CV-22 JTT-NG SS Questions and Responses.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- CV-22 Joint Tactical Terminal - Next Generation
- Solicitation number
- N00019-26-RFPREQ-APM275-0086
About this file
This file is a Questions and Responses document addressing inquiries from interested parties regarding the CV-22 Joint Tactical Terminal - Next Generation (JTT-NG) Sources Sought notice. The document clarifies three key technical and administrative requirements for potential contractors.
Regarding the CV-22 aircraft configuration model requirement, interested parties must possess or have access to the CV-22 Computer Visualization Assembly System or CATIA model of the current aircraft configuration to investigate A-kit installation and develop installation data packages. The Government has clarified that the V-22 Systems Engineering Plan and Configuration Management Plan will be provided with the formal Request for Proposal. Notably, the CV-22 configuration model is proprietary data owned by the Bell Boeing Joint Project Office rather than Government-owned data; interested parties must already have independent access to this model and cannot request it from the Government. These clarifications indicate that respondents to the future RFP will need to have pre-existing relationships or access agreements with Bell Boeing to obtain the necessary technical documentation for design and integration work on the JTT-NG A-kits.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CV-22 JTT-NG SS Questions and Responses.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CV-22 Joint Tactical Terminal - Next Generation Sources Sought Questions and Responses | |
| Question | Government Response |
| What is meant in the statement "Interested parties must already have access to the CV-22 aircraft configuration model"? | Interested parties must either be in possession of or have access to the CV-22 Computer Visualization Assembly System or CV-22 Computer Aided Three Dimensional Interactive Application (CATIA) model of the current configuration so that the installation of the Joint Tactical Terminal - Next Generation A-kit designs can be investigated and installation data package can be developed. |
| The sources sought states that the contractor’s work must abide by the V-22 Systems Engineering Plan and Configuration Management Plan. Will that data be made available? | The V-22 Systems Engineering Plan and Configuration Management Plan will be provided with the Request for Proposal. |
| The sources sought states that interested parties must already have access to the CV-22 aircraft configuration model. Is this model government owned data that we can request access to or is this proprietary data? Who is the data owner? | Interested parties must already have access to the CV-22 aircraft configuration model. The Government does not own this data. It's proprietary, owned by Bell Boeing Joint Project Office. |
File details come from the government source that posted it. Updated .