIONS (PMS408).

BLK 10, 12, 13: NLT 60 CALENDAR DAYS PRIOR TO FAQT FOR EACH

SYSTEM. REVISIONS NLT 14 CALENDAR DAYS AFTER CHANGES THAT

AFFECT THIS DATA ITEM.

BLK 14: IDE, IAW CONTRACT

SEE

ADDRESSEE

LIST

15. TOTAL

G. PREPARED BY

Barbara Hime

H. DATE

7/1/2016

I. APPROVED BY J. DATE

7/5/2016

17. PRICE

GROUP

18.

ESTIMATED

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 8 of 36 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X QCIC

D. SYSTEM/ITEM

JCREW FRP

E. CONTRACT/PR NO.

N00024-16-R-6327

F. CONTRACTOR

1. DATA ITEM NO

A008

2. TITLE OF DATA ITEM

Acceptance Test Report

3. SUBTITLE

Functional Evaluation/Acceptance Test (FE/AT) Report

4. AUTHORITY (Data Acquisition Doc. No)

DI-QCIC-81891

5. CONTRACT REFERENCE

3.1, 3.1.6.2

6. REQUIRING OFFICE

PMS 408

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See BLK 16

12. DATE OF 1st SUBMISSION

See BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A Draft

Final

Reg Repro

16. REMARKS

BLK 8: APPROVAL IS FOR TECHNICAL CONTENT. GOVERNMENT

RESPONSE TIME IS 30 CALENDAR DAYS. ANY REJECTED SUBMISSION

SHALL BE CORRECTED AND RESUBMITTED WITHIN 15 CALENDAR DAYS

OF THE DATE OF REJECTION.

BLK 9: STATEMENT “D” REASON: DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY;

CONTAINS CRITICAL CREW PROGRAM INFORMATION (7 OCT 15). OTHER

U.S. REQUESTS SHALL BE REFERRED TO THE PROGRAM MANAGER,

EXPEDITIONARY MISSIONS (PMS408).

BLK 10 AND 12: SUBMIT TEST REPORT NLT 30 CALENDAR DAYS AFTER

TEST EVENT CONDUCTED.

BLK 14: IDE, IAW CONTRACT

SEE

ADDRESSEE

LIST

15. TOTAL

G. PREPARED BY

Barbara Hime

H. DATE

7/1/2016

I. APPROVED BY J. DATE

7/5/2016

17. PRICE

GROUP

18.

ESTIMATED

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 9 of 36 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X SESS 1

D. SYSTEM/ITEM

JCREW FRP

E. CONTRACT/PR NO.

N00024-16-R-6327

F. CONTRACTOR

1. DATA ITEM NO

A009

2. TITLE OF DATA ITEM

Failure Summary and Analysis Report

3. SUBTITLE

Failure Analysis and Corrective Action System

(FRACAS)

4. AUTHORITY (Data Acquisition Doc. No)

DI - SESS-80255A

5. CONTRACT REFERENCE

3.2

6. REQUIRING OFFICE

PMS 408

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF 1st SUBMISSION

See BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

MTHLY

Draft

Final

Reg Repro

16. REMARKS

BLK 8: APPROVAL IS FOR TECHNICAL CONTENT. GOVERNMENT

RESPONSE TIME IS 30 CALENDAR DAYS. ANY REJECTED SUBMISSION

SHALL BE CORRECTED AND RESUBMITTED WITHIN 30 DAYS OF THE DATE

OF REJECTION.

BLK 9: STATEMENT “D” REASON: DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY;

CONTAINS CRITICAL CREW PROGRAM INFORMATION (7 OCT 15). OTHER

U.S. REQUESTS SHALL BE REFERRED TO THE PROGRAM MANAGER,

EXPEDITIONARY MISSIONS (PMS408).

BLK 12: 30 DAYS AFTER FIRST FAILURE OCCURANCE.

BLK 14: IDE, IAW CONTRACT

SEE

ADDRESSEE

LIST

15. TOTAL

G. PREPARED BY

Barbara Hime

H. DATE

7/1/2016

I. APPROVED BY J. DATE

7/5/2016

17. PRICE

GROUP

18.

ESTIMATED

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 10 of 36 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X SESS

D. SYSTEM/ITEM

JCREW FRP

E. CONTRACT/PR NO.

N00024-16-R-6327

F. CONTRACTOR

1. DATA ITEM NO

A010

2. TITLE OF DATA ITEM

Failure Summary and Analysis Report

3. SUBTITLE

Failure Analysis and Corrective Action Report

(FACAR)

4. AUTHORITY (Data Acquisition Doc. No)

DI-SESS-81927

5. CONTRACT REFERENCE

3.2.2.4

6. REQUIRING OFFICE

PMS 408

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF 1st SUBMISSION

See BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

MTHLY

Draft

Final

Reg Repro

16. REMARKS

BLK 8: APPROVAL IS FOR TECHNICAL CONTENT. GOVERNMENT

RESPONSE TIME IS 30 CALENDAR DAYS. ANY REJECTED SUBMISSION

SHALL BE CORRECTED AND RESUBMITTED WITHIN 30 DAYS OF THE DATE

OF REJECTION.

BLK 9: STATEMENT “D” REASON: DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY;

CONTAINS CRITICAL CREW PROGRAM INFORMATION (7 OCT 15). OTHER

U.S. REQUESTS SHALL BE REFERRED TO THE PROGRAM MANAGER,

EXPEDITIONARY MISSIONS (PMS408).

BLK 12: CONTRACTOR SHALL SUBMIT INITIAL FACAR REPORT NLT 30

CALENDAR DAYS FROM FIRST FAILURE OCCURRENCE.

BLK 14: IDE, IAW CONTRACT

SEE

ADDRESSEE

LIST

15. TOTAL

G. PREPARED BY

Barbara Hime

H. DATE

7/1/2016

I. APPROVED BY J. DATE

7/5/2016

17. PRICE

GROUP

18.

ESTIMATED

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 11 of 36 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X SESS

D. SYSTEM/ITEM

JCREW FRP

E. CONTRACT/PR NO.

N00024-16-R-6327

F. CONTRACTOR

1. DATA ITEM NO

A011

2. TITLE OF DATA ITEM

Parts List

3. SUBTITLE

Initial O-Level and Initial Depot Spares and Consumables Lists

4. AUTHORITY (Data Acquisition Doc. No)

DI-SESS-81359B (See Blk 16)

5. CONTRACT REFERENCE

3.4.2.1, 3.4.2.2

6. REQUIRING OFFICE

PMS 408

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF 1st SUBMISSION

See BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See BLK 16 Draft

Final

Reg Repro

16. REMARKS

BLK 4: PARAGRAPHS 3.C, 3.F.3, 3.F.9 AND 4 DO NOT APPLY.

BLK 8: APPROVAL IS FOR TECHNICAL CONTENT. GOVERNMENT

RESPONSE TIME IS 30 CALENDAR DAYS. ANY REJECTED SUBMISSION

SHALL BE CORRECTED AND RESUBMITTED WITHIN 30 CALENDAR DAYS

OF THE DATE OF REJECTION.

BLK 9: STATEMENT “D” REASON: DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY;

CONTAINS CRITICAL CREW PROGRAM INFORMATION (7 OCT 15). OTHER

U.S. REQUESTS SHALL BE REFERRED TO THE PROGRAM MANAGER,

EXPEDITIONARY MISSIONS (PMS408).

BLK 10 AND 12: TO BE DELIVERED 120 DAC. SEPARATE LIST IS REQUIRED

FOR INITIAL O-LEVEL SPARES AND CONSUMMABLES AND FOR INITIAL

DEPOT SPARES AND CONSUMMABLES FOR EACH.

BLK 13: REVISIONS NLT 15 CALENDAR DAYS AFTER UPDATES ARE

REQUIRED DUE TO CHANGES TO APPROVED JCREW SYSTEM

HARDWARE CONFIGURATION ITEMS.

BLK 14: IDE, IAW CONTRACT

SEE

ADDRESSEE

LIST

15. TOTAL

G. PREPARED BY

Barbara Hime

H. DATE

7/1/2016

I. APPROVED BY J. DATE

7/5/2016

17. PRICE

GROUP

18.

ESTIMATED

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 12 of 36 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X

D. SYSTEM/ITEM

JCREW FRP

E. CONTRACT/PR NO.

N00024-16-R-6327

F. CONTRACTOR

1. DATA ITEM NO

A012

2. TITLE OF DATA ITEM

Depot Maintenance Work Request (DMWR) Manuals

3. SUBTITLE

4. AUTHORITY (Data Acquisition Doc. No)

TMCR SNIPP-160028-000

5. CONTRACT REFERENCE

3.4.3

6. REQUIRING OFFICE

PMS 408

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

1TIME

12. DATE OF 1st SUBMISSION

120 DAC

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A Draft

Final

Reg Repro

16. REMARKS

BLK 8: APPROVAL IS FOR TECHNICAL CONTENT AND ACCURACY.

APPROVAL IS REQUIRED BEFORE IMPLEMENTING THE DEVIATION.

GOVERNMENT RESPONSE TIME IS 45 CALENDAR DAYS. ANY REJECTED

SUBMISSION SHALL BE CORRECTED AND RESUBMITTED WITHIN 30

CALENDAR DAYS OF THE DATE OR REJECT

BLK 9: STATEMENT “D” REASON: DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY;

CONTAINS CRITICAL CREW PROGRAM INFORMATION (7 OCT 15). OTHER

U.S. REQUESTS SHALL BE REFERRED TO THE PROGRAM MANAGER,

EXPEDITIONARY MISSIONS (PMS408).

BLK 14: IDE, IAW CONTRACT

SEE

ADDRESSEE

LIST

15. TOTAL

G. PREPARED BY

Barbara Hime

H. DATE

7/1/2016

I. APPROVED BY J. DATE

7/5/2016

17. PRICE

GROUP

18.

ESTIMATED

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 13 of 36 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X MGMT

D. SYSTEM/ITEM

JCREW FRP

E. CONTRACT/PR NO.

N00024-16-R-6327

F. CONTRACTOR

1. DATA ITEM NO

A013

2. TITLE OF DATA ITEM

Unique Identification (IUID) Activity and Verification Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Doc. No)

DI-MGMT-81858

5. CONTRACT REFERENCE

3.4.4

6. REQUIRING OFFICE

PMS 408

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See BLK 16

12. DATE OF 1st SUBMISSION

See BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See BLK 16 Draft

Final

Reg Repro

16. REMARKS

BLK 4: ELECTRONIC MEDIA USING MICROSOFT EXCEL IS PERFERRED.

BLK 8: APPROVAL IS FOR TECHNICAL CONTENT. GOVERNMENT

RESPONSE TIME IS 30 CALENDAR DAYS. ANY REJECTED SUBMISSION

SHALL BE CORRECTED AND RESUBMITTED WITHIN 14 DAYS OF THE DATE

OF REJECTION.

BLK 9: STATEMENT “D” REASON: DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY;

CONTAINS CRITICAL CREW PROGRAM INFORMATION (7 OCT 15). OTHER

U.S. REQUESTS SHALL BE REFERRED TO THE PROGRAM MANAGER,

EXPEDITIONARY MISSIONS (PMS408).

BLK 10 AND 13: REVISIONS NLT 15 CALENDAR DAYS AFTER END OF EACH

QUARTER WITH DELIVERY OF ADDITIONAL NEW OR REPAIRED

GOVERNMENT SYSTEMS DURING PERIOD OF PERFORMANCE FOR

PRODUCTION SYSTEMS DELIVERY ORDER.

BLK 12: NLT 15 CALENDAR DAYS AFTER END OF FIRST QUARTER THAT

CONTRACTOR DELIVERED NEW AND/OR REPAIRED GOVERNMENT

SYSTEMS ON PRODUCTION SYSTEMS DELIVERY ORDER CLINS.

BLK 14: IDE, IAW CONTRACT

SEE

ADDRESSEE

LIST

15. TOTAL

G. PREPARED BY

Barbara Hime

H. DATE

7/1/2016

I. APPROVED BY J. DATE

7/5/2016

17. PRICE

GROUP

18.

ESTIMATED

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 14 of 36 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X SESS

D. SYSTEM/ITEM

JCREW FRP

E. CONTRACT/PR NO.

N00024-16-R-6327

F. CONTRACTOR

1. DATA ITEM NO

A014

2. TITLE OF DATA ITEM

Configuration Management Plan

3. SUBTITLE

Contractor's Configuration Management Plan

4. AUTHORITY (Data Acquisition Doc. No)

DI-SESS-80858C (See Blk 16)

5. CONTRACT REFERENCE

3.5

6. REQUIRING OFFICE

PMS 408

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF 1st SUBMISSION

30 DAC

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See BLK 16 Draft

Final

Reg Repro

16. REMARKS

BLK 4: BLK 4: CONTRACTOR'S FORMAT ACCEPTABLE.

BLK 8: APPROVAL IS FOR TECHNICAL CONTENT. GOVERNMENT

RESPONSE TIME IS 30 CALENDAR DAYS. ANY REJECTED SUBMISSION

SHALL BE CORRECTED AND RESUBMITTED WITHIN 30 CALENDAR DAYS

OF THE DATE OF REJECTIONS.

BLK 9: STATEMENT “D” REASON: DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY;

CONTAINS CRITICAL CREW PROGRAM INFORMATION (7 OCT 15). OTHER

U.S. REQUESTS SHALL BE REFERRED TO THE PROGRAM MANAGER,

EXPEDITIONARY MISSIONS (PMS408).

BLK 13: REVISIONS NLT 15 CALENDAR DAYS AFTER UPDATES ARE

REQUIRED DUE TO PROGRAM CHANGES THAT REQUIRE UPDATES.

BLK 14: IDE, IAW CONTRACT

SEE

ADDRESSEE

LIST

15. TOTAL

G. PREPARED BY

Barbara Hime

H. DATE

7/1/2016

I. APPROVED BY J. DATE

7/5/2016

17. PRICE

GROUP

18.

ESTIMATED

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 15 of 36 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X ENVR

D. SYSTEM/ITEM

JCREW FRP

E. CONTRACT/PR NO.

N00024-16-R-6327

F. CONTRACTOR

1. DATA ITEM NO

A015

2. TITLE OF DATA ITEM

Environmental Stress Screening Procedures and Implementation Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Doc. No)

DI-ENVR-81014

5. CONTRACT REFERENCE

3.1.6.2.1

6. REQUIRING OFFICE

PMS 408

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See BLK 16

12. DATE OF 1st SUBMISSION

See BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See BLK 16 Draft

Final

Reg Repro

16. REMARKS

BLK 8: APPROVAL IS FOR TECHNICAL CONTENT AND ACCURACY.

APPROVAL IS REQUIRED BEFORE IMPLEMENTING THE DEVIATION.

GOVERNMENT RESPONSE TIME IS 45 CALENDAR DAYS. ANY REJECTED

SUBMISSION SHALL BE CORRECTED AND RESUBMITTED WITHIN 30

CALENDAR DAYS OF THE DATE OF REJECTION.

