RFP N00024-15-R-2221

View the file

Other files

File Type Posted
Att_7_-_Amendment_1_Q A.xlsx XLSX spreadsheet
4.7m_Inflatable_Att_1-5.xls XLS spreadsheet
Att_7_-_Amendment_1_Q A.xlsx XLSX spreadsheet
4.7m_Inflatable_Att_1-5.xls XLS spreadsheet
4.7m_Inflatable_Att_1-5.xls XLS spreadsheet
Att_6_-_Boat_Builder_Performance_POC.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2020

UNDER DPAS (15 CFR 700)

11. DELIVERY FOR FOB

RFQ

SEE SCHEDULE

14. METHOD OF SOLICITATION

IFB RFP

CODE

SEE ADDENDUM

BLOCK IS MARKED

DESTINATION UNLESS

12. DISCOUNT TERMS

(No Collect Calls)

13b. RATING

13a. THIS CONTRACT IS A RATED ORDER

X

X

CODE

N00024-15-R-2221 29-Jun-2015

b. TELEPHONE NUMBER

202-781-1778

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 24 Jul 2015

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV 3/2005)

Prescribed by GSA

FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY

CODE 10. THIS ACQUISITION IS

UNRESTRICTED

FAX: NAICS:

TEL:

CODE 18a. PAYMENT WILL BE MADE BYOFFEROR

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TEL.

N00024

SIZE STD:

9. ISSUED BY

FACILITY

CODE

17a.CONTRACTOR/

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

JON M. GOFUS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES

SEE SCHEDULE

TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS

SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS

SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

SB

HUBZONE SB

SET ASIDE: % FOR

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

N0002415NR53070

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

TEL: EMAIL:

2 COPIES

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

.OFFER DATED YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE

X

8(A)

SVC-DISABLED VET-OWNED SB

EMERGING SB

X

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

SEE SCHEDULE

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT

PAGE 2 OF

23. UNIT PRICE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV 3/2005) BACK

Prescribed by GSA

FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

N00024-15-R-2221

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

CLIN

Number

4.7m Inflatable Boat

FFP

25 Each

Philippines J9-P-LAF FOB: Origin

PURCHASE REQUEST NUMBER: N0002415NR53070

NET AMT

Unique Item Indentification (UID)

25 Each

Spares

1 Lot

Crew familiarization and Training

1 Each

FOB: Destination

4.7m Inflatable Boat

6 Each

Kenya J9-P-LAC

Unique Item Identification (UID)

6 Each

Spares

1 Lot

Crew familiarization and Training

1 Each

FOB: Destination

CLAUSES INCORPORATED BY FULL TEXT

HQ B-2-0022 CONTRACT SUMMARY FOR PAYMENT OFFICE (FIXED PRICE) (FEB 1997)

This entire contract is fixed price.

SECTION C: DESCRIPTIONS AND SPECIFICATIONS (Philippines J9-P-LAF)

Item 0001: 4.7m Inflatable Boats - Quantity twenty five (25) - The Offeror shall construct and deliver twenty five

(25) 4.7m Inflatable Boats, complete with standard boat equipment listed in the Standard Equipment List (Attachment 1). Equipment listed is for one complete boat.

Item 0002: UID – Quantity tewnty five (25) - Item(s) delivered shall comply with the Unique Item Identification (UID) requirements for all boats delivered under Item 0001. UID requirements are detailed in the UID Clause in Section H and in Section I DFARs 252.211-7003, Item Identification and Valuation. Pricing is to be included in Attachment 3, Item 101. UID shall be placed on the following items:

1. Boats

2. Engines

Item 0003: Spares – For the RFP, the Offeror shall provide pricing for all items listed in Attachment 4 and 5.

Item 0004: Crew familiarization and Training - The contractor shall send two instructors to Cavite, Philippines to conduct crew familiarization and maintenance training for twenty-five (25) 4.7m inflatables with Johnson 55hp multi fuel for ten (10) working days. Training must occur 90 days after final delivery in-country. Contractor must provide a read ahead syllabus required one month prior to final USG acceptance. A full trip report is due to the USG no later than one month after conclusion of the reactivation and crew familiarization. At a minimum training shall cover the following:

A. BOAT LAYOUT AND OPERATION (Classroom and At-sea)

1. Physical Layout of the inflatable

2. Location & Operation of Mechanical Systems

(To Include: Steering, Fuel, etc)

3. Start-up procedures

4. Boat Handling characteristics (i.e. navigation)

5. Docking and Mooring procedures

6. Shut down procedures

B. BOAT MAINTENANCE (Classroom and At-sea)

C. BOAT REPAIR

1. Minor and Emergency Sponson Repair. Provide proper maintenance procedures and cycle operations specific to 4.7m inflatables.

