JA 6 302-1
293 KB Posted
- Solicitation number
- N00019-05-G-0026-1-20-09
About this file
CJ A Technical Documentation
Text of this file
Technical Documentation
J&A Number 07-234C P-8A Studies J&A Template: One Source v1E
Justification for Other than Full and Open Competition
6.302-1 Only one responsible source and no other supplies or services will satisfy agency requirements.
Please fill in all of the required details below.
Guidance for fields can be found at the bottom of the window. Additional guidance may be available by pressing “F1”
T1. J&A Description:
J&A Number: 07-234C Acquisition Name: P-8A Studies T2. Technical Point of Contact:
WHAT is being acquired?
T3. Concisely describe the nature of this acquisition: This acquisition is for the procurement of engineering, logistics, prototyping, production, installation, testing, analyses investigations, trade studies and/or capability demonstrations, design improvements, technology insertions, obsolescence, and product improvements for reliability (includes potential P-8A International Participation and Cost as an Independent Variable requirements) services and supplies associated with the P-8A Program. These orders supplement the P-8A System Development and Demonstration (SDD) contract that was awarded on 14 June 2004 (J&A No. AIR 23057) and is in line with the P-8A Acquisition Plan 290-02-01 Revision 3 that was approved on 19 August 2005.
T4. The estimated total dollar amount, including options, of this action is: $55,000,000 T5. This J&A approves the following type of action(s): (Coordinate with PCO)
FORMCHECKBOX
Single action
· New FORMDROPDOWN type FORMDROPDOWN
FORMCHECKBOX
Class of actions. If this is a Class J&A, it covers actions through FY 2010.
· New FORMDROPDOWN type FORMDROPDOWN N00019-05-G-0026
T6. Specifically the below supplies or services are covered under this justification (including options):
The quantities identified below are estimated and may be adjusted to reflect other such quantities as may be authorized and appropriated by Congress.
Description
(Non-major items / services may be identified generically in logical grouping) Estimate QTY - Unit
Estimate Delivery Requirement / POP
T7. This requirement will be funded with the following appropriations (appn):
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
appn
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
appn
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
appn
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
appn
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
appn
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
FORMDROPDOWN
WHO? Who Is the only source?
T8. The Boeing Company is the only source that can provide the above supplies or services and no other supplies or services will satisfy the program’s requirements.
WHY is the source above the only one that can fulfill the requirement?
In accordance with Title 10 U.S.C 2304(c)(1) as cited in FAR 6.302-1, “Only one responsible source and no other supplies or services will satisfy agency requirements.”
T9. Only the specified source can provide the above described supplies or services due to:
(Check all that are applicable and use as much detail as necessary)
FORMCHECKBOX
Insufficient Technical Data and / or Rights The Government does not possess adequate data and / or the rights necessary to competitively award this requirement.
· Explain why the technical data is necessary for this acquisition:
· Does the Government possess all the technical data required to competitively award this requirement?
FORMCHECKBOX
Yes
· If Yes, explain why the Government does not possess sufficient data rights for the competition of this requirement:
· If Yes, could the necessary rights to the data be purchased?
FORMCHECKBOX
Yes, the necessary rights could be purchased for an estimated $ .
This amount was determined by .
This amount is economically unfeasible due to
FORMCHECKBOX
No, explain;
FORMCHECKBOX
No
· If No, explain why the Government does not posses sufficient technical data to competitively award this requirement.
· If No, could the necessary technical data and rights be purchased?
FORMCHECKBOX
Yes, the necessary Data and Rights could be purchased for $ .
This amount was determined by .
This amount is economically unfeasible due to
FORMCHECKBOX
No, explain; .
FORMCHECKBOX
Special Tooling Only the referenced source has access to special tooling which is necessary to fulfill this requirement.
· Explain why the special tooling is necessary for this acquisition:
· Could the necessary special tooling be purchased?
FORMCHECKBOX
Yes, the necessary tooling could be purchased for an estimated
This amount was determined by .
This amount is economically unfeasible due to
FORMCHECKBOX
No, explain; .
FORMCHECKBOX
Substantial Duplication of cost (for follow-on actions only) The above source is deemed to be the only source available because an award to a source other than the original provider would result in a substantial duplication of cost which would not be recovered through competition.
· An estimated $2,354,320,215.50 worth of work would be duplicated
· Explain in detail how this amount was determined The amount is equivalent to the current funded value of the P-8A SDD contract.
FORMCHECKBOX
Unacceptable delay of work (for follow-on actions only) The above source is deemed to be the only source available because an award to a source other than the original provider would result in an unacceptable delay in fulfilling the Government’s requirements.
· Going to another source would create a delay of approximately Four Years
· Explain in detail how this delay estimate was determined If this effort were to be competed, it would take approximately four years for another contractor to advance to the current development phase of the P-8A Program.
· Explain in detail how the Government would be unable to meet its requirements by this delay Award to any source other than The Boeing Company would result in significant schedule delays preventing the Navy from meeting the required P-8A Initial Operational Capability (IOC) date.
· Describe the specified source’s ability to provide the needed supplies / services within the necessary timeframe.
The Boeing Company is the only known responsible source that possesses the requisite knowledge of the aircraft and weapon system design, operation, and maintenance to satisfy the Navy's IOC timeline.
FORMCHECKBOX
Other
· Be specific and delineate why only the stated source can provide the above supplies or services.
HOW? / Background Further required information
T10. Is there a supporting acquisition planning document for this program?
Yes
· If Yes, is the supporting acquisition planning document current?
(ensure legal counsel has a copy of the latest document)
FORMCHECKBOX
Yes, it is current as of 19 August 2005
FORMCHECKBOX
No, explain;
· If Yes, is this J&A consistent with the content of the supporting acquisition planning document, including MOPAS?
FORMCHECKBOX
Yes, it is consistent.
FORMCHECKBOX
No, explain;
FORMCHECKBOX
No
· If No, why is there not a supporting acquisition planning document?
A supporting acquisition planning document is not required in accordance with DFARS FORMDROPDOWN
Other, explain;
T11. Market Research and / or Survey.(Required Pre-Solicitation notices do NOT satisfy this requirement)
Performed
· Describe the research and / or survey that was conducted:
FORMCHECKBOX
Not Performed
· No market research or survey was conducted due to: Given that only one qualified source exists to meet the Navy's requirement, no market research was conducted. In accordance with FAR 5.201, a synopsis will be issued for each BOA order. Award will not be made until the synopsis time requirement in FAR 5.203 has passed and any responses to the synopsis have been reviewed. Any parties interested in subcontracting opportunities will be referred to The Boeing Company's Subcontracting Manager.
T12. Follow-on Information: (Required for all actions)
· Will this requirement be acquired again?
FORMCHECKBOX
Yes
· If Yes, what is being done to remove barriers to competition?
FORMCHECKBOX
Nothing, explain: A best value limited competition was conducted for the P-8A SDD contract. On 14 June 2004, The Boeing Company was awarded the SDD contract and thus is the only unique, sole-source provider for this effort.
FORMCHECKBOX
Actions such as,
· If Yes, Will it be competed in the future?
FORMCHECKBOX
No, explain: The Boeing Company is the sole designer, developer, integrator, manufacturer, and supplier of this effort. Award to any other source other than The Boeing Company would result in significant schedule delays and substantial duplication of costs that would not be recovered through competition.
FORMCHECKBOX
Yes on (when)
FORMCHECKBOX
No, this is a one time buy.
FORMCHECKBOX
No, this a final buy.
· Is this for a follow-on requirement?
FORMCHECKBOX
Yes
· If Yes, Is the previous J&A attached?
FORMCHECKBOX
Yes
FORMCHECKBOX
No, explain:
No
(Remember to insert names of signing officials on next sheet)
Technical Certification
I certify that the facts and representations included in sections T1 through T12 and the supporting acquisition planning documentation are accurate and complete.
_________________________________________ Date:______________
Name: Title:
Contracting Officer Certification
(If the total dollar value of the justification is less than $550K, this certification constitutes the approval.)
To the best of my knowledge and belief I certify the accuracy and completeness of this justification including the attached Technical Documentation and supporting acquisition planning documentation.
Name: Title: Code: Phone:
Counsel
Based upon the certification contained herein, this justification is legally sufficient.
Approved
_________________________________________ Date:______________
Other files
| File | Type | Posted |
|---|---|---|
| JA 6 302-1 Contracts.doc | DOC document |
On GovTribe
Work with this file