BLK 9: STATEMENT “D” REASON: DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY;

CONTAINS CRITICAL CREW PROGRAM INFORMATION (7 OCT 15). OTHER

U.S. REQUESTS SHALL BE REFERRED TO THE PROGRAM MANAGER,

EXPEDITIONARY MISSIONS (PMS408).

BLK 10, 12, 13: NLT 60 CALENDAR DAYS PRIOR TO ESS. REVISIONS NLT 14

CALNEDAR DAYS AFTER CHANGES THAT AFFECT THIS DATA ITEM.

BLK 14: IDE, IAW CONTRACT

SEE

ADDRESSEE

LIST

15. TOTAL

G. PREPARED BY

Barbara Hime

H. DATE

7/1/2016

I. APPROVED BY J. DATE

7/5/2016

17. PRICE

GROUP

18.

ESTIMATED

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 16 of 36 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X ENVR

D. SYSTEM/ITEM

JCREW FRP

E. CONTRACT/PR NO.

N00024-16-R-6327

F. CONTRACTOR

1. DATA ITEM NO

A016

2. TITLE OF DATA ITEM

Environmental Stress Screening (ESS) Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Doc. No)

DI-ENVR-81663

5. CONTRACT REFERENCE

3.1.6.2.1

6. REQUIRING OFFICE

PMS 408

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See BLK 16

12. DATE OF 1st SUBMISSION

See BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A Draft

Final

Reg Repro

16. REMARKS

BLK 8: APPROVAL IS FOR TECHNICAL CONTENT AND ACCURACY.

APPROVAL IS REQUIRED BEFORE IMPLEMENTING THE DEVIATION.

GOVERNMENT RESPONSE TIME IS 45 CALENDAR DAYS. ANY REJECTED

SUBMISSION SHALL BE CORRECTED AND RESUBMITTED WITHIN 30

CALENDAR DAYS OF THE DATE OF REJECTION.

BLK 9: STATEMENT “D” REASON: DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY;

CONTAINS CRITICAL CREW PROGRAM INFORMATION (7 OCT 15). OTHER

U.S. REQUESTS SHALL BE REFERRED TO THE PROGRAM MANAGER,

EXPEDITIONARY MISSIONS (PMS408).

BLK 10 AND 12: SUBMIT REPORT NLT 30 CALENDAR DAYS AFTER A TEST

EVENT IS CONDUCTED.

BLK 14: IDE, IAW CONTRACT

SEE

ADDRESSEE

LIST

15. TOTAL

G. PREPARED BY

Barbara Hime

H. DATE

7/1/2016

I. APPROVED BY J. DATE

7/5/2016

17. PRICE

GROUP

18.

ESTIMATED

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 17 of 36 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X SESS

D. SYSTEM/ITEM

JCREW FRP

E. CONTRACT/PR NO.

N00024-16-R-6327

F. CONTRACTOR

1. DATA ITEM NO

A017

2. TITLE OF DATA ITEM

Notice of Revision (NOR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Doc. No)

DI- SESS-80642D

5. CONTRACT REFERENCE

3.5.2

6. REQUIRING OFFICE

PMS 408

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF 1st SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

BLK 8: APPROVAL IS FOR TECHNICAL CONTENT. GOVERNMENT

RESPONSE TIME IS 30 CALENDAR DAYS. ANY REJECTED SUBMISSION

SHALL BE CORRECTED AND RESUBMITTED WITHIN 30 DAYS OF THE DATE

OF REJECTION.

BLK 9: STATEMENT “D” REASON: DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY;

CONTAINS CRITICAL CREW PROGRAM INFORMATION (7 OCT 15). OTHER

U.S. REQUESTS SHALL BE REFERRED TO THE PROGRAM MANAGER,

EXPEDITIONARY MISSIONS (PMS408).

BLK 14: IDE, IAW CONTRACT

SEE

ADDRESSEE

LIST

15. TOTAL

G. PREPARED BY

Barbara Hime

H. DATE

7/1/2016

I. APPROVED BY J. DATE

7/5/2016

17. PRICE

GROUP

18.

ESTIMATED

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 18 of 36 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X SESS

D. SYSTEM/ITEM

JCREW FRP

E. CONTRACT/PR NO.

N00024-16-R-6327

F. CONTRACTOR

1. DATA ITEM NO

A018

2. TITLE OF DATA ITEM

Request for Variance (RFV)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Doc. No)

DI-SESS-80640D

5. CONTRACT REFERENCE

3.5.3

6. REQUIRING OFFICE

PMS 408

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See BLK 16

12. DATE OF 1st SUBMISSION

See BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See BLK 16 Draft

Final

Reg Repro

16. REMARKS

BLK 8: APPROVAL IS FOR TECHNICAL CONTENT AND ACCURACY.

APPROVAL IS REQUIRED BEFORE IMPLEMENTING THE DEVIATION.

GOVERNMENT RESPONSE TIME IS 45 CALENDAR DAYS. ANY REJECTED

SUBMISSION SHALL BE CORRECTED AND RESUBMITTED WITHIN 30

CALENDAR DAYS OF THE DATE OF REJECTION.

BLK 9: STATEMENT “D” REASON: DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY;

CONTAINS CRITICAL CREW PROGRAM INFORMATION (7 OCT 15). OTHER

U.S. REQUESTS SHALL BE REFERRED TO THE PROGRAM MANAGER,

EXPEDITIONARY MISSIONS (PMS408).

BLK 10 AND 12: NLT 15 CALENDAR DAYS AFTER REQUIREMENT FOR

DEVIATION HAS BEEN IDENTIFIED.

BLK 14: IDE, IAW CONTRACT

SEE

ADDRESSEE

LIST

15. TOTAL

G. PREPARED BY

Barbara Hime

H. DATE

7/1/2016

I. APPROVED BY J. DATE

7/5/2016

17. PRICE

GROUP

18.

ESTIMATED

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 19 of 36 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X PSSS

D. SYSTEM/ITEM

JCREW FRP

E. CONTRACT/PR NO.

N00024-16-R-6327

F. CONTRACTOR

1. DATA ITEM NO

A019

2. TITLE OF DATA ITEM

Diminishing Manufacturing Sources and Material Shortages (DMSMS) Health Analysis Report

3. SUBTITLE

DMSMS Health Analysis and Forecasting Bill of Materials Report

4. AUTHORITY (Data Acquisition Doc. No)

DI-PSSS-81656A

5. CONTRACT REFERENCE

3.5.4

6. REQUIRING OFFICE

PMS 408

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

QTRLY

12. DATE OF 1st SUBMISSION

90 DAC

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A Draft

Final

Reg Repro

16. REMARKS

BLK 4: PARAGRAPH 2.6 DOES NOT APPLY.

BLK 8: APPROVAL IS FOR TECHNICAL CONTENT. GOVERNMENT

RESPONSE TIME IS 30 CALENDAR DAYS. ANY REJECTED SUBMISSION

SHALL BE CORRECTED AND RESUBMITTED WITHIN 30 DAYS OF THE DATE

OF REJECTION.

BLK 9: STATEMENT “D” REASON: DISTRIBUTION AUTHORIZED TO THE

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY;

CONTAINS CRITICAL CREW PROGRAM INFORMATION (7 OCT 15). OTHER

U.S. REQUESTS SHALL BE REFERRED TO THE PROGRAM MANAGER,

EXPEDITIONARY MISSIONS (PMS408).

BLK 14: IDE, IAW CONTRACT

SEE

ADDRESSEE

LIST

15. TOTAL

G. PREPARED BY

Barbara Hime

H. DATE

7/1/2016

I. APPROVED BY J. DATE

7/5/2016

17. PRICE

GROUP

18.

ESTIMATED

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 20 of 36 Pages

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the…