Attachment 5 Government Furnished Information (GFI) List Microsoft Excel spreadsheet 1 tab
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| ATTACHMENT 5 | Solicitation No: N00024-16-R-6327 | ||||||
| GOVERNMENT FURNISHED INFORMATION: All Unclassified GFI in digital format will be delivered to the vendor via the IDE and will become a part of this contract. | |||||||
| PROGRAM TITLE: JCREW I1B1 | |||||||
| ITEM NO. | Title | DUE DATE | SOW | Revision | Date of Document | Date of Delivery | |
| 1 | JCREW I1B1, Performance Specification | 1.0, 3.1, 3.1.6.2.1.1, 3.2, 3.4. | 2.2 | 17-Feb-12 | sent via DVD (Classified - Secret) | ||
| 2 | JCREW I1B1 Technical Data Package, including Firmware and Software Folders | With RFP | 1.0, 1.1, 3.1 | sent via DVD (Unclassified) | |||
| 3 | First Article Qualification Test (FAQT) Plan and Procedures | 3.1, 3.1.6.1 | D1-61523 - Rev A | 23-Mar-16 | 24-Jun-16 | ||
| 4 | Physical Configuration Audit (PCA) Plan Technical Review Action Plan (TRAP) | 3.1.2.2 | 1.0 | 22-Mar-16 | 24-Jun-16 | ||
| 5 | Lowest Replaceable Unit (LRU) | 3.1.4, 3.1.5 | D1-61074 - Rev A | 23-Mar-16 | 24-Jun-16 | ||
| 6 | Integrated Logistics Support (ILS) Documentation including tech and training manuals | 3.4 | Will be delivered upon contract award | ||||
| 7 | Logistics Product Database (LPD) | 3.4 | Will be delivered upon contract award | ||||
| 8 | Field Maintenance Manuals | 3.4.6 | Will be delivered upon contract award | ||||
| 9 | JCREW I1B1 Configuration Management (CM) Plan | 3.5 | 2.0 | 1-Sep-15 | 24-Jun-16 | ||
| 10 | Closed Loop Failure Reporting System (FRACAS Strategy) | 3.2.2 | 1.0 | 12-May-12 | 24-Jun-16 | ||
| 11 | JCREW I1B1 Systems Engineering Plan (SEP) | 3.1.1 | 2.0 | 14-Jul-14 | 24-Jun-16 | ||
| 12 | Failure Modes, Effects, and Criticality Analyses (FMECA) | 3.2, 3.2.1 | Latest Rev | ||||
| 13 | Operational Mode Summary/Mission Profile (OMS/MP) | 1.1 | 22-Dec-11 | 24-Jun-16 | |||
| 14 | JCREW I1B1 Security Classification Guide | 1 | 2-Apr-07 | 24-Jun-16 | |||
| 15 | Production Reliability Acceptance Test (PRAT) | 3.1, 3.1.6.2.2, 3.1.6.2.2.1 | D1-61526 - Latest Rev | 24-Jun-16 | |||
| 16 | Functional Evaluation/Acceptance Test (FE/AT) | 3.1, 3.1.6.2 | D1-61522 - Rev D | 17-Mar-16 | 24-Jun-16 | ||
| 17 | Reliability Stress Prediction | 3.2 | D1-61075 - Rev 7 | 20-Aug-12 | 24-Jun-16 | Same GFI as Reliability Critical Items List | |
| 18 | Reliability Block Diagram | 3.2 | D1-61044 - Rev 4 | 31-Jul-13 | 24-Jun-16 | ||
| 19 | Reliability Critical Items List | 3.2 | D1-61075 - Rev 7 | 20-Aug-12 | 24-Jun-16 | Same GFI as Reliability Stress Prediction | |
| 20 | Program Protection Plan (PPP) | 3.8 | 2 | 3-May-16 | Sent via mail (Classified) - Will be delivered upon contract award | ||
| 21 | Program Protection Implementation Plan (PPIP) | 3.8 | Will be delivered upon contract award |