Draft_RFP_Q As_Deferred_Questions_15APR2015.pdf

PDF 192 KB Posted

Attached to
Alternative Source -F/A-18A/B/C/D Depot Level Maintenance
Solicitation number
N00019-15-R-0090
Issued by

About this file

Q A's Volume 3

View the file

Other files

File Type Posted
Amendment_0003.pdf PDF
Attachment_13_-_Government_Furnished_Property_List.pdf PDF
Attachment_13_-GFP_List_.pdf PDF
Amendment_0002_-_N00019-15-R-0090.pdf PDF
Site_Visit_Q As.pdf PDF
Final_RFP_Q As_Vol_3.pdf PDF
CDRL_A003_-_Program_Plans_-_Ground_Operations.PDF PDF
Attachment_15_-_CSDR.xls XLS spreadsheet
CDRL_A002_-_Program_Plan_-_CM.PDF PDF
CDRL_A004_-_Program_Plans_-_Airfield_Operations _Flight_Planning _and_Flight_Missions.PDF PDF
Amendment_0001_-_N00019-15-R-0090.pdf PDF
CDRL_A00L_-_IMS.PDF PDF
CDRL_A005_-_Program_Plans_-_Aviation_Safety.PDF PDF
L-5_Vol_4_CSDR.xls XLS spreadsheet
Attachment_1_-_Contractor_Depot_Level_Maintenance_Statement_of_Work.PDF PDF
Final_RFP_Questions_Vol_2.pdf PDF
CDRL_A00Q_-_Parts_and_Material_Summary_Report.PDF PDF
Attachment_13_-_Government_Furnished_Property_List.pdf PDF
CDRL_A00M_-_Contractor_Cost_Data_Reporting.pdf PDF
Final_RFP_Q As.pdf PDF
PASS_ID_FORM_.pdf PDF
Site_Visit_Request.pdf PDF
A00C.PDF PDF
A00Q.PDF PDF
A002.PDF PDF
Attachment_5A_--_HFH_Inspection_Results_Summary_(Part_1_of_2).docx DOCX document
A007.PDF PDF
Attachment_12_Program_Protection_Plan.docx DOCX document
A001.PDF PDF
A003.PDF PDF
A00F.PDF PDF
A006.PDF PDF
A00P.PDF PDF
Attachment_10_NAVAIR_NMCI_process_for_DFCs.docx DOCX document
Attachment_9_Task_Order_Summary.xlsx XLSX spreadsheet
L-5_Vol_4_CSDR.xls XLS spreadsheet
Attachment_4_--_HFH_Induction_Configurations.xlsx XLSX spreadsheet
A008.PDF PDF
Attachment_6B_--_PR_Tracking_(Part_2_of_2).xlsx XLSX spreadsheet
A00D.PDF PDF
Attachment_7_Unit_Price_Matrix_(FFP).xlsx XLSX spreadsheet
A00G.PDF PDF
Supplement_1_-_Supplement_to_the_Exhibits.doc DOC document
Attachment_3_Cybersecurity_Plan.docx DOCX document
Attachment_15_-_CSDR.xls XLS spreadsheet
A00A.PDF PDF
Attachment_6A_--_PR_Tracking_(Part_1_of_2).docx DOCX document
A00K.pdf PDF
N00019-15-R-0090_signed_SOW.PDF PDF
FINAL_RFP_N00019-15-R-0090.pdf PDF
Show 40 more

Latest 50 of 113 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM

Document

Reference

COMMENTS TO: Alternate Source - F/A-18A/B/C/D Depot Level Maintenance

SOLICITATION DOCUMENT N00019-15-R-0090 (Dated 02 March 2015) Answer

Q&A #39 and Draft

RFP, Section L, Page

79 of 115, Para

5252.215-9503

Reference provides an anticipated award date of October 20, 2015. Please confirm if this is still valid and provide a full acquisition schedule.

Anticipated Dates:

Final RFP Release: 16 Apr 2015

Proposal Due: 3 Jun 2015

Contract Award: 3 Dec 2015

Solicitation Section

L, Part A, Paragraph

4.0, Pg. 85

RFP Section L Section 4.0 PROPOSAL PACKAGING AND SUBMISSION states: “However it is requested that Volume 1

(Executive Summary), Table ES-1 (Offeror’s Summary); Volume 1 (Executive Summary), Table ES-2 (Relevant Contract

Summary); Volume 3 (Past Performance) Table PP-1 (Past Performance Contract Data); and Annex C (Final Versions of

Previous SOW/PWS shall be submitted two weeks prior to the submission date/time…” With this statement, it appears that the only the Volume 3 Table PP-1 (Past Performance Contract Data) is due in early submittal. However, the last sentence in this paragraph states: “Failure to submit Volume 3 by the date/time established for receipt will cause the proposal submission to be rejected in its entirety.” Please clarify if the entire volume 3 is due in early submittal or just the Table PP-1.

With respect to Past Performance,only Table PP-1 and Annex C are required for early submittal.

Solicitation, Section

L, Part A, Paragraph

3.0, Table 2 (Pg. 84) -

Annexes &

Section L, Part B, Paragraph 3.3, Pg.

RFP Section L, 3.3 Evaluations, a. Relevancy (Pg. 95) states: “Final Versions of Previous SOW/PWSs for Past

Performance) should only be provided in electronic format and should not be provided in hard copy”. However, in

3.0, Table Gen Inst 2 (Pg. 84) Proposal Structure states:

Annex C // Final Versions of Previous SOW/PWSs // As Needed // 1 Original- // 1 Original-for Past Performance 6 Copies 2 Copies

Do Offerors need to supply Annex C in both hard and soft copies in the final submission in addition to the electronic copy with the early submission?

The Final RFP will be updated to clarify the requirement.

Solicitation Section

L, Part B, Paragraph

2.1, Pg. 91

RFP Section L, 2.1 Management Support Approach, e.3 states: “Large Business Offerors shall provide a Small Business

Subcontracting Plan conforming to the requirements of FAR 19.7 and DFARS 219.7 as part of Annex C (Table T-2

(Small Business Goals) and Small Business Subcontracting Plan)”. Should this be Annex B instead of C, as identified in

Table Gen Inst 2 Proposal Structure on Pg. 84?

Yes, changes will be addressed in Final RFP.

82 SOW

There is no mention of an Authorized Government Technical Representative (AGTR) in the SOW. Will NAVAIR consider locating such a representative on-site to perform this function at a Canadian location?

No, the Government does not intend to utilize an

AGTR.

Attached is the list of documents identified, to date, that will be required to properly estimate the DLM scope. The most critical documents are the missing TDs (2 released and 11 in Val/Ver stage). We also would like to request, if available, the referenced drawings in the discreet mod packages. In certain cases, the technical instruction refers to a specific area of a drawing, so in those cases the drawing is required. We would like to ask for the drawings for all the

Mod packages as these would be the most useful in estimating the job.

See attached list, including status of requested documents. The Government intends to make available modification drawings in the technical library.