D. MECHANICAL SYSTEMS INDOCTRINATION AND

TRAINING

1. Engine Start up Proce dures

2. Steering Components Operation and Care

3. Engine Troubleshooting

E. VENDOR TO PROVIDE ALL NECESSARY EQUIPMENT

FOR IN-COUNTRY TRAINING (i.e. classroom requirements (i.e. projector), pier accommodations, prime mover requirements, etc).

In accordance with ITEM NO. 0004, the contractor shall also procure two (2) gallons of fuel for each 4.7m inflatable boat (50 gallons total) for purposes of operation and maintenance training.

SECTION DESCRIPTIONS AND SPECIFICATION (Kenya J9-P-LAC)

Item 0005: 4.7m Inflatable Boats - Quantity six (6) - The Offeror shall construct and deliver six (6) 4.7m Inflatable Boats, complete with standard boat equipment listed in the Standard Equipment List (Attachment 2). Equipment listed is for one complete boat.

Item 0006: UID – Quantity six (6) - Item(s) delivered shall comply with the Unique Item Identification (UID) requirements for all boats delivered under Item 0005. UID requirements are detailed in the UID Clause in Section H and in Section I DFARs 252.211-7003, Item Identification and Valuation. Pricing is to be included in Attachment 3, Item 101. UID shall be placed on the following items:

1. Boats

2. Engines .

Item 0007: Spares – For the RFP, the Offeror shall provide pricing for all items listed in Attachment 5.

Item 0008: Crew familiarization and Training - The contractor shall send two instructors to Mtongwe, Kenya (Mkunguni Jetty) to conduct crew familiarization and maintenance training for six (6) 4.7m inflatables with Yamaha 55hp multi fuel for ten (10) working days. Training must occur 90 days after final delivery in-country. Contractor must provide a read ahead syllabus required one month prior to final USG acceptance. A full trip report is due to the USG no later than one month after conclusion of the reactivation and crew familiarization. At a minimum training shall cover the following:

A. BOAT LAYOUT AND OPERATION (Classroom and At-sea)

7. Physical Layout of the inflatable

8. Location & Operation of Mechanical Systems

(To Include: Steering, Fuel, etc)

9. Start-up procedures

10. Boat Handling characteristics (i.e. navigation)

11. Docking and Mooring procedures

12. Shut down procedures

B. BOAT MAINTENANCE (Classroom and At-sea)

C. BOAT REPAIR

1. Minor and Emergency Sponson Repair. Provide proper maintenance procedures and cycle operations specific to 4.7m inflatables.

D. MECHANICAL SYSTEMS INDOCTRINATION AND

TRAINING

4. Engine Start up Procedures

5. Steering Components Operation and Care

6. Engine Troubleshooting

E. VENDOR TO PROVIDE ALL NECESSARY EQUIPMENT

FOR IN-COUNTRY TRAINING (i.e. classroom requirements (i.e. projector), pier accommodations, prime mover requirements, etc).

In accordance with ITEM NO. 0008, the contractor shall also procure two (2) gallons of fuel for each 4.7m inflatable boat (12 gallons total) for purposes of operation and maintenance training.

NOTICE OF ACCESS TO TECHNICAL DATA

It is agreed and understood that in signing this delivery order, the Offeror acknowledges that they have in their possession, or have access to, all the technical data needed to build, outfit and deliver all the products and services required in this delivery order. The term “technical data” as used in this clause means “technical data” as defined in DFARS 252.227-7013 and 252.227-7015, and includes items such as, but not limited to, drawings, sketches, specifications, wiring diagrams, process descriptions, manufacturing procedures, etc. Accordingly, the Offeror is not relying on any Government Furnished Information to complete the requirements of this delivery order.

HQ C-2-0004 ACCESS TO THE VESSEL(S) (AT) (NAVSEA) (JAN 1983)

Officers, employees and associates of other prime Contractors with the Government and their subcontractors, shall, as authorized by the Supervisor, have, at all reasonable times, admission to the plant, access to the vessel(s) where and as required, and be permitted, within the plant and on the vessel(s) required, to perform and fulfill their respective obligations to the Government. The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Supervisor to be given admission to the plant and access to the vessel(s) for office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of the respective responsibilities involved, and reasonable to their performance.

HQ C-2-0013 CONTRACTOR PROBLEM IDENTIFICATION REPORTS (NAVSEA) (MAY 1993)

(a) Contract Problem Identification Reports (CPIRs) shall be used by the Contractor for the purpose of alerting the Government to actual or potential contract problems and of establishing an early dialogue between the Contractor and the Government with regard thereto.

(b) A "contract problem" is a fact or circumstance of which the Contractor is aware that does, will or reasonably is anticipated to (1) have a significant or substantial impact on the delivery schedule or completion of contract performance or the cost of performance of the contract (increase or decrease) or (2) requires modification to the contract or specification(s). The terms "significant" and "substantial" shall be interpreted in the same manner as they would be interpreted by a reasonably prudent business person under the relevant circumstances.

(c) The Contractor shall report each contract problem promptly and in no event later than ten (10) calendar days, after the Contractor identifies such contract problem. A written CPIR shall be transmitted via the Administrating Contracting Officer (ACO) to the Procuring Contracting Officer and to the cognizant technical code. Each CPIR shall be entitled "Contract Problem Identification Report", shall be dated, numbered sequentially and shall set forth the following based on the best and most complete information then known or available to the Contractor:

(1) The nature of the contract problem;

(2) The date on which the contract problem arose and the date on which the contract problem was identified as such;

(3) The anticipated direct and consequential effects of the contract problem upon the delivery schedule or completion of contract performance or the cost of performance of the contract;

(4) Identification of the supplies and/or services which are or may be affected; and

(5) The Contractor's recommended solution to the reported contract problem.

(d) Follow up status reports of each contract problem, identified by the original CPIR number, shall be furnished monthly or more frequently as required by the Contracting Officer. A final follow up report shall be furnished immediately following resolution of each contract problem.

(e) CPIRs shall not be submitted when notice of the same contract problem is required to be furnished to the Government pursuant to any other requirement of this contract. The submission of a CPIR, however, does not relieve the Contractor of its obligations to provide notice required under any other requirement of this contract.

HQ C-2-0024 EXTENSION OF COMMERCIAL WARRANTY (NAVSEA) (NOV 1996)

The Contractor shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that such warranty is available at no additional cost to the Government. The Contractor shall provide a copy of the standard commercial warranty with the item. The standard commercial warranty period shall begin upon the final acceptance of the applicable material or software.

Acceptance of the standard commercial warranty does not waive the Government’s rights under the “Inspection” clause, nor does it limit the Government’s rights with regard to other terms and conditions of the contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty.

HQ C-2-0063 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)

(APR 2004)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors are free to enter into separate non-disclosure agreements with the file room contractor. (Please contact Director, E Business Division for contractor specifics.) However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

Section D: Packaging and Marking

Items 0001, 0002, 0003, 0005, 0006 and 0007 shall be prepared for shipment with the Offeror's best commercial practice. The Offeror shall be responsible for the condition of all deliverables until receipt inspection and final acceptance at the prescribed below destination by a U.S. Government representative is completed.

WARRANTY NOTIFICATION FOR ITEM(S) 0001 and 0005- (NAVSEA) (NOV 1996)

The Contractor shall apply a permanent warranty notification stamping or marking on each warranted deliverable end item and its container. The notification shall be placed in close proximity to other required stamping or markings so as to be easily readable by personnel. The warranty notification shall read:

THIS ITEM WARRANTED UNDER CONTRACT N00024-

__________________ TO CONFORM TO DESIGN,

MANUFACTURING, AND PERFORMANCE REQUIREMENTS

AND BE FREE FROM DEFECTS IN MATERIAL AND

WORKMANSHIP FOR 365 DAYS FROM

DATE OF ACCEPTANCE.. IF ITEM IS DEFECTIVE NOTIFY MR. AARON RATLIFF

(NAVSEA CODE PMS 325F) AND PCO.

HQ D-2-0003 ADDITIONAL MARKING REQUIREMENTS FOR FMS ITEMS (NAVSEA) (SEP 1992)

(a) The following identifying marks shall appear on the outside of each box, parcel and/or crate and all shipping papers included in each shipment:

NAVY

FMS CASE FMS Case J9-P-LAF/J9-P-LAC

REQUISITION NO. N00024-15-R-2221

ITEM DESCRIPTION J9-P-LAF/J9-P-LAC 4.7M Inflatable Boats

If a consolidated shipment of several items in one container is forwarded, add to the above information

"CONSOLIDATED SHIPMENT, CONTAINS ITEMS".

(b) The inscription "UNITED STATES OF AMERICA" shall be affixed in a suitable size indelible stencil, label or printed form on all external shipping containers or the exterior surface of uncrated items.

(c) All invoices, correspondence, reports and other documents shall be identified with the appropriate FMS case designator, requisition number(s), and item description(s).

HQ D-2-0004 IDENTIFICATION MARKING OF PARTS (NAVSEA) (NOV 1996)

Identification marking of individual parts within the systems, equipments, assemblies, subassemblies, components, groups, sets or kits, and of spare and repair parts shall be done in accordance with applicable specifications and drawings.

To the extent identification marking of such parts is not specified in applicable specifications or drawings, such marking shall be accomplished in accordance with the following:

(1) Parts shall be marked in accordance with generally accepted commercial practice.

(2) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.

HQ D-2-0007 MARKING AND PACKING LIST(S) - ALTERNATE I (NAVSEA) (DEC 2005)

(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with MIL-STD- 129P with change 3 dated 29 October 2004.

(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the Contractor with each shipment in accordance with the above cited MIL-STD. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items.

Where DD Form 1348-1 or DD Form 1348-1A is applicable and an assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.

(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped.

The master packing list shall be attached to the number one container and so identified.

(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by part number and/or national stock number. Refer to the above cited MIL-STD for marking of assorted (related-unrelated) items.

Section E: Inspection and Acceptance

Receipt inspection and final acceptance to be performed as described below. The contractor’s “Delivery Ticket” or “Bill of Lading” shall be used as confirmation of delivery and receipt by the Government. Receipt inspection and final acceptance is performed by a NAVSEA representative. Receipt inspection primarily consists of the Government noting apparent shipping damage and/or apparent shortages.

Upon receipt, an acceptance inspection is performed and the contractor is notified of any discrepancies in a Post- Delivery Inspection Report (PDIR) typically within 15 work days (i.e., exclusive of weekends and Federal holidays) of receipt. Contractor is to document correction or plan of action for resolution of discrepancies in response to the PDIR. Final acceptance is dependent upon delivery in accordance with Section F, acceptance inspection, Post- Delivery discrepancy resolution notification (i.e., correction or acceptable plan of action).

PHILIPPINES

ITEM NO.

ACCEPT BY

INSPECT AT INSPECT BY

4.7m Inflatable and Parts 1-25

Builders Facility Ms. Kelly Campbell or other authorized NAVSEA Representative

PMS 325F

(202) 781-5300

Unique Identification Labels

Builders Facility Ms. Kelly Campbell or other authorized NAVSEA Representative

PMS 325F

(202) 781-5300

Spares

Builders Facility Ms. Kelly Campbell or other authorized NAVSEA Representative

PMS 325F

(202) 781-5300

KENYA

ITEM NO.

ACCEPT BY

INSPECT AT INSPECT BY

4.7m Inflatable and Parts 1-6

Builders Facility Mr. Aaron Ratliff or other authorized NAVSEA Representative

PMS 325F

(202) 781-1628

Unique Identification Labels

Builders Facility Mr. Aaron Ratliff or other authorized NAVSEA Representative

PMS 325F

(202) 781-1628

Spares

Builders Facility Mr. Aaron Ratliff or other authorized NAVSEA Representative

PMS 325F

(202) 781-1628

Satisfactory inspection, including data, (i.e., drawings, manuals, certifications, etc.), is a condition for acceptance of the boat by the Government. A draft copy of the data should be provided 30 days prior to the first boat’s delivery date to:

Program Executive Office, Ships Attn: Ms. Kelly Campbell 1333 Isaac Hull Ave. SE Stop 2501 Washington Navy Yard, DC 20376-2501

A final copy should be provided with each boat at delivery plus qty two (2) additional final copies provided with delivery of the first boat.

HQ E-2-0013 PRELIMINARY ACCEPTANCE (AT) (NAVSEA) (JAN 1983)

Upon satisfactory completion of the applicable trial requirements and upon delivery as provided in Section F of this contract, each vessel shall be preliminarily accepted.

HQ E-2-0007 GUARANTY PERIOD (FT) (NAVSEA) (JAN 1990)

(a) As used in this contract, the term "defects" includes any and all defects, deficiencies, deteriorations, and failure in the vessel(s). There shall be a guaranty period for each vessel beginning at the time of preliminary acceptance and ending twelve (12) months after preliminary acceptance of the vessel, unless extended as provided in paragraph

(b) below.

(b) The guaranty period for each vessel shall be extended by the time during which such vessel is not available for unrestricted service by reason of any defects for which the Contracting Officer shall determine the Contractor to be responsible. During said period the vessel, after being fully equipped and armed and in all respects complete and ready for service, may be finally tried by and at the expense of the Government under conditions prescribed by the Secretary of the Navy. The Contractor may, with approval of the Contracting Officer, have an engineer on board such vessel during such period. Such engineer shall have every reasonable opportunity to inspect the working of such vessel in all its parts but shall have no power to direct or control its operation.

HQ E-2-0005 FINAL ACCEPTANCE (AT) (NAVSEA) (MAY 1995)

Each vessel shall be finally accepted upon the expiration of its guaranty period.

Section F: Deliveries and Performance

Items 0001, 0002, 0003, 0005, 0006 and 0007 shall be delivered FOB Origin. The contractor shall be responsible for the condition of Items 0001, 0002, 0003, 0005, 0006 and 0007 until receipt inspection and all items are picked up by the Defense Transportation System (DTS).

PHILIPPINES

Delivery dates for Items 0001, 0002 and 0003 are as follows:

Boats No. 1-25: 240 Days After Contract Award (DACA).

Delivery dates for Item 0004 is no later than 90 days after final delivery in-country.

KENYA

Delivery dates for Items 0005, 0006 and 0007 are as follows:

Boats No. 1-6: 180 DACA

Delivery dates for Item 0008 is no later than 90 days after final delivery in-country.

Earlier delivery of the above items is acceptable and encouraged.

CLAUSES INCORPORATED BY REFERENCE

52.247-29 F.O.B. Origin FEB 2006 52.247-65 F.O.B. Origin, Prepaid Freight--Small Package Shipments JAN 1991 52.242-15 Stop-Work Order AUG 1989

HQ F-2-0002 ADDITIONAL SHIPPING INSTRUCTIONS FOR FMS ITEMS (NAVSEA) (SEP 1992)

(a) The Contractor shall, within sixty days prior to the first scheduled delivery date, notify the cognizant Contract Administration Office (CAO) of the point of origin, description of material, quantity, approximate gross weight and cubic measurement, number of cases, approximate date shipment is expected to be ready for movement, appropriate requisition number(s) and FMS case designator. The notification shall be accompanied by six (6) copies of priced Material Inspection and Receiving Report (MIRR) (DD Form 250) with packing lists.

(b) The CAO shall forward the above information to .

(c) Subsequent to notification as required by paragraph (b), the CAO shall:

(1) Forward four (4) copies of priced DD Form 250 with packing lists and one (1) copy of bill of lading to the Country Freight Forwarder, and

(2) Forward two (2) copies of priced DD Form 250 with packing lists and one (1) copy of bill of lading or other evidence of delivery to the office specified in paragraph (b) above.

HQ F-2-0005 F.O.B. ORIGIN (MODIFIED) (AUG 2014)

All supplies hereunder shall be delivered free of expense to the Government in accordance with instructions specified in the clause hereof entitled "F.O.B. ORIGIN" (FAR 52.247-29) at or near the Contractor's plant, TBD, for shipment at Government expense (normally on Government bill(s) of lading) in accordance with the delivery information provided herein.

The Contractor shall not ship directly to a military air or water port terminal without authorization by the cognizant Contract Administration Office.

If shipping instructions have not been provided within sixty (60) days prior to first scheduled delivery date, the Contractor shall submit a written request for shipping instructions to Mr. Aaron Ratliff (aaron.ratliff@navy.mil) , with a copy to the cognizant Contract Administration Office.

All data to be furnished under this contract shall be delivered prepaid to destination(s) at the time(s) specified on the Contract Data Requirements List(s), DD Form 1423.

FMS item(s), if any, shall be shipped on a separate bill of lading and Interstate Commerce Act Section 10721 rates do not apply.

SECTION G:

SECTION G: CONTRACT ADMINISTRATION DATA

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.246-7000 Material Inspection And Receiving Report MAR 2008

252.204-0001 LINE ITEM SPECIFIC: SINGLE FUNDING. (SEP 2009)

The payment office shall make payment using the ACRN funding of the line item being billed.

(End of clause)

252.204-7006 BILLING INSTRUCTIONS (OCT 2005)

When submitting a request for payment, the Contractor shall--

(a) Identify the contract line item(s) on the payment request that reasonably reflect contract work performance; and

(b) Separately identify a payment amount for each contract line item included in the payment request.

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

(Contracting Officer: Insert applicable document type(s). Note: If a “Combo” document type is identified but not supportable by the Contractor's business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

(Contracting Officer: Insert inspection and acceptance locations or “Not applicable”.)

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC ____ Issue By DoDAAC ____ Admin DoDAAC ____ Inspect By DoDAAC ____ Ship To Code ____ Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) ____ Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____

(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

Bridget McClerking, Assistant Program Manager (bridget.mcclerking@navy.mil)

(Contracting Officer: Not applicable)

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

(navseawawfhq@navy.mil)

(Contracting Officer: Not applicable)

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

mailto:bridget.mcclerking@navy.mil mailto:navseawawfhq@navy.mil

HQ G-2-0009 SUPPLEMENTAL INSTRUCTIONS REGARDING ELECTRONIC INVOICING (NAVSEA) (SEP 2012)

(a) The Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the technical instruction (TI), sub line item number (SLIN), or contract line item number (CLIN) level, rather than on a total contract/TO basis, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of other direct costs (ODCs), materials, and travel, by TI, SLIN, or CLIN level. For other than firm fixed price subcontractors, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal. Subcontractors may email encryption code information directly to the Contracting Officer (CO) and Contracting Officer Representative (COR). Should the subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the CO and COR; or other method as agreed to by the CO.

(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and CO on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and CO email notification as required herein.

SECTION H: SPECIAL CONTRACT REQUIREMENTS

5252.232-9108 FINAL SETTLEMENT (FT) (JAN 1983)

Upon final acceptance of the vessel(s), or in the event of the termination of this contract on such terms that none of the vessel(s) is to be completed, then upon such termination, the Contractor shall be entitled to receive the balance owing to it under this contract, such payment to be made promptly after the amount of such balance shall have been determined. The Contractor and each assignee under an assignment in effect at the time of final settlement shall execute and deliver at the time of and as a condition precedent to final payment, a release in form and substance satisfactory to and containing such exemptions as may be found appropriate by the Contracting Officer, discharging the Government, its officers, agents and employees of and from liabilities, obligations and claims arising under this contract. The Contracting Officer may authorize partial payments on account of any such balance to be made in advance of final settlement. If this contract shall have been terminated in whole or in part, any such release shall also contain a release of all claims against the Government arising out of or by virtue of such termination.

5252.233-9103 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT (AT) - ALTERNATE I

(APR 1999)

(a) For the purposes of this requirement, the term "change" includes not only a change that is made pursuant to a written order designated as a "change order" but also (i) an engineering change proposed by the Government or the Contractor pursuant to the "Other Change Proposals" or other requirements of this contract and (ii) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment under the "CHANGES" clause or any other article or requirement of this contract.

(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect of a change made pursuant to a written order designated as a "change order" or in respect of a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect of any other act or omission to act on the part of the Government, the proposal supporting such request shall include the following information for each individual item or element of the request:

(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of identifiable components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work. Items of identifiable raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;

(2) Description of work necessary to undo work already completed which has been deleted by the change;

(3) Description of work which is substituted or added by the change. A list of identifiable components and equipment (not bulk materials or items) involved, should be included. Separate descriptions are to be furnished for design work and production work;

(4) Description of interference and inefficiencies in performing the change;

(5) Description of disruption attributable solely to the change; which description shall include the following information:

(i) Description of each identifiable element of disruption and how work has been, or may be, disrupted;

(ii) The calendar period of time during which disruption occurred, or may occur;

(iii) Area(s) of the Contractor's operations where disruption occurred, or may occur;

(iv) Trade(s) or functions disrupted, with a breakdown of manhours and material for each trade or function;

(v) Scheduling of trades before, during, and after period of disruption insofar as such scheduling may relate to or be affected by the estimated disruption;

(vi) Description of any measures taken to lessen the disruptive effect of the change;

(6) Delay in delivery attributable solely to the change;

(7) Other work or increased costs attributable to the change;

(8) Supplementing the foregoing, a narrative statement of the nature of the alleged Government act or omission, when the alleged Government act or omission occurred, and the "causal" relationship between the alleged Government act or omission and the claimed consequences thereof, cross-referenced to the detailed information provided as required above.

(c) Each proposal submitted in accordance with this requirement shall include a copy of the Contractor's ship's labor budget at the cost level in effect as of the date the event began, the cost incurred at the cost level as of the same date, and the proposed effect of the change at the cost class level.

(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in subparagraphs (b)(1) through (b)(8) above, or that the Contractor may not reasonably be able to furnish complete information on all of the factors listed in subparagraph (b)(1) through (b)(8) above. Accordingly, the Contractor is only required to set forth in its request for equitable adjustment information with respect to those factors which are relevant to the individual request for equitable adjustment, or in the level of detail which is reasonably available to the Contractor.

(e) In addition to any information required under paragraph (b) above, each proposal submitted in support of a claim for equitable adjustment, under any requirement of this contract, in an amount which requires certified cost or pricing data, shall contain such cost or pricing data as the Contracting Officer shall require with respect to each individual claim item, and shall be in sufficient detail to permit the Contracting Officer to cross reference the claimed increased costs, or delay in delivery, or both, as appropriate, with the information submitted pursuant to subparagraphs (b)(1) through (b)(8) hereof.

5252.233 9107 EQUITABLE ADJUSTMENTS: WAIVER AND RELEASE OF CLAIMS (AT) (JAN 1983)

(a) Whenever the Contractor, after receipt of a change made pursuant to the clause of this contract entitled "CHANGES" or after affirmation of a constructive change under the "NOTIFICATION OF CHANGES" (FAR 52.243-7) requirement, submits any claim for equitable adjustment under the foregoing, such claim shall include all types of adjustments in the total amounts to which the foregoing entitle the Contractor, including but not limited to adjustments arising out of delays or disruptions or both caused by such change.

(b) Further, the Contractor agrees (except as the parties may otherwise agree) that, if required by the Contracting Officer, it will execute a release, in form and substance satisfactory to the Contracting Officer, as part of the supplemental agreement setting forth the aforesaid equitable adjustment, and that such release shall discharge the Government, its officers, agents and employees, from any further claims including but not limited to further claims arising out of delays or disruptions or both, caused by the aforesaid change.

SECTION I: CONTRACT CLAUSES

52.204-7 System for Award Management JUL 2013

52.204-19 Incorporation by Reference of Representations and Certifications.

DEC 2014

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

DEC 2014

52.222-50 Combating Trafficking in Persons MAR 2015 52.223-6 Drug-Free Workplace MAY 2001 52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.229-3 Federal, State And Local Taxes FEB 2013 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-11 Extras APR 1984 52.232-16 Progress Payments APR 2012 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.243-1 Changes--Fixed Price AUG 1987 52.249-1 Termination For Convenience Of The Government (Fixed

Price) (Short Form)

APR 1984

52.249-8 Default (Fixed-Price Supply & Service) APR 1984 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General DEC 2012 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7012 Safeguarding of Unclassified Controlled Technical

Information

NOV 2013

252.204-7015 Disclosure of Information to Litigation Support Contractors FEB 2014 252.211-7008 Use of Government-Assigned Serial Numbers SEP 2010 252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7001 Buy American And Balance Of Payments Program-- Basic

(Nov 2014)

NOV 2014

252.225-7002 Qualifying Country Sources As Subcontractors DEC 2012 252.225-7012 Preference For Certain Domestic Commodities FEB 2013 252.225-7028 Exclusionary Policies And Practices Of Foreign Government APR 2003 252.225-7031 Secondary Arab Boycott Of Israel JUN 2005 252.225-7048 Export-Controlled Items JUN 2013 252.227-7015 Technical Data--Commercial Items FEB 2014 252.231-7000 Supplemental Cost Principles DEC 1991 252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.246-7006 Warranty Tracking of Serialized Items JUN 2011 252.247-7023 Transportation of Supplies by Sea APR 2014

52.212-4 CONTRACT TERMS AND CONDITIONS-- COMMERCIAL ITEMS (MAY 2015)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights (1) within a reasonable time after the defect was discovered or should have been discovered; and

(2) before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes'', as amended (41 U.S.C. 601-613).

Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement or any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include--

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, contract line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer--Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.--

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C.

3903) and prompt payment regulations at 5 CFR part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .