Att. (14) - ROM Request Form (2025.02.03).docx
DOCX document 62 KB Posted
- Attached to
- C-40 Contractor Logistics Support: Solicitation
- Solicitation number
- N0001925R0003
About this file
This document is a Rough Order of Magnitude (ROM) Request Form for a task order under an existing Indefinite-Delivery/Indefinite-Quantity (IDIQ) contract N0001925R0003 with the Naval Air Systems Command (NAVAIR). The request pertains to C-40 aircraft maintenance and support services, specifically covering depot-level maintenance, modification, repair labor, field team support, and material procurement for 17 U.S. Navy and 2 U.S. Marine Corps aircraft.
The ROM form outlines a process for submitting an expedited proposal, with applicable Contract Line Item Numbers (CLINs) for labor, travel, and material. The proposal is due by 28 April 2025, with an estimated performance period to be determined. The government emphasizes that this ROM request is not a binding commitment, and any work undertaken by the contractor prior to contract execution is at their own risk. The total estimated price and specific performance details will be finalized through the proposal submission and subsequent negotiation process.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0001920R0013 Attachment 5 N0001925R0003
ROUGH ORDER OF MAGNITUDE REQUEST/EXPEDITED REQUEST FOR PROPOSAL
NAVAIR ROM Request Letter Number: Date: j
| To: | Contracting Representative, AAR Government Services, Inc. | |
| Subj: | REQUEST FOR ROUGH ORDER OF MAGNITUDE | |
| Ref: | (a) | Base IDIQ Contract N0001925R0003 Attachment (1), Performance Work Statement |
1. REQUEST:
The Government requests the Contractor submit a Rough Order of Magnitude (ROM) via the enclosed ROM form for the Government-identified requirement described herein with a validity period of N5 days. Upon Government authorization, for Aircraft on Ground (AOG) and urgent efforts, the Contractor shall prepare and submit a follow-up formal proposal. All other efforts will require a formal Request for Proposal (RFP) at a later date. The Procuring Contracting Officer (PCO) shall make the final procedural determination.
1. CONTRACT ACTION:
Subject to PCO discretion, the Government contemplates execution of a task order issued against base Indefinite-Delivery/Indefinite-Quantity (IDIQ) Contract N0001925R0003 in accordance with Reference (a) and consistent with the information set forth herein.
1. REQUIREMENT:
The Government requires Description of work, material, and travel required; needed repairs or replacements; desired result / what the work will accomplish / why is it necessary
1. URGENCY: ☐ AOG ☐ Priority (Expedited) ☐ Routine (RFP to follow)
1. APPLICABLE CLINS:
| ☐ | 0028, Depot-Level Maintenance/Modification/Repair Labor |
| ☐ | 0029, Drop-In Maintenance/Modification/Repair Labor |
| ☐ | 0030, Depot Field Team (DFT) Support Labor |
| ☐ | 0031, Depot Field Team (DFT) Support Travel |
| ☐ | 0032, Beyond Fair Wear and Tear (BFWT) Material |
| ☐ | 0033, Government-Directed Shipping |
1. PERFORMANCE:
Need Date: j Requested Work Start Date: j Place of Performance/Delivery Location:
| ☐ | Performed on aircraft , located at in . |
| ☐ | Delivered to/Performed at: in . |
1. ALTERNATE ROM SUBMISSION (OPTIONAL):
The proposal for the subject request shall be submitted by: j
| PREPARED BY: | APPROVED BY: | ||||
| . | . | . | . | ||
| Government Technical Representative | Date | Program Management Representative | Date |
ROUGH ORDER OF MAGNITUDE FORM
Contractor ROM Number: Date: j
| To: | Procuring Contracting Officer (PCO) | |
| Via: | Government Technical Point of Contact (TPOC) | |
| Subj: | ROUGH ORDER OF MAGNITUDE AND REQUEST FOR AUTHORIZATION TO PROCEED WITH A PROPOSAL FOR THE GOVERNMENT-IDENTIFIED REQUIREMENT | |
| Ref: | (a) | Base IDIQ Contract N0001925R0003 Attachment (1), Performance Work Statement |
1. REQUEST:
The requirement described herein is within the scope of base Indefinite-Delivery/Indefinite-Quantity (IDIQ) Contract N0001925R0003 and, if approved, will be performed under a new Task Order in accordance with Reference (a) and consistent with the information set forth herein.
| ☐ | The Contractor requests approval of this Rough Order of Magnitude (ROM) and authorization to proceed with a proposal for the Government-identified urgent requirement as described in the enclosed NAVAIR ROM Request Letter Number . . |
| ☐ | The Contractor submits this ROM for the effort described in the enclosed NAVAIR ROM Request Letter Number . . A formal proposal for the Government-identified requirement as described therein will be prepared once a formal RFP is received. |
2. DESCRIPTION OF ANTICIPATED EFFORT/PRODUCT:
Labor:
Material:
Shipping:
Travel:
| 3. ESTIMATED TOTAL PRICE/NTE: . | ☐ | Estimated | ☐ | Firm | |||||
| APPLICABLE CLINS: | EST. CLIN PRICE & TYPE: | EST. HOURS: | |||||||
| ☐ | 0028, Depot-Level Maintenance/Modification/Repair Labor | . | ☐ | FFP | ☐ | NTE | . | ||
| ☐ | 0029, Drop-In Maintenance/Modification/Repair Labor | . | ☐ | FFP | ☐ | NTE | . | ||
| ☐ | 0030, Depot Field Team (DFT) Support Labor | . | ☐ | FFP | ☐ | NTE | . | ||
| ☐ | 0031, Depot Field Team (DFT) Support Travel | . | ☐ | FFP | ☐ | NTE | |||
| ☐ | 0032, Beyond Fair Wear and Tear (BFWT) Material | . | ☐ | FFP | ☐ | NTE | |||
| ☐ | 0033, Government-Directed Shipping | . | ☐ | FFP | ☐ | NTE |
4. PERFORMANCE/DELIVERY SCHEDULE/LOCATION:
Requested Award Date: j Estimated Turn-Around-Time: .
Proposed Period of Performance: j through j Place of Performance/Delivery Location:
| ☐ | Performed on aircraft , located at in . |
| ☐ | Delivered to/Performed at: in . |
SUBMITTED BY:
| j | |
| Authorized Representative | Date |
----------------------------- Submit to: Government C-40 Deputy IPTL & Copy Contracts Representative -----------------------------
GOVERNMENT AUTHORIZATION
PROPOSAL SUBMISSION:
The proposal for the subject request shall be submitted by: j
REVIEW: (Government Technical Point of Contact/Contracting Officer’s Representative) TPOC/COR Recommendation: ☐ Approve ☐ Disapprove Comments:
| j | |
| Authorized Representative | Date |
-------------------------------------------------------------- Forward to: Program Management --------------------------------------------------------------
VERIFIFICATION: (Integrated Project Team Lead/Program Management Representative) Program Management Decision: ☐ Approve ☐ Disapprove Comments:
| j | |
| Authorized Representative | Date |
------------------------------------------------------------------------ Forward to: Contracts -----------------------------------------------------------------------
DETERMINATION/AUTHORIZATION: (Procuring Contracting Officer) PCO Determination: ☐ RFP to Follow ☐ Proposal Authorized ☐ Rejected for the following Reason(s):
Comments:
| j | |
| Authorized Representative | Date |
The Government has reviewed the subject ROM and verified that the identified work is within IDIQ contract scope, consistent with the Government requirement, and is not currently funded. The Government concurs that the action set forth is both appropriate and necessary and anticipates funding approval for the amount specified herein.
The following applies to requests Authorized by the PCO:
** Government approval of this ROM shall operate in lieu of a formal Request for Proposal (RFP).
This approval shall not be interpreted as a contract or commitment on the part of the Government and the Government is not responsible for any costs associated with the preparation or submission of the proposal.
Authorization to proceed with a proposal is granted with the understanding that the Government fully intends to issue a task order consistent with the information provided herein following the receipt of a fully supported proposal, a successful negotiation of a FFP or NTE price, and subject to actual funding availability. Any work undertaken by the Contractor prior to contract execution shall be at its own risk.
The Contractor shall submit a proposal consistent with the Reference (a) PWS and in accordance with Federal Acquisition Regulations (FAR) 15.208 and FAR 15.403-5(b)(2) to NAVAIR Contracts no later than the date specified above and shall remain valid for a period of no less than 120 days.
The proposal should include a written rationale defining calculations and underlying assumptions made in its preparation, provide support for the basis of its estimate, and verify sources such as historical pricing, vendor quotes, or other estimating methodology. The Contractor shall provide all supporting pricing information and data used in its development so as to permit the level of analysis necessary to establish that the proposed price is fair and reasonable as mandated by FAR 15.402(a)(2), Department of Defense FAR Supplement (DFARS) 215.404-1(b) and DFARS Procedures, Guidance, Information (PGI) 215.402.
Submit to: Government Technical Point of Contact Copy: Contracts
| Attachment (7) | ||
| 3 FEB 2025 | 3 of 3 | Rough Order of Magnitude Request & Submission Forms |
File details come from the government source that posted it. Updated .