This is an Invitation to Bid (ITB) addendum issued by the Jacksonville Transportation Authority (JTA), a Florida state agency, for the procurement of bus wash blower equipment and installation services at the Myrtle Avenue Operations Campus (MAOC). The project involves the removal and replacement of bus wash blower systems, including demolition of existing equipment, surface patching, installation of new blower equipment with support structures, electrical connections, and all necessary ancillary work to create a complete turnkey system capable of blowing water from both the top and sides of buses. The solicitation requires bidders to submit sealed bids by 2:00 PM local time on Friday, September 27, 2024. A non-mandatory pre-bid meeting was held on August 26, 2024, and site tours were offered on August 27, 2024, and September 17, 2024, with attendance strongly encouraged. The Notice of Intent to Award (NOITA) is scheduled for October 11, 2024. The contract is firm fixed-price with a total allowed completion time of 150 calendar days from issuance of the Notice to Proceed, with substantial completion required within 120 calendar days and a final 30-day completion window.
Pricing is provided on a line-item basis with unit costs for permitting, demolition, surface patching, blower arch equipment (quantity 2), installation services, electrical work, temporary fencing, and freight, with provisions for additional miscellaneous items as needed. A Disadvantaged Business Enterprise (DBE) participation goal of 8.5% has been established for this contract, requiring bidders to either meet the goal or submit documented good faith efforts. Bid security of 5% of the total bid price is required, with performance and payment bonds at 100% of the contract price mandatory if the contract exceeds the federal simplified acquisition threshold. The JTA is subject to federal transit administration (FTA) requirements including Buy America provisions, Davis-Bacon prevailing wage requirements, and various civil rights and environmental compliance standards. Bidders must be in good standing with the State of Florida, not listed in the System for Award Management (SAM) as an excluded party, and possess all required licenses and certifications. The contract will be awarded to the lowest responsive and responsible bidder whose proposal conforms to all material terms and conditions of the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JACKSONVILLE TRANSPORTATION AUTHORITY
INVITATION TO BID (ITB) FOR
MYRTLE AVENUE OPERATIONS CAMPUS (MAOC) BUS WASH BLOWERS
BID SUBMISSION DATE:
BY 2:00 PM (LOCAL), FRIDAY, SEPTEMBER 27, 2024
ITB NUMBER: ITB No. 24-011
Jacksonville Transportation Authority
100 LaVilla Center Drive
Jacksonville, Florida 32204
INVITATION TO BID
TABLE OF CONTENTS
I. NOTICE FOR PUBLICATION
II. INSTRUCTIONS TO BIDDERS
III. SPECIFICATIONS & SPECIAL CONDITIONS
IV. INSURANCE REQUIREMENTS
V. REQUIRED CLAUSES FOR FEDERALLY ASSISTED CONTRACTS
VI. PRICING TABLE
VII. EVALUATION PHASE
VIII. VENDOR QUESTIONNAIRE
1. NOTICE FOR PUBLICATION
INVITATION TO BID No. ITB No. 24-011
SUBJECT: Myrtle Avenue Operations Campus (MAOC) Bus Wash Blowers
BID SUBMISSION DEADLINE: Friday, September 27, 2024, 2:00 pm. (local time)
The Jacksonville Transportation Authority (the “Authority” or the “JTA”) hereby requests
Sealed Bids for ITB No. 24-011, Myrtle Avenue Operations Campus (MAOC) Bus Wash
Blowers.
The Jacksonville Transportation Authority herein after referred to as (the “Authority” or “JTA”) a body politic and corporate and an agency of the State of Florida, located at 100 LaVilla Center
Drive, Jacksonville, Florida 32204, hereby requests sealed bids for ITB No. 24-011 Myrtle
Avenue Operations Campus (MAOC) Bus Wash Blowers herein after referred to as (“ITB” or the “Bid”)
Sealed Bids will be received by the Jacksonville Transportation Authority (the “Authority” or the
“JTA”), until the above-stated Submittal closing/opening dates and times on the eProcurement
Portal at https://procurement.opengov.com/portal/jtafla/projects/109598
The complete Solicitation package will be available Friday, August 9, 2024 and may be obtained by visiting the eProcurement Portal. A complete examination and understanding of information contained in the Solicitation is necessary in order for the Bidder to properly submit a Bid. The
Solicitation also includes a detailed set of Instructions to Bidders. All Bids shall be prepared in accordance with the Instructions to Bidders. The failure to comply with any requirement contained in the Solicitation may result in the rejection of the Bid as non-responsive or a finding that the
Bidder is not qualified.
Proposals must be uploaded to the eProcurement Portal by the date and time identified in this solicitation. We strongly recommend that you give yourself sufficient time and at least ONE (1) day before Closing Time to begin the uploading process and to finalize your submission. Late proposals will not be accepted and the eProcurement Portal will not accept submissions past the date and time of closing/opening.
1.1. Disadvantaged Business Enterprise (DBE)
All Bidders are hereby notified that the DBE requirements of 49 CFR Part 26 do apply to this
Solicitation. The DBE participation goal for this Contract is 8.5%. It is the policy of the Authority https://procurement.opengov.com/portal/jtafla/projects/109598 to practice nondiscrimination based on race, color, sex, or national origin in the award or performance of this Contract. The Authority encourages participation by all firms qualifying under this Solicitation, regardless of business size or ownership.
This resulting contract, if any, will be subject to contract compliance payment tracking, and the prime contractor and any DBE subcontractors shall provide any noted and/or requested contract compliance-related payment data electronically in the B2GNow Contract Compliance Program
System. The prime contractor and all DBE subcontractors are responsible for responding by any noted response audit date or due date to any instructions or request for information, and to check the B2GNow Contract Compliance Program System on a regular basis. The prime contractor is responsible for ensuring all DBE subcontractors have completed all requested items and that their contact information is up-to-date.
Access information related to contractor access of the system will be provided to a designated point of contact with each contractor upon award of the contract. The B2GNow Contract
Compliance Program System is web-based and Contract Compliance Reporting – Vendor Training and can be accessed at the following Internet address: https://jtafla.dbesystem.com/
1.2. Bonds & Insurance
A Bid Security in the amount of five percent (5%) of the total Bid price is required. The
Contract, if awarded, may require a Performance Bond and Payment Bond. Specific bonding and insurance requirements are set forth in the Solicitation package. Insurance shall be written by an insurer who holds a current Certificate of Authority pursuant to Chapter 624, Florida Statutes, and who has a most recently published rating by A.M. Best & Company of “A-” or better.
1.3. Type of Procurement
Professional Services (Non-CCNA)
1.4. Contract Type
Firm - Fixed Price
1.5. Contract Term
The Contract shall commence upon the Authority’s issuance of a Notice to Proceed (NTP) with substantial completion within one hundred and twenty (120) calendar days allowing thirty (30) calendar days for final completion. Total allowed contract time is one hundred and fifty (150) calendar days.
1.6. Basis of Award
The JTA will make the Contract award, if any, to the responsible Bidder who’s Bid, conforming to all the material terms and conditions of the solicitation documents, is the lowest in price and technically acceptable, and in accordance with its Procurement Rule 002, which is incorporated herein by reference. Possesses the management, financial, technical, and appropriate capabilities https://jtafla.dbesystem.com/ necessary to fulfill the requirements of the Contract; whose proposals conforms to the solicitation requirements. For the purpose of this procurement, the Authority is seeking total cost with all technical factors considered The JTA reserves the right to waive any irregularity in any Bid, to request clarification of any Bid, to request additional information from any Bidder, to reject any or all Bids, in whole or in part, and to re-advertise, cancel, or postpone the solicitation, at any time, with or without cause, without liability to any Bidder. The JTA also reserves the right to take into consideration the Bidder’s qualifications and past performance with the JTA or any other entity in determining if the Bidder is responsible and qualified.
Respondent is hereby notified that Section 287.05701, Florida Statutes, requires that JTA may not request documentation of or consider a Bidder's social, political, or ideological interests when determining if the Bidder is a responsible Bidder, and JTA may not give any preference to any
Bidder based on that vendor’s social, political, or ideological interests.
1.7. Minimum Requirements
Bidders must be in good standing and authorized to transact business in the State of Florida;
must not be listed in the System for Award Management (SAM) as an excluded party; and must demonstrate compliance with any other minimum requirements as stated in the Scope of Work and/or Instructions to Bidders. Each Bid must include a copy of the Bidder’s State of Florida
Certificate of Status or Good Standing and a copy of all necessary licenses, registrations or certifications that are required to perform the Work.
In addition, all licenses required for Bidders whose businesses and professions are regulated by the Florida Department of Business and Professional Regulation must be active and current at the time the Bid is submitted. Failure to demonstrate compliance may result in being deemed non-responsive.
1.8. Questions and Answers
All questions or concerns regarding this solicitation must be submitted on the eProcurement
Portal prior to 12:00 pm (EST) on Monday, September 2, 2024. You will not be able to send messages after this time. Late questions may be answered at the sole discretion of the
Authority. All responses to questions will be uploaded to the Portal and issued in an Addendum, on NO VALUE. Please contact the Procurement Department at procurement@jtafla.com regarding any questions or concerns prior to the questions deadline.
1.9. Cone of Silence
From the date of the initial publication of this Solicitation until the contract is awarded and the protest period has expired, all communication relating to this Solicitation, with the exception of
Disadvantaged Business Enterprise (DBE) related questions, shall be sent to the following JTA email address:
Andrea Nelson
Contract Administrator II anelson@jtafla.com
All DBE questions shall be addressed to Ken Middleton at DBE1@jtafla.com or 904-598-8728.
This includes questions related to certification or assistance with finding certified DBE’s to partner with.
If you are not sure who to send a question to, please send it to procurement@jtafla.com and it will be forwarded to the appropriate personnel.
All other communication to the JTA or any JTA employee, supplier, or Board Member regarding this Solicitation is prohibited, unless made in accordance with JTA's Solicitation and Award
Protest Rule. The JTA Board of Directors has established a zero tolerance policy and the JTA will disqualify any Bidder who makes or causes to be made, directly or indirectly, any improper communication. Nothing contained in this paragraph prohibits JTA personnel from initiating contact with a Bidder and subsequent communication related thereto for the purpose of obtaining additional information that is relevant to the Solicitation.
Bidders are hereby notified that the JTA is subject to the Florida Public Records Law and the
Government in the Sunshine Act, as set forth in Florida Statutes Chapters 119 and 286; as such, most communications to the JTA are subject to public disclosure, and the selection meeting(s), if any, will be open to the public.
All JTA contracts are subject to funding availability and are not binding upon the Authority until duly executed by the Authority and delivered to the Bidder.
1.10. Timeline
Release Project Date: August 9, 2024
Pre-Bid Meeting (Non-Mandatory): August 26, 2024, 11:00am
Ways to join:
Join from the meeting link https://jtafla.webex.com/jtafla/j.php?MTID= m5689ad4f7bfd559e6a1f67b794930a35
Join by meeting number
Meeting number (access code): 2351 694
Meeting password: PrFhersm738
Tap to join from a mobile device (attendees only)
+1-415-655-0002,,23516940263## United
States Toll
Join by phone
+1-415-655-0002 United States Toll
Global call-in numbers
Join from a video system or application
Dial 23516940263@jtafla.webex.com
You can also dial 173.243.2.68 and enter your meeting number.
https://jtafla.webex.com/jtafla/j.php?MTID=m5689ad4f7bfd559e6a1f67b794930a35 https://jtafla.webex.com/jtafla/j.php?MTID=m5689ad4f7bfd559e6a1f67b794930a35 mailto:23516940263@jtafla.webex.com http://173.243.2.68/
Site Tour: August 27, 2024, 10:00am
Attendance of the Site Tour is strongly encouraged. The Site Tour will be conducted on the date and time provided or as revised in any released Addenda.
Please meet in front of the following location:
100 North Myrtle Avenue, Building # 1
Jacksonville, FL 32204
All attendees must wear Personal Protective
Equipment (PPE) (i.e., Safety Vest) this is
Mandatory. Attendees must provide their own PPE. This will not be provided, and you will not be allowed on JTA property to attend the Site Tour if a Safety Vest is not worn.
Deadline for Questions: September 2, 2024, 12:00pm
Second Site Tour: September 17, 2024, 10:00am
The Second Site Tour will be conducted on the date and time provided or as revised in any released Addenda.
Please meet in front of the following location:
100 North Myrtle Avenue, Building # 1
Jacksonville, FL 32204
All attendees must wear Personal Protective
Equipment (PPE) (i.e., Safety Vest) this is
Mandatory. Attendees must provide their own PPE. This will not be provided, and you will not be allowed on JTA property to attend the Site Tour if a Safety Vest is not worn.
Second Deadline for Questions: September 19, 2024, 12:00pm
Bid Opening: September 27, 2024, 2:00pm
Notice of Intent to Award (NOITA) : October 11, 2024
2. INSTRUCTIONS TO BIDDERS
2.1. INTRODUCTION
The Jacksonville Transportation Authority (the “Authority” or “JTA”) is a public body politic and corporate agency of the State of Florida created under Chapter 349, as amended, Florida
Statutes. The Authority is a transit and transportation facilities provider in North Florida, constructing and improving roadways as well as constructing, equipping and operating transit services. The Authority operates in Duval County, Florida (the “County”), including in the City of Jacksonville, Florida (the “City”), and surrounding areas.
2.2. SOLICITATION TERMINOLOGY
The term Solicitation includes all documents that are included or referenced in the Solicitation package, including without limitation, the Invitation to Bid, Notice for Publication, Instructions to Bidders, Specifications, Scope of Work, Special Conditions, Insurance Requirements, Contract Form, General Conditions, Required Clauses for Federally-Assisted Contracts, Required Bid Forms, Certifications, Addenda, Project Manual, Drawings, Specifications, and the documents, reports, and information referenced in such Solicitation. The terms Bidder, Contractor, Vendor, Firm and Supplier may be used interchangeably.
2.3. BIDDER'S OFFICIAL RECEIPT OF SOLICITATION DOCUMENTS
The Bidder must request and receive the complete Solicitation package directly from the JTA
OpenGov Procurement Portal https://procurement.opengov.com/portal/jtafla . If you submit a
Bid and you do not receive the solicitation documents directly from the JTA OpenGov
Procurement Portal, there is a serious risk that you will not be kept informed of Addenda and, therefore, your Bid may be deemed non-responsive.
2.4. BID DELIVERY
Bids must be uploaded, submitted and finalized by the due date, at the location identified in the
Notice for Publication (the “Notice”), or as amended in an Addendum. No additional promotional or advertising information will be accepted. We strongly recommend that you give yourself sufficient time and at least ONE (1) day before the submission deadline to begin the uploading process and to finalize your submission. The eProcurement Portal will not allow the acceptance of late proposals. Facsimile, electronic mail and in-person deliveries will not be accepted. The
Authority is the official timekeeper and the Authority's determination of the time shall be deemed correct and final.
Pursuant to Article 1, Section 24 of the Florida Constitution and under Chapter 119, Florida
Statutes, if a Respondent considers any portion of the documents, data, or records submitted in response to this solicitation to be confidential, proprietary, trade secret, or otherwise not subject to disclosure pursuant to applicable State of Florida laws, the Respondent must provide JTA with a separate “REDACTED COPY” of its response. This redacted copy shall be submitted, on the eProcurement Portal, and shall be clearly titled “REDACTED COPY” at the same time the
Proposer submits its response to the solicitation. An entire proposal or the proposed cost in a proposal cannot be identified as “CONFIDENTIAL”, “PROPRIETARY” or “TRADE SECRET”.
The Respondent must provide a brief description of the grounds for claiming exemption from public records law, including the specific statutory citation for such exemption that allows the withholding on the require form “Certification of Redacted Copy”.
Facsimile and electronic transmissions will not be accepted. Late Bids are not able to be accepted through the eProcurement Portal. Any responses that are delivered in person will not be accepted.
The Authority is the official timekeeper and the Authority's determination of the time shall be deemed correct and final.
The Bid should contain a cover page containing the following information:
• name of a single point of contact
• business name
• address https://procurement.opengov.com/portal/jtafla
• phone number
• email address
• ITB No. and Title
2.5. BID ADDENDA
The Authority may respond to questions, or it may clarify or change any part of this Solicitation by issuing an Addendum. By submitting a Bid, each Bidder consents to the content of all Addenda, whether or not received by the Bidder. Bids must include the written acknowledgment of all
Addenda hat are released for this solicitation. The Solicitation may only be modified or clarified by Addenda and no verbal or informal writing that attempts to modify or interpret the
Solicitation will be binding upon the Authority.
2.6. BIDDER REVIEW OF SOLICITATION AND CONTRACT DOCUMENTS
By submitting a Bid, the Bidder represents that it has fully informed itself as to: (i) the conditions to be encountered; (ii) the character, quality, and quantities of work to be performed; (iii) the goods and materials to be furnished; and (iv) all of the requirements of the Solicitation and Contract documents, including the plans, specifications, and the labor and security conditions under which the Contract is to be performed. The Bidder shall not be relieved of its obligation to furnish all goods, materials, equipment, labor, and services necessary to complete the Contract by reason of having failed to inform itself with respect to those matters. If this acquisition is related to a project in which conditions, specifications, and/or plans have been issued, those documents, where applicable, are incorporated herein. The Authority does not guarantee the accuracy of any information that may have been provided in connection with the Solicitation and it expressly disclaims the accuracy of any information related to subsurface conditions. If this is a lump sum
Contract, the Authority does not assume any responsibility for determining the quantities required.
2.7. LIQUIDATED DAMAGES
The Contractor and the Authority acknowledge and agree that time is of the essence in the completion of the Work it is of utmost importance for the Contractor to complete the Work within the time set forth in the Contract. The Contractor understands and agrees that its failure to complete the Work within the required time will significantly impact the Authority, and that the impacts, costs, and other damages resulting from that failure are impossible to reasonably quantify as of the date the Contract is executed. Therefore, Contractor acknowledges and agrees that, if the
Contractor fails to achieve Substantial Completion or Final Completion or any other milestone date(s) identified in the Contract documents within the established timeframe, as adjusted by
Contract Amendments, if any, the Contractor and the Contractor’s surety shall immediately be liable to the Authority for Liquidated Damages for such delay, not as a penalty but as compensation to the Authority for its damages incurred due to such delay, as follows: and one-thousand five-hundred and 00/100 Dollars ($1,500.00) per calendar day for each and every consecutive calendar day elapsing between the date fixed for Substantial Completion of the Work and the date
Substantial Completion is actually achieved, and if specified in the Contract Documents, every consecutive calendar day elapsing between the date fixed for a defined milestone and the date that the milestone is actually achieved; and one-thousand five-hundred and 00/100 Dollars ($1,500.00) per calendar day for each and every consecutive calendar day beyond the calendar days fixed for
Final Completion of the Work and the date Final Completion is actually achieved.
2.8. BID SECURITY
Each Bid must contain a Bid Security in the form of a Bid Bond, Certified Check, Cashier’s Check, Treasurer’s Check, and/or Official Bank Check. The Bid Security shall be in an amount not less than five percent (5%) of the amount of the total Bid price. A Bid Bond must be issued by a fully qualified Surety company, both acceptable to the Authority and listed as a company currently authorized under 31 CFR, Part 223 as possessing a Certificate of Authority as described thereunder. In submitting this Bid, the Bidder understands and agrees that the Bid may not be withdrawn for a period of ninety (90) days subsequent to the opening of Bids, without the written consent of the Authority.
It is also understood and agreed that the Bid Security shall guarantee that the Bidder will not withdraw any part or all of the Bid for a period of ninety (90) days after the Bid opening without the written consent of the Authority. If the Bidder improperly withdraws its Bid or if the Bidder receives a Notice of Intent to Award and fails to: enter into the Contract; furnish adequate and acceptable Performance Bond(s) and Payments Bond(s), if required; furnish adequate and acceptable insurance; or, furnish other documents required by the Authority for execution of any of the above, all within ten (10) days after demand by the Authority of such action and in any event no later than issuance of the Notice to Proceed, the Bidder shall forfeit the entire amount of the
Bid Security to the extent of the Authority’s damages occasioned by such withdrawal, refusal, inability to enter into the Contract, or provide adequate security or insurance therefore.
It is further understood and agreed that to the extent the defaulting Bidder’s Bid Security
(excluding any income generated thereby which has been retained by the Authority) shall prove inadequate to fully recompense the Authority for the damages occasioned by the Bidder’s default, the undersigned Bidder agrees to indemnify the Authority and pay over to the Authority the difference between the Bid Security and the Authority’s total damages, which include reasonable attorneys' fees, if any, so as to make the Authority whole. The Bidder understands that any attempt to materially alter any of the terms of the Solicitation package, including the Contract or Bond forms may render the Bid non-responsive.
2.9. PERFORMANCE AND PAYMENT BONDS
A. If awarded the Contract and if the Contract price is estimated to exceed the federal simplified acquisition threshold, as amended, the Bidder shall obtain and submit to the
Authority within ten (10) days after demand by the Authority, and in any event no later than issuance of the Notice to Proceed, Performance and Payment Bonds (at its sole cost) that are acceptable to the Authority.
B. The amount of the Performance and Payment Bonds shall be one hundred percent (100%) of the Contract price, per 2 C.F.R. § 200.325.
C. The Authority will require additional Performance and Payment Bond protection if the
Contract price is increased. The increase in protection shall be equal to one hundred percent (100%) of the increase in Contract price. The Bidder will be responsible for issuing the additional bonding protection within ten (10) days upon the full execution of the contract amendment in which the Contract price is increased.
The Payment and Performance Bonds shall be written through a licensed Florida agency on behalf of a surety company licensed to do business in Florida meeting the following requirements:
A. For Contracts in which the Total Contract Price exceeds $100,000, the Surety must be rated no less than “B+” as to management and no less than “VI” as to strength and for
Contracts in which the Total Contract Price exceeds $1,000,000, the Surety must be rated no less than “A-” as to management and no less than “VIII” as to strength, by the latest edition of Best's Insurance Guide, published by A.M. Best Company, Post Office Box
1107, Summit, New Jersey 08901.
B. The Surety executing the Bonds shall be on the current list of the U.S. Treasury
Department as being approved by and for writing bonds for Federal projects in an amount not less than the Penal Sum of the Bonds provided to the Authority. Bonding Limit – Any
One Risk: The bonding limit of the Surety shall not exceed five percent (5%) of the policyholder surplus (capital and surplus) as listed by the aforementioned Best's
Insurance Guide.
C. The Contractor shall, before commencing with the Work, record a copy of the
Performance and Payment Bonds in the Duval County clerk’s office pursuant to Florida
Statute 255.05. Upon request of any person or entity appearing to be a potential beneficiary of bonds covering payment of obligations arising under the Contract, the
Contractor shall promptly furnish a copy of the applicable bond or shall permit a copy to be made.
If the Surety on any bond furnished by the Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated or suspended in any state or it ceases to meet the requirements defined above, or any such bond is otherwise void or defective for any reason, the
Contractor shall within ten (10) days thereafter substitute the applicable Performance and Payment
Bonds from a different Surety, pursuant to the Contract. The Authority may at its sole discretion suspend all Work pursuant to the Contract, pending the Contractor procuring adequate substitute bonds.
Bidders are hereby notified that as a public entity, the Authority’s property is not subject to the
Construction Lien Law contained in Chapter 713, Florida Statutes.
2.10. QUALIFICATIONS AND REFERENCES
The Authority reserves the right to request any additional information it deems necessary regarding the Bidder’s previous experience and qualifications, and the Authority may also consider any evidence available to it regarding the financial, technical, and other qualifications and abilities of the Bidder. The Bidder shall provide any requested additional information within forty-eight (48) hours of such request.
2.11. NON-RESPONSIVE BIDS MAY BE REJECTED
The failure to comply with any requirement contained in the Notice, Instructions to Bidders, Bid
Forms, and/or other Solicitation documents may result in the rejection of the Bid as non-responsive.
2.12. RESERVATION OF RIGHTS IN THE SOLICITATION PROCESS
The Authority reserves all rights it is entitled to under the law, including the right to:
• reject any or all Bids and to cancel or postpone the Solicitation, in whole or in part, for any reason, without liability;
• issue subsequent or concurrent Solicitation(s) for the work described herein;
• perform background checks, reference checks, and consider any information the
Authority deems pertinent to the Solicitation;
• request additional copies of the Bid from the Bidder, at no cost to the Authority; and
• request additional or omitted information and seek clarifications of any Bid.
2.13. REQUIRED FORMS AND CERTIFICATIONS
Bidders shall complete and return all Bid Forms required by Section "REQUIRED FORMS &
CERTIFICATIONS". The Bid Forms must be submitted using the exact Forms provided and must be signed by an authorized representative of the Bidder. Any alteration of the Forms or failure to submit required Forms may cause the Bid to be rejected as non-responsive.
The Forms cannot be marked “N/A” and returned as an effort to comply with the requirements.
These Forms MUST be completed, signed, and returned with your Bid. The burden is on each
Bidder to know of and submit all required Forms with Bid submittals. If the Authority determines that a Bidder has failed to return completed Form(s), and/or has failed to sign all required Form(s), the Bid may be rejected as non-responsive.
2.14. DISADVANTAGED BUSINESS ENTERPRISE (DBE) PROGRAM
It is the official policy of the U.S. Department of Transportation (DOT) and the Authority that
Disadvantaged Business Enterprises (DBEs) have a level playing field on which to participate in the performance of all contracts. This Solicitation and contract award are subject to the requirements of Title 49 Code of Federal Regulations, Part 26.
The Bidder and its subcontractors shall not discriminate on the basis of race, creed, color, sex, sexual orientation, gender identity, national origin, age, disability, religion, or family status in the performance of the Contract. The Bidder shall carry out applicable requirements of the DBE program in the award and administration of the work associated with the Contract.
In accordance with 49 CFR Part 26.55, to count towards the goal the DBE must be performing a commercially useful function on the contract. If a DBE does not perform or exercise responsibility for at least 30 percent of the total cost of its contract with its own work force, or the DBE subcontracts a greater portion of the work of a contract than would be expected on the basis of normal industry practice for the type of work involved, you must presume that it is not performing a commercially useful function. This is true for a DBE Prime Contractor and lower tier DBE firms on the contract.
A. Participation Goals. If a DBE participation goal has been established for the
Contract:
Bidders must meet one (1) of the following criteria to be considered for the Contract:
1. Achieve the DBE participation goal as specified below;
OR
2. Submit documentation detailing its good faith efforts.
The Authority’s award of this Contract is conditioned upon Bidder satisfying the good faith effort requirements of 49 CFR §26.53.
As a condition of bid responsiveness, Bidders must submit the following information with its Bid on the forms provided herein:
1. The names and addresses of Disadvantaged Business Enterprise (DBE) firms that will participate in the contract;
2. A description of the work that each DBE firm will perform;
3. The dollar amount of the participation of each DBE firm listed under (1)
4. Written statement from Bidder or Offeror that attests their commitment to use the
DBE firm(s) listed under (1) to meet the Authority’s project goal; and
5. If Bidder or Offeror cannot meet the advertised project DBE goal, evidence of good faith efforts undertaken by the Bidder or Offeror as described in appendix A to 49
CFR part 26.
The successful Bidder must provide written confirmation of participation from each of the
DBE firms the Bidder lists in its commitment within five days after Bid opening.
1. The names and addresses of Disadvantaged Business Enterprise (DBE) firms that will participate in the contract;
2. A description of the work that each DBE firm will perform;
3. The dollar amount of the participation of each DBE firm listed under (1)
4. Written statement from Bidder or Offeror that attests their commitment to use the
DBE firm(s) listed under (1) to meet the Authority’s project goal; and
5. If Bidder cannot meet the advertised project DBE goal, evidence of good faith efforts undertaken by the Bidder as described in appendix A to 49 CFR part 26.
A. Participation Goals. If a DBE participation goal has not been established for this project, Bidders are encouraged to make every attempt to secure a level of DBE participation that contributes toward the achievement of Authority's overall DBE goal of
27%. When a goal has been established, the failure of the Bidder to either meet the participation goal or submit satisfactory evidence of good faith efforts may result in the
Bid being rejected as non-responsive.
DBE Goal Established For The Contract: The Bidder shall make a good faith effort to subcontract (NO VALUE%) of the dollar value of the total annual aggregate amount of the
Contract as set forth in the Notice, to certified DBE subcontractors (race conscious). Contracted
Bidders shall submit reports, on forms provided or approved by the Authority: (1) with each invoice, indicating the amount of the progress payment due to DBE firms; and (2) quarterly and annual reports indicating the total aggregate amounts paid by the Authority to the Bidder, and the amount and percentages of those payments which have been paid to individually identified DBE firms.
Documenting Goal Initiatives. DBE forms will be used to document the Bidder's achievement of the established DBE goal for the Contract or, if no goal is specified, information on DBE participation. DBE forms shall be as complete and accurate as possible, and shall include all required information. Failure to comply with these requirements may be cause for rejection of the
Bid. A Bidder who does not meet the stated DBE goals, where assigned, must also submit Good
Faith Effort documentation as part of its Bid (see the “Good Faith Efforts” section listed below).
Bidders who do not address these requirements may be deemed non-responsive.
Determining Compliance with DBE Requirements for Contracts with a DBE Goal –
Forms. Each Bidder must acknowledge its commitment to achieving the DBE participation goals set by the Authority. There are several required forms that must be submitted as part of the
Solicitation process, which support this requirement:
• Schedule of Subcontractors Form - Identifies those subcontractors/suppliers whom the
Bidder will utilize on the Contract, including the certified DBE businesses, and the scope and relative value (expressed as a percentage) of work to be performed by each subcontractor.
• Intent to Perform as a DBE - Submitted for each DBE subcontractor/supplier, outlining the dollar value of the work to be performed.
• Bidder's List - Lists all potential subcontractors/suppliers contacted by the Bidder for the
Contract.
If the Bidder is awarded a Contract with the Authority, it must enter into a formal written agreement with the DBEs identified in its Schedule of Suppliers/Subcontractors Form in accordance with the assignments identified and outlined in the Intent to Perform as a DBE.
If the selected Bidder is a certified DBE and intends to perform a portion of the work with its own forces, the Bidder shall identify the responsibilities it intends to perform by type and by percentage of work to be done. In order for the work to be counted towards the DBE goal assigned to the project, the Bidder must perform the work as specified and may not delegate or contract the specified responsibilities to other entities.
Certification. ALL PROPOSED DBEs MUST BE CERTIFIED BY THE FLORIDA UNIFORM
CERTIFICATION PROGRAM (UCP) AT THE TIME OF SUBMISSION OF THE BID. If a subcontractor/supplier is not certified by the aforementioned certification program at the time of submission, the Bidder can neither report the non-certified business' participation, nor include that company's dollar value of work towards any established DBE goals. Applications for certification may be obtained from the Authority directly or from the Authority’s website at www.jtafla.com. The Bidder shall fully comply with all requests for additional documentation. In determining an applicant's eligibility for DBE status, the Authority will generally rely upon the
Federal Certification Process, as described in 49 CFR Part 26. In addition, as a member of the
Unified Certification Program (UCP) within the state of Florida where FDOT is the host agency, the Authority will accept DBEs certified by FDOT and may, on a case-by-case basis, accept a DBE certification decision made by another UCP or non-Florida Department of Transportation.
Good Faith Efforts. Any Bidder who is unable to meet the requested DBE participation goal, where established, is required to include, as part of its Bid, Good Faith Effort documentation detailing the attempts made to secure DBE participation. An important component in evaluating a
Bidder's good faith efforts is the number of qualified DBEs expressing an interest in performing work under the Contract. When there is limited availability of such firms, a Bidder cannot reject a
DBE as unqualified unless the Bidder has sound reasons to do so, as determined by a thorough investigation of the DBE's capabilities.
https://www.jtafla.com/
The extent and type of actions required for a Bidder to meet the good faith effort requirement may vary depending upon such factors as industry practice, time available for submitting a Bid, and the type of agreement involved. See Appendix A to 49 CFR Part 26 for additional information. The following list, which is neither exclusive nor exhaustive, provides examples of the actions and activities which would be considered good faith efforts on the part of a Bidder attempting to meet the prescribed DBE goal:
A. Attending planned pre-proposal meetings scheduled by the Authority to review resources, such as certified DBE vendor lists, and to discuss, among other things, DBE participation opportunities;
B. Advertising in general circulation, trade association, and minority/women-focused media concerning subcontracting opportunities;
C. Soliciting the interest of a reasonable number of DBEs through written notices, and allowing an adequate amount of time for response and inquiry from interested parties;
D. Contacting prospective DBE participants in response to initial Solicitations to assess level of interest;
E. Utilizing subcontracting arrangements and other techniques to structure the project in a manner designed to increase the likelihood of participation of DBE firms;
F. Providing interested DBEs with adequate information about the plans, specifications, scope of work, and requirements of the Contract;
G. Discussing with interested DBEs the required capabilities of the project, and performing a thorough investigation of the DBE’s qualifications to determine inherent competencies;
H. Using good business judgment to negotiate in good faith with interested DBEs regarding price, and reviewing all reasonable quotes from interested DBE businesses;
I. Assisting interested DBEs in obtaining bonding, lines of credit, insurance, and other guarantees required by the Authority and/or the Bidder;
J. Supporting interested DBEs in obtaining necessary equipment, supplies, materials, or related assistance and services; and
K. Effectively utilizing the services of various community and professional organizations to aid in identifying qualified DBEs. These organizations include, but are not limited to minority and women-based: community organizations; chambers of commerce;
contractor groups; local, state, and federal business assistance offices; the Authority; and other organizations that provide assistance in the identification of DBEs.
These efforts are active steps, ones that may significantly increase the potential for sufficient DBE participation and the achievement of DBE participation goals. When the Authority determines that the Bidder's actions were mere pro forma efforts that fall short of the good faith efforts such as those listed above, the Bid may be rejected as non-responsive.
2.15. BIDDER DISQUALIFICATION
Any of the following causes may be considered sufficient for the disqualification of a Bidder and the rejection of its Bid:
A. submission of more than one (1) Bid from a Bidder for the same work by an individual, entity, partnership, or corporation under the same or different names; submission of alternate Bid(s), unless the Solicitation (or an Addendum) has clearly provided for alternate bids on the Bid Forms; or having a financial interest in another bidder;
B. evidence of collusion between or among Bidders;
C. work for which the Bidder is committed by contract, which, in the Authority's judgment and sole discretion, might hinder or prevent the prompt completion of the Contract if awarded to the Bidder;
D. being behind on the approved completion schedule for any existing contract or contract completed within two (2) years of the Bid submission date with the Authority where the
Contractor has been assessed liquidated damages, being involved in litigation with the
Authority, or having been declared by the Authority to be in default on a previous contract with the Authority;
E. poor, negligent, or defective performance of work for the Authority or any other party on prior projects, which, in the Authority's judgment and sole discretion, raises doubts as to the Bidder's ability to properly perform the Contract;
F. appearance of the Bidder on the Department of General Services' Convicted Vendors
List; debarment or suspension of the Bidder by the Authority pursuant to the Authority’s
Administrative Rule 003; or for “covered transactions,” as that term is defined in 49 CFR
Part 29, with a value greater than $25,000, if the Bidder is presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal agency;
G. submitting more than one (1) price on each item even though it has two (2) or more types or styles that will meet specifications: Bidders must determine for themselves which to offer;
H. violating the Cone of Silence;
I. having any real or apparent conflict of interest, including any relationship with or interest in those firms who have assisted the Authority in the preparation of the Solicitation;
J. misstating or omitting a material fact in the Bid, submitting a Bid that is conditional, or submitting a bid that contains unauthorized conditions, limitations, exceptions, or alterations;
K. failing to properly: (i) execute any Bid Form; (ii) execute any Bid Security; (iii) execute other required documents, or (iv) meet the minimum requirements of the Solicitation; or
L. any other reason, as determined in the sole discretion of the Authority, that warrants rejection of the Bid or disqualification of the Bidder, including listing unqualified subcontractors or failing to provide adequate references for the Bidder and/or any subcontractors upon request.
The Authority may cancel or postpone the Solicitation and may reject any and all Bids, with or without cause, and may waive any minor irregularity in any Bid.
2.16. TAXES
The Authority is exempt from the following taxes: (a) State of Florida Sales Tax by Certificate
No.85-8012646346C-1; and (b) Federal Excise Tax Registration No. 59-6018367. The only purchases allowed to be made using these exemptions are to be made on either an Authority
Purchase Order or an Authority check. The sales tax exemption does not apply to goods or services that are purchased or consumed by the Bidder for which the Bidder is deemed to be the ultimate consumer. The Bid price shall include all applicable taxes and charges, if any.
2.17. CARTAGE
All cartage and package charges shall be included in the Bid Price.
2.18. DEVIATIONS TO SPECIFICATIONS
All requests for deviations from the specifications must be submitted as a written question prior to the deadline for questions. Bids may be rejected as non-responsive if deviations are used without being approved in an Addendum.
2.19. “OR EQUAL” SUBSTITUTIONS
All products listed in the Scope of Work are requested by the Authority. Even though a particular manufacturer's name or brand may be specified, Bids may include other manufacturer brands that meet the salient characteristic and quality requirements of the name brand or Original Equipment
Manufacturer (OEM). Bidders are instructed to submit the alternate brand’s salient characteristics and specifications (ie. Catalog cuts, technical descriptive data) in their Bid submission. Samples may be required to be submitted at the discretion of the Authority.
2.20. DATA REQUIRED TO BE SUBMITTED
A. Whenever the specifications indicate a product of a particular manufacture, model, or brand, in the absence of any statement to the contrary by the Bidder, the Bid will be interpreted as being for the exact brand, model, or manufacture specified, together with all accessories, qualities, tolerances, compositions, etc., enumerated in the detailed specifications.
B. If no particular brand, model, or make is specified, and if no data is required to be submitted with the Bid, the successful Bidder, after award and before manufacture or shipment, may be required to submit a working drawing or detailed descriptive data sufficient to enable the Authority to determine whether all requirements of the specifications are being complied therewith.
2.21. PROVISION FOR OTHER AGENCIES
By submitting its Bid, the Bidder hereby agrees to extend the terms, conditions, and other negotiated agreements to any Transit Authority, or any City, County, or State Government agency within the State of Florida. It is understood that some negotiated agreements may require further negotiations between the successful Bidder and the entity desiring to benefit from this
Solicitation. Any such resulting agreements will be independent of the Authority.
2.22. PROCUREMENT DEPARTMENT AS AGENT
When the Procurement Department is acting as agent for “other public activities” defined as activities receiving financial support in part from the Authority but not under the direct governing jurisdiction of the Authority, the name of such public activity shall be substituted for the words “JTA” and “Authority” throughout the Solicitation and Contract.
2.23. DISCOUNTS
ALL DISCOUNTS OTHER THAN PROMPT PAYMENT SHALL BE INCLUDED IN THE
BID PRICE. Prompt payment discounts will be considered during the administration of the
Contract, but will not be considered in determining the low Bid.
2.24. UNIT PRICE ERRORS
In case of error in extension of price in the Bid, the unit price shall govern. The Bidder understands that the quantities have been estimated by the Authority for the purposes of soliciting and evaluating Bids, and that if the actual quantities differ from the estimates, the
Authority is only obligated to pay for the actual quantities ordered by the Authority.
2.25. ETHICS PROVISION
The Bidder, by submitting its Bid and/or by accepting a Purchase Order, represents that it has reviewed the provisions of the Jacksonville Ethics Code contained in chapter 602, Jacksonville
Ordinance Code; the provisions of the Procurement Code contained in chapter 126, Jacksonville
Ordinance Code; and the Authority’s Supplier Code of Business Conduct.
2.26. ACKNOWLEDGEMENT AND AGREEMENT TO CONTRACT TERMS
By signing the Bid Form, the Bidder acknowledges its agreement to all terms, conditions, and specifications contained in this Solicitation and resulting Contract, if any. When the Authority issues a Purchase Order(s), the Bidder shall comply with all the terms, conditions, and specifications contained in this Solicitation and resulting Contract, per the Order of Precedence in the Contract, until expiration or termination of the Contract. The work is to begin only after proper authorization and issuance of a Purchase Order or Notice to Proceed.
2.27. NO BID PREP COSTS
Under no circumstances will the Authority compensate any Bidder for the costs associated with responding to this Solicitation.
2.28. ALL-INCLUSIVE BID
The Bid shall include, at no additional cost to the Authority, all necessary safety equipment: in addition, all necessary taxes, licenses, permits, and insurance shall also be obtained by the Bidder at no additional cost to the Authority.
2.29. REQUEST FOR CLARIFICATION AND SUPPLEMENTAL INFORMATION
The Authority reserves the right to seek clarification and supplemental information from any or all Bidders when the Bid contains any information or implication that is ambiguous.
2.30. PUBLIC RECORDS AND GOVERNMENT IN THE SUNSHINE LAWS
The Authority is subject to the Florida Public Records Law, the Government in the Sunshine Act, and possibly the Freedom of Information Act (FOIA). In compliance therewith, at the sole discretion of the Authority, the Authority may disseminate or make available to any person, without the consent of the Bidder, information regarding the Contract or the Bid, including without limitation: requirements; specifications; drawings; sketches; schematics; models; samples; tools;
computer or other apparatus programs; and technical information or data, whether or written or oral, furnished to the Authority in connection with this Solicitation.
2.31. AVAILABILITY OF BIDS AFTER OPENING
In accordance with the Florida Public Records Law, Chapter 119, Florida Statutes, copies of all
Bids are available for public inspection thirty (30) days after the opening of Bids or on the date of
Notice of Intent to Award, whichever is earlier. Bidders may review opened Bids once they are available for public inspection by contacting the JTA Public Records Office at publicrecords@jtafla.com.
If JTA rejects all Bids submitted in response to a competitive Solicitation and concurrently provides notice of its intent to reissue the competitive Solicitation, the rejected Bids remain exempt from §§ 119.07(1) and 119.24(a), Florida Statutes, Art. I of the State Constitution until such time as JTA provides notice of an intended decision concerning the reissued competitive Solicitation or until JTA withdraws the reissued competitive Solicitation. A Bid is not exempt for longer than twelve (12) months after the initial notice rejecting all Bids.
IF THE CONTRACTOR HAS QUESTIONS REGARDING THE
APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE
CONTRACTOR’S DUTY TO PROVIDE PUBLIC RECORDS RELATING
TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC
RECORDS AT:
• VIA MAIL TO: JTA PUBLIC RECORDS CUSTODIAN, 100
LAVILLA CENTER DRIVE, 5TH FLOOR, JACKSONVILLE,
FLORIDA 32204;
• VIA TELEPHONE AT: (904) 632-5510;
• VIA EMAIL TO: PUBLICRECORDS@JTAFLA.COM
2.32. PROHIBITION AGAINST CONTRACTING WITH SCRUTINIZED COMPANIES
By submitting a bid:
A. Supplier hereby certifies that it is not on the Scrutinized Companies that Boycott Israel List and is not engaged in a boycott of Israel, as defined in Florida Statutes § 287.135, as amended;
B. When the contract value is $1,000,000 or more; Supplier hereby certifies that it is: (1) not on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List as defined in Florida Statutes §
287.135; and (2) not engaged in business operations in Cuba or Syria, as defined in Florida
Statutes § 287.135, as amended.
2.33. STANDARD ASSURANCES (including Non-Collusion and Debarment Certifications)
By submitting a signed Bid, each Bidder certifies, under penalty of perjury, that:
A. The Bidder understands all requirements and, if selected, the Bidder will comply with all of the requirements of the Solicitation, the Bid, and any resulting Contract.
B. The signatory of the Bidder is of lawful age, and no other person, firm, or corporation, other than those clearly identified in the Bid, has any interest in the Bid and/or any resulting Contract.
C. The Bid is made without any understanding, agreement, or connection with any other
Bidder or potential Bidder for the Contract, and is in all respects fair and without collusion or fraud; no attempt has been made or will be made by…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .