Attachment_18_CSDR_Plan.xls

XLS spreadsheet 99 KB Posted

Attached to
P-8A Airframe and Engine Depot Maintenance Competition Federal contract opportunity
Solicitation number
N00019-15-R-2004
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

Section J Attachment 18

View the file

Other files for this federal contract opportunity

Other files attached to P-8A Airframe and Engine Depot Maintenance Competition, newest first.
File Type Posted
Att_L-7_Prime_Contractor_Cost_Summary_FFP_Amendment_10.xlsx XLSX spreadsheet
Att_L-5_Price_Matrix_Amendment_10_.xlsx XLSX spreadsheet
Att_L-5_Price_Matrix_Amendment_8_.xlsx XLSX spreadsheet
Att_L-9_Prime_Contractor_Tech_Directives_FFP_Amendment_0007.xlsx XLSX spreadsheet
Att_L-5_Price_Matrix_Amendment_0007.xlsx XLSX spreadsheet
Amendment_0006.pdf PDF
Exhibit_N_NAVY-OY6_Part_A_CDRLs_Amendment_0006.pdf PDF
Exhibit_N_NAVY-OY6_Part_A_CDRLs_Amendment_05.pdf PDF
Exhibit_AB_RAAF-OY4_Part_B_CDRLs.docx DOCX document
Exhibit_AS_FMS-OY5_Part_B_CDRLs.docx DOCX document
Exhibit_E_NAVY-OY2_Part_A_CDRLs.docx DOCX document
Exhibit_AU_FMS-OY6_Part_B_CDRLs.docx DOCX document
Exhibit_C_NAVY-OY1_Part_A_CDRLs.docx DOCX document
Exhibit_N_NAVY-OY6_Part_A_CDRLs.docx DOCX document
Att_L-7_Prime_Contractor_Cost_Summary_FFP_Amendment_4.xlsx XLSX spreadsheet
Exhibit_H_RAAF-OY3_Part_A_CDRLs.docx DOCX document
Exhibit_A_NAVY-IDIQ_Part_A_CDRLs.docx DOCX document
Exhibit_AT_FMS-OP6_Part_A_CDRLs.docx DOCX document
Att_L-9_Prime_Contractor_Tech_Directives_FFP_Amendment_4.xlsx XLSX spreadsheet
N00019-15-R-2004_Conform_through_amendment_0003_(1-11-17).docx DOCX document
Q_302.docx DOCX document
Q__300-301.docx DOCX document
Q_287-295_for_posting.pdf PDF
JPO_PSFD_Final_Signed_MOU.pdf PDF
N00019-15-R-2004-0003.pdf PDF
Att_L-9_Prime_Contractor_Tech_Directives_FFP_Amendment_3.xlsx XLSX spreadsheet
Attachment_19.xlsx XLSX spreadsheet
USN_Engine_EGTM_Trend_Summary.pdf PDF
Q_and_A285-286_for_positng.pdf PDF
Q A_212_thru_254_1_Dec.docx DOCX document
Exhibit_AD_RAAF-OY5_Part_B_CDRLs.pdf PDF
Att_L-8_Prime_Contractor_Cost_Summary_T M_Amendment_1.xlsx XLSX spreadsheet
Exhibit_P_RAAF-OY6_Part_A_CDRLs.pdf PDF
Exhibit_N_NAVY-OY6_Part_A_CDRLs.pdf PDF
Exhibit_G_NAVY-OY3_Part_A_CDRLs.pdf PDF
N00019-15-R-2004-0001.pdf PDF
Exhibit_AB_RAAF-OY4_Part_B_CDRLs.pdf PDF
Exhibit_E_NAVY-OY2_Part_A_CDRLs.pdf PDF
Exhibit_AC_NAVY-OY5_Part_B_CDRLs.pdf PDF
Exhibit_AE_NAVY-OY6_Part_B_CDRLs.pdf PDF
Exhibit_C_NAVY-OY1_Part_A_CDRLs.docx DOCX document
Attachment_9_CFM56-7B_CSI-CAI_Items.xlsx XLSX spreadsheet
Att_L-3_Vol_3_PPQ_Combined.docx DOCX document
Exhibit_AB_RAAF-OY4_Part_B_CDRLs.docx DOCX document
Exhibit_H_RAAF-OY3_Part_A_CDRLs.docx DOCX document
Exhibit_U_NAVY-OY1_Part_B_CDRLs.docx DOCX document
Attachment_8_Technical_Directives.xlsx XLSX spreadsheet
Exhibit_J_NAVY-OY4_Part_A_CDRLs.docx DOCX document
Attachment_4_Government_Furnished_Property_List.xlsx XLSX spreadsheet
Att_L-5_Price_Matrix.xlsx XLSX spreadsheet
Show all 50

P-8A Airframe and Engine Depot Maintenance Competition has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 2794, Pg 1

COST AND SOFTWARE DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1. MAJOR PROGRAMa. NAME:P-8A Multi-Mission Maritime Aircraft (MMA) Program
b. PHASE/MILESTONEc. PRIME MISSION PRODUCT2. WBS SYSTEM TYPE3. SUBMISSION TYPE4. CURRENT SUBMISSION DATE (YYYYMMDD)5. LAST APPROVED PLAN DATE (YYYYMMDD)
Pre-ABXC-FRPSustainmentAircraft SystemXINITIAL
AC-LRIPO&SCHANGE20160922
6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code)6b. TELEPHONE NUMBER (Include Area Code)6c. FAX NUMBER (Include Area Code)6d. E-MAIL ADDRESS
R.L. Gage

47254 Davis Spur Road

Patuxent River, MD 20670(301) 342-2432r.gage@navy.mil
7. PLAN TYPE8. PREPARING ORGANIZATION9a. CONTRACTOR NAME/ADDRESS9b. CONTRACT NUMBER9c. APPROPRIATION10. APPROVED PLAN NUMBER
PROGRAMXCONTRACT (PRIME)i. PERFORMING ORGANIZATIONii. DIVISIONTBDXRDT&ETBD
CONTRACT (SUB)NAVAIR 4.2TBDXPROCUREMENT
XO&M
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):DD 1921-1 / 1921-5 EAC:EVM Reporting:
XX
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYCCDRg. SRDR
FORMATSh. IPMR

FORMAT 1

b. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-5
(SFCHR)f. EAC
1.01.0P-8A Sustainment EffortXXXX
1.11.1Unit-Level Manpower (System Level Cost Only)XXXX
1.21.2Unit Operations (System Level Cost Only)XXXX
1.31.3MaintenanceXXXX
1.3.11.3.1Consumables and Repair PartsXXXX
1.3.1.11.3.1.1Airframe/Hull/Vehicle Consumables and Repair PartsXXXX
1.3.1.21.3.1.2Propulsion Consumables and Repair PartsXXXX
1.3.1.31.3.1.3Electronics/Avionics Consumables and Repair PartsXXXX
1.3.1.41.3.1.4Other Major Subsystem Consumables and Repair Parts 1..n (Specify)XXXX
1.3.1.51.3.1.5Other Consumables and Repair PartsXXXX
1.3.21.3.2Depot Level Reparables (DLRs) / Repair of Reparables (RORs)XXXX
1.3.2.11.3.2.1Airframe/Hull/Vehicle DLRsXXXX
1.3.2.21.3.2.2Propulsion DLRsXXXX
1.3.2.31.3.2.3Electronics/Avionics DLRsXXXX
1.3.2.41.3.2.4Other Major Subsystems DLRs 1..n (Specify)XXXX
1.3.2.51.3.2.5Other DLRsXXXX
1.3.31.3.3Intermediate MaintenanceXXXX
1.3.3.11.3.3.1Intermediate Maintenance Consumable Materials and Repair PartsXXXX
1.3.3.21.3.3.2Intermediate-Level Government MaintenanceXXXX
1.3.3.31.3.3.3Intermediate-Level Contractor MaintenanceXXXX
1.3.3.41.3.3.4Other Intermediate-Level MaintenanceXXXX
1.3.41.3.4Depot MaintenanceXXXX
1.3.4.11.3.4.1Scheduled OverhaulXXXX
1.3.4.1.11.3.4.1.1Airframe/Hull/Vehicle Scheduled Overhaul (Contractor Depot Repair)XXXX
1.3.4.1.1.1.11.3.4.1.1.1Test AssetsXXXX
1.3.4.1.1.1.1.11.3.4.1.1.1.1Inspection Depot WorkXXXX
1.3.4.1.1.1.1.21.3.4.1.1.1.2Over & Above Depot WorkXXXX
1.3.4.1.1.1.1.31.3.4.1.1.1.3Aircraft Strip and PaintXXXX
1.3.4.1.1.1.21.3.4.1.1.2Fleet AssetsXXXX
1.3.4.1.1.1.2.11.3.4.1.1.2.1Inspection Depot WorkXXXX
1.3.4.1.1.1.2.21.3.4.1.1.2.2Over & Above Depot WorkXXXX
1.3.4.1.1.1.2.31.3.4.1.1.2.3Aircraft Strip and PaintXXXX
1.3.4.1.21.3.4.1.2Propulsion Scheduled Overhaul (Contractor Depot Repair)XXXX
1.3.4.1.2.11.3.4.1.2.1Test AssetsXXXX
1.3.4.1.2.1.11.3.4.1.2.1.1Performance RestorationXXXX
1.3.4.1.2.1.21.3.4.1.2.1.2Life Limited PartsXXXX
1.3.4.1.2.1.31.3.4.1.2.1.3Over & AboveXXXX
1.3.4.1.2.1.41.3.4.1.2.1.4RefurbishmentXXXX
1.3.4.1.2.1.4.11.3.4.1.2.1.4.1Fan and BoosterXXXX
1.3.4.1.2.1.4.21.3.4.1.2.1.4.2HPC (High Pressure Compressor) Rotor ModuleXXXX
1.3.4.1.2.1.4.31.3.4.1.2.1.4.3HPC (High Pressure Compressor) Stator ModuleXXXX
1.3.4.1.2.1.4.41.3.4.1.2.1.4.4Combustion ModuleXXXX
1.3.4.1.2.1.4.51.3.4.1.2.1.4.5HPT (High Pressure Turbine) Nozzles ModuleXXXX
1.3.4.1.2.1.4.61.3.4.1.2.1.4.6HPT (High Pressure Turbine) Rotor Module ModuleXXXX
1.3.4.1.2.1.4.71.3.4.1.2.1.4.7HPT (High Pressure Turbine) Shroud Support & LPT (Low Pressure Turbine) stg 1 Nozzle ModuleXXXX
DD FORM 2794, AUGUST 2015PREVIOUS EDITION IS OBSOLETE
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):DD 1921-1 / 1921-5 EAC:EVM Reporting:
XX
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYCCDRg. SRDR
FORMATSh. IPMR

FORMAT 1

b. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-5
(SFCHR)f. EAC
1.3.4.1.2.1.4.81.3.4.1.2.1.4.8LPT (Low Pressure Turbine) ModuleXXXX
1.3.4.1.2.21.3.4.1.2.2Fleet AssetsXXXX
1.3.4.1.2.2.11.3.4.1.2.2.1Performance RestorationXXXX
1.3.4.1.2.2.21.3.4.1.2.2.2Life Limited PartsXXXX
1.3.4.1.2.2.31.3.4.1.2.2.3Over & AboveXXXX
1.3.4.1.2.2.41.3.4.1.2.2.4RefurbishmentXXXX
1.3.4.1.2.2.4.11.3.4.1.2.2.4.1Fan and BoosterXXXX
1.3.4.1.2.2.4.21.3.4.1.2.2.4.2HPC (High Pressure Compressor) Rotor ModuleXXXX
1.3.4.1.2.2.4.31.3.4.1.2.2.4.3HPC (High Pressure Compressor) Stator ModuleXXXX
1.3.4.1.2.2.4.41.3.4.1.2.2.4.4Combustion ModuleXXXX
1.3.4.1.2.2.4.51.3.4.1.2.2.4.5HPT (High Pressure Turbine) Nozzles ModuleXXXX
1.3.4.1.2.2.4.61.3.4.1.2.2.4.6HPT (High Pressure Turbine) Rotor Module ModuleXXXX
1.3.4.1.2.2.4.71.3.4.1.2.2.4.7HPT (High Pressure Turbine) Shroud Support & LPT (Low Pressure Turbine) stg 1 Nozzle ModuleXXXX
1.3.4.1.2.2.4.81.3.4.1.2.2.4.8LPT (Low Pressure Turbine) ModuleXXXX
1.3.4.1.31.3.4.1.3Electronics/Avionics Scheduled OverhaulXXXX
1.3.4.1.41.3.4.1.4Other Major Subsystems Scheduled Overhaul 1..n (Specify)XXXX
1.3.4.1.51.3.4.1.5Other Scheduled OverhaulXXXX
1.3.4.21.3.4.2Unscheduled OverhaulXXXX
1.3.4.2.11.3.4.2.1Airframe/Hull/Vehicle Unscheduled OverhaulXXXX
1.3.4.2.21.3.4.2.2Propulsion Unscheduled OverhaulXXXX
1.3.4.2.31.3.4.2.3Electronics/Avionics Unscheduled OverhaulXXXX
1.3.4.2.41.3.4.2.4Other Major Subsystems Unscheduled Overhaul 1..n (Specify)XXXX
1.3.4.2.51.3.4.2.5Other Unscheduled Unscheduled OverhaulXXXX
1.3.4.31.3.4.3Emergency RepairsXXXX
1.3.4.3.11.3.4.3.1Airframe/Hull/Vehicle Emergency RepairXXXX
1.3.4.3.1.11.3.4.3.1.1Test AssetsXXXX
1.3.4.3.1.21.3.4.3.1.2Fleet AssetsXXXX
1.3.4.3.21.3.4.3.2Propulsion Emergency RepairXXXX
1.3.4.3.2.11.3.4.3.2.1Test AssetsXXXX
1.3.4.3.2.21.3.4.3.2.2Fleet AssetsXXXX
1.3.51.3.5Other MaintenanceXXXX
1.3.61.3.6Packing, Handling, Shipping and TransportationXX
1.41.4Sustaining Support (System Level Cost Only)XXXX
1.4.11.4.1System Specific TrainingXN/A
1.4.21.4.2Support Equipment Replacement and RepairXN/A
1.4.31.4.3Sustaining/Systems EngineeringXXXX
1.4.3.11.4.3.1Reliability And Maintainability EngineeringXN/A
1.4.3.21.4.3.2Logistics Engineering (LSA Updates, Logistics Analysis)XXXX
1.4.3.31.4.3.3Supply Analysis EffortsXXXX
1.4.3.41.4.3.4Safety/Human Systems Integration EngineeringXN/A
1.4.3.51.4.3.5Affordability EngineeringXXXX
1.4.3.61.4.3.6Obsolescence EngineeringXN/A
1.4.3.71.4.3.7Availability ManagementXXXX
1.4.3.81.4.3.8Product Engineering SupportXXXX
1.4.3.91.4.3.9Certification and AccreditationXXXX
1.4.3.101.4.3.10Configuration ManagementXXXX
1.4.3.111.4.3.11System Performance AnalysisXXXX
1.4.3.121.4.3.12SupplyXXXX
1.4.3.131.4.3.13Data AnalysisXXXX
1.4.3.141.4.3.14Physical SecurityXXXX
1.4.41.4.4Program ManagementXXXX
1.4.4.11.4.4.1Contractor Logistics Support (CLS) ManagementXN/A
1.4.4.21.4.4.2CLS Supply ManagementXN/A
1.4.4.31.4.4.3Financial/Schedule Planning and ReportingXXXX
1.4.4.41.4.4.4Transition to Lead ServiceXXXX
1.4.4.51.4.4.5Quality Assurance (Program Level)XXXX
1.4.4.61.4.4.6Administrative SecurityXXXX
1.4.4.71.4.4.7Transition to Performance Based Logistics (PBL)XN/A
1.4.4.81.4.4.8Risk MitigationXXXX
1.4.51.4.5Information SystemsXXXX
1.4.61.4.6Data and Technical PublicationsXXXX
1.4.71.4.7Simulator/Training Device Operations and RepairXN/A
1.4.81.4.8Other Sustaining Support (Specify in Remarks)XXXX
1.51.5Continuing System ImprovementsXXXX
DD FORM 2794, AUGUST 2015PREVIOUS EDITION IS OBSOLETE
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):DD 1921-1 / 1921-5 EAC:EVM Reporting:
XX
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYCCDRg. SRDR
FORMATSh. IPMR

FORMAT 1

b. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-5
(SFCHR)f. EAC
1.5.11.5.1Hardware Modifications or Modernization (Tech Directives)XXXX
1.5.1.11.5.1.1Mod Kit DevelopmentXN/A
1.5.1.21.5.1.2Mod Kit ProcurementXXXX
1.5.1.31.5.1.3Mod Kit Initial SparesXN/A
1.5.1.41.5.1.4Mod Kit InstallationXXXX
1.5.21.5.2Software SupportXN/A
1.61.6Installation and Personnel Support (System Level Only)XN/A
1.71.7FMS OffsetsXXXX
Subtotal CostXX
Reporting Contractor G&AXX
Reporting Contractor Undistributed BudgetXX
Reporting Contractor Management ReserveXX
Reporting Contractor FCCMXX
Total CostXX
Reporting Contractor Profit/Loss or FeeXX
Total PriceXX
DD FORM 2794, AUGUST 2015PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 2

14. CSDR SUBMISSION DATES
a.
SUBMISSIONb.
FORM(S)c.
EVENTd.
REPORT TYPEe. AS OF DATEf. DUE DATE
(YYYYMMDD)(YYYYMMDD)
1CWBS DictionaryP-8A Sustainment - CWBS DictionaryInitial2018093020181130
31921, 1921-5P-8A Sustainment - FY2018 Annual ReportInterim2018093020181130
41921, 1921-5P-8A Sustainment - FY2019 Annual ReportInterim2019093020191130
51921, 1921-5P-8A Sustainment - FY2020 Final ReportFinal2020093020201130
61921, 1921-5P-8A Sustainment - FY2021 Final ReportFinal2021093020211130
71921, 1921-5P-8A Sustainment - FY2022 Final ReportFinal2022093020221130
81921, 1921-5P-8A Sustainment - FY2023 Final ReportFinal2023093020231130
91921, 1921-5P-8A Sustainment - FY2024 Final ReportFinal2024063020240830
15. REMARKS
1. Describe significant accounting changes from previous accounting period, if applicable.
2. DD Form 1921-3 Contractor Business Data Report:

a. The Contractor Business Data Report is prepared by and for the business entity (e,g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government.

b. Reports are submitted annually at the end of the contractor's fiscal year.

c. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.

3. The contractor must report costs for each aircraft/engine inducted discretely, and must not include any costs associated with another aircraft/engine. (E.g., if four aircraft/engine are inducted prior to 9/30/2018, four sets of 1921 and 1921-5 reports will be submitted to submission event 3, FY2018 Annual Report. Reports for each aircraft/engine must be submitted annually, until the aircraft/engine work has been completed.
4. Any allocation methodologies for support hours not specific to an individual aircraft/engine shall be noted in Block 22 of the 1921 and 1921-5 reports.
5. The contractor must modify the name of WBS element 1.0 for each 1921 and 1921-5 report to reflect the corresponding US Navy BUNO or RAAF BUNO for each set of reports for aircraft.
6. The contractor must modify the name of WBS element 1.0 for each 1921 and 1921-5 report to reflect the corresponding US Navy or RAAF Serial Number for each set of reports for engines.
7. The contractor shall modify the WBS structure to include line items for each incorporated technical directive as children for 1.5.1.2 and 1.5.1.4 as appropriate for the 1921 report and as children under Block 22 in the 1921-5 report.
9. The contractor shall report all task cards used in Inspection of the aircraft/engine to date and aircraft/engine at completion in Block 22 of the 1921-5 report.
8. The contractor shall report the incorporated technical directives in the units to date and units at completion in Columns C and G of the 1921 report, and Block 22 of the 1921-5 reports.
*Note (Final report when all end items have been delivered to the Government (DD 250) and 95% of contract costs incurred)
DD FORM 2794 (PAGE 2), AUGUST 2015PREVIOUS EDITION IS OBSOLETE

File details come from the government source that posted it. Updated .