DEPARTMENT OF THE NAVY

NAVAL SEA SYSTEMS COMMAND

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 2037t-003l

IN REPlY TO

CJ&A No: 20,876(E) Code: SEA 02214 PR No: N0002413NR91646

CLASS JUSTIFICATION AND APPROVAL

FOP. USE OF OThER THAN FULL AflD OPEN COMPETITION

JUSTIFICATION

Contracting Activity

The Naval Sea Systems Command, Shipbuilding Contracts Division (SEA 022).

2. Description of the Action Being Approved

The award of sole source contract actions to Huntington Ingalls Incorporated - Newport News Shipbuilding (HIINC) for advance planning and long-lead-time material procurement for the USS GEORGE WASHINGTON (CVN 73) Refueling Complex Overhaul (Real!). The funding for the advance planning and long-lead-time material procurement contract actions will, occur during fiscal years

Authority to act under this Class J&A expires or the month in which the commencement of CVN 73 RCOH accomplishment occurs, whichever is later.

3. Description of Supplies/Services

The proposed class of contract actions will provide for the advance planning, documentation, engineering, procurement, shipchecks, fabrication, and shipyard work necessary to prepare and make ready for the accomplishment of the CVN 73

RCOH.

CVN 73 P~OH advance planning efforts will include; material forecasting, long-lead-time material procurement~ under an ordering provision, purchase order development., technical document and drawing development, shipchecks, scheduling, resource forecasting and planning, development and mutual agreement of Cost Data Sheets, developing the accomplishment contract requirements (as an Alpha Acquisition effort), data acquisition, pre-overhaul tests and inspections, limited industrial efforts (Smart Start Work) , and other technical studies as required. Contract actions for additional Smart Start Work and long lead materials shall occur as necessary

CJ&A Plo. 20,876(E) in order to maintain schedule and minimize cost if the commencement date of the CVN 73 RCOH accomplishment is modified.

Estimated Dollar Value

[ SCN $N j rn4 FY15 FY16 RCOR Advance

Procurement & P1annin~

TOTAL

4. Statutory Authority_fermitting Other Than Full and Open Competition

10 U.S.C. 2304(c) (1) — Only one responsible source and no other supplies or services will satisfy agency requirements.

5. Rationale Justifying Use of Cited Statuto~ Authority

The planning and preparation for accomplishment of a refueling complex overhaul of a nuclear aircraft carrier is extremely complicated and of a highly technical and specialized nature.

The work requires planning for alterations to ship systems and inspection, test and repair of systems and components as well as design of infrastructure improvements to enable the ship to be maintained, upgraded and operated with only normal maintenance under the Incremental Maintenance Program. The work is further complicated by planning the simultaneous refueling and overhaul of two nuclear reactor plants.

NIINC is (a) the original building yard contractor for all ships of the CVN 68 class, (b) the reactor planning yard, (c) the lead design refueling yard, and Cd) the only shipyard capable of refueling and overhauling a nuclear powered aircraft carrier. Therefoize, it is the only source with the -knowledge, experience, and facilities required to plan and prepare for the CVN 73 RCOI-1 without an unacceptable disruption of Navy—wide overhaul and repair schedules.

HIINC is the only responsible source able to satisfy the agency’ s requirements.

CJ&A No..: 20,876(E)

6. Description of Efforts Made to Solicit Offers from as Many Offerors as Practicable

In accordance with FAR 5.2, these requirements were synopsized on the Federal Business Opportunities (FBO) website. on 19 February 2013. To date, no responses have been received and no responses are anticipated. No additional market research was conducted because it is not practicable, for the reasons discussed in paragraph 5 above, for any company other than HIINC to provide the required supplies and services.

7. Determination of Fair and Reasonable Costs

In accordance with FAR 15.402(a), the Contracting Officer must ensure all supplies.and services are procured at a fair and reasonable price. The contractor will submit cost and pricing data in accordance with FAR 15.402—4. Analysis of the proposals will be performed by technical analysts and contract specialists, with the assistance of the Defense Contract management Agency analysts and Defense Contract Audit Agency auditors. The Contracting Officer will use cost and price analysis to determine that the final price is fair and reasonable. Further, the contractor will certify that the cost and pricing data is current, accurate and complete as of the time of settlement of negotiations.

8. Actions to Remove Barriers to Competition

For the reasons set forth in Paragraph 5, NAVSEA has no plans at this time to compete future contracts for the types of supplies/services covered by this document. If another potential source emerges, NAVSEA will assess whether competition for future requirements is feasible.

CJ&A No.: 20,876(E)

TECHNICAL/REQUIREMENTS CERTIFICATION (FAR 6.303-2(b))

I certify that the facts and representations wider my cognizance, which are included in this justification and its supporting data, including NAVSEA Acquisition Plan No. 11-010 Rev 0, except as noted herein, are complete and accurate to the best of my knowledge and belief.

I certify that this justification is accurate and complete to the best of my knowledge and belief.

Upon the basis of the above justification, I hereby approve, as Navy Senior Procurement Executive the solicitation of the proposed procurements using of other than full and open competition, pursuant to the authority of 10 U.S.C. 2304(c) (1).

TECHNICAL COGNIZANCE:

LEGAL SUFFICIENCY REVIEW (NMCAG 5206.303 (90))

CONTRACTING OFflCER—CERTIFICATION (FAR 6.303-2 (a) (12))

APPROVAL BLOCK

Namel rifle) and Title (Code)