15_0805_SOURCES_SOUGHT_-_LPD_26__27_FOA__PSA.pdf
PDF 29 KB Posted
- Solicitation number
- N00024-15-R-2439
About this file
Sources Sought and Appendix 1 N00024-15-R-2439
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation: N00024-15-R-2439
SOURCES SOUGHT SYNOPSIS
The Naval Sea System Command is issuing this sources sought synopsis as a means of conducting market research to identify parties having an interest in and the resources to support this requirement for the Fitting Out Availability (FOA) and Post Shakedown Availability (PSA) for LPD 26 (JOHN P MURTHA) and for LPD 27 (PORTLAND). The result of this market research will contribute to determining the method of procurement. The applicable North American Industry Classification System (NAICS) code assigned to this procurement is 336611 Ship Building and Repairing.
THERE IS NO SOLICITATION AT THIS TIME. This request for capability information does not constitute a request for proposals; submission of any information in response to this market survey is purely voluntary; the government assumes no financial responsibility for any costs incurred.
If your organization has the potential capacity to perform the above described efforts, further detailed in Appendix 1, please provide the following information: 1) Organization name, address, e-mail address, web site address, telephone number, and size and type of ownership for the organization; and 2) Tailored capability statements addressing the particulars of this effort, with appropriate documentation supporting claims of organizational and staff capability. If significant subcontracting or teaming is anticipated in order to deliver technical and industrial capability, organizations should address the administrative and management structure of such arrangements.
The Government will evaluate market information to ascertain potential market capacity to 1) provide efforts consistent in scope and scale with those described in this notice and otherwise anticipated; 2) secure and apply the full range of corporate financial, human capital, and technical resources required to successfully perform similar requirements; and 3) implement a successful project management plan that includes: compliance with tight program schedules; cost containment; meeting and tracking performance; hiring and retention of personnel and risk mitigation.
BASED ON THE RESPONSES TO THIS SOURCES SOUGHT NOTICE/MARKET
RESEARCH, THIS REQUIREMENT MAY BE SET-ASIDE FOR SMALL BUSINESSES OR
PROCURED THROUGH FULL AND OPEN COMPETITION. In accordance with FAR 52.219- 14, should the prospective contract be competed as a small business set aside, the prospective offeror would be required to perform 50% of the cost of manufacturing, to include industrial work, planning, engineering, and program management. If you are a small business, include a description of your plan to meet the requirements listed in Appendix 1 within the capability statement portion of your submission. Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding their submissions.
Submission Instructions: Interested parties who consider themselves qualified to perform the herein described efforts are invited to submit a response to this Sources Sought Notice by 1500 EDT on 14 August 2015. All responses under this Sources Sought Notice must be emailed to lawrence.gordin@navy.mil and matthew.p.mccarthy1@navy.mil.
If you have any questions concerning this opportunity please contact the technical point of contact: Matthew McCarthy at (202) 781-4944 or matthew.p.mccarthy1@navy.mil.
Respondents are responsible for properly marking and clearly identifying proprietary information or trade secrets contained within their response. The Government will not be liable for, or suffer any consequential damages for any proprietary information not properly marked and clearly identified. Information provided shall be treated as Business Sensitive and will not be shared outside of Government activities and agencies without the permission of the provider.
Please choose one of the methods below to submit your response:
1. For electronic file sizes over 5 MB upload and submit your response to the Safe Access File Exchange (SAFE) application (https://safe.amrdec.army.mil/safe/). Please follow the steps below:
A. Proceed as a Guest user by clicking on "I do not have a CAC or this machine is not configured to read my CAC and I would like to access SAFE as a Guest User"
B. Fill in all required fields C. Upload your RFI response and grant file access to the following email address:
lawrence.gordin@navy.mil and matthew.p.mccarthy1@navy.mil.
D. Click the "Submit" button
2. For electronic file sizes fewer than 5 MB send by email to lawrence.gordin@navy.mil and matthew.p.mccarthy1@navy.mil.
3. Submit digital copies files on CD or DVD by mail. Include two digital copies (e.g., 2 CD’s or 2 DVD’s). Mailing address: Naval Sea Systems Command, Attn: Mr. Matthew McCarthy, PMS317, 1333 Isaac Hull Ave SE, Washington, DC 20376. Please label your package with the solicitation number N00024-15-R-2439.
Note: Preferred method of sending in responses for all electronic file sizes is by the SAFE application; however, responses will be accepted by email and mail as described above.
mailto:lawrence.gordin@navy.mil mailto:matthew.p.mccarthy1@navy.mil mailto:lawrence.gordin@navy.mil mailto:matthew.p.mccarthy1@navy.mil
APPENDIX 1: Purpose and Objectives
The purpose of this contract is to provide management, labor, material and facilities, as required, to accomplish Ship Fitting Out Availabilities (FOAs), Post Shakedown Availabilities (PSAs), and Emergent Work onboard the LPD 26 (JOHN P MURTHA) and LPD 27 (PORTLAND). The FOA is intended to complete fitting out and to correct design-related deficiencies and complete system installations to support ship Post Delivery Test & Trial (PDT&T). The PSA is intended to correct deficiencies and accomplish system/equipment upgrades identified during ship PDT&T and shakedown periods. A separate Life Cycle Engineering & Support (LCES) Planning Yard will manage a comprehensive process for work specification development, material procurement, fabrication, and kitting to support FOA/PSA and Emergent Work. The FOA and PSA onboard the LPD 26 and LPD 27 will take place at Naval Base San Diego, CA. The planning efforts for each availability will begin approximately 4 months prior to the start of each availability. The execution efforts for the FOA on LPD 26 and LPD 27 will take approximately 200,000 labor hours each, exclusive of any emergent work, and will each last 8 weeks. The execution effort for the LPD 26 PSA will take approximately 500,000 labor hours, exclusive of any emergent work, and will last 21 weeks. The execution effort for the LPD 27 PSA will take approximately 450,000 labor hours, exclusive of any emergent work, and will last 18 weeks. Emergent work is estimated at 200,000 hours across all of the availabilities.
For information purposes, the breakdown by craft/trade set forth below reflects the Navy’s average historical hard task labor experience on previous LPD 17 ship class FOAs / PSAs.
As a result, it is also the basis for the production labor mix anticipated to accomplish the total FOA / PSA work package for LPD 26 and LPD 27:
CRAFT/TRADE PERCENTAGE OF TOTAL LABOR
Program Management 20%
Shipfitters 7% Machinists 5% Firewatch/Safety 9% Electrical/Electronic 10% Pipefitters 16% Painters/Blasters 7% Riggers 4% Sheetmetal 5% Carpenters 2% Laggers/Insulators 4% Welders 11% Total 100%
Note: Program Management should include planners, estimators, schedulers, trade supervision, etc.
The following summarize the major requirements contemplated for the above outlined scope of work:
1. Management, Planning, Engineering, Design, Liaison, Scheduling:
The LCES Planning Yard will manage a comprehensive process for work specification development, material procurement, fabrication, and kitting. The Contractor is responsible for detailed schedule integration, manning resource allocation, material management and execution of work items. Additionally, the Contractor shall provide onboard spare parts and test equipment for all Contractor procured equipment which is different from that previously installed onboard the ship. The range and depth of spare parts shall be in accordance with documented manufacturer's recommendations to support the ship for ninety (90) days. Also, the contractor will need to incorporate emergent work as identified during various tests and inspections in to the scheduled availabilities.
2. Labor and Material:
Efforts include those craft/trade categories listed above in the percentage of total labor breakdown. Material kits will be delivered to the Contractor as Government Furnished Material (GFM) in advance of the FOA / PSA, and pre-staged by the Contractor in a warehouse, in preparation for FOA / PSA. Material provided by the executing yard will include incidental, or consumable materials, such as nuts, bolts and washers, pipe insulation, welding rods, pipe hangers, paint brushes, cable hangers and studs, cable stuffing tubes and fittings and any contractor furnished material required to accomplish work. Note: The Contractor will conduct tests, except those designated as Government responsible, and participate in Post Repair Sea Trials to verify the accuracy and completion of all shipyard industrial work.
3. Facilities:
The following facilities will need to be provided in order to execute the FOA/PSA scope of work: (1) Production Shops; (2) Secured and controlled environmental facilities for combat systems and electronics; and (3) Warehouse/storage facilities to accommodate pre-positioning and long lead time material. Please describe your available facilities or your plan to secure necessary facilities.
4. Past Performance:
Please describe relevant and comparable prime contract and subcontract work. The Government shall consider as relevant any work on amphibious and surface combatant availabilities performed within the preceding four years. Emphasis will be placed on industrial efforts with significant work package growth that demonstrate an offeror's ability to successfully accomplish large, dynamic, intensive availabilities within the ship’s homeport.
5. Additional Requirements:
Due to the prospective dollar value and contract type of this potential contract, it is expected that the potential contract will contain requirements for an Earned Value Management System (DFARS 252.234-7002) and Accounting System (DFARS 252.242-7006).
File details come from the government source that posted it. Updated .