MV-Fuel-Reduction-Bid-Package-WM.pdf
PDF 12 MB Posted
- Attached to
- Mission Viejo Fuel Reduction Project
- Solicitation number
- Not on record
- Issued by
- Orange County, California
About this file
This is a comprehensive bid package for the Mission Viejo Fuel Reduction Project issued by the City of Mission Viejo, California. The project will increase defensible space and roadside protection between habitable structures and open spaces across 16 parcels throughout the city. Specifically, the work involves clearing weeds and brush, thinning trees and shrubs, removing dead vegetation, and applying herbicides as needed. A mandatory pre-bid meeting is scheduled for May 14, 2025, at 2:00 pm, and sealed bids are due on May 21, 2025, at 2:00 pm. The contract term is from July 1, 2025, through June 30, 2027, with a potential option to renew for one additional two-year term. Bidders must possess California Contractor Licenses C-27 (Landscapers) and C-49 (Tree and Palm Contractors).
The project is funded through a grant and will be competitively bid, with the lowest responsive and responsible bidder selected. The total project is estimated across four sites totaling approximately 130 acres, including 100-foot defensible space zones and 50-foot roadside protection zones. Bid documents are available for $40, and bidders must submit a 10% bid bond. The estimated contract value is not explicitly stated, but the comprehensive scope suggests a significant municipal investment in wildfire risk reduction. The project aligns with CalFire and Orange County Fire Authority recommendations for fuel management in high and very high fire hazard severity zones, with specific environmental considerations including restrictions on construction timing to protect nesting birds and sensitive habitats.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF MISSION VIEJO
CALIFORNIA
SPECIFICATIONS
AND CONTRACT DOCUMENTS
FOR
MISSION VIEJO
FUEL REDUCTION PROJECT
APRIL 2025
PREPARED BY:
CITY OF MISSION VIEJO
200 CIVIC CENTER DRIVE
MISSION VIEJO, CALIFORNIA 92691-2778
(949) 470-3095
DO N
OT C
OPY
DO N
CALIFORNIA
SPECIFICATIONS AND CONTRACT DOCUMENTS
FOR
MISSION VIEJO FUEL REDUCTION PROJECT
APPROVED BY:
JERRY HILL DATE
ASSISTANT CITY MANAGER /
DIRECTOR OF PUBLIC SERVICES DO N
TABLE OF CONTENTS
MISSION VIEJO FUEL REDUCTION PROJECT
NOTICE INVITING SEALED BIDS ...................................................................................... NIB-1
INSTRUCTIONS TO BIDDERS ............................................................................................. IB-1
PROPOSAL DOCUMENTS
Proposal ...................................................................................................................... P-1 Non-Collusion Affidavit ................................................................................................ P-7 Bid Bond ...................................................................................................................... P-9 Iran Contracting Act Certification………...……..………………….………………………P-12 Sufficient Funds Declaration……………………..……………………...…………………P-14 Proposal Bid Sheet .................................................................................................... P-16 Vendor Approval Application W9 form
CONTRACT AGREEMENT
Agreement ................................................................................................................. CA-1 Faithful Performance Bond ...................................................................................... CA-15 Labor and Materials Payment Bond ......................................................................... CA-17
GENERAL SPECIFICATIONS
Terms ....................................................................................................................... GS-1 Utility Requirements ................................................................................................. GS-4 San Diego Regional Water Quality Requirements .................................................... GS-5 Flow and Acceptance of Water ................................................................................. GS-5 Standard Specifications ............................................................................................ GS-6 Wage Rates and Labor Codes ................................................................................. GS-7 Substitution of Securities………………………………………………...…………………GS-8
GENERAL PROVISIONS
PART I – GENERAL PROVISIONS…………..…………………………………………..GP-1
SPECIAL PROVISIONS
PART II - SCOPE OF WORK ................................................................................... SP-1 PART III - VEGETATION ........................................................................................... SP-4
PART IV – TREES……….………………………………………………………………….SP-4
PART V – PROFESSIONALISM…………………………………………………………..SP-7
Performance Deficiency Notification Form
EXHIBITS
Exhibit A – OCFA Vegetation Management Guideline Exhibit B – CEQA Notice of Exemption Exhibit C – Site Maps Exhibit D – 2025 CalFire Fire Severity Zones
APPENDIX
San Diego Regional Water Quality Control Board – Municipal Activity Maintenance Procedures
DO N
NB-1
NOTICE INVITING BIDS
MISSION VIEJO FUEL REDUCTION PROJECT
NOTICE IS HEREBY GIVEN that sealed bids will be received by the City of Mission Viejo, as “AGENCY,” for furnishing all materials, equipment, tools, labor and incidentals as required for the above-stated project in strict accordance with the specifications and drawings on file at the office of the City Clerk of the City of Mission Viejo.
Bids will be received at the City Clerk’s Counter, 2nd Floor, City Hall, 200 Civic Center, City of Mission Viejo, until the hour of 2:00pm on Wednesday, May 21, 2025, at which time and place the bids will be publicly opened and read aloud. Bids shall be submitted in sealed envelopes marked on the outside, "MISSION VIEJO FUEL REDUCTION PROJECT”. If submitting your bid via carrier service, please contact the City Clerk Department at 949-470-3052 to confirm receipt of your bid no less than one hour before bid opening.
The Work to be constructed under the Contract is located in the City of Mission Viejo. The Work to be performed consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above-stated Contract. The general items of Work to be done hereunder consist of:
The project will increase defensible space and roadside protection between habitable structures and open spaces by: The clearing of weeds and brush; thinning of trees, shrubs, and brush; removal of all dead shrubs, brush, and trees; and herbicide application as needed.
The Agency reserves the right, after opening bids, to reject any or all bids, or to make award to the lowest responsive and responsible bidder and reject all other bids; to waive any informality in the bidding; and to take all bids under advisement for a period of 90 days. Bids will be compared on the basis of the Engineer's estimate of the quantities of the several items of Work as shown on the Base Bid Sheets. Only such plans, specifications, and items of work as are appropriate shall apply to the Work as bid.
At the time of Contract award to a bidder, the bidder shall possess a current California Contractor Licenses Class C-27 (Landscapers Contractor) and Class C-49 (Tree and Palm Contractor) licenses.
A mandatory pre-bid meeting will be held on Wednesday, May 14, 2025 at 2:00pm, at City Hall located at 200 Civic Center Rd, in Mission Viejo. Failure to attend the mandatory pre-bid meeting will cause all non-attending bidders to be deemed non-responsive and their bid package shall not be further considered by the City for any reason. The bid submittal shall be held for seven (7) days for pick-up by the bidder who submitted it and if not picked up, then shall be disposed of in a public trash receptacle. The City, in its sole discretion, may retain and
DO N
NB-2
immediately draw down on the bid bond, in whole or part, to compensate it for the time expended on reviewing the bid package as submitted.
Each bid must be accompanied by all required pages of the Proposal (see Instructions to Bidders), including a certified or cashier's check, or a corporate surety bond on the form furnished by the AGENCY, as a guarantee that the bidder will, if an award is made to him in accordance with the terms of his bid, promptly secure workmen's compensation insurance and liability insurance, execute a contract in the required form, and furnish satisfactory bonds for the faithful performance of the contract and for the payment of claims of material and laborers thereunder. Said check or bidder's bond shall be in an amount not less than 10% of the amount of the bid.
The successful bidder will be allowed to substitute securities or establish an escrow in lieu of retainage, pursuant to Public Contract Code Section 22300, and as described in the Agreement Between Agency and Contractor and General Conditions.
The Performance and Payment Bonds shall be submitted before execution of the Contract. The Performance Bond shall be not less than 100% of the total amount of the bid price named in the Contract. The Payment Bond shall be not less than 100% of the total amount of the bid price named in the Contract. The AGENCY reserves the right to reject any bond if, in the opinion of the AGENCY Attorney, the Surety's acknowledgment is not in the form included in the Contract Documents or in another form substantially as prescribed by law.
In accordance with provisions of Section 1773.2 (amended 1977) of the California Labor Code copies of the prevailing rate of per diem wages as determined by the State Director of Industrial Relations are on file in the office of the City Clerk of the City of Mission Viejo. It shall be mandatory upon the Contractor to whom the Contract is awarded and upon any subcontractor under him to pay not less than said specified rates to all workmen employed by them in the execution of the Contract.
The Contractor and all Subcontractors, of any tier, must comply with the requirements of the California Labor Code including but not limited to Sections §§1715.5, 1725.5, 1771.1, 1771.1a, 1771.4(a)(1), 1774, 1775, 1776, 1777.5, 1813 and 1815. A contractor or subcontractor shall not be qualified to submit a bid or to be listed in a bid proposal subject to requirements of Public Contract Code Section 4104, nor shall it be qualified to enter into, or engage in the performance of, any contract of public work, unless it is currently registered and qualified under Labor Code Section 1725.5 to perform public work (as “public work” is defined by Division 2, Part 7, Chapter 1 (§§1720 et seq.) of the Labor Code). [Note: Required in the Notice by Labor Code §1771.1(b).]
Contractors are required to register with the Department of Industrial Relations (DIR).
Notwithstanding any other requirements (including federal labor requirements), this contract is subject to compliance monitoring and enforcement by the Department of Industrial relations
(DIR).
DO N
NB-3
The City of Mission Viejo hereby notifies all bidders that it will affirmatively ensure that in any Contract entered into pursuant to this advertisement, Disadvantaged Business and Underutilized Disadvantaged Business Enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, creed, color, or national origin in consideration for an award.
Complete sets of said Contract Documents may be purchased at a cost of $40.00 (Forty Dollars) per set and are obtainable from the City of Mission Viejo, 200 Civic Center, Engineering Counter, Mission Viejo, California 92691, 949-470-3040. No refund will be made of any charges for sets of Contract Documents. Plans and specifications can be mailed for an additional $10.00 (Ten Dollars) per set. For additional information, contact the Project Manager, Corey Gonyea, at 949-470-3095.
Dated this ______ day of _____________, 20__.
Kim Schmitt City Clerk
City of Mission Viejo 200 Civic Center Mission Viejo, California 92691
Rev. 6/18 IB-1
INSTRUCTIONS TO BIDDERS
MISSION VIEJO FUEL REDUCTION PROJECT
1. PROPOSAL FORMS, AND REVIEW OF PLANS AND SPECIFICATIONS
Bids shall be submitted in writing on the Proposal forms provided by the AGENCY. All information requested therein must be clearly and legibly set forth in the manner and form indicated. The Proposal must include all pages of the Proposal form with all of the required information, including but not limited to the Bidder's Information, Proposal Bid Sheet, List of Subcontractors, Bidder's Statement of Past Contract Disqualifications, Non-Collusion Affidavit, Bid Bond, Iran Contracting Act Certification (if required), and Sufficient Funds Declaration.
The AGENCY will not consider any proposal not meeting these requirements.
In addition, the AGENCY shall not accept any bid or enter into any contract without proof of the Bidder’s current registration to perform public work under Labor Code Section 1725.5; and the Bidder shall not accept any sub-bid or enter into any subcontract without proof of the subcontractor’s current registration to perform public work under Labor Code Section 1725.5.
Each bidder must review the plans and specifications in its capacity as a contractor prior to submitting its bid, and any errors must be reported to the AGENCY.
2. PROPOSAL GUARANTEE (BID BOND)
Proposals must be accompanied by a proposal guarantee consisting of a certified check or bid bond payable to the AGENCY in the minimum amount of ten percent (10%) of the total amount bid. Any proposal not accompanied by such a guarantee will not be considered. If a bidder to whom a Contract is awarded fails or refuses to execute the Contract Documents or furnish the required insurance policies and bonds as set forth in those documents, the proposal guarantee shall be forfeited to the AGENCY. The proposal guarantees of all bidders will be held until the successful bidder has properly executed all Contract Documents.
3. PROPOSED SCHEDULE
May 1, 2025 Advertise for bids in local newspaper, trade journals & Internet May 14, 2025 2:00 p.m. – MANDATORY Pre-bid meeting at Mission Viejo City Hall – 200 Civic Center
Road, Mission Viejo 92691 May 21, 2025 2:00 p.m. - Bid Opening – City Clerk’s Counter – 2nd floor – City Hall June 10, 2025 Award of contract July 1, 2025 Contract begins
This schedule is proposed. Should the “Construction begins” date slip, the contract days take precedence
**Failure to attend the mandatory pre-bid meeting will cause all non-attending bidders to be deemed non-responsive and their bid package shall not be further considered by the City for any reason. The bid submittal shall be held for
DO N
Rev. 6/18 IB-2 seven (7) days for pick-up by the bidder who submitted it and if not picked up, then shall be disposed of in a public trash receptacle. The City, in its sole discretion, may retain and immediately draw down on the bid bond, in whole or part, to compensate it for the time expended on reviewing the bid package as submitted.”
4. NON-COLLUSION AFFIDAVIT
Bidder shall declare that the only persons or parties interested in the Proposal as principals are those named therein; that no officer, agent, or employee of the AGENCY is personally interested, directly or indirectly, in the Proposal; that the Proposal is made without connection to any other individual, firm, or corporation making a bid for the same Work; and that the Proposal is in all respects fair and without collusion or fraud. The Non-Collusion Affidavit shall be executed and submitted with the Proposal.
5. PROPOSAL BID SHEET
Bidders shall give unit prices for each and all of the items set forth. No aggregate bids will be considered. The bidder shall set forth for each item of Work, in clearly legible figures, a unit item price and a total for the item in the respective spaces provided for this purpose. The quantities listed in the bid sheets are supplied to give an indication of the general scope of Work, but the accuracy of figures is not guaranteed and the bidder shall make its estimates from the drawings. In case of a variation between the unit price and the totals shown by the bidder, the unit price will be considered to be the bid.
6. DELIVERY OF PROPOSAL
Proposals may be mailed or delivered by messenger. However, it is the bidder's responsibility alone to ensure delivery of the Proposal to the hands of the AGENCY's designated official prior to the bid opening hour stipulated in the "Notice Inviting Bids." Late Proposals will not be considered. Proposals shall be enclosed in a sealed envelope plainly marked on the outside, "SEALED BID FOR THE MISSION VIEJO FUEL REDUCTION PROJECT.”
7. WITHDRAWAL OF PROPOSALS
A Proposal may be withdrawn by a written request signed by the Bidder. Such requests must be delivered to the AGENCY's designated official prior to the bid-opening hour stipulated in the "Notice Inviting Bids." The withdrawal of a Proposal will not prejudice the right of the Bidder to submit a new Proposal, providing there is time to do so. Proposals may not be withdrawn after said hour without forfeiture of the proposal guarantee, unless withdrawal is allowed under law.
8. IRREGULAR PROPOSALS
Unauthorized conditions, limitations or provisions attached to a Proposal will render it irregular and may cause its rejection. The completed Proposal forms shall be without interlineations, alterations or erasures. Notwithstanding the foregoing, the City may waive such if allowed by law, and if, in the City’s discretion, it deems that waiver is in the City’s best interest and that
DO N
Rev. 6/18 IB-3 such interlineations, alterations or erasures do not substantially alter the written response or create an unfair advantage to such bidders. Alternative Proposals will not be considered unless specifically requested. No oral, telegraphic or telephonic Proposal, modification or withdrawal will be considered.
9. TAXES
No mention shall be made in the proposal of Sales Tax, Use Tax, or any other tax, as all amounts bid will be deemed and held to include any such taxes, which may be applicable.
10. DISQUALIFICATION OF BIDDERS
In the event that any bidder on the Contract submits a proposal on another contract on the same work of improvement, all such proposals will be rejected and the bidder will be disqualified.
This restriction does not apply to subcontractors or suppliers who may submit quotations to more than one bidder.
The Contract will not be awarded or executed unless the Bidder is licensed in accordance with the provisions of the State Business and Professions Code.
11. INTERPRETATION OF PLANS AND DOCUMENTS
If any person contemplates submission of a bid for the proposed Contract and is in doubt as to the true meaning of any part of the plans, specifications or other proposed Contract Documents, or finds discrepancies in, or omissions from, the drawings or specifications, he may submit to the Engineer of said AGENCY a written request for an interpretation or correction thereof. The person submitting the request will be responsible for its prompt delivery. Any interpretation or correction of the proposed documents shall be made only by addendum duly issued and copy of such addendum will be mailed or delivered to each person receiving a set of such documents.
The Engineer will not be responsible for any other explanation or interpretations of the proposed documents.
12. ADDENDA OR BULLETINS
The effect of all addenda to the Contract Documents shall be considered in the bid, and said addenda shall be made a part of the Contract Documents and shall be returned with them. Before submitting its bid, each bidder shall inform itself as to whether or not any addenda have been issued, and failure to cover in this bid any such addenda issued, may render its bid irregular and may result in its rejection by the AGENCY.
13. LEGAL RESPONSIBILITIES
All Proposals must be submitted, filed, made, and executed in accordance with State and Federal laws relating to bids for contracts of this nature whether the same are expressly referred to herein or not.
Rev. 6/18 IB-4
Any bidder submitting a Proposal shall by such action thereby agree to each and all of the terms, conditions, provisions, and requirements set forth, contemplated, and referred to in the Plans, Specifications, and Contract Documents, and to full compliance therewith.
14. AWARD OF CONTRACT
The award of contract, if made, will be to the most responsible Bidder as determined solely by the City, pursuant to the City’s Plans, Specifications and Contract Documents and in the best interests of the City pursuant to law. At the time of contract award, the successful bidder shall hold the contractor’s license(s) required in Notice Inviting Bids. Additionally, the AGENCY reserves the right to reject any or all Proposals, to accept any bid to waive any irregularity if allowed by law, and to take the bids under advisement for the period of time stated in the "Notice Inviting Bids," all as may be required to provide for the best interests of the AGENCY. In no event will an award be made until all necessary investigations are made as to the responsibility and qualifications of the bidder to whom the award is contemplated.
No bidder may withdraw its proposal for a period of forty-five (45) days after the time set for opening thereof, unless permitted by law. However, the AGENCY will return all proposal guarantees within ten (10) days after the award of the Contract or rejection of the bids, as the case may be, to the respective bidders whose Proposals they accompany.
15. LABOR CODE
Pursuant to the provisions of Section 1773 of the Labor Code of the State of California, the AGENCY has obtained the general provisions rate of per diem wages and the general prevailing rate for holiday and overtime work in this locality for each craft, classification, or type of workman needed to execute the Contract from the State Director of the Department of Industrial Relations (DIR). It shall be the responsibility of the prime Contractor to comply with all applicable sections of the Labor Code.
Travel and subsistence payments to each workman needed to execute the Work shall be made as such travel and subsistence payments are defined in the applicable collective bargaining agreements filed in accordance with Section 1773.8 of the Labor Code.
The Contractor shall comply with the provisions of Section 1774 of the Labor Code. Failure to comply with the subject section will subject the Contractor to penalty and forfeiture provisions of Section 1775 of the Labor Code.
Pursuant to the provisions of Section 1770 of the Labor Code, the general prevailing rate of wages has been ascertained (which rate includes employer payments for health and welfare, vacation, pension and similar purposes) applicable to the Work to be done, for straight time, overtime, Saturday, Sunday, and holiday work. The holiday wage rate listed shall be applicable to all holidays recognized in the collective bargaining agreement of the particular craft, classification, or type of workmen concerned.
Rev. 6/18 IB-5
This project is subject to compliance registration, monitoring, and enforcement by the DIR. (See, among others, Labor Code §§1715.5, 1725.5, 1771.1 and 1771.4.)
The AGENCY will not recognize any claim for additional compensation because of the payment by the Contractor of any wage rate in excess of the prevailing wage rate or the Federal Minimum Wage Rate (whichever is greater) as set forth in the Contract. The possibility of wage increases is one of the elements to be considered by the Contractor in determining its bid, and will not under any circumstances be considered as the basis of a claim against the AGENCY on the Contract.
The Contractor and subcontractors shall comply with Section 1777.6 which stipulates that it shall be unlawful to refuse to accept otherwise qualified employees as registered apprentices solely on the grounds of race, religious creed, color, national origin, ancestry, sex, or age, except as provided in Section 3077, of such employee.
16. WORKERS’ COMPENSATION CERTIFICATE
Section 3700 of the State Labor Code requires that every employer shall secure the payment compensation by either being insured against liability to pay compensation with one or more insurers or by securing a certificate of consent to self-insure from the State Director of Industrial Relations. In accordance with this section and with Section 1861 of the State Labor Code, the Contractor shall sign a Compensation Insurance Certificate, which is included with the Contract Agreement, and submit same to City along with the other required Contract Documents prior to performing any Work. Reimbursement for this requirement shall be considered as included in the various items of Work.
17. CLAYTON ACT AND CARTWRIGHT ACT
In accordance with Section 7103 of the Public Contract Code, in entering the Contract to supply goods, services, or materials, the Contractor and its subcontractors offer and agree to assign to the AGENCY all rights and interest in and all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 [commencing with Section 16700] of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the Contract or the subcontracts. This assignment shall be made and become effective at the time the AGENCY tenders final payment to the Contractor, without further acknowledgment by the parties.
18. SUBLETTING AND SUBCONTRACTING
Pursuant to the Subletting and Subcontracting Fair Practices Act (commencing with Section 4100 of the Public Contract Code), bidders are required to list in their Proposal the name, location of place of business, license number, and the portion of the Work of each subcontractor who will perform Work or labor or render services in or about the construction of the Work or improvement, and each subcontractor who specially fabricates and installs a portion of the Work or improvement according to detailed drawings contained in the Plans and Specifications, but only if (a) for a Contract for construction of streets or highways, including bridges, the dollar
DO N
Rev. 6/18 IB-6 amount of the subcontractor’s work is in excess of $10,000 or ½ of 1% of the total bid in the Proposal, whichever is greater; or (b) for all other Contracts, the dollar amount of the subcontractor’s work is in excess of ½ of 1% of the total bid in the Proposal. Failure to list a subcontractor for a portion of the work means that the prime Contractor will do that portion of the work. It is the AGENCY's intent for the Subletting and Subcontracting Fair Practices Act to apply to all phases of the work.
Attention is directed to the provisions in Sections 10262 and 10262.5 of the Public Contract Code and Section 7108.5 of the Business and Professions Code concerning prompt payment to subcontractors. The Contractor shall return all moneys withheld in retention from the subcontractor within 30 days after receiving payment for Work satisfactorily Completed, even if the other Contract Work is not Completed and has not been accepted by the Agency. This requirement shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise available to the Contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the Contractor or deficient subcontract performance or noncompliance by a subcontractor.
19. INSURANCE
Prior to commencement of Work, Contractor shall obtain, provide, and maintain at its own expense policies of insurance of the type and amounts described below and in a form satisfactory to City. If Contractor uses existing coverage to comply with these requirements and that coverage does not meet the requirements set forth herein, Contractor agrees to amend, supplement, or endorse the existing coverage to do so.
General Liability Insurance. Contractor shall maintain a policy of general liability insurance against any and all claims arising out of or in connection with the work to be performed for this Project with coverage at least as broad as ISO form No. CG 00 01. Contractor shall provide coverage in an amount not less than two million dollars ($2,000,000.00) per occurrence, four million dollars ($4,000,000.00) general aggregate, for bodily injury, personal injury, and property damage, and a four million dollar ($4,000,000.00) completed operations aggregate. The policy shall be endorsed to reflect that the per occurrence and aggregate coverage shall apply on a per PROJECT basis, coverage available shall not be eroded by other claims on other projects.
The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted. Coverage provided by Contractor shall be primary, and any insurance or self-insurance procured or maintained by City shall not be required to contribute with it. This policy shall name City, its officers, officials, employees, agents, and volunteers as additional insureds, covering both ongoing and completed operations, using ISO additional insured endorsement forms CG 20 10 and CG 20 37, or equivalent form(s). Coverage shall not be limited to the vicarious liability or supervisory role of any additional insured.
Automobile Liability Insurance. Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with Work to be performed for this Project, including coverage for any owned, hired, non-owned, or rented vehicles, in an
DO N
Rev. 6/18 IB-7 amount not less than one million dollars ($1,000,000.00) combined single limit for each accident.
Workers’ Compensation/Employers’ Liability. Contractor acknowledges awareness of Section 3700 et seq. of the California Labor Code, which requires every employer to be insured against liability for workers’ compensation. Contractor covenants that it shall comply with such provisions prior to commencement of work performed for this Project. Contractor shall maintain workers’ compensation insurance per statutory limits and employer’s liability insurance in an amount not less than one million dollars ($1,000,000.00) per accident for bodily injury or disease. Contractor shall require all subcontractors to provide such workers’ compensation and employer’s liability insurance for all of subcontractors’ employees. Contractor shall submit to City, along with the certificate of insurance, a waiver of subrogation endorsement in favor of City, its officers, agents, employees, and volunteers. Contractor shall similarly require all subcontractors to waive subrogation.
Umbrella or Excess Liability Insurance. (If required to meet higher limits). Contractor shall obtain and maintain an umbrella liability insurance policy with limits that will provide bodily injury, personal injury, and property damage liability coverage, including commercial general liability, automobile liability, and employer’s liability. Such policy or policies shall include the following terms and conditions:
A. A drop-down feature requiring the policy to respond if any primary insurance that would otherwise have applied proves to be uncollectible in whole or in part for any reason, other than bankruptcy or insolvency of said primary insurer;
B. “Pay on behalf of” wording as opposed to “reimbursement”;
C. Concurrency of effective dates with primary policies.
Should Contractor obtain and maintain an excess liability policy, such policy shall be excess over commercial general liability, automobile liability, and employer’s liability policies. Such policy or policies shall include wording that the excess liability policy follows the terms and conditions of the underlying policies.
Self-Insured Retentions
Any self-insured retentions must be declared to and approved by City. City reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible, or require proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention through confirmation from the underwriter.
Other Insurance Provisions:
Proof of Insurance. Contractor shall provide certificates of insurance and required endorsements to City as evidence of the insurance coverage required herein. Insurance certificates and endorsements must be approved by City’s Risk Management prior to
DO N
Rev. 6/18 IB-8 commencement of Work. Current certification of insurance shall be kept on file with City for the contract period and any additional length of time required thereafter. City reserves the right to require complete, certified copies of all required insurance policies, at any time.
Requirements not Limiting. Requirements of specific coverage features or limits contained herein are not intended as a limitation on coverage, limits on other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver or limitation of any type. If the Contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.
Duration of coverage. Contractor shall procure and maintain for the contract period, and any additional length of time required thereafter, insurance against claims for injuries to persons or damages to property, or financial loss which may arise from or in connection with the performance of the Work for this project by Contractor, their agents, representatives, employees, or subcontractors/subconsultants. Contractor must maintain general liability and umbrella or excess liability insurance for as long as there is a statutory exposure to completed operations claims. City and its officers, officials, employees, and agents shall continue as additional insureds under such policies.
Primary/noncontributing. Coverage provided by Contractor shall be primary and any insurance or self-insurance procured or maintained by City shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of City before City’s own insurance or self-insurance shall be called upon to protect it as a named insured. For any claims related to this project, the Contractor's insurance coverage shall be primary insurance as respects to the City, its officers, officials, employees, agents, or volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, agents, or volunteers shall be in excess of the Contractor's insurance and shall not contribute with it.
Products/completed operations coverage. Products/completed operations coverage shall extend a minimum of three (3) years after project completion. Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent contractors. If the insured is using subcontractors, the Policy must include work performed “by or on behalf” of the insured. Policy shall contain no language that would invalidate or remove the insurer’s duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the insurer. The City, its officials, officers, agents, and employees, shall be included as additional insureds under the Products and Completed Operations coverage.
Rev. 6/18 IB-9
Waiver of Subrogation. All insurance coverage maintained or procured pursuant to these specifications/for this Project shall be endorsed to waive subrogation against City, its elected or appointed officers, agents, officials, employees, and volunteers or shall specifically allow Contractor or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against City and shall require similar written express waivers and insurance clauses from each of its subcontractors/ subconsultants.
Additional Insured Status. The general liability, automobile liability, and umbrella/excess liability policies shall provide, or be endorsed to provide that the City, its officers, officials, employees, agents, and volunteers are to be covered as additional insureds as respects: liability arising out of activities performed by or on behalf of the Contractor, products and Completed operations of the Contractor; premises owned, occupied or used by the Contractor; or automobiles owned, leased, hired, or borrowed by the Contractor. The coverage shall contain no special limitations on the scope of protection afforded to the City, its officers, officials, employees, agents, or volunteers.
Separation of Insureds. A severability of interests provision must apply for all additional insureds ensuring that Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions.
Notice of Cancellation. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, canceled by either party, reduced in coverage or in limits except after thirty (30) days' prior written notice by certified mail, return receipt required, has been given to the City. Contractor agrees to oblige its insurance agent or broker and insurers to provide the City with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage. If any of the Contractor’s insurers are unwilling to provide such notice, then Contractor shall have the responsibility of notifying City immediately in the event of Contractor’s failure to renew any of the required insurance coverages, or insurer’s cancellation or non-renewal.
Timely notice of claims. Contractor shall give City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor’s performance for this Project, and that involve or may involve coverage under any of the required liability policies.
Any failure to comply with reporting or other provisions of the policies including breaches of warranties shall not affect coverage provided to the City, its officers, officials, employees, agents, or volunteers.
Prohibition of undisclosed coverage limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to City and approved of in writing.
Rev. 6/18 IB-10
Additional insurance. Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the Work.
Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best's rating of no less than A:VII.
Verification of Coverage
Contractor shall furnish the City with original endorsements effecting coverage required herein.
The endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf. All certificates and endorsements are to be received and approved by the City before Work commences. Contractor's insurer shall provide complete, certified copies of all required insurance policies, including endorsements effecting the coverage required by these specifications.
Contractor acknowledges and agrees that any actual or alleged failure on the part of the City to inform Contractor of non-compliance with any requirement imposes no additional obligations on the City nor does it waive any rights hereunder.
Subcontractors
Contractor agrees to ensure that its subconsultants, subcontractors, and any other party who is brought onto or involved in the project/service by Contractor (hereinafter collectively “subcontractor”), provide the same minimum insurance coverage and endorsements required of Contractor. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. However, in the event Contractor’s subcontractor cannot comply with this requirement, which proof must be submitted to the City, Contractor shall be required to ensure that its subcontractor provide and maintain insurance coverage and endorsements sufficient to the specific risk of exposure involved with subcontractor’s scope of work and services, with limits less than required of the Contractor, but in all other terms consistent with the Contractor’s requirements herein. This provision does not relieve the Contractor of its contractual obligations under the agreement and/or limit its liability to the amount of insurance coverage provided by its subcontractors. This provision is intended solely to provide Contractor with the ability to utilize a subcontractor who may be otherwise qualified to perform the work or services but may not carry the same insurance limits as required of the Contractor herein given the limited scope of work or services provided by the subcontractor. Contractor agrees that upon request, all agreements with subcontractors, and others engaged in the project, will be submitted to City for review.
20. ARBITRATION
Optional Arbitration; Applicable Law
Rev. 6/18 IB-11
In lieu of litigation of a dispute, the Contractor and City may agree to submit the dispute to binding arbitration so long as agreed by the parties in writing and approved in writing by the Board as an amendment to the Contract Documents. Except as provided below or as may be agreed upon by the parties in writing, (a) any such arbitration shall be governed by Code of Civil Procedure §§1280 et seq., and (b) the arbitration award must be supported by law and substantial evidence, and that the award may be vacated if not so supported, per Code of Civil Procedure Section 1296. Should any provision in this “Arbitration” section be found to be unenforceable, then such provision shall be severed and the parties agree that the remaining provisions shall be binding and enforceable as if adopted absent the unenforceable provision. Should the parties wish to modify any provision in this “Arbitration” section, the parties may do so.
Selection of Arbitrator
If the parties agree to binding arbitration, upon notification of a party's election to proceed with arbitration under this section, the parties shall have thirty (30) days to jointly select an arbitrator.
In the event that the parties are unable to reach an agreement as to the selection of an arbitrator, an arbitrator will be selected from the American Arbitration Association's panel of construction arbitrators. There shall be no limit on the number of arbitrators that a party can disqualify with respect to the American Arbitration Association's list of arbitrators.
Amount in Controversy/Discovery
If the parties agree to arbitration, the following would apply:
1. If the amount in controversy is less than $50,000, then, notwithstanding any other provision of law, the only discovery permitted will be (1) the noticing and taking of one deposition (in accordance with Code of Civil Procedure Section 2025) by each party to the dispute and (2) inspection demands pursuant to Code of Civil Procedure Section 2031.
2. If the amount in controversy is equal to or greater than $50,000 but less than $150,000, then, notwithstanding any other provision of law, the only discovery permitted will be (1) the noticing and taking of no more than three depositions (in accordance with Code of Civil Procedure Section 2025) by each party to the dispute and (2) inspection demands pursuant to Code of Civil Procedure Section 2031.
3. If the amount in controversy is equal to or greater than $150,000, then all discovery rules contained in the California Civil Discovery Act, Code of Civil Procedure Section 2016, et seq., shall apply to the arbitration, except each party will only be allowed to propound no more than fifty (50) special interrogatories, and no requests for admissions shall be permitted.
The above deposition limits shall not be applicable to expert depositions. Experts shall be designated and deposed in accordance with Code of Civil Procedure §2034.
Procedure/Evidence
Rev. 6/18 IB-12
If the parties agree to arbitration, the following would apply:
1. General and specific rules of trial procedure and evidence as set forth in the California Code of Civil Procedure and the California Evidence Code, respectfully, shall apply except that the arbitrator may admit any relevant evidence which he believes should be afforded consideration.
2. Motions for summary judgment and/or summary adjudication of issues shall be permitted only if the amount in controversy is equal to or greater than $50,000. Motions for summary judgment and/or summary adjudication of issues shall be heard in accordance with the Federal Rules of Civil Procedure, Rule 56. The arbitrator shall also have the authority to decide specific legal and/or factual issues by way of a motion for summary judgment and/or summary adjudication of issues regardless of whether or not such resolve a cause of action.
3. Demurrers and motions for judgment on the pleadings shall not be allowed. The arbitrator shall review the pleadings and, in the arbitrator's sole, discretion a dismissal and/or amendment of a pleading can be ordered.
4. The arbitrator shall conduct a pre-arbitration conference for purposes of coordinating the arbitration. At the pre-arbitration conference, all of the following issues shall be addressed:
procedural matters, exchange of exhibits, witness lists, motions in limine, arbitration briefs, and the potential for narrowing issues and/or factual disputes by stipulation or by bifurcating the arbitration. The arbitrator can bifurcate specific factual and/or legal issues in addition to causes of action.
5. The arbitrator will close the arbitration hearing after presentation of the evidence and receipt of final briefs, which must be submitted within twenty (20) days from the final presentation of evidence. The time limit within which the award must be filed begins with the closing of the hearing.
6. The arbitrator may for good cause reopen the hearing through request of either party, at any time, before the award is made and/or legal issues in addition to causes of action.
7. The arbitrator's award must be mailed promptly to the parties, but no later than thirty (30) days after the closing of the hearing. The award will be based upon the evidence introduced at the hearing, including all logical and reasonable inferences made therefrom. Pursuant to Code of Civil Procedure Section 1296, the arbitration award must be supported by law and substantial evidence, or else it may be vacated. The arbitrator may grant any remedy that is just and equitable.
Joinder
No arbitration in which the parties elect to participate that arises out of or relates to the contract documents shall include by consolidation, joinder, or any other manner any other person or entity who is not a party to this contract unless:
Rev. 6/18 IB-13
1. the inclusion of such other person or entity is necessary if complete relief is to be afforded among those who are already parties to the arbitration, and
2. such other person or entity is substantially involved in a question of law or fact which is common to those who are already parties to the arbitration and which will arise in such proceedings, and
3. the written consent of the other person or entity sought to be included and of City and
Contractor has been obtained for such inclusion, which consent shall make specific reference to this section; but no such consent shall constitute consent to arbitration of any dispute not specifically described in such consent or to arbitration with any party not specifically identified in such consent.
Costs and Fees
Prior to a decision being rendered in any arbitration, the parties shall split the arbitrator's fees and be responsible for the prompt payment thereof.
Conclusiveness of Judgment
Any arbitration award will be final and binding and there is no direct appeal from the award on the grounds of error in the application of the law or based upon the arbitrator's interpretation of the facts presented. The only reasons for challenging an arbitrator's award are those set forth in the Code of Civil Procedure, Section 1286.2(a), (b), (c) and/or (f), and Section 1296 (failure to base the award on applicable law and substantial evidence). If any party other than the City seeks to challenge the arbitrator's award pursuant to these Code of Civil Procedures sections, such party must post a bond in the amount of 150% of the arbitrator's award (including the award of costs and fees).
Duration
From the time any arbitration proceedings are initiated, such proceedings must be completed within six (6) months, unless (1) the amount in controversy equals or exceeds $150,000, the arbitration must be completed within one year or (2) the arbitrator extends the completion period for good cause or based upon the stipulation of the parties. Arbitration proceedings shall be deemed initiated upon the appointment of the arbitrator.
21. HOURS FOR PERFORMANCE
Working hours for the construction project will be 7:00 a.m. to 4:00 p.m. on any Working Day.
Contractor is to take into special consideration that the nature of the Work is located in public areas and facilities. As such, all work will not disrupt or conflict with public activities.
P-1
PROPOSAL
TO CITY OF MISSION VIEJO, as AGENCY:
In accordance with AGENCY's "Notice Inviting Bids", the undersigned bidder (“BIDDER”) hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above-stated Contract as set forth in the Plans, Specifications, and Contract Documents therefor, and to perform all Work in the manner and time prescribed therein.
BIDDER declares that this proposal, including the bid sheets, the subcontractor list, the non-collusion declaration, the Iran Contracting Act declaration, and a sufficient funds declaration (“Proposal”) is based upon careful examination of the Work site, Plans, Specifications, Notice Inviting Bids, Instructions to Bidders, and other Contract Documents. If this proposal is accepted for award, BIDDER agrees to enter into the Contract with AGENCY at the unit and/or lump sum prices set forth in this Proposal. BIDDER understands that failure to enter into the Contract in the manner and time prescribed will result in forfeiture to AGENCY of the Bid Bond accompanying this proposal.
BIDDER understands that a bid is required for the entire Work, that any estimated quantities set forth in the Proposal are solely for the purpose of comparing bids, and that final compensation under the Contract will be based upon the actual quantities of Work satisfactorily Completed.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .