14R5353_P0015.pdf
PDF 825 KB Posted
- Attached to
- Advance Off-board Electronic Warfare Preliminary Design, Development, and Low-Rate Initial Production
- Solicitation number
- N00024-14-R-5353
About this file
N0002414R5353 Amendment 0015
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 14R5353_0014.pdf | ||
| 14R5353_Amend_0013.pdf | ||
| 14R5353_0012.pdf | ||
| 14R5353_0011.pdf | ||
| 14R5353_0010.doc | DOC document | |
| 0009.pdf | ||
| 0008.pdf | ||
| J-20_Contractor_Award_Information_(13Nov2014).pdf | ||
| N0002414R5353_0007.pdf | ||
| AOEW_CDRL_Exhibit_B112_-_Amendment_0006.pdf | ||
| N0002414R5353_0006.pdf | ||
| 14R5353_0005.pdf | ||
| 14R5353_0004.pdf | ||
| 14R5353_0003.pdf | ||
| Enclosure_(1)_Q A.pdf | ||
| 14R5353_0002.pdf | ||
| N00024-14-R-5353_Attachments.zip | ZIP file | |
| RFP_Classified_Material_Request_Form.pdf | ||
| N00024-14-R-5353.pdf | ||
| 14R5353_0001.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002414NR42054
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See continuation sheet for details regarding the purposes of this solicitation amendment.
1. CONTRACT ID CODE PAGE OF PAGES
S 1 114
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Sep-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00024-14-R-5353
X 9B. DATED (SEE ITEM 11)
19-Aug-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Sep-2016
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00024-14-R-5353
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
The purposes of this amendment 15 are to:
(1) Revise Section B to:
(a) Update the fiscal years
(b) Change the quantity of EDMs to two for SLIN 0101AA and the quantity of EDM Mass Models to four for SLIN 0101AB
(c) Create Option SLIN 0101AD for a quantity of three EDM emulators, Option SLIN 0101AE for a quantity of one Technique Generation Tool, Option SLIN 0101AF for a quantity of two EDMs, Option SLIN 0101AG for a quantity of three EDM Mass Models, and Option SLINs 0207AD/E, 0311AC/D for up to four additional LRIP Mass Models - all subsequent sections are updated to reflect the revised quantities in Section B;
(2) Update delivery dates listed in Section F;
(3) Revise Section J to:
(a) Update Attachments J-1/2/4/5/7/8/9/10/11 and Exhibits A and B
(b) Add Attachments J-21/22/23/24;
(4) Update Section L and M; and
(5) Add and update clauses throughout the RFP.
SECTION A - SOLICITATION/CONTRACT FORM
The standard size code 750 has been added.
The Issued By organization below has been deleted:
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2060
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
Preliminary Design of Advanced Off-board Electronic Warfare (AOEW) System (FY15). See Note C.
To:
Preliminary Design of Advanced Off-board Electronic Warfare (AOEW) System. See Note C..
SUBCLIN 0101AA
AOEW AMP Engineering Manufacturing and Development (EMD) and delivery of 4 Engineering Development Models (EDMs), EDM Spares and Technical Data Package (TDP). (FY16) See Notes B, C, E and F.
To:
AOEW AMP Engineering Manufacturing and Development (EMD) and delivery of 2 Engineering Development Models (EDMs), EDM Spares and Technical Data Package (TDP). See Notes B, C, E and F..
SUBCLIN 0101AB
AOEW AMP Engineering Manufacturing and Development (EMD) and delivery of 2 Engineering Development Models (EDMs) mass models. (FY16) See Notes B, C, E and F.
To:
AOEW AMP Engineering Manufacturing and Development (EMD) and delivery of 4 Engineering Development Models (EDMs) mass models. See Notes B, C, E and F..
SUBCLIN 0101AC
AOEW AMP Engineering Manufacturing and Development (EMD) and delivery of 2 Engineering Development Models (EDMs), EDM Spares and Technical Data Package (TDP). (FY16) See Notes B, C, E and F.
To:
AOEW AMP Engineering Manufacturing and Development (EMD) and delivery of 2 Engineering Development Models (EDMs), EDM Spares and Technical Data Package (TDP). See Notes B, C, E and F..
CLIN 0201
AOEW AMP LRIP Unit (FY19). See Notes B, D, G and H.
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H..
CLIN 0202
AOEW AMP LRIP Unit (FY19). See Notes B, D, G and H.
SUBCLIN 0202AA
AOEW AMP LRIP Unit (FY19). See Notes B, D, G and H.
SUBCLIN 0202AB
AOEW AMP LRIP Unit (FY19). See Notes B, D, G and H.
CLIN 0203
AOEW AMP LRIP Unit (FY19). See Notes B, D, G and H.
SUBCLIN 0203AA
AOEW AMP LRIP Unit (FY19). See Notes B, D, G and H.
SUBCLIN 0203AB
SUBCLIN 0203AC
AOEW AMP LRIP Unit (FY19). See Notes B, D, G and H.
CLIN 0204
AOEW AMP LRIP Unit (FY19). See Notes B, D, G and H.
SUBCLIN 0204AA
AOEW AMP LRIP Unit (FY19). See Notes B, D, G and H.
SUBCLIN 0204AB
AOEW AMP LRIP Unit (FY19). See Notes B, D, G and H.
SUBCLIN 0204AC
SUBCLIN 0204AD
AOEW AMP LRIP Unit (FY19). See Notes B, D, G and H.
CLIN 0205
FY19. See Note B.
FY20. See Note B..
CLIN 0207
Production Representative mass models. (FY19) See Notes B, D, and H.
Production Representative mass models. (FY20) See Notes B, D, and H..
SUBCLIN 0207AA
Delivery of 1 Production Representative mass model. (FY19) See Notes B, D, and H.
Delivery of 1 Production Representative mass model. (FY20) See Notes B, D, and H..
SUBCLIN 0207AB
Delivery of 1 Production Representative mass model. (FY19) See Notes B, D, and H.
SUBCLIN 0207AC
Delivery of 1 Production Representative mass model. (FY19) See Notes B, D, and H.
CLIN 0301
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
AOEW AMP LRIP Unit (FY21). See Notes B, D, G and H..
CLIN 0302
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0302AA
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0302AB
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
CLIN 0303
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0303AA
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0303AB
AOEW AMP System LRIP Unit (FY20). See Notes B, D, G and H.
AOEW AMP System LRIP Unit (FY21). See Notes B, D, G and H..
SUBCLIN 0303AC
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
CLIN 0304
AOEW AMP System LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0304AA
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0304AB
AOEW AMP System LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0304AC
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0304AD
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
CLIN 0305
AOEW AMP System LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0305AA
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0305AB
AOEW AMP System LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0305AC
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0305AD
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0305AE
CLIN 0306
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0306AA
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0306AB
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0306AC
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0306AD
SUBCLIN 0306AE
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0306AF
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
CLIN 0307
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0307AA
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0307AB
SUBCLIN 0307AC
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0307AD
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0307AE
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0307AF
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0307AG
CLIN 0308
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0308AA
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0308AB
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0308AC
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0308AD
SUBCLIN 0308AE
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0308AF
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
To:
The unit of issue Each has been added.
SUBCLIN 0308AG
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
SUBCLIN 0308AH
AOEW AMP LRIP Unit (FY20). See Notes B, D, G and H.
CLIN 0309
(FY20) See Note B
(FY21) See Note B.
CLIN 0311
Production Representative mass models. (FY20) See Notes B, D, and H.
Production Representative mass models. (FY21) See Notes B, D, and H..
SUBCLIN 0311AA
Delivery of 1 Production Representative mass model. (FY20) See Notes B, D, and H.
Delivery of 1 Production Representative mass model. (FY21) See Notes B, D, and H..
SUBCLIN 0311AB
Delivery of 1 Production Representative mass model. (FY20) See Notes B, D, and H.
To:
Delivery of 1 Production Representative mass model. (FY21) See Notes B, D, and H..
SUBCLIN 0101AD is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
0101AD
1 Lot
OPTION EMD - AOEW AMP
CPIF
AOEW AMP Engineering Manufacturing and Development (EMD) and delivery of 3 Engineering Development Models (EDMs) Emulators with required connectors, ancillary hardware, storage cases, and user manual. See Notes B, C, E and F.
FOB: Destination
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
SUBCLIN 0101AE is added as follows:
0101AE
CPIF
AOEW AMP Engineering Manufacturing and Development (EMD) and delivery of 1 Technique Generation Tool (hardware, software and firmware), source code, instruction manual, and Technical Data Package. See Notes B, C, E and F.
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SUBCLIN 0101AF is added as follows:
0101AF
CPIF
AOEW AMP Engineering Manufacturing and Development (EMD) and delivery of 2 Engineering Development Models (EDMs), EDM Spares and Technical Data Package (TDP). See Notes B, C, E and F.
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SUBCLIN 0101AG is added as follows:
0101AG
CPIF
AOEW AMP Engineering Manufacturing and Development (EMD) and delivery of 3 Engineering Development Models (EDMs) mass models. See Notes B, C, E and F.
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SUBCLIN 0207AD is added as follows:
0207AD
1 Each
OPTION AOEW AMP LRIP Mass Model
FPI
Delivery of 1 Production Representative mass model. (FY20) See Notes B, D, and H.
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SUBCLIN 0207AE is added as follows:
0207AE
FPI
Delivery of 1 Production Representative mass model. (FY20) See Notes B, D, TOTAL TARGET PRICE
CEILING PRICE
SUBCLIN 0311AC is added as follows:
0311AC
FPI
Delivery of 1 Production Representative mass model. (FY21) See Notes B, D, TOTAL TARGET PRICE
CEILING PRICE
SUBCLIN 0311AD is added as follows:
0311AD
FPI
Delivery of 1 Production Representative mass model. (FY21) See Notes B, D, TOTAL TARGET PRICE
CEILING PRICE
The following have been modified:
DETERMINATION OF SCHEDULE INCENTIVE FOR ITEM 0101 (to include Items 0101AA, 0101AB 0101AC, 0101AD, 0101AE, 0101AF, and 0101AG)
A. As part of the CPIF structure for Item 0101, the Contractor may earn a Schedule Incentive. The Government's purpose for including a Schedule Incentive is to encourage and reward Contractor initiative toward achieving a cost less than the AOEW AMP Target Cost and completing CLIN 0101, AOEW AMP Engineering Development Model (EDM), ahead of schedule and within Target Cost.
B. In the event the Contractor delivers early and comes in at or below Target Cost, the Contractor may earn a greater share of the underrun, based on the following:
30 – 59 calendar days early completion of CLIN 0101, to include SLINs 0101AA, 0101AB, 0101AC, 0101AD, 0101AE, 0101AF, and 0101AG from the schedule in Section F will result in a unilateral modification to update Section I 52.216-10 under run share to 40/60, or
60 calendar days or earlier completion of CLIN 0101, to include SLINs 0101AA, 0101AB, 0101AC, 0101AD, 0101AE, 0101AF, and 0101AG from the schedule in Section F will result in a unilateral modification to update Section I 52.216-10 under run share to 30/70.
If the Government does not fully fund Item 0101, to include Items 0101AA, 0101AB, 0101AC, 0101AD, 0101AE, 0101AF, and 0101AG to completion, the Contractor will not be eligible to earn the Schedule Incentive.
C. Pursuit of the Schedule Incentive shall not come at the expense of the overall AOEW AMP effort. In the event of an overrun, no schedule incentive may be earned.
D. Schedule Incentive Determination Procedures
1. Upon early successful passing of exit criteria as detailed for Item 0101 in the SOW, the Government will use the CPR data available in the accounting periods following completion of CLIN 0101 to determine whether the Contractor is in or projected to be in an overrun situation. The Government will issue a unilateral modification revising the underrun share line pursuant to paragraph B above, if applicable.
E. The Government’s determination of Schedule Incentive earned is a unilateral decision made solely at the discretion of the Government.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
If exercised Item 0102 – The Contractor shall provide Unlimited or Government Purpose Data Rights in Technical Data, Computer Software, and Computer Software Documentation in accordance with the Supplemental 7017-CRL (Commercial Restrictions List) Cost-Price list. The Contractor shall remove or revise markings and legends in accordance with the rights provided. The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements Lists, DD Form 1423, Exhibit E, and CDRL E001.
HQ C-2-0014 CONTRACTOR'S PROPOSAL (NAVSEA) (MAR 2001)
(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with detailed obligations to which the Contractor committed itself in Proposal to be completed by the Government dated to be completed by the Government in response to NAVSEA Solicitation No. N00024-14-R-5353.
(b) The Government reserves the right to incorporate by reference select portions of the technical volume(s) of the Contractor's proposal. Those portions incorporated by reference are follows:
Listing To Be Filled In Unilaterally by the Government at the Time of Award
The technical volume(s) of the Contractor's proposal is incorporated by reference and hereby made subject to the provisions of the "ORDER OF PRECEDENCE" (FAR 52.215-8) clause of this contract. Under the "ORDER OF PRECEDENCE" clause, the technical volume of the Contractor's proposal referenced herein is hereby designated as item
(f) of the clause, following "the specification" in the order of precedence.
SECTION D - PACKAGING AND MARKING
Item 0002 Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.
All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.
Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), DOD 5220.22-M dated 28 February 2006 with Change 1 dated 28 March 2013.
Item(s) 0003 - The supplies furnished hereunder shall be cleaned, preserved, packaged, packed and marked in accordance with the instructions provided by the Contracting Officer, Provisioning Activity, or ACO. When not otherwise specified, spare and repair parts shall be packaged to ensure protection against corrosion, deterioration, physical, and electrical damage during shipment from the Contractor to the point of delivery.
SECTION E - INSPECTION AND ACCEPTANCE
The Acceptance/Inspection Schedule for CLIN 0001 has been changed from:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
To:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Origin Government Origin Government
The Acceptance/Inspection Schedule for CLIN 0002 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0003 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0101 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0101AA has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0101AB has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0101AC has been changed from:
N/A N/A N/A Government
To:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0101AD:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0101AE:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0101AF:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0101AG:
The Acceptance/Inspection Schedule for CLIN 0102 has been changed from:
N/A N/A N/A Government
To:
Destination Government Destination Government
The Acceptance/Inspection Schedule for SUBCLIN 0102AA has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0103 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0201 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0202 has been changed from:
To:
The Acceptance/Inspection Schedule for SUBCLIN 0202AA has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0202AB has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0203 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0203AA has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0203AB has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0203AC has been changed from:
The Acceptance/Inspection Schedule for CLIN 0204 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0204AA has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0204AB has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0204AC has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0204AD has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0205 has been changed from:
The Acceptance/Inspection Schedule for CLIN 0206 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0207 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0207AA has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0207AB has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0207AC has been changed from:
N/A N/A N/A Government
To:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0207AD:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0207AE:
The Acceptance/Inspection Schedule for CLIN 0301 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0302 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0302AA has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0302AB has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0303 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0303AA has been changed from:
The Acceptance/Inspection Schedule for SUBCLIN 0303AB has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0303AC has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0304 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0304AA has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0304AB has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0304AC has been changed from:
The Acceptance/Inspection Schedule for SUBCLIN 0304AD has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0305 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0305AA has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0305AB has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0305AC has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0305AD has been changed from:
N/A N/A N/A Government
The Acceptance/Inspection Schedule for SUBCLIN 0305AE has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0306 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0306AA has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0306AB has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0306AC has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0306AD has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0306AE has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0306AF has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0307 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0307AA has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0307AB has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0307AC has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0307AD has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0307AE has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0307AF has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0307AG has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0308 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0308AA has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0308AB has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0308AC has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0308AD has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0308AE has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0308AF has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0308AG has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0308AH has been changed from:
To:
The Acceptance/Inspection Schedule for CLIN 0309 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0310 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0311 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0311AA has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for SUBCLIN 0311AB has been changed from:
N/A N/A N/A Government
To:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0311AC:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0311AD:
The following have been added by full text:
INSPECTION/ACCEPTANCE TERMS
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Origin Government Origin Government 0002 Origin Government Origin Government 0003 Origin Government Origin Government 0101 Origin Government Origin Government 0101AA Origin Government Origin Government 0101AB Origin Government Origin Government 0101AC Origin Government Origin Government 0101AD Origin Government Origin Government 0101AE Origin Government Origin Government 0101AF Origin Government Origin Government 0101AG Origin Government Origin Government 0102 Destination Government Destination Government 0102AA Destination Government Destination Government 0103 Origin Government Origin Government 0201 Origin Government Origin Government 0202 Origin Government Origin Government 0202AA Origin Government Origin Government 0202AB Origin Government Origin Government 0203 Origin Government Origin Government 0203AA Origin Government Origin Government 0203AB Origin Government Origin Government 0203AC Origin Government Origin Government 0204 Origin Government Origin Government 0204AA Origin Government Origin Government 0204AB Origin Government Origin Government 0204AC Origin Government Origin Government 0204AD Origin Government Origin Government 0205 Destination Government Destination Government 0206 Destination Government Destination Government 0207 Origin Government Origin Government 0207AA Origin Government Origin Government 0207AB Origin Government Origin Government 0207AC Origin Government Origin Government 0207AD Origin Government Origin Government 0207AE Origin Government Origin Government
0301 Origin Government Origin Government 0302 Origin Government Origin Government 0302AA Origin Government Origin Government 0302AB Origin Government Origin Government 0303 Origin Government Origin Government 0303AA Origin Government Origin Government 0303AB Origin Government Origin Government 0303AC Origin Government Origin Government 0304 Origin Government Origin Government 0304AA Origin Government Origin Government 0304AB Origin Government Origin Government 0304AC Origin Government Origin Government 0304AD Origin Government Origin Government 0305 Origin Government Origin Government 0305AA Origin Government Origin Government 0305AB Origin Government Origin Government 0305AC Origin Government Origin Government 0305AD Origin Government Origin Government 0305AE Origin Government Origin Government 0306 Origin Government Origin Government 0306AA Origin Government Origin Government 0306AB Origin Government Origin Government 0306AC Origin Government Origin Government 0306AD Origin Government Origin Government 0306AE Origin Government Origin Government 0306AF Origin Government Origin Government 0307 Origin Government Origin Government 0307AA Origin Government Origin Government 0307AB Origin Government Origin Government 0307AC Origin Government Origin Government 0307AD Origin Government Origin Government 0307AE Origin Government Origin Government 0307AF Origin Government Origin Government 0307AG Origin Government Origin Government 0308 Origin Government Origin Government 0308AA Origin Government Origin Government 0308AB Origin Government Origin Government 0308AC Origin Government Origin Government 0308AD Origin Government Origin Government 0308AE Origin Government Origin Government 0308AF Origin Government Origin Government 0308AG Origin Government Origin Government 0308AH Origin Government Origin Government 0309 Destination Government Destination Government 0310 Destination Government Destination Government 0311 Origin Government Origin Government 0311AA Origin Government Origin Government 0311AB Origin Government Origin Government 0311AC Origin Government Origin Government 0311AD Origin Government Origin Government
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
Title Number Date Tailoring ISO 9000 20 September 2005 None ISO 9001 13 November 2008 None
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph
(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
Item 0001 – Preliminary Design - Work completed under this CLIN will be accepted upon successful completion of required CLIN exit criteria as detailed for item 0001 in the SOW, Attachment J-1.
(If option is exercised) Item 0101 – Engineering Manufacturing and Demonstration (EMD). Work completed under this CLIN will be accepted upon successful completion of required CLIN exit criteria as detailed for item 0101 in the SOW, Attachment J-1. AOEW AMP Engineering Development Model (EDM), Spare Parts and Emulators, Technical Data Package (TDP) – Inspection and acceptance shall be at the source evidenced by a DD Form 250 signed by an authorized Government representative of the PEO IWS 2.0 Program Office. Copies of the DD Form 250’s indicating Government acceptance shall be forwarded to the PEO IWS 2.0 Program Office.
(If options are exercised) Item(s) 0201, 0202, 0203, 0204, 0207, 0301, 0302, 0303, 0304, 0305, 0306, 0307, 0308, 0311 – AOEW AMP Low Rate Initial Production (LRIP) Units – Inspection and acceptance shall be at the source evidenced by a DD Form 250 signed by an authorized Government representative from the cognizant Defense Contract Management Agency (DCMA) office. Copies of the DD Form 250’s indicating Government acceptance shall be forwarded to the PEO IWS 2.0 Program Office.
The following have been deleted:
52.246-11 Higher-Level Contract Quality Requirement FEB 1999
The following included by reference have been revised:
52.246-3 Inspection Of Supplies Cost-Reimbursement MAY 2001
SECTION F - DELIVERIES OR PERFORMANCE
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 N/A N/A N/A N/A
0002 N/A N/A N/A N/A
0003 N/A N/A N/A N/A
0101 N/A N/A N/A N/A
0101AA 14 Months After Option
Exercise Date (MAOED)
1 NAVAL SURFACE WARFARE CENTER
DAHLGREN
LORRI FOSTER
6220 TISDALE ROAD, SUITE 159
DAHLGREN VA 22448
540-653-4277
N00178
0101AB 14 MAOED 1 AIR TEST AND EVALUATION
SQUADRON TWO ONE
TOM MARTZ
22755 SAUFLEY ROAD, UNIT 1, HANGER
PATUXENT RIVER MD 20670-1618
301-757-3273
39784
0101AC 20 MAOED 1 NAVAL SURFACE WARFARE CENTER
DAHLGREN
LORRI FOSTER
6220 TISDALE ROAD, SUITE 159
DAHLGREN VA 22448
540-653-4277
0101AD 3 MAOED 1 NAVAL SURFACE WARFARE CENTER
DAHLGREN
LORRI FOSTER
6220 TISDALE ROAD, SUITE 159
DAHLGREN VA 22448
0101AE 4 Months After CDR 1 NAVAL RESEARCH LABORATORY
TACTICAL ELECTRONIC WARFARE
DIVISION
ATTN: OFFBOARD COUNTERMEASURES
BRANCH (JIM DURBIN/JEFF HEYER)
4555 OVERLOOK AVE SW
WASHINGTON DC 20375
202-404-2538
N00173
0101AF 36 MAOED 1 NAVAL SURFACE WARFARE CENTER
DAHLGREN
LORRI FOSTER
6220 TISDALE ROAD, SUITE 159
DAHLGREN VA 22448
0101AG 36 MAOED 1 AIR TEST AND EVALUATION
SQUADRON TWO ONE
TOM MARTZ
22755 SAUFLEY ROAD, UNIT 1, HANGER
PATUXENT RIVER MD 20670-1618
301-757-3273
39784
N/A
0103 N/A
0201 10 MAOED 1 NSWC CRANE DIVISION
JEFF GRANNAN
SUPPLY OPERATIONS BLDG 41, 300
HIGHWAY 36
CRANE IN 47522-5001
812-854-4596
N00164
0202 N/A N/A N/A N/A
0202AA 10 MAOED 1 NSWC CRANE DIVISION
JEFF GRANNAN
SUPPLY OPERATIONS BLDG 41, 300
HIGHWAY 36
CRANE IN 47522-5001
812-854-4596
0202AB 10 MAOED 1 (SAME AS PREVIOUS LOCATION)
0203 N/A N/A N/A N/A
0203AA 10 MAOED 1 NSWC CRANE DIVISION
JEFF GRANNAN
SUPPLY OPERATIONS BLDG 41, 300
HIGHWAY 36
CRANE IN 47522-5001
812-854-4596
0203AB 10 MAOED 1 (SAME AS PREVIOUS LOCATION)
0203AC 11 MAOED 1 CENTER FOR INFORMATION
DOMINANCE
640 ROBERTS AVE
PENSACOLA, FL 32511
63082
0204 N/A N/A N/A N/A
0204AA 10 MAOED 1 NSWC CRANE DIVISION
JEFF GRANNAN
SUPPLY OPERATIONS BLDG 41, 300
HIGHWAY 36
CRANE IN 47522-5001
812-854-4596
0204AB 10 MAOED 1 (SAME AS PREVIOUS LOCATION)
0204AC 11 MAOED 1 CENTER FOR INFORMATION
DOMINANCE
640 ROBERTS AVE
PENSACOLA, FL 32511
0204AD 11 MAOED 1 (SAME AS PREVIOUS LOCATION)
0205 N/A N/A N/A N/A
0206 N/A N/A N/A N/A
N/A N/A N/A N/A
0207AA 10 MAOED 1 CNATTU Norfolk POC: ATC Gable
BLDG SP341
9287 Seventh Avenue Norfolk, VA 23511
N66046
0207AB 10 MAOED 1 CNATTU JAX
POC: ADCS Jeffery Jackson
PAUL NELSON HELOCOPTER TRAINING
CENTER
BLDG 926 NAS JAX
JACKSONVILLE, FL. 32212-0091
N66051
0207AC 11 MAOED 1 CNATTU North Island POC: ADCS Poblete BLDG 677 Stockdale Blvd San Diego, CA 92135-7059
N66065
0207AD 11 MAOED 1 CNATTU North Island POC: ADCS Poblete BLDG 677 Stockdale Blvd
0207AE 12 MAOED 1 CNATTU JAX
POC: ADCS Jeffery Jackson
PAUL NELSON HELOCOPTER TRAINING
CENTER
BLDG 926 NAS JAX
JACKSONVILLE, FL. 32212-0091
N66051
0301 10 MAOED 1 NSWC CRANE DIVISION
JEFF GRANNAN
SUPPLY OPERATIONS BLDG 41, 300
HIGHWAY 36
CRANE IN 47522-5001
812-854-4596
0302 N/A N/A N/A N/A
0302AA 10 MAOED 1 NSWC CRANE DIVISION
JEFF GRANNAN
SUPPLY OPERATIONS BLDG 41, 300
HIGHWAY 36
CRANE IN 47522-5001
812-854-4596
0302AB 10 MAOED 1 (SAME AS PREVIOUS LOCATION)
0303 N/A N/A N/A N/A
0303AA 10 MAOED 1 NSWC CRANE DIVISION
SUPPLY OPERATIONS BLDG 41, 300
HIGHWAY 36
CRANE IN 47522-5001
812-854-4596
0303AB 10 MAOED 1 (SAME AS PREVIOUS LOCATION)
0303AC 11 MAOED 1 (SAME AS PREVIOUS LOCATION)
0304 N/A N/A N/A N/A
0304AA 10 MAOED 1 NSWC CRANE DIVISION
JEFF GRANNAN
SUPPLY OPERATIONS BLDG 41, 300
HIGHWAY 36
CRANE IN 47522-5001
812-854-4596
0304AB 10 MAOED 1 (SAME AS PREVIOUS LOCATION)
0304AC 11 MAOED 1 (SAME AS PREVIOUS LOCATION)
0304AD 11 MAOED 1 (SAME AS PREVIOUS LOCATION)
0305 N/A N/A N/A N/A
0305AA 10 MAOED 1 NSWC CRANE DIVISION
JEFF GRANNAN
SUPPLY OPERATIONS BLDG 41, 300
HIGHWAY 36
CRANE IN 47522-5001
812-854-4596
0305AB 10 MAOED 1 (SAME AS PREVIOUS LOCATION)
0305AC 11 MAOED 1 (SAME AS PREVIOUS LOCATION)
0305AD 11 MAOED 1 (SAME AS PREVIOUS LOCATION)
0305AE 12 MAOED 1 (SAME AS PREVIOUS LOCATION)
0306 N/A N/A N/A N/A
0306AA 10 MAOED 1 NSWC CRANE DIVISION
JEFF GRANNAN
SUPPLY OPERATIONS BLDG 41, 300
HIGHWAY 36
CRANE IN 47522-5001
812-854-4596
0306AB 10 MAOED 1 (SAME AS PREVIOUS LOCATION)
0306AC 11 MAOED 1 (SAME AS PREVIOUS LOCATION)
0306AD 11 MAOED 1 (SAME AS PREVIOUS LOCATION)
0306AE 12 MAOED 1 (SAME AS PREVIOUS LOCATION)
0306AF 12 MAOED 1 (SAME AS PREVIOUS LOCATION)
0307 N/A N/A N/A N/A
0307AA 10 MAOED 1 NSWC CRANE DIVISION
JEFF GRANNAN
SUPPLY OPERATIONS BLDG 41, 300
HIGHWAY 36
CRANE IN 47522-5001
812-854-4596
0307AB 10 MAOED 1 (SAME AS PREVIOUS LOCATION)
0307AC 11 MAOED 1 (SAME AS PREVIOUS LOCATION)
0307AD 11 MAOED 1 (SAME AS PREVIOUS LOCATION)
0307AE 12 MAOED 1 (SAME AS PREVIOUS LOCATION)
0307AF 12 MAOED 1 (SAME AS PREVIOUS LOCATION)
0307AG 13 MAOED 1 (SAME AS PREVIOUS LOCATION)
0308 N/A N/A N/A N/A
0308AA 10 MAOED 1 NSWC CRANE DIVISION
SUPPLY OPERATIONS BLDG 41, 300
HIGHWAY 36
CRANE IN 47522-5001
812-854-4596
0308AB 10 MAOED 1 (SAME AS PREVIOUS LOCATION)
0308AC 11 MAOED 1 (SAME AS PREVIOUS LOCATION)
0308AD 11 MAOED 1 (SAME AS PREVIOUS LOCATION)
0308AE 12 MAOED 1 (SAME AS PREVIOUS LOCATION)
0308AF 12 MAOED (SAME AS PREVIOUS LOCATION)
0308AG 13 MAOED 1 (SAME AS PREVIOUS LOCATION)
0308AH 13 MAOED 1 (SAME AS PREVIOUS LOCATION)
0309 N/A N/A N/A N/A
0310 N/A N/A N/A N/A
0311 N/A N/A N/A N/A
0311AA 10 MAOED 1 CNATTU North Island
POC: ADCS Poblete BLDG 677 Stockdale Blvd
0311AB 10 MAOED 1 HSM Wing WPN SCH Mayport POC: Michel Jenkins NS Mayport BLDG 1555 Floor 1 Jacksonville, FL 32228-0000
N32417
0311AC 11 MAOED 1 CNATTU North Island POC: ADCS Poblete BLDG 677 Stockdale Blvd
0311AD 11 MAOED 1 HSM Wing WPN SCH Mayport POC: Michel Jenkins NS Mayport BLDG 1555 Floor 1 Jacksonville, FL 32228-0000
N32417
The Contractor shall perform the work described in SECTION C, at the level of effort specified in SECTION B, as follows:
ITEM(S) FROM TO
0205, 0309 Date of Option Exercise 12 Months After Option Exercise
(MAOE)
SECTION G - CONTRACT ADMINISTRATION DATA
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
Invoice and Receiving Report Combo, Cost Voucher
(Contracting Officer: Insert applicable document type(s). Note: If a “Combo” document type is identified but not supportable by the Contractor's business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
See Section E
(Contracting Officer: Insert inspection and acceptance locations or “Not applicable”.)
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC TBD Issue By DoDAAC N00024 Admin DoDAAC TBD Inspect By DoDAAC TBD Ship To Code TBD Ship From Code TBD Mark For Code TBD Service Approver (DoDAAC) TBD Service Acceptor (DoDAAC) TBD Accept at Other DoDAAC TBD LPO DoDAAC TBD DCAA Auditor DoDAAC TBD Other DoDAAC(s) TBD
(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
To be filled in at award
(Contracting Officer: Insert applicable email addresses or “Not applicable.”)
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
-NAVSEA HQ WAWF Helpdesk: WAWFHQ@navy.mil; or -Your local contracting office WAWF POC/Group Administrator (GAM)
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(End of clause)
Enter below the address (street and number, city, county, state and zip code) of the Contractor's facility which will administer the contract if such address is different from the address shown on the SF 26 or SF 33, as applicable.
CONTRACTING OFFICER’S COMMANDER
REPRESENTATIVE: ATTN: AMY ARABUCKI
PEO IWS 2.0
NAVAL SEA SYSTEMS COMMAND
1333 ISAAC HULL AVENUE SE STOP 2301
WASHINGTON NAVY YARD DC 20376
Telephone No. 202/781-3256 Email Address: amy.arabucki@navy.mil
PURCHASING OFFICE ATTN: NICOLE ROONEY
REPRESENTATIVE: NAVAL SEA SYSTEMS COMMAND
1333 ISAAC HULL AVENUE SE STOP SEA 0253
WASHINGTON NAVY YARD DC 20376
Telephone No. (202) 781-1088 Email Address: nicole.rooney@navy.mil mailto:WAWFHQ@navy.mil
SECTION H - SPECIAL CONTRACT REQUIREMENTS
5252.216-9122 LEVEL OF EFFORT (DEC 2000)
(a) The Contractor agrees to provide the total level of effort specified in the next sentence in performance of the work described in Sections B and C of this contract. The total level of effort for the performance of this contract shall be 35,000 hours (Item 0205) and 100,000 hours (Item 0309) total man-hours of direct labor, including subcontractor direct labor for those subcontractors specifically identified in the Contractor's proposal as having hours included in the proposed level of effort.
(b) Of the total man-hours of direct labor set forth above, it is estimated that (Offeror to fill-in) man-hours are uncompensated effort.
Uncompensated effort is defined as hours provided by personnel in excess of 40 hours per week without additional compensation for such excess work. All other effort is defined as compensated effort. If no effort is indicated in the first sentence of this paragraph, uncompensated effort performed by the Contractor shall not be counted in fulfillment of the level of effort obligations under this contract.
(c) Effort performed in fulfilling the total level of effort obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as (local travel to and from an employee's usual work location), uncompensated effort while on travel status, truncated lunch periods, work (actual or inferred) at an employee's residence or other non-work locations (except as provided in paragraph (j) below), or other time and effort which does not have a specific and direct contribution to the tasks described in Sections B and C.
(d) The level of effort for this contract shall be expended at an average rate of approximately 673 hours (Item 0205) and 1,922 hours (Item 0309) hours per week. It is understood and agreed that the rate of man-hours per month may fluctuate in pursuit of the technical objective, provided such fluctuation does not result in the use of the total man-hours of effort prior to the expiration of the term hereof, except as provided in the following paragraph.
(e) If, during the term hereof, the Contractor finds it necessary to accelerate the expenditure of direct labor to such an extent that the total man-hours of effort specified above would be used prior to the expiration of the term, the Contractor shall notify the Contracting Officer in writing setting forth the acceleration required, the probable benefits which would result, and an offer to undertake the acceleration at no increase in the estimated cost or fee together with an offer, setting forth a proposed level of effort, cost breakdown, and proposed fee, for continuation of the work until expiration of the term hereof. The offer shall provide that the work proposed will be subject to the terms and conditions of this contract and any additions or changes required by then current law, regulations, or directives, and that the offer, with a written notice of acceptance by the Contracting Officer, shall constitute a binding contract. The Contractor shall not accelerate any effort until receipt of such written approval by the Contracting Officer. Any agreement to accelerate will be formalized by contract modification.
(f) The Contracting Officer may, by written order, direct the Contractor to accelerate the expenditure of direct labor such that the total man-hours of effort specified in paragraph (a) above would be used prior to the expiration of the term. This order shall specify the acceleration required and the resulting revised term. The Contractor shall acknowledge this order within five days of receipt.
(g) If the total level of effort specified in paragraph (a) above is not provided by the Contractor during the period of this contract, the Contracting Officer, at its sole discretion, shall either (i) reduce the fee of this contract as follows:
Fee Reduction = Fee (Required LOE - Expended LOE) Required LOE or (ii) subject to the provisions of the clause of this contract entitled "LIMITATION OF COST" (FAR 52.232-20) or "LIMITATION OF COST (FACILITIES)" (FAR 52.232-21), as applicable, require the Contractor to continue to perform the work until the total number of man-hours of direct labor specified in paragraph (a) above shall have been expended, at no increase in the fee of this contract.
(h) The Contractor shall provide and maintain an accounting system, acceptable to the Administrative Contracting Officer and the Defense Contract Audit Agency (DCAA), which collects costs incurred and effort (compensated and uncompensated, if any) provided in fulfillment of the level of effort obligations of this contract. The Contractor shall indicate on each invoice the total level of effort claimed during the period covered by the invoice, separately identifying compensated effort and uncompensated effort, if any.
(i) Within 45 days after completion of the work under each separately identified period of performance hereunder, the Contractor shall submit the following information in writing to the Contracting Officer with copies to the cognizant Contract Administration Office and to the DCAA office to which vouchers are submitted: (1) the total number of man-hours of direct labor expended during the applicable period; (2) a breakdown of this total showing the number of man-hours expended in each direct labor classification and associated direct and indirect costs; (3) a breakdown of other costs incurred; and (4) the Contractor's estimate of the total allowable cost incurred under the contract for the period. Within 45 days after completion of the work under the contract, the Contractor shall submit, in addition, in the case of a cost underrun; (5) the amount by which the estimated cost of this contract may be reduced to recover excess funds and, in the case of an underrun in hours specified as the total level of effort; and (6) a calculation of the appropriate fee reduction in accordance with this clause. All submissions shall include subcontractor information.
(j) Unless the Contracting Officer determines that alternative worksite arrangements are detrimental to contract performance, the Contractor may perform up to 10% of the hours at an alternative worksite, provided the Contractor has a company-approved alternative worksite plan. The primary worksite is the traditional “main office” worksite.
An alternative worksite means an employee’s residence or a telecommuting center. A telecommuting center is a geographically convenient office setting as an alternative to an employee’s main office. The Government reserves the right to review the Contractor’s alternative worksite plan. In the event performance becomes unacceptable, the Contractor will be prohibited from counting the hours performed at the alternative worksite in fulfilling the total level of effort obligations of the contract. Regardless of work location, all contract terms and conditions, including security requirements and labor laws, remain in effect. The Government shall not incur any additional cost nor provide additional equipment for contract performance as a result of the Contractor’s election to implement an alternative worksite plan.
(k) Notwithstanding any of the provisions in the above paragraphs, the Contractor may furnish man-hours up to five percent in excess of the total man-hours specified in paragraph (a) above, provided that the additional effort is furnished within the term hereof, and provided further that no increase in the estimated cost or fee is required.
SECTION I - CONTRACT CLAUSES
The following have been added by reference:
52.204-19 Incorporation by Reference of Representations and Certifications.
DEC 2014
52.204-21 Basic Safeguarding of Covered Contractor Information Systems
JUN 2016
52.209-10…